Customer Name : Account Number: Customer Service Address (Street, City, State, ZIP Code): Customer Mailing Address: Customer Telephone Number:

Similar documents
TILLAMOOK PEOPLE S UTILITY DISTRICT

SOLAR PHOTOVOLTAIC DISTRIBUTED GENERATION CUSTOMER GUIDELINES, APPLICATION & INTERCONNECTION AGREEMENT

ELECTRICAL DISTRICT # 2

RENEWABLE ENERGY PROGRAM Step 1, Section 1 ENROLLMENT FORM FOR LEASED RESIDENTIAL AND SMALL COMMERCIAL PHOTOVOLTAIC AND WIND TURBINE SYSTEMS

Application for Interconnection and Net Metering Revision: 1 Revised: November 7, 2017

Photovoltaic Solar Plan Review

INTERCONNECTION RULES AND REGULATIONS FOR NET ENERGY METERING SYTEMS

40kW (and under) Solar/Inverter Installations Generation Interconnection Application to Minnesota Power

This is intended to provide uniform application of the codes by the plan check staff and to help the public apply the codes correctly.

ENGINEERING SPECIFICATION

Municipality Generator Interconnection Application Single Meter Application Part I

Rider : NET METERING SERVICE AND ELECTRICAL SYSTEM INTEGRATION

INTERCONNECTION STANDARDS FOR CUSTOMER-OWNED GENERATING FACILITIES 25 kw OR LESS PUBLIC UTILITY DISTRICT NO. 1 OF CHELAN COUNTY

REQUIREMENTS FOR PARALLEL OPERATION FOR CUSTOMERS WITH GENERATION NOT EXCEEDING 50 kw

Louisville Gas and Electric Company

3. Customer shall provide space for metering equipment and meter base as per Springville City Power requirements.

Application for Commission Approval to Construct a Generating Station Pursuant to Public Utilities Article Section and

December 13, This document was filed with the Board of Public Utilities on December 13, It is awaiting final approval by BPU staff.

New Ulm Public Utilities. Interconnection Process and Requirements For Qualifying Facilities (0-40 kw) New Ulm Public Utilities

Maryland Level 2, Level 3 & Level 4 Interconnection Request Application Form (Greater than 10 kw to 10 MW or less)

RULE 21 GENERATING FACILITY INTERCONNECTION APPLICATION SMUD s Distribution System - (SMUD FORM 2655)

Umatilla Electric Cooperative Net Metering Rules

Consumer Guidelines for Electric Power Generator Installation and Interconnection

Policy Bulletin No. 25 Net Metering. Public Utility District No. 1 of Klickitat County 1313 South Columbus Goldendale, WA 98620

City of Banning Electric Utility - Residential Self Generating Facility Program (Photovoltaic Systems <48kW)

Load Side PV Connections

DIVISION 311 MISCELLANEOUS ELECTRICAL RULES

Questions from the AHJ To Fuse or Not to Fuse?

RULES FOR CUSTOMER INTERCONNECTION OF ELECTRIC GENERATING FACILITIES

SUPPLEMENTAL CORRECTION SHEET FOR SOLAR PHOTOVOLTAIC SYSTEMS - ELECTRICAL

REVISED 8/1/2018 SOLAR PHOTOVOLTAIC DISTRIBUTED GENERATION CUSTOMER GUIDELINES, APPLICATION & WGC INTERCONNECTION AGREEMENT

Columbia Water & Light Interconnection & Net Metering Agreement Electrical Facility

Maryland Level 2, Level 3 & Level 4 Interconnection Request Application Form (Greater than 10 kw to 10 MW or less)

Level 2, Level 3 & Level 4 Interconnection Request Application Form (Greater than 25 kw to 10 MVA or less)

SOUTH HADLEY ELECTRIC LIGHT DEPARTMENT Net Metering Policy As Amended 03/23/16 By the South Hadley Municipal Light Board

To complete the process for a net metering interconnection, please follow the steps below:

KAUAI ISLAND UTILITY COOPERATIVE KIUC Tariff No. 1 RULE NO. 17 NET ENERGY METERING

Adopted: September 24, 2015 Version: Version 1.0

SANTA CLARA CITY RENEWABLE NET METERING & INTERCONNECTION AGREEMENT

Solar Power Installation Application

APPLICATION Net Energy Metering Interconnection For Solar And/Or Wind Electric Generating Facilities Of 30 Kilowatts Or Less

Document Requirements for Engineering Review- PV Systems v1.1 12/6/2018

City of Washington, Kansas Electric Department. Net Metering Policy & Procedure For Customer-Owned Renewable Energy Resources

INTERCONNECTION for GENERATING FACILITIES Up to 20 MW

INTERCONNECTION STANDARDS FOR PARALLEL OPERATION OF SMALL-SIZE GENERATING FACILITIES KILOWATTS IN THE STATE OF NEW JERSEY

STREAMLINED SOLAR CHECKLIST Owner Name:

2016 Photovoltaic Solar System Plan Review List

Inverter Advancements in UL1741 and UL 62109

Definitions. Scope. Customer Generation Interconnection Requirements

Solar PV Standard Plan Simplified Central/String Inverter Systems for One- and Two-Family Dwellings

Solar PV Standard Plan Simplified Central/String Inverter Systems for One- and Two-Family Dwellings

NORTH CAROLINA INTERCONNECTION REQUEST APPLICATION FORM. Utility: Duke Energy Progress

Level 2, Level 3 & Level 4 Interconnection Request Application Form (Greater than 10 kva to 10 MVA or less)

WOLFEBORO MUNICIPAL ELECTRIC DEPARTMENT NET METERING PILOT PROGRAM. Customer-Owned Renewable Energy Generation Resources (25 Kilowatts or Less)

APPLICATION FOR INSTALLATION OF SMALL SCALE EMBEDDED ELECTRICITY GENERATION

Instructions for Completing Oncor s Interconnection Application For Solar PV Projects

MCCOOK PUBLIC POWER DISTRICT McCook, Nebraska BOARD POLICY NUMBER 488

Application for Operation of & Net Metering for Member-Owned Generation Name: Mailing Address: City: County: State: Zip Code: _

To complete the process for a net metering interconnection, please follow the steps below:

New Hampshire Electric Cooperative (NHEC) Introduction to Net Metering

MISSOURI SERVICE AREA

INTERCONNECTION REQUIREMENTS POLICY

PSNH INTERCONNECTION REQUEST

Microinverters and AC PV modules are becoming. Microinverters and AC PV Modules. Different Beasts. Perspectives on PV.

Supply-Side PV Connections

City of, Kansas Electric Department. Net Metering Policy & Procedures for Customer-Owned Renewable Energy Resources

Mike Holt s Illustrated Guide to SOLAR PV SYSTEMS

DER Commissioning Guidelines Community Scale PV Generation Interconnected Using Xcel Energy s Minnesota Section 10 Tariff Version 1.

REVISION NO.: 7 EFFECTIVE: 07/07/16

Code Compliance. Perspectives on PV. Back to the Grid, Designing PV Systems for

Please Refer to Attached Sample Form

APPLICATION Net Energy Metering (NEM2) Interconnection For Solar And/Or Wind Electric Generating Facilities Of 30 Kilowatts Or Less

Form C Renewable Energy Micro-Generation Connection Application Distribution System

Application for Service Residential Subdivision / Development

DISTRIBUTED RESOURCE GENERATION Feed-In-Tariff Single Phase

Please Refer to Attached Sample Form

Lassen MUD PV BUYDOWN PROGRAM Photovoltaic Systems Guidelines

SOLAR PV STANDARD PLAN - COMPREHENSIVE Central/String Inverter Systems for One and Two Family Dwellings

Permit for Charging Equipment Installation Electric Vehicle Supply Equipment (EVSE)

Information Packet Kissimmee Utility Authority Customer-Owned Renewable Generation Interconnection And Net Metering Program

Duke Energy Carolinas North Carolina Interconnection Request Checklist

Sample Application for Certificate of Public Convenience and Necessity from NC Solar Center

Section 6. Generation Interconnection

Summary of General Technical Requirements for the Interconnection of Distributed Generation (DG) to PG&E s Distribution System

Oncor Application for Interconnection of Distributed Generation

DISCONNECT SWITCH REQUIREMENTS FOR DISTRIBUTED GENERATION CUSTOMERS

To complete the process for a net metering interconnection, please follow the steps below:

24. SOLAR INCENTIVE PROGRAM II

Net Metering Program

Plumas County Record of Surveys

Net Metering Service. Customer Information Package

Customer Requirements Downtown Secondary Network Service

Document Requirements for Engineering Review PV Systems v1.0 6/9/2017

Legal Name of the Customer (or, if an individual, individual's name): Name: Contact Person: Mailing Address: Physical Address: City: State: Zip Code:

GUIDE FOR MICROGENERATION INTERCONNECTION TO CITY OF MEDICINE HAT ELECTRIC DISTRIBUTION SYSTEM

NET METER REQUEST FORM

Louisiana Net Metering Service. Customer Information Package

NEW HAMPSHIRE ELECTRIC COOPERATIVE S (NHEC) ABOVE THE CAP NET METERING INTERCONNECTION APPLICATION INFORMATION

SOUTHERN PUBLIC POWER DISTRICT DISTRIBUTED GENERATION STANDARD

To complete the process for a net metering interconnection, please follow the steps below:

Transcription:

Please print the following information. Interconnect Customer Information Customer Name : Account Number: Customer Service Address (Street, City, State, ZIP Code): Customer Mailing Address: Customer Telephone Number: Customer Cell Number: Customer E-Mail: Photovoltaic Inverter/Panel Information Inverter Manufacturer: Model Number: Is the equipment UL 1741 listed? YES NO Attach manufacturer s cut-sheet showing UL 1741 listing or certified sheet stating tested to UL 1741 Number of PV Panels Model Nos. Are the PV panels UL 1703 listed? YES NO AC Output Voltage Total Power Output 1

System Performance and Solar Array Data Max. Power Output (Watts): Max. Power Voltage(Volts): Max. Power Current (Amps): Does Inverter Disconnect Properly?: Miscellaneous System Design Information Is a gate code(s) necessary for access to the property and/or community? If yes, please provide Will the system utilize a supply (line) side tap per NEC 690.64(A)? Will the system consist of two or more power sources (PV, Wind, Emergency generator, etc.)? Is this a system expansion that only adds panels? Other information contractor or engineer believe will be important, i.e., proposed exceptions 2

Installation Information This system has been installed in compliance with IEEE 929 Recommended Practice for Utility Interface of Photovoltaic (PV) Systems and the latest edition of the National Electric Code. The Photovoltaic System components are Listed and Tested by a NRTL to UL Standard 1741. Contractor (signed): Contractor License Class: Expiration Date: Name (print): Mailing Address: Telephone Number: Cell Number: E-Mail Address: Government Authority Having Jurisdiction (AHJ) Check one: City of Benson Cochise County Santa Cruz County City of Safford Graham County Exemption (see Note 2) City of Willcox Pima County Other, explain: NOTES 1) PV/Wind Generation designs shall be prepared by and/or under the direct supervision of an AZ registrant where prescribed by the Arizona Board of Technical Registration in their Rules and Statutes. The complete Rules and Statutes may be found at the Arizona State Board of Technical Registration website: http://www.btr.state.az.us. Objections to interpretations of these Rules and Statutes will be submitted to the AZ Board of Technical Registration for resolution. SSVEC will support the following but not limited to Rules and Statutes: (a) the Arizona Administrative Code Title 4, Chapter 30, Article 3, Section R4-30-302 Electrical (b) Plans, A. states: A registrant shall prepare and submit drawings and specifications for a new electrical system or an addition or modification to an existing electrical system provided the service and associated electrical feeders exceeds 600 amperes 120/240 volts, single phase or 225 amperes 120/208 volts, three phase and the fault current exceeds 10,000 amperes. (b) Arizona Revised Statutes, Title 32, Chapter 1, Article 3. Regulatory Provisions, 32-142 Public Works A., states: Drawings, plans, specifications, estimates for public works of the state or a political subdivision thereof involving architecture, engineering, shall be prepared by or under the direct supervision of a registrant within the category involved. 2) The City of Safford Utilities requires the customer/contractor obtain a construction permit and pass AHJ plans review and an AHJ installation inspection. If the customer submits an exemption 3

from the AHJ installation inspection, the owner may at their option and expense, provide to COS a certification from a State of Arizona registered professional engineer. The certification shall be stamped by the engineer and state the installation adheres to all applicable local, national and industry codes and standards. In addition, the engineer shall certify that all equipment and material are in agreement with the application and design information submitted to the City of Safford, and the equipment and material are installed according to manufacturer s recommendations and City of Safford s Service Entrance Requirements. Additional Information The customer must include an electrical one-line and three-line diagram of the PV installation with this agreement form. The electrical one-line diagram must show connections, bus size, circuit breakers, fuses, etc. between main electrical components such as meter(s), main panel, main disconnect switch/breaker, PV breaker, ac utility disconnect switch, PV inverter(s), sub-panel, loads, etc. The customer must also include a detailed map that shows major cross roads and plant locations. A Site Plan must be submitted showing the arrangement of major equipment, including the electric service entrance section and utility meter, locations of PV inverter, interface equipment, and Disconnect Switch. The licensed electrical or PV contractor should be able to provide the electrical one-line diagram, three-line diagram, detailed map, and site plan, and detailed material/labor invoice. Incomplete submittals may result in project delays and additional administrative and engineering charges that shall not be included in rebate calculations. Customer and Customer contractor/electrician agree not to tamper and/or disable any COF Hold Tag or COS padlock on the ac utility disconnect switch. The purpose of this switch is to protect COS personnel and emergency agency personnel from dangerous backfeeds on circuits they are working on. The Customer is aware that SSVEC personnel will not energize the solar system when they remove the COS hold tag and padlock. Customer agrees not to encroach on or reduce the safe work space area required by the City Service Entrance Specifications around the City of Safford s service meter and the ac utility disconnect switch. Customer agrees that City of Safford equipment, in particular the ac utility disconnect switch shall remain readily accessible on a 24 hour/7 days a week basis. 4

GRID TIE INTERCONNECT AGREEMENT By signing below, the customer understands, and is in agreement with, City of Safford Electric Utilities Photovoltaic System Interconnection Requirements. The customer should not proceed with the PV project until City of Safford verbally contacts the customer and indicates approval of the information supplied by the customer on the agreement form. The customer should not operate the PV system in parallel with the utility until the governmental authority having jurisdiction or an AZ registered engineer has approved the installation and City of Safford Utilities has released the photovoltaic installation and has signed below. Customer Name (please print): Address: City Safford Customer s Signature Date By signing below, City of Safford Electric Utilities, has released the Customer s Photovoltaic System, and therefore, the customer is authorized to operate the PV system in parallel with the utility. City of Safford s Utilities Signature Date City OF SAFFORD WILL NOT ASSUME ANY RESPONSIBILITY FOR THE PROTECTION OF THE CUSTOMER S PHOTOVOLTAIC SYSTEM, OR OF ANY OTHER PORTION OF THE CUSTOMER S ELECTRICAL EQUIPMENT. THE CUSTOMER IS FULLY AND SOLELY RESPONSIBLE FOR PROTECTING THEIR EQUIPMENT IN A MANNER TO PREVENT ANY FAULTS OR OTHER DISTURBANCES FROM DAMAGING THE CUSTOMER S EQUIPMENT. 5