Petition for Determination of Average Pooled Purchase Cost for FY

Case No. 163 of In the matter of

Case No. 109 of Coram. Shri Azeez M. Khan, Member Shri Deepak Lad, Member. Maharashtra State Electricity Distribution Co. Ltd.

3mO :th c:tll '{ Government of India. Ministry of Power. Northern Regional Power Committee

UP Electricity Regulatory Commission Vidyut Niyamak Bhawan, Vibhuti Khand, Gomti Nagar, Lucknow. Public Notice

Indian Energy Exchange December For Public Use

CASE No. 35 of In the matter of

KERALA STATE ELECTRICITY REGULATORY COMMISSION. NOTIFICATION Dated, Thiruvananthapuram 6 th August,2007

Maharashtra Electricity Regulatory Commission (Renewable Purchase Obligation, Its. Regulations, 2016 STATEMENT OF REASONS

Bihar Electricity Regulatory Commission Vidyut Bhawan, J.L.Nehru Marg, Patna

SCHEDULE 62 COGENERATION AND SMALL POWER PRODUCTION SCHEDULE - IDAHO

Legal Considerations Related to Distributed Energy Resources

Before the. Case No. 106 of 2009

WASHINGTON ELECTRIC COOPERATIVE, INC. NET METERING TARIFF POLICY BULLETIN NO. 38 NM

Shortage

प वर स स टम ऑपर शन क प र शन स समट ड (भ रत रक र क उद यम)

Shortage

Shortage

Shortage

RATE 765 RENEWABLE FEED-IN TARIFF

FITCHBURG GAS AND ELECTRIC LIGHT COMPANY NET METERING SCHEDULE NM

Petition No. 1051, 1054 & 1055 of 2015 BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW Date of Order :

EXTRA ORDINARY 16 AASHAADHA, 1937(S) BIHAR ELECTRICITY REGULATORY COMMISSION

Thank you for your time and attention to this matter. Please feel free to contact me if you have any questions regarding the filing.

WASHINGTON ELECTRIC COOPERATIVE, INC. NET METERING TARIFF POLICY BULLETIN NO. 38 NM

Guidelines for Solar Grid Power Projects

BSES. Date 4" May 231C. Ref RA/ /01/N 19

Subject: Project No MW wind farm at Village Badabagh, District Jaisalmer, Rajasthan.

Wheeling charges, Banking charges & Cross Subsidy Surcharge for Solar Power Generators

RIDER NM NET METERING

Sub : In the matter of determination of Parallel Operation Charges. MPERC, Bhopal - Petitioner

ENERGY STRATEGY FOR YUKON. Net Metering Policy DRAFT FOR CONSULTATION

Case Nos. 108 of In the matter of

JAMMU AND KASHMIR STATE POWER DEVELOPMENT CORPORATION LIMITED PUBLIC NOTICE

2lr1344 CF 2lr1396. Drafted by: Heide Typed by: Rita Stored 02/02/12 Proofread by Checked by By: Senator Pinsky A BILL ENTITLED

FITCHBURG GAS AND ELECTRIC LIGHT COMPANY NET METERING SCHEDULE NM

ANNEX MOTOR VEHICLES AND MOTOR VEHICLES' PARTS. Article 1. General Provisions

EASTERN ILLINI ELECTRIC COOPERATIVE REGULATION NO. 26A

TERMS AND CONDITIONS XXV. NET METERING CUSTOMERS AND SMALL AGRICULTURAL GENERATORS

NEWFOUNDLAND AND LABRADOR BOARD OF COMMISSIONERS OF PUBLIC UTILITIES AN ORDER OF THE BOARD NO. P.U. 17(2017)

PUBLIC Law, Chapter 539 LD 1535, item 1, 124th Maine State Legislature An Act To Create a Smart Grid Policy in the State

HARYANA POWER GENERATION CORPORATION LIMITED Regd. Office C-7, Urja Bhawan, Sector-6, Panchkula Corporate Identity Number: U45207HR1997SGC033517

MENARD ELECTRIC COOPERATIVE POLICY MANUAL. SECTION IV Operating Rules for Cooperative Members

RPO-REC Framework: Emerging Challenges and way forward. Background Presentation

NET ENERGY METERING RIDER Rider NEM. Certain words, when used in this Rider NEM shall be understood to have the following meanings:

THE PUBLIC SERVICE COMMISSION OF MARYLAND

D.P.U A Appendix B 220 CMR: DEPARTMENT OF PUBLIC UTILITIES

JEA Distributed Generation Policy Effective April 1, 2018

Policy & Regulatory Issues : Solar & Wind. Shri Rajinder Kumar Kaura CMD, Bergen Group India 21 st August 2014

RIPUC No Cancelling RIPUC No Sheet 1 THE NARRAGANSETT ELECTRIC COMPANY NET METERING PROVISION

SAILASHREE VIHAR, BHUBANESWAR TEL , , FAX

TERMS AND CONDITIONS

Buy All Sell All Rider for Interconnection of Renewable Generation

: : : : : : : Commonwealth Edison Company ( ComEd ), pursuant to Section of the Public

(2) Scope. 220 CMR applies to all Distribution Companies subject to the jurisdiction of the Department.

M.P.S.C. No. 2 Electric Third Revised Sheet No. 65 (Rate Case) Cancels Second Revised Sheet No. 65

Xcel Energy Guidelines for Interconnection of Electric Energy Storage with the Electric Power Distribution System

STATE LOAD DISPATCH CENTRES (SLDC)

Xcel Energy Guidelines for Interconnection of Electric Energy Storage with the Electric Power Distribution System

Overview of S.L Competitive Energy Solutions for North Carolina

BOOT/OPEX/Pay As You Use Model for Rooftop Solar Projects Workshop on Getting Started on Energy Management & Solar

RATE ORDER 2015 UNIFORM ELECTRICITY TRANSMISSION RATES January 08, 2015

Net Metering & Compensation Seminar

Policy for Net-Metering based Renewable Energy Applications, Madhya Pradesh, DRAFT

Renewable Regulatory Fund (RRF) Mechanism : -

In-House paper on Implementation of Telescopic Tariffs in LMV-6 category

MPSEZ Utilities Private Limited Truing up for FY and Determination of Tariff for FY

Net Energy Metering and Interconnections. Community Solar in the District of Columbia

MASSACHUSETTS ELECTRIC COMPANY NANTUCKET ELECTRIC COMPANY NET METERING PROVISION

A member-consumer with a QF facility shall not participate in the Cooperative s electric heat rate program.

In-House Paper on the implementation of Single Part Tariff in Power Distribution

CASE No. 139 of Coram. Shri. Azeez M. Khan, Member Shri. Deepak Lad, Member. Shri A. W. Mahajan (Rep) ORDER

RAPPAHANNOCK ELECTRIC COOPERATIVE SCHEDULE NEM-8 NET ENERGY METERING RIDER

ROANOKE ELECTRIC COOPERATIVE RATE SCHEDULES

Case No. 164 of Coram. Shri. Anand B. Kulkarni, Chairperson

University of Alberta

POWER DEVELOPMENT DEPARTMENT OF JAMMU AND KASHMIR JANIPUR, JAMMU TEL: FAX: PUBLIC NOTICE

MISSOURI SERVICE AREA

Frequently Asked Questions Trico Proposed Net Metering Tariff Modifications

CYPRUS ENERGY REGULATORY AUTHORITY REGULATION OF RENEWABLE ENERGY SOURCES FOR THE FUTURE

Case No. 141 of Coram. Shri. Azeez M. Khan, Member Shri. Deepak Lad, Member. V/s Maharashtra State Electricity Distribution Co. Ltd.

Renewable Energy System Tariffs and Pricing

SOUTH HADLEY ELECTRIC LIGHT DEPARTMENT Net Metering Policy As Amended 03/23/16 By the South Hadley Municipal Light Board

ATTACHMENT 14 RESOLUTION NO. 5888(14) Supersedes Schedule NEM of Resolution No. 5592(09) Schedule NEM NET ENERGY METERING

Gujarat Energy Transmission Corporation Limited (GETCO)

HOUSE BILL 801. (0lr2294) ENROLLED BILL Economic Matters/Finance

Government of India Central Electricity Authority SP&PA Division R.K. Puram, New Delhi

HOUSE AMENDED PRIOR PRINTER'S NOS. 13, 30, 47, PRINTER'S NO , 56 THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL

26 Compendium of Policies, Regulations, Technical Standards & Financing Norms for Solar Power Projects

Analysis of Operating Results and Financial Status

KAUAI ISLAND UTILITY COOPERATIVE KIUC Tariff No. 1 RULE NO. 17 NET ENERGY METERING

Case No.33/2010 AND. DUET India Infrastructure Pvt. Ltd., having its registered office at 815, ITT, Nehru Place, New Delhi

Model Legislation for Autonomous Vehicles (2018)

FRENCH BROAD ELECTRIC MEMBERSHIP CORPORATION RATE SCHEDULES

Uttar Pradesh Electricity Regulatory Commission, Lucknow

CHAPTER 25. SUBSTANTIVE RULES APPLICABLE TO ELECTRIC SERVICE PROVIDERS.

BEFORE THE FLORIDA PUBLIC SERVICE COMMISSION

Policy for Net-Metering based Renewable Energy Applications, Madhya Pradesh, DRAFT

160 MW Solar-Wind Hybrid project with BESS at Ramgiri, Andhra Pradesh

City of, Kansas Electric Department. Net Metering Policy & Procedures for Customer-Owned Renewable Energy Resources

Transcription:

BEFORE THE HIMACHAL PRADESH ELECTRICITY REGULATORY COMMISSION, SHIMLA Determination of Average Pooled Purchase Cost for FY 2014-15 Submitted to Himachal Pradesh State Electricity Regulatory Commission Himachal Pradesh State Electricity Board Limited Vidyut Bhawan, Shimla (H.P.) 171 004 HPSEB Limited i

BEFORE THE HIMACHAL PRADESH ELECTRICITY REGULATORY COMMISSION, SHIMLA M.A. No.. Petition No 141/2013 IN THE MATTER OF: Determination of Average Pooled Purchase Cost (APPC) for FY 2014-15 AND IN THE MATTER OF Himachal Pradesh State Electricity Board Limited (hereinafter referred to as "HPSEBL" or "The HPSEBL"), Vidyut Bhawan, Shimla 171004 - Applicant The Applicant respectfully submits as under: - 1. Himachal Pradesh State Electricity Board Limited (HPSEBL) is a deemed licensee under first provision of Section 14 of the Electricity Act 2003 for distribution and supply of electricity in the state of Himachal Pradesh. Consequent to the enactment of the Electricity Act, 2003 (hereinafter referred to as the Act ), the process of approval of proposed tariffs is vested with the State Commission. Based on the provisions of Section 62 of the Act and in compliance with the directives of the Commission on the matter, HPSEBL is filing the current petition, in order to meet its financial requirements. 2. This Petition determines the APPC for FY 2014-15. HPSEB Limited ii

Table of Contents A1: DEFINITIONS... 4 A2: INTRODUCTION... 5 A3: BACKGROUND... 6 A4: DETERMINATION OF APPC RATE FOR FY 2014-15... 7 PROPOSAL FOR APPC RATE FOR FY 2014-15... 7 A5: PRAYER... 12 List Of Tables TABLE 1: APPC RATES... 8 HPSEB Limited iii

A1: DEFINITIONS Distribution Licensee means a licensee authorized to operate and maintain a distribution system for supplying electricity to the consumers in his area of supply as defined in the Act Renewable energy sources means renewable sources such as small hydro, wind, solar including its integration with combined cycle, biomass, bio fuel cogeneration, urban or municipal waste and such other sources as recognized or approved by MNRE; excluding the nuclear power stations and hydel power stations of capacity above 25 MW. Eligible entity means the entity eligible to receive the renewable energy certificates. Pooled Cost of Purchase means the weighted average pooled price at which the distribution licensee has purchased the electricity including cost of self generation, if any, in the previous year from all the energy suppliers long-term and short-term, but excluding those based on renewable energy sources, as the case may be. Preferential Tariff: The tariff fixed / approved by the Hon ble Commission for sale of energy to a distribution licensee from a generating station based on renewable energy sources. HPSEB Limited Page 4

A2: INTRODUCTION The petition pertains to determination of Average Pooled Power Purchase Cost (APPC) for the financial year 2014-15. Regulation 5(1) of the CERC (Terms and Conditions for recognition and issuance of Renewable Energy Certificate for Renewable Energy Generation) Regulations,2010, specifies that- A generating company engaged in generation of electricity from renewable energy sources shall be eligible to apply for registration for issuance of and dealing in Certificates if it fulfils inter alia the following conditions: It sells the electricity generated either (i) (ii) To the distribution licensee of the area in which the eligible entity is located, at a price not exceeding the pooled cost of power purchase of such distribution licensee, To any other licensee or to an open access consumer at a mutually agreed price, or through power exchange at market determined price. HPSEB Limited Page 5

A3: BACKGROUND 3.1 HPSEB Limited likes to submit that while nearly all the components of power purchase cost is determined by CERC & HPERC in advance, the Average Pooled Power Purchase Rate (APPC Rate) is being determined by HPERC on year to year basis. 3.2 HPSEB Limited thus submits its current petition for determination of APPC rates which covers the following: (1) Proposal for APPC Rate for FY 2014-15. HPSEB Limited Page 6

A4: DETERMINATION OF APPC RATE FOR FY 2014-15 4.1 As per CERC Terms and Conditions for recognition and issuance of Renewable Energy Certificate for Renewable Energy Generation Regulations, 2010, Pooled Cost of Power Purchase Cost means: The weighted average pooled price at which the Distribution Licensee has purchased the electricity including cost of self generation, if any, in the previous year from all the energy suppliers, long-term and short-term, but excluding those based on renewable energy sources, as the case may be. 4.2 Thus the definition focuses on the following: (1) The Purchase of Electricity should be from all energy suppliers, (i) (ii) (iii) (iv) which includes long term suppliers which includes short term suppliers which includes own generation which excludes renewable energy sources (2) The Purchase of Electricity should be in the previous year only which in this case is FY 2013-14, Proposal for APPC Rate for FY 2014-15 4.3 Keeping in view of above, the pooled power rate is computed for FY 2013-14 considering factors mentioned below: (1) The provisional purchase (quantum and costs) for FY 2013-14 has been considered as details of bills from some of the ISTS sources is yet to be received. (2) The arrears pertaining to past periods (paid in FY 2013-14) have been excluded as these are not recurring in nature. (3) Unscheduled Interchange (UI) Purchase has also not been included in line with the philosophy approved by the Hon ble Commission in APPC order of 2012-13. HPSEB Limited Page 7

(4) The PGCIL/Transmission Charges/ULDC/Other Charges in line with the philosophy approved by the Hon ble Commission in APPC order of 2012-13. (5) The rates of Own generating stations have been taken from the Annual Performance Review for FY 14 under the 2 nd MYT Control Period dated 27 th April 2013. (6) The Forward (inward) Banking at zero cost has been considered as approved by the commission in previous order. Table 1: APPC Rates Power Purchase Cost (In Crores) PP Cost from HPSEBL Stations Bassi 227.85 93 21.29 Giri 228.27 55 12.49 Bhaba 534.17 44 23.66 Larji 527.23 266 140.33 Total 1517.52 130 197.77 PP Cost from BBMB Stations BBMB Old 43.80 86 3.77 BBMB New 395.50 47 18.72 Dehar 178.65 75 13.43 Pong 51.89 41 2.13 Total 669.84 57 38.04 PP Cost from NTPC Stations Anta(GF) 82.71 415 34.29 Anta(LF) 0.00 0 0.00 Anta (RF) 0.06 1083 0.06 Auraiya(GF) 58.17 518 30.12 Auraiya(LF) 0.00 0 0.00 Auraiya(RF) 0.20 1227 0.25 Dadri(GF) 105.13 450 47.32 Dadri(LF) 0.00 893 0.00 HPSEB Limited Page 8

Dadri(RF) 0.12 834 0.10 Unchahar-I 44.66 387 17.28 Unchahar-II 86.43 382 33.01 Unchahar-III 51.07 439 22.43 Rihand-1 STPS 244.85 231 56.57 Rihand-2 STPS 230.60 239 55.16 Rihand-3 STPS 114.98 341 39.23 Singrauli 49.69 169 8.39 Dadri II TPS 22.67 512 11.60 Jhajjar STPS 36.57 546 19.95 Khalgaon 143.19 405 58.04 Total 1271.10 341 433.80 PP Cost from NHPC Stations Chamera-I 64.72 178 11.54 Chamera-II 60.93 311 18.97 Chamera-III 35.86 445 15.96 Parbati -III 0.28 0 0.00 Salal 32.02 178 5.71 Tanakpur 12.12 253 3.06 Uri 68.10 212 14.44 Uri II 1.39 382 0.53 Dhauli Ganga 13.58 283 3.84 Dulhasti 14.01 663 9.30 Sewa 4.11 525 2.16 Total 307.12 278 85.53 PP Cost from other Stations NAPP 94.42 249 23.50 RAPP 155.75 343 53.45 Nathpa Jhakri SoR 200.99 283 56.87 Nathpa Jhakri Equity 189.67 519 98.38 Shanan BSS 5.26 40 0.21 Shanan Extn 45.00 21 0.93 Yamuna (UJVNL) 481.64 65 31.37 HPSEB Limited Page 9

Khara 56.86 37 2.10 Baspa 1171.01 261 305.54 Tehri I 127.22 396 50.43 Koteshwar 43.59 330 14.39 Total 2571.41 248 637.19 PP Cost of Free Power & Equity Power Baira Suil 29.59 292 8.63 Chamera-I 84.93 292 24.77 Chamera II 86.35 292 25.20 Shanan Share 2.63 292 0.77 Ranjeet Sagar Dam 67.84 292 19.26 Malana - I 57.64 292 16.83 Malana - II 3.93 292 1.14 Baspa II 159.68 292 46.62 Nathpa Jhakri 688.56 292 200.98 Karcham Wangtoo 80.17 292 23.37 Private Micros (Upto 5 MW) 2.28 292 0.67 Private Micros (Above 5 MW) 23.56 292 6.88 Ghanvi 9.12 292 2.66 Baner 5.10 292 1.49 Gaj 5.58 292 1.63 Larji 70.49 292 20.57 Khauli 5.44 292 1.59 AD Hydro 9.31 292 2.71 Chamera III 26.31 292 7.67 Budhil 3.47 292 1.01 Total 1421.98 292 414.435 Upto 25 MW (REC Tariff) 138.11 217 29.97 Total 138.106 217 29.969 PP Cost of Banking, Market and Bilateral Purchase & UI HPSEB Limited Page 10

Banking 357.00 0 0.00 Bilateral Purchase 0.00 0.00 PXI/IEX 113.32 295 33.40 Total 470.32 71 33.40 Grand Total 8367.4 224 1870.13 Proposed APPC Rate (in Paise) 224 4.4 In view of the above, while HPSEB Limited has computed the APPC Rate with Free Power, it would like to request the Commission to kindly: Approve the APPC Rate of 224 paise per unit for FY 2014-15. HPSEB Limited Page 11

A5: PRAYER 5.1 HPSEBL requests the Hon ble Commission to: a) Approve the APPC Rates as proposed. b) To make the APPC rates effective from 01 st April 2014. c) To condone any inadvertent omissions/ errors/ shortcomings and permit the Petitioner to add/ change/ modify/ alter this filing and make further submissions as may be required at a future date d) To allow further submissions, addition and alteration to this Petition as may be necessitating from time to time. e) Treat the filing as complete in view of substantial compliance as also the specific requests for waivers with justification placed on record; f) And pass such other and further orders as are deemed fit and proper in the facts and circumstances of the case. BY APPLICANT HPSEB Limited Page 12