Rejuvenation Instructions

Similar documents
ABTQ-103 rev 01 Last review:

HIGH POWER RGB LED SERIES. The HB Series Advantage! Architectural Illumination Systems!

D-Sub adaptor Cable clamps for metric cable entries Cable clamps for PG cable entries Further Accessories

PRAIRIE 360 4X4 (KVF360-A/C), PRAIRIE 360 2X4 (KVF360-B), PRAIRIE 650 4X4 (KVF650-A/B), PRAIRIE 700 4X4 (KVF700-A/B/D),

Tips & Technology For Bosch business partners

Tools Required. Installation. Step 1. Headlight lense removal (Driver's side shown, Passenger side similar)

INSTALLATION INSTRUCTIONS FOR PART #50015 DIESEL MPG-MAX WATER / METHANOL INJECTION SYSTEM 6.0L/6.4L/6.7L POWERSTROKE DIESEL

INSTALLATION INSTRUCTIONS FOR PART #20010 RT1/RT2/DOM WATER / METHANOL INJECTION SYSTEMS

Gearbox Installation Manual

PSS INSTALLATION INSTRUCTIONS

Installation instructions: 13 Pin Electrical system for towing hitch

INSTALLATION INSTRUCTIONS FOR PART #47002 WATER / METHANOL INJECTION SYSTEM UNIVERSAL TURBO DIESEL

You have a Chiller, Now What?

Solvent Filter. What is a Solvent Trap, Solvent Recycler or Solvent Filter? Why use a solvent filter? Why is the HIT Solvent Filter better?

EnergyBar 6. Setup Guide

Contents. Han Q Technical characteristics Han Q 5/ Han Q 5/ Technical characteristics Han Q 7/

PV-70 Remotely Operated Cryogenic Globe Valve Installation, Operation, and Maintenance Manual

{EMS Shock} Student Name: Period:

Parts Checklist: ZJ Front 3-Link Long Arm Upgrade Installation Instructions *BOX 1* *BOX 2* Jeep Grand Cherokee ZJ

MT Pressure Switch INSTALLATION AND OPERATING INSTRUCTIONS. Kaustubha Udyog (Orion Instruments)

Mini H1 Twin Kit - Installation Instructions

XJ 4-Link Rear Long Arm Instructions

BC7 BATTERY CABINET INSTALLATION / OPERATION / MAINTENANCE

72 Mustang Mach 1 tachometer cluster and gauge conversion

INSTALLATION INSTRUCTIONS FOR PART #20001 FORCED INDUCTION BOOST COOLER WATER / METHANOL INJECTION SYSTEMS

Parts Checklist: XJ Front 3-Link Long Arm Upgrade Installation Instructions *BOX 1* *BOX 2* Jeep Cherokee XJ

Volume 1.1 OPERATIONAL MANUAL MODEL: CG-211Y PIPE TORCH/BURNER MACHINE. by BLUEROCK Tools

Advanced 3 Million Wireless USB Limousine Underbody Kit

Parts Checklist: WJ Front 3-Link Long Arm Upgrade Installation Instructions *BOX 1* (1) *BOX 2* (1) Jeep Grand Cherokee WJ

Generator/Loadbank Quick Connection Switchboard

REMOTE GREASING KIT FOR MORGANS SERIES 2

General Faucet Installation Instructions

Motorized Pulley 320L, 320M & 320H, Ø in. (321 mm)

OWNER S MANUAL. DCR-205-XX-DC Powered Drum Rotators

A very common arrangement for oil lubricated stern tube bearings. A simplex seal arrangement is fitted to both inner and outer ends.

NEXT UPS Systems MANTIS II Tower 750/1000/1500 Installation and user manual English

AMERICAN IRON HORSE IGNITER TEST BOX

INSTALLATION INSTRUCTIONS FOR PART #48005 DIESEL STAGE 3 MPG-MAX WATER / METHANOL INJECTION SYSTEM CHEVY/GM DURAMAX 6.6L DIESEL

Effective Date: 10-January Table of Contents

How to Sweat (Solder) Copper Pipe By See Jane DrillTM Copyright 2013, All Rights Reserved

EDBRO RIGID INCLINOMETER

INSTALLATION INSTRUCTIONS FOR PART #49005 DIESEL STAGE 3 MPG-MAX WATER / METHANOL INJECTION SYSTEM CUMMINS 5.9L/6.7L DIESEL

Audi 8L A3 and B5 A4 ColorMFA Install Guide ColorMFA from AutoPilot. Instructions from Clusters by Litke and pinout from Drive2

Trouble Shooting Guide for AFVK-SP Series Valve Kit (AF-4000 Series Gas Valves)

SERVICE FACTORY DIRECTED MODIFICATION MC IMMEDIATE INSPECTION REPAIR ONLY AS REQUIRED ENGINE PULLEY WEAR

INSTRUCTION MANUAL 9500/12000 LBS. D9500SC / D9500SR / D9500SRD D12000SC / D12000SR / D12000SRD MODEL:

VALVE-REGULATED SEALED LEAD ACID BATTERY. FMJ GEL Series. High Performance. Product Guide

IMPORTANT SAFETY INSTRUCTIONS

GLOBAL LIFT CORP. Owner s Manual. Rotational Series R-375

MEDMASTER TROFFER Luminaires for MRI/Imaging Suites LED MRIT SERIES

Boston Gear WOR Series Mechanical Overload Release Clutches for the Water and Wastewater Industry

Motorized Pulley 165E, Ø 165 mm

INSTALLATION INSTRUCTIONS FOR PART #48002 WATER / METHANOL INJECTION SYSTEM DURAMAX 6.6L DIESEL

INSTALLATION INSTRUCTIONS FOR PART #47002 WATER / METHANOL INJECTION SYSTEM UNIVERSAL TURBO DIESEL. 2010, Snow Performance, Incorporated

DriveCam Unit Installation Instructions

Planar Blind-Mate Connectors DC to 40 GHz

INSTALLATION INSTRUCTIONS FOR PART #50103 Diesel TOW MAX WATER / METHANOL INJECTION SYSTEM FORD POWERSTROKE 7.3L DIESEL

ANNEX A Descriptions and Photos

INSTALLATION INSTRUCTIONS FOR PART #49103 Diesel TOW MAX WATER / METHANOL INJECTION SYSTEM DODGE CUMMINS 5.9L/6.7L DIESEL

BUTTON CELL CR2430 BSI M G T E D BRIEF SPECIFICATION

CS369-R51I Thank you very much for purchasing our air conditioner.

INSTALLATION INSTRUCTIONS FOR PART #50113 Diesel TOW MAX WATER / METHANOL INJECTION SYSTEM 6.0L/6.4L/6.7L POWERSTROKE Diesel

Volume 1.1 OPERATIONAL MANUAL MODEL: CG-30 TRACK TORCH/BURNER MACHINE. by BLUEROCK Tools

WELCOME. WEB LOCATION Los Angeles, CA

Technical Manual. eluma. Aluminum Frame LED Panels. patents pending. Technical Specifications Subject to Change

CAUTION: Do not install damaged parts!!!

Double throttle/check valve type Z2FS10

Lithium Battery Shipping Overview

MG1 TM MAGNETIC SUPER-COMPACT SYSTEM FILTER

Installation, Operation & Maintenance Manual. SunWize Power & Battery Power Ready System

Headsight HHC JD xx20 series. Combine Manual

EnergyCell PLC Series. Owner s Manual

INSTALLATION INSTRUCTIONS FOR PART #15021 WATER / METHANOL INJECTION SYSTEMS

LED Driver Feedback Signs

Mag-Nus2 MAGNETIC, SELF CLEANING, DIRT SEPARATOR

Design Standard - Fume Hoods & Fume Hood Exhausts

START-UP DRIP IRRIGATION SYSTEM

BioWave Hydro DI-9200 User Manual

GLOBAL LIFT CORP. Owner s Manual. Superior Series Proformance Series S-350 / P-375

Model: TM-3 INSTALLATION AND OPERATION INSTRUCTIONS

INSTALLATION & USER S GUIDE

Headsight HHC HH 14 series. Combine Manual

CRUSHER BUCKETS. Made In Italy

INSTALLATION INSTRUCTIONS

MG1 TM COMPACT MAGNETIC SYSTEM FILTER

FIRST: Top battery (closest to the arm) SECOND: Middle battery. LAST: Top battery (furthest from arm)

Machine Safeguarding

WJ 6.5 Critical Path Lift Kit Installation Instructions

GENUINE ACCESSORIES INSTALLATION INSTRUCTIONS SECURITY SYSTEM KIT CONTENTS SHOCK SENSOR F-D15 WINDOW DECAL (QTY 2) F-D16

VB 60/ Zero Flow sensitive unloader valve

LN products. Contents. LN Cabinets for LAN applications. LN Enclosures. LN Open Racks

INSTALLATION INSTRUCTIONS

A L L Diagnostic Trouble Codes ( DTC ): P Code Charts P0302

FUELS SAFETY BRANCH INFORMATION BULLETIN July 1994

SICO 1800 Single & Dual-Height Stage System A single or dual-height mobile folding stage with carpet or hard tuff-deck surface.

Motorized Pulley 138E, Ø 138 mm

Adjusting the Pekar K68 for your Dnepr or Ural Adjustment section translated from Pekar K68 manual

Overall dimensions... page 34 Efficiency... page 36 Options... page 37. SJ Series screw jacks - travelling nut (Mod.B) - spare parts...

ROOF INSPECTION GUIDE

Route Sheet Guidelines

Transcription:

Rejuvenatin Instructins #521 200A Elbws UPR This NRI cvers the fllwing: Hw t prepare 200amp pre-mlded elbws fr injectin. Hw t install and re-infrce an injectin elbw. Hw t size an injectin elbw t match the cable system. Trademarks: http://www.nvinium.cm/trademarks/ Patents: http://www.nvinium.cm/patents/ WARNING: It is dangerus wrking arund energized high-vltage systems, pressurized systems, and chemicals. Always wrk in accrdance t the Nvinium Field Operatins Safety Handbk (FOSH) r ther lcal gverning safety standards. Nvinium, Inc. engineering@nvinium.cm 22820 Russell Rd Kent, WA 98032 Revised: March 1, 2016 (253) 395-0200

Table f Cntents Intrductin... 2 1. Applicatins.... 2 2. Pressure rating.... 2 3. Limitatins.... 3 4. Required equipment.... 3 Installing 200A Elbws... 3 1. Install the elbw.... 5 2. Operatins and maintenance.... 5 Sizing Instructins... 6 1. Small-interface lad-break elbws.... 7 2. Large-interface lad-break elbws.... 7 3. Dead-break elbws.... 7 4. Lugs.... 8 5. Injectin elbw accessries.... 8 NRI 521 200A Elbws UPR Revised: March 1, 2016 Page 1 f 8

Intrductin 1. Applicatins. 200amp lad-break and dead-break dead-frnt elbw terminatins. Three cnfiguratins (standard, extended, and repair length) injectin elbws are available (Table 1). Extended length and repair length injectin elbws can make up 8 ¾ f cable length. Cnfiguratin Capacitive Test Pint Make-up Length N -- Standard Length Yes 3¼ Extended Length Yes 8¾ Repair Length 2. Pressure rating. 30psi. Table 1: Injectin elbw cnfiguratins. NRI 521 200A Elbws UPR Revised: March 1, 2016 Page 2 f 8

3. Limitatins. Capacitive test pints are available n the extended length and repair length injectin elbws nly. The injectin prt adds 2½ t the back f an elbw and may nt fit in smaller enclsures. Injectin caps are insulated and are nt fully shielded with a semi-cnductive layer. Accessries fr injectin elbws such as injectin caps, permanent caps, and prbes are nt interchangeable between the tw manufacturers (Cper and Elastimld). 4. Required equipment. Injectin elbw. Lug (fr replacement). Injectin cap (fr injectin). Prbe kit (35kV Cper elbws nly). Installing 200A Elbws If yu are installing an injectin elbw n a cable that was nt previusly terminated with an elbw, fllw the instructins supplied with the elbw t trim the insulatin and install the cmpressin cnnectr. If yu are retrfitting an injectin elbw n a cable that was previusly terminated, fllw the steps belw and reference the manufacturer s instructins where directed. Carefully remve and discard the ld prbe and elbw. Clean the cable and remve grease r crrsin inhibitr frm arund the cnductr strands. Measure the cable s insulatin diameter and use the tables at the end f this NRI t determine the crrect part number fr the injectin elbw. Carefully inspect the existing craftwrk including the insulatin shield cutback, the insulatin s surface, cnductr strands, and the cnnectr fr damage. If the craftwrk des nt meet Nvinium standards, take crrective actins. NOTE: All lugs that are nt bi-metal (cpper tp) must be replaced. NRI 521 200A Elbws UPR Revised: March 1, 2016 Page 3 f 8

Cmpare the existing cable prep dimensins t the instructin sheet that is included with the injectin elbw and make any necessary adjustments. Figure 1: Instructin sheet example. Adjust the insulatin cutback as necessary t expse ¼ t ½ f cnductr strands between the cnnectr and insulatin. The cnductr strands rtate arund at a 15 angle. It is pssible t create a suitable flw path int the cable by pening the cnductr strands. There are tw methds t accmplish this gal: 1. Open the strands by rtating the cnnectr the ppsite directin f the strand lay by 15. Remember, 15 is the strand lay angle. OR 2. Tighten the strands by rtating the cnnectr 15 in the strand lay s directin. Then, rtate the cnnectr back 15 t its riginal psitin. Examine fr any strands that brke during the rtatin steps. Re-terminate if necessary. ¼ ½ gap 15 Figure 2: Check the gap and twist the cnnectr t pen the cnductrs. NRI 521 200A Elbws UPR Revised: March 1, 2016 Page 4 f 8

1. Install the elbw. Lightly lubricate the surface f the cable s insulatin. D nt apply lubricatin t the inside f the elbw as the grease may accumulate arund the cnductr strands and blck flw. Push the elbw nt the cable. Lightly lubricate the -ring n the prbe and carefully install the prbe. D nt rtate the prbe during insertin until the threads are engaged. Use the trque wrench supplied in the kit r ther apprved tl t tighten. Psitin the hse clamp n the thick prtin f the elbw and tighten until it just starts t defrm the surface f the rubber. D nt remve the yellw warning tags frm the elbw r injectin cap. 2. Operatins and maintenance. Figure 3: Psitin the hse clamp as shwn. The flw test and pressure test shuld nly be perfrmed using the injectin cap that will be used fr injectin in rder t avid cntaminatin between cables. Injectin caps are shipped in sealed plyethylene bags and shuld be pened just prir t installatin. Re-using the injectin cap and tubing is permitted. The mlded rubber shuld display n swelling, blisters r belling, and the black plastic stem shuld be free f scratches. Scratches n the stem can capture dirt and cmprmise its ability t functin as a sealing surface and insulating interface. Lng-term expsure t injectin fluid can cause swelling that may cmprmise the injectin cap. Injectin caps that n lnger lk like new must be discarded. NRI 521 200A Elbws UPR Revised: March 1, 2016 Page 5 f 8

Fr strage between uses, the injectin cap and tubing shuld be fully drained f fluid, and the uter surface f the tubing and the inner surface f the injectin cap shuld be wiped clean. The tubing shuld be neatly rlled and then stred alng with the injectin cap in a large re-sealable zip-lck bag. Large re-sealable zip-lck bags are available thrugh Supply Chain by part number 820122. Prir t use, the injectin cap shuld be examined and cleaned. Figure 4: Re-sealable plastic bag fr string injectin caps. Permanent caps must be stred in a plyethylene bag whenever they are nt installed n an injectin elbw. The re-sealable bags may als be rdered separately by part number. Figure 5: Re-sealable plastic bag fr string permanent caps. Sizing Instructins Injectin elbws are sized accrding t the insulatin diameter f the cable. Elbws can be further specified t match the system such as fr lad-break and dead-break cnfiguratins, single-phase and 3- phase applicatins, 15, 25, 35kV systems, and with r withut capacitive test pints. Figure 6: Size elbws accrding t the insulatin diameter. NRI 521 200A Elbws UPR Revised: March 1, 2016 Page 6 f 8

1. Small-interface lad-break elbws. Vltage Rating 15 kv 25 kv Elbw Type Standard Extended w/ Test Prt Insulatin Dia. DIM "A" Elastimld 0.640" - 0.820" 168ALR-F 816119 0.767" - 0.950" 168ALR-G 816120 0.850" - 1.050" 168ALR-H 816121 0.980" - 1.180" 168ALR-J 816407 0.665" - 0.895" 168AELR-6689 816419 0.880" - 1.100" 168AELR-88110 818586 0.980" - 1.180" 168AELR-J 819183 Repair w/ Test Prt 0.640" - 0.820" 168ARLR-F 819141 0.767" - 0.950" 168ARLR-G 819142 Standard 0.767" - 0.950" 274ALR-G 816122 0.850" - 1.050" 274ALR-H 816123 Extended w/ Test Prt 0.880" - 1.100" 274AELR-88110 817299 0.980" - 1.180" 274AELR-J 819076 28 kv Extended w/ Test Prt 0.880" - 1.100" 274AELR-88110-CS854 819437 0.980" - 1.180" 274AELR-J-CS854 819815 35 kv Standard 0.980" - 1.180" 376ALR-J-5240 816544 Table 2: Small-interface lad-break elbws. 2. Large-interface lad-break elbws. Vltage Rating Elbw Type Insulatin Dia. DIM "A" Cper 35 kv Standard 0.995" -1.180" LEIN235D00 819065 1 3. Dead-break elbws. Table 3: Large-interface lad-break elbws. Vltage Rating Elbw Type Insulatin Dia. DIM "A" Elastimld 15/25 kv Standard Extended w/ Test Prt 0.640" - 0.820" 156ALR-F-CS624 816418 0.850" - 1.050" 156ALR-H-CS624 816124 0.665" - 0.895" 156AELR-6689-CS624 820058 0.740" - 0.950" 156AELR-7495-CS624 820059 0.880" - 1.100" 156AELR-88110-CS624 818422 Table 4: Dead-break injectin elbws. NRI 521 200A Elbws UPR Revised: March 1, 2016 Page 7 f 8

4. Lugs. Determine the cable size and use Table 5 t select the apprpriate part number fr an injectin elbw lug. Shrt Lug Standard Lug Extended Lug Repair Lug Cnductr Size Cper Elbws Elastimld Elbws Shrt Lugs Standard Extended Repair Lugs #4-816420 818746 - #3-816421 - - #2 820025 816422 816525 819161 #1 820026 816423 816526-1/0 819146 816424 816527 819160 2/0 820027 816425 816528-3/0-816426 11556-1 1-4/0-816427 11556-2 1-5. Injectin elbw accessries. Table 5: Injectin elbw lugs. All available injectin elbw caps, prbes, and ther accessries are prvided in Table 6 belw. Descriptin Elastimld Elbws 1-Phase Cper Elbws Caps Injectin 815629 819068 Permanent 815732 819069 Prbes Lad Break 15 kv 816333-25 kv 816334-3-Phase 35 kv 819431 819067 1 819066 Dead Break 15/25 kv 820057 - Spare O-Ring 816335-10-Pack 2 35 kv Kit - 11377-1 11377-3 Table 6: Injectin elbw accessries. NRI 521 200A Elbws UPR Revised: March 1, 2016 Page 8 f 8