Sunwize Water Pumping Kit Quick Start

Similar documents
Sunwize Power Ready Express Quick Start

The Solar Power Kit includes the following components. Please be sure you have all listed components before beginning. 5/16" x 2" Carriage Bolt

SunWize SWPB Series Solar Modules GENERAL INSTALLATION & USER GUIDE

Top-of-Pole Mount for 4 Modules (TPM4) For Module Types D, E, F, & G

Solar Dolly. Assembly Manual

HELIOMOTION QUICK ASSEMBLY GUIDE PV-650

Top-of-Pole Mount for 6 Modules (TPM6) For Module Type D

EG80/EG145 INSTALLATION GUIDE

Top-of-Pole Mount for 12 Modules (TPM12) For Module Types D, E, F, & G

Top-of-Pole Mount for 12 Modules (TPM12) For Module Types D, E, F, & G When High Wind Version (HWV) or 6h x 2w, L

Top-of-Pole Mount for 6 Modules (TPM6) For Module Types A, B, & C

Top-of-Pole Mount for 6 Modules (TPM6) For Module Types A, B, & C ASSEMBLY INSTRUCTIONS. step-by-step assembly and installation

SunWize SW and OEM Series Solar Modules GENERAL INSTALLATION & USER GUIDE

Top-of-Pole Mount for 2 Modules (TPM2) For Module Types C, D, E, F, G, & H

HELIOMOTION QUICK ASSEMBLY GUIDE PV-650

Top-of-Pole Mount for 8 Modules (TPM8) For Module Types D, E, F, G, & H ASSEMBLY INSTRUCTIONS. step-by-step assembly and installation

HELIOMOTION QUICK ASSEMBLY GUIDE PV-1300

Copyright 2012 DelSolar Co. Ltd MQWRD installation manual-iec Ver. 1.4

Oberbauer/ITEX Solar Power Systems

Top-of-Pole Mount for 15 Modules (TPM15) For Module Types E, F, & G ASSEMBLY INSTRUCTIONS

Installation, Operation and Maintenance Guide. 12, 24, and 48 Volt Systems

EG 320. Installation GUIDE GUÍA DE InstalacÍon GUIDE D'installation. Model Modelo Modèle EG 320

Top-of-Pole Mount for 1 Module (TPM1) For Module Type H ASSEMBLY INSTRUCTIONS. step-by-step assembly and installation

INSTALLATION MANUAL CRYSTALLINE SOLAR MODULES

CP-250E-60/72-208/240-MC4 Microinverter with Modular Trunk Cable

MULTI-POLE MOUNT MULTI-POLE MOUNT. Assembly Instructions. Assembly Instructions. step-by-step assembly and installation

MULTI-POLE MOUNT LARGE GROUND MOUNT. Assembly Instructions. Assembly Instructions. step-by-step assembly and installation

Apollo Solar Inverter Switchgear Module Installation Manual Rev 1.2 Page 1

INSTALLATION MANUAL.

CP /240-MC4 User Manual

CAT-1 Series 3. Installation Guide. The Valley Group, Inc. 871 Ethan Allen Hwy. Suite 104 Ridgefield, CT 06877

ELECTRIC START KIT KIT P/N

TPM Fuse Panel Installation Guide. Document INS-727XXXXXXX This manual covers the following part numbers- Trimm 727XXXXXXX Family

Nanometrics Solar Power System

I n s t a l l a t i o n M a n u a l. f o r T E D

Solar PV General Introduction Guide for Electricians

Billboard LED Solar System STOP! THIS IS IMPORTANT

INSTALLATION INSTRUCTIONS FOR THE TOMAHAWK ELECTRIC REVERSE

DURA-PANEL W OUTPUT: 12 VDC, 20 Watt W OUTPUT: 12 VDC, 50 Watt W OUTPUT: 12 VDC, 100 Watt

Combo HPU Kidney Loop Motor

TM INSTALLATION GUIDE TM 1

ELECTRIC START KIT P/N APPLICATION BEFORE YOU BEGIN KIT CONTENTS. Instr Rev Page 1 of 6. All Polaris Pro-Ride Snowmobiles

TPM/GMT Panel Installation Guide

ME217PIB / ME503PIB SMART INTERLOCK TECHNOLOGY ACME ADAPTER INTERLOCK BRACKET INSTALLATION AND OPERATING INSTRUCTIONS

Top-of-Pole Mount for 1 Module (TPM1) For Module Types A, B, C, D, E, F, & G ASSEMBLY INSTRUCTIONS. step-by-step assembly and installation

AUXILIARY BATTERY BOX INSTALLATION INSTRUCTIONS

pg 2 Disassembly, Wire and Amplifier Plate Installation pg 9 Glovebox Subwoofer Installation pg 13 Kick Panel Speakers Installation

SAFETY THIS PRODUCT IS FOR OFFROAD USE ONLY. ALL LIABILITY FOR INSTALLATION AND USE RESTS WITH THE OWNER.

Product Manual MNX10015 / REV B MODEL SB142, SB242. Dual Output Series Switch Boxes

Title Goes Here and Can Run Solar Photovoltaic up to 3 lines as shown here Systems as you see

GN-3A Polaris General SSV Works 3 Speaker Audio Kit

Infinity 1U 19 Converter Shelf Models: J L224-48V to +24V, L V to -48V

MODEL 1200S MAGNETIC LOCK

GET GROUNDED. Renewable Energy System Grounding Basics

Recommended Tools: Phillips Screwdriver, 13mm and 10mm Wrench, 5/16 nut driver, Flat Blade Screwdriver

RZ3-5K Polaris RZR XP 1000 & 900 Kicker 5 Speaker Audio Kit

Photovoltaic Modules Installation Manual for Australia

Installing Power Components

RZ3-5A Polaris RZR XP 1000 & 900 SSV Works 5 Speaker Audio Kit

Midnite Kid Basic Solar Charging Kit

MODEL 600S 600 POUND SINGLE MAGNETIC LOCK SPECIFICATIONS

Automotive: Lightheads

MNBRATKIT MidNite Brat Solar Charging Kit

Zeon Control Pack Relocation Kit 78 Cable Length

DEALER SETUP INSTRUCTION

Proper installation of this product requires the installer to have a good understanding of automotive electronics, systems and procedures.

TOYOTA VENZA 2009 TRAILER WIRE HARNESS Procedure

ANZI Transfer Switch and Generator Wiring Installation Addendum

Battery Cables. Wire & Cable

GMT Fuse Panel Installation Guide

KD240GX-LFB2, KD245GX-LFB2 KD250GX-LFB2

MODEL 600LB 600 POUND SINGLE MAGNETIC LOCK WITH LED, BOND SENSOR & DOOR STATUS SENSOR SPECIFICATIONS

INSTALLATION INSTRUCTIONS HIGH OUTPUT 2 SPEED RAD FAN ASSEMBLY

INSTRUCTIONS. Power Panel. Installation Instructions

ARABLE SOLAR INSTALLATION GUIDE

PHASE 3 POWERSPORTS AUDIO KIT RZR POLARIS. pg 2 Disassembly, Wire and Amplifier Plate Installation. pg 9 Glovebox Subwoofer Installation

RZ3-3A Polaris RZR XP 1000 & 900 SSV Works 3 Speaker Audio Kit

Installation guide for Suntech Power photovoltaic module Purpose of this guide

Installation Manual LIGHTWAY PV MODULES. Revision Date March 30, 2013 /Applicable for IEC certified products

Product Manual. Installation Instructions for CHSM-230M Series Solar Module

TOYOTA VENZA 2009 TRAILER WIRE HARNESS Procedure

MULTI-POLE MOUNT - G2 ASSEMBLY INSTRUCTIONS. step-by-step assembly and installation. Version 1, Rev D SP PCN

Wiring the 2015 FRC Control System

SAVE THESE INSTRUCTIONS

Instruction Bulletin NF Panelboard Dual Sub-Feed Circuit Breaker Adapter Kit Installation onto an NF Panelboard Class 1670

FLEXIBLE PHOTOVOLTAIC MODULES. Instruction Manual

INSPECTION REQUIREMENTS: PHOTOVOLTAIC (PV) RESIDENTIAL

Users Manual. Defender 1 8.0KW to 14.0KW Online Emergency Lighting Inverter. Technical Manual # Revision B

Solar module user manual Conergy PM 225P-250P

Users Manual. Cobra Plus Stand-By Emergency Lighting Inverter. Technical Manual # Revision B

AeroVironment Universal Solar Pump Controllers

Total Front Access Wall Mount Fuse Panel Installation Guide. Document INS This manual covers the following part numbers

Davis Wind Speed and Direction Smart Sensor (S-WCF-M003) Manual

Solar Power Installation Application

HID INSTALLATION ON RST1000 Futura

TECHNICAL BULLETIN: Instructions for Upgrading to V3.3 Sun Sensors. Sun Sensor Identification:

SOLAR PHOTOVOLTAIC SYSTEMS INSPECTOR CHECKLIST

MODEL ELC-12/60-D BATTERY CHARGER

Photovoltaic Module with Battery Back-up Installation & Maintenance Information IF Figure 1. SAVE THESE INSTRUCTIONS FOR FUTURE REFERENCE

Grounding Systems. Equipment Grounding & Grounded Conductors

Transcription:

Document # 310014 Sunwize Water Pumping Kit Quick Start The purpose of this guide is to assist you in setting up your system quickly and efficiently. Important! Prior to field installation Determine and fill in the information below. Refer to http:// www.ngdc.noaa.gov/geomag-web/#declination to determine required information using site Lat./Long. or zip code. See page 4 for detailed instructions. Array tilt angle Magnetic declination See inside for list of required tools and additional materials. Share your installation photo: email to marketing@sunwizepower.com For technical support call 866-827-6527

System Parts List You will need these tools: PV Modules PV-Module mount PV-Module output conductor kit Pump Controller Installation Kit (Optional) DC Disconnect (Optional) Float Switch Wide, medium, and narrow flat head and Phillips screwdrivers Socket driver set and open end wrenches (3/8-3/4 ) 5/32 Allen Wrench 3/16 Allen wrench Magnetic compass Tape measure Grease pencil, chalk, scribe, or other marker Digital multi-meter Digital clamp on Amp meter (optional) You will need to supply these parts (not included): Galvanized steel pole - 2-8 sch 40 (if required) Equipment grounding - ground per local electrical code UV resistant cable ties Photovoltaic (PV) modules generate electricity when exposed to light. Modules pose a shock hazard and risk of serious injury or death if instructions and safety precautions are not followed carefully. Cover the glass faces of the modules with opaque material while working on the system to stop the production of electricity. Avoid touching the terminals and isolate wire end until all connections are complete. Batteries can explode or severely burn if the terminals are shorted to the opposite polarity. A single point system ground is required per NEC A.690. It is recommended to tie the battery negative (-) terminal to the equipment chassis at the time of installation. Always observe proper polarities when making electrical connections to the modules, batteries, and controller.

1 System Installation PV Mount Installation Attach top of array structure to pole at desired maximum height using supplied band clamps or u-bolts per the manual provided with the mount. Assemble the rest of the mount per the manual and adjust the mount to the desired angle of tilt. Pump Controller Installation When mounting the controller, make sure it is mounted in a vertical position. The controller must be mounted vertically to cool properly and to keep the electroinics dry. It is recommended to mount the controller on the north side of the PV array mounting pole. This not only reduces the wire run from the array to the controller, but also helps keep the controller cool under the shade of the array. DC Disconnect Installation (Optional) Images for reference only When using a DC disconnect, it should be mounted somwhere inbetween the PV array and the pump controller. The disconnect should be easily accessible.

2a Electrical Installation Grounding Set controller to OFF position Controller must be grounded, with its ground lug, to an 8-foot ground rod. Use wire rated for outdoor use per local codes and size per NEC A.690 for system earth grounding. Verify system neutral bonding is per local code. Pump Wiring Set controller to OFF position 1. Connect the green pump ground connector to controller chassis ground block. 2. Connect pump motor leads to the Pump terminals on the controller. Red to LD+ and black to LD-. 3. (Optional) Connect the float switch leads to the remote switch terminals

2b Electrical Installation PV Array Wiring (Direct) 1. Route the output conductors from the PV array to the controller. Secure the conductors to the PV panel frame or the mounting surface using wire ties or other restraining hardware (not provided). Install the cord grip fitting to the bottom of the controller using the 1/2 inch knock out provided. 2. Inside the controller, mate the RED PV(+) conductor to the controller PV(+) terminal block. Mate the BLACK PV(-) conductor to the controller PV(-) terminal block. Mate the PV array GREEN GND conductor to the controller ground lug. 3. For all connections use correct interconnect cables and tray cable (see figure right). 1 Module 2 Modules PV Array Wiring (Disconnect) 1. Split the provided tray cable and module grounding wire into two lengths. One that will reach from the PV array to the disconnect and one that will reach from the disconnect to the controller. 2. Route the output conductors from the PV array to the disconnect box. Secure the conductors to the PV panel frame or the mounting surface using wire ties or other restraining hardware (not provided). Install the cord grip fitting to the bottom of the disconnect using the 1/2 inch knock out provided. 3. Route conductors from the disconnect box to the controller. Install a cord grip fitting to the bottom of both the disconnect and controller. 4. Inside the disconnect, mate the RED PV(+) conductor to the bottom of the DC breaker and the RED Controller(+) conductor to the positive combiner lug. Mate both the BLACK PV(-) conductor and BLACK Controller(-) conductor to the negative bus bar. Mate both GREEN GND conductors to the ground bus bar. 5. Inside the controller mate the RED(+) conductor to the PV(+) terminal block. Mate the BLACK(-) conductor to the PV(-) terminal block. Mate the GREEN GND conductor to the controller ground lug. 6. For all connections use correct interconnect cables and tray cable (see figure right). PV ARRAY CONTROLLER

3 Test the PV System Confirm all connections, fittings, and fasteners are secure and the PV array surface is clean and facing South. Measure Voltages (Confirm controller/disconnect are off before measuring) Verify the PV polarity is positive. If negative, reverse wiring to the system and check again. **WARNING** REVERSE POLARITY CAN RESULT IN NON-WARRANTIED PRODUCT DAMAGE Set controller/disconnect to the ON position 1. Set controller power switch to the ON position 2. If you have a DC disconnect, set the breaker to the ON (closed) position. Confirm that the controller status LEDs function properly. Measure PV array voltage from the PV(+) terminal to the PV(-) terminal in the controller. (If you have a DC disconnect measure the voltage from the PV(+) bus bar to the PV(-) bus bar in the combiner box) 24V WPK systems 42VDC (open circuit voltage) The system should now be operational. If the system will not start refer to the trouble shooting guide in the pump controller manual.

4 Calculate Installation Tilt and Azimuth For optimum performance, your PV array should face true south in the Northern Hemisphere (and true north in the Southern Hemisphere). However, when determining direction using a magnetic compass, indicated bearings will vary from true bearings because of the difference between the location of the true and magnetic north poles. This angular difference varies with location on the globe and is called the declination. Locate your using the web site below. (Great accuracy is not critical). Using the magnetic declination from the web site calculate true South. For example, the declination for Washington, D.C., is approximately -11º; for Chicago, IL, -3º; and for Los Angeles, CA, +14º. Determine magnetic south at your site using a magnetic compass. If the local declination found in step 2 is negative, true south is that number of degrees added to magnetic south. For example, at Washington, D.C., true south is the same as 180º + 11º = 191º indicated. If the local declination found in step 2 is positive, true south is that number of degrees subtracted from magnetic south. For example, at Los Angeles, true south is the same as 180º 14º = 166º indicated. Orient your array in the direction of true south (or north if applicable) as determined above. The Internet site http://www.ngdc.noaa.gov/geomag-web/#declination will calculate magnetic variation from an input of latitude and longitude, or Zip code. For optimum performance, your PV array should set to a specific tilt angle. To determine the desired tilt angle of the array, use the latitude from step one above. Take this value and add the factor based on the table below. This will provide the optimum worst case performance with the minimum amount of annual adjustment, based on the winter months (Northern hemisphere). Latitude range between 90 45 SET TO 60 Latitude range between 40 25 +15 Latitude range between 25 15 +5 Latitude range between 10 0 SET TO 15