Vacuum Circuit Breakers (Vehicle)

Similar documents
Vacuum Circuit Breaker (Vehicle)

Vacuum Circuit Breakers (Vehicle)

Vacuum Circuit Breakers (Vehicle) Type HKR 7.5kV to 15kV. Instructions Installation Operation Maintenance SGIM-9928C

Vacuum Circuit Breakers (Vehicle)

Vacuum Circuit Breakers (Vehicle)

Vacuum Circuit Breakers (Vehicle) Type MSV 5kV. Instructions Installation Operation Maintenance SGIM-9988

Vacuum Circuit Breakers (Vehicle) Type FSV 5kV to 15kV. Instructions Installation Operation Maintenance SGIM-9968

Vacuum Circuit Breakers (Vehicle)

Vacuum Circuit Breakers (Vehicle)

Type 2 Arc Resistant WL Low Voltage Metal-Enclosed Switchgear

Type 38-3AH3 38 kv vacuum circuit breaker instruction manual. Installation operation maintenance E50001-F710-A238-V1-4A00. Answers for energy.

Installation Instructions For Motor Control Center (MCC) Units

Instruction manual. Types GMSG and GMSG-GCB 5 kv to 15 kv vacuum circuit breakers.

SIEMENS. XJ-L Busway Systems. Storage, Installation and Maintenance Instructions for... Piece No. 32-J Rev 3

SecoVac * Ground & Test Device

IB PowlVac ITE-HK Remote Racking Device

Instruction and Installation Guide

GE CONSUMER & INDUSTRIAL

Instruction manual. Type 3AH35-MA vacuum circuit breaker magnetic-actuator operator module.

Type 3AH kv to 38 kv vacuum circuit breaker operator module instruction manual

Instruction manual. Type 3AH35-MA vacuum circuit breaker magnetic-actuator operator module.

SM-1700 Secondary Shunt Trip Coil Assembly. Powered by Safety

RGZESDI Inverter Duty AC Induction Motors

Instruction Booklet for the Installation, Operation and Maintenance of Type 5-15 kv VCP-WG Vacuum Circuit Breaker 4000A MiniMod

SIGNAL WORDS QUALIFIED PERSON

Test Cabinet (Inspection Box) Instructions. for Testing Accessories on Manually and Electrically Operated EntelliGuard G Low Voltage Circuit Breakers

Instructions for VCP-W Simple Electrical Ground & Test Device (SEG&TD) with simplified interlock scheme - bottom terminal set version

COOPER POWER SERIES. 600 A 15, 25, and 35 kv Class Cleer Loadbreak Bushing Insert Installation Instructions. Loadbreak/Deadbreak Connectors MN650016EN

Hubbell has a policy of continuous product improvement. Please visit hubbellpowersystems.com to confirm current design specifications.

COOPER POWER. SERIES ELF Current-Limiting Dropout Fuse Installation Instructions. Fusing Equipment MN132028EN. Pull ring. Housing

COOPER POWER. SERIES CMU Medium voltage power fuse installation instructions. Fusing Equipment MN132032EN

GE Industrial Solutions. User/Installation Manual for 4.76kV -15kV SecoBloc

COOPER POWER SERIES. HX-CB loadbreak fuse cutout installation instructions. Fusing Equipment MN132011EN

Cradle Mounted Key Interlock Guide Frame Accessory

COOPER POWER SERIES. Screened Separable Connectors MN650023EN. Effective October 2016 Supersedes March 2012 (IS )

COOPER POWER SERIES. 200 A loadbreak junction 15 and 25 kv class installation instructions. Loadbreak Connectors MN650015EN

COOPER POWER SERIES. QD5 Quik-Drive tap-changer reversing neutral stationary contact asssembly kit A26 installation instructions

COOPER POWER SERIES. Dielectric grease application to recloser cable instructions. Reclosers MN280070EN

TYPE AST. Grounding Switch. ALL Ratings INSTALLATION & INSTRUCTION MANUAL

Power Break Circuit Breakers

Instruction Manual 15kV KVAN-1125M 1200/2000A Maxi-Vac Medium-Voltage Vacuum Circuit Breaker

Effective June 2016 New Issue

COOPER POWER SERIES. Screened Separable Connectors MN650024EN. Effective October 2016 Supersedes March 2012 (IS )

Factory Authorized Mechanism Enhancement (FAME)

Distributed by Tri-State Equipment Company Inc. Web: PH: FAX:

COOPER POWER SERIES. 200 A Fused Loadbreak Elbow Connector Replacement Fuse Installation Instructions. Fusing Equipment MN132021EN

COOPER POWER SERIES. Types 4H single-phase and 6H three-phase vacuum interrupter conversion kits. Reclosers MN280014EN

Lineman s Hoist. Operating, Maintenance & Parts Manual. Follow all instructions and warnings for LMST680-2

Vacuum Circuit-Breakers, Type HVX kv, of cassette design, cassette with motor drive

Simple Electrically Operated Ground & Test Device For use in Type VCP-W Switchgear rated up to 15kV, 25 and 40kA UPPER TERMINAL SET VERSION

NorthStar. brand. Instruction Manual. SLIM Tach SL Thru-Shaft Diameter. Magnetoresistive Encoder Designed for GE Wind Energy

Vacuum Circuit Breaker Type VAD-3

GE Industrial Solutions. DEH Installation and Maintenance Manual AKD-20 AR / Entellisys AR Exhaust Plenum System

5/15/27 kv, 25/31.5/50/63 ka Manual Ground & Test Devices Installation, Operations and Maintenance Manual

ProTrip Conversion Kits. For GE Types AK-15, AK-25, and AKU- 25 Low-Voltage Power Circuit Breakers INTRODUCTION. DEH Installation Instructions

COOPER POWER SERIES. K-Limiter back-up current-limiting fuse installation instructions. Fusing Equipment MN132010EN

ibusway for Data Center

1. Safety practices General Introduction Standards...3

ADVAC Medium Voltage Vacuum Circuit Breaker Installation and Operation Manual

COOPER POWER SERIES. KA716L7001 adjustable control valve kit for Types L, E, 4E, V4E, and V4L reclosers installation and adjustment instructions

Low Voltage WavePro TM and EntelliGuard TM Circuit Breakers Remote Racking Operator

Effective November 2016 Supersedes February 2012 (S )

User manual W-VACi. W-VACi 12 / 17.5 / 24 kv IEC Vacuum Circuit Breakers

Type GM-SG 5 kv and 15 kv non-arc-resistant metal-clad switchgear instruction manual

McCANNA Actuation Systems B

O & M Manual for the EATON Generator Ready Loadcenter

TIASTAR Motor Control Center Installation And Maintenance Instructions For Units Only

COOPER POWER SERIES. High-voltage primary bushings installation instructions. OEM Equipment MN800008EN

Type GM38 38 kv metal-clad switchgear instruction manual. Installation operation maintenance E50001-F710-A236-V1-4A00. Answers for energy.

ABB ADVAC TM. INSTALLATION/MAINTENANCE INSTRUCTIONS Medium Voltage Vacuum Power Circuit Breakers and Auxiliary Devices

COOPER POWER SERIES. Pad-mounted Switchgear MN285019EN. Effective March 2017 Supersedes February 2007 (S )

PowlVac Type PV STD/CDR Vacuum Circuit Breaker

Replacement of 600-Ampere Bushing and 200-Ampere Bushing-Well Adapters

High-voltage primary bushings installation instructions

Type NR oil switch installation and operation instructions

COOPER POWER SERIES. Expulsion fuse installation instructions. Capacitors MN230005EN. Effective November 2016 Supersedes November 2001 (S )

TRINETICS CSD SERIES OIL SWITCH INSTALLATION INSTRUCTIONS

COOPER POWER SERIES. 600 A 15/25 kv class T-OP II connector assembly installation instructions. Deadbreak Apparatus Connectors MN650048EN

COOPER POWER SERIES. Surge arrester interchangeable fuse cutout combination installation instructions. Surge Arresters MN235004EN

Model QML1750A. Motorcycle / ATV Lift. (1,750 lb capacity) INSTALLATION, OPERATION AND MAINTENANCE MANUAL

S Voltage Regulators GENERAL. PRODUCT INFORMATION Introduction. Contents. Acceptance and Initial Inspection. Handling and Storage.

SIEMENS. Combination Starter Enclosure Kit Classes 49EC17 & 49EC18 Instruction Guide E87010-A0151-T003-A1-49EC. August, 2012

Figure 1. Kearney Type HX cutout.

50 / 75 / 150 DHP [Cable or Hard Bus Application] Ground and Test Device

Effective November 2016 Supersedes September 1998 (S )

PAD-MOUNTED SWITCHGEAR INSPECTION & MAINTENANCE RECOMMENDATIONS TYPE PSI/II. 15kV 25kV. Qualified Persons

CR193 Vacuum Limitamp* Contactors

COOPER POWER SERIES. Edison Modular Fuse (EMF) Installation Instructions. Fusing Equipment MN132031EN

February 28 th, 2018 UPDATE: Important Product Safety Bulletin Immediate Action Required INSTRUCTIONS FOR FIELD RISK MITIGATION

Operation and Maintenance Manual

Medium Voltage Equipment 5-15 kv GM-SG and 38 kv GM38 Metal-Clad Switchgear General

www. ElectricalPartManuals. com SIEMENS Vacuum Circuit Breaker Operator Module Type 3AH 4.16kV to 38kV Medium-Voltage Equipment

COOPER POWER SERIES. UltraSIL polymer-insulated D-73P disconnect switches installation instructions. Switches MN008004EN

Installation and Operation

Powered by Safety 01.4IB.77000B PowlVac-ND Vacuum Circuit Breaker

Effective March 2015 Supersedes S August 2012

S Voltage Regulators PRODUCT INFORMATION GENERAL. Contents. Acceptance and Initial Inspection. Handling and Storage.

Installation, Operation, and Maintenance

GWI Rev. 1 October 2007 Supersedes Rev. 0 Dated February 2004

IB PowlVac CDR Vacuum Circuit Breaker. 5kV & 15kV 1200A, 2000A, & 3000A. Powered by Safety

Transcription:

Vacuum Circuit Breakers (Vehicle) Type AMR For Allis Chalmers 5kV Instructions Installation Operation Maintenance E50001-U229-A289-X-US00

Hazardous voltages and high-speed moving parts. Will cause death, serious injury or equipment damage. De-energize and ground the equipment before maintenance. Maintenance should be performed only by qualifi ed personnel. The use of unauthorized parts should not be used in the repair of the equipment. Follow all safety instructions contained herein. IMPORTANT The information contained herein is general in nature and not intended for specifi c application purposes. It does not relieve the user of responsibility to use sound practices in application, installation, operation, and maintenance of the equipment purchased. Siemens reserves the right to make changes in the specifi cations shown herein or to make improvements at any time without notice or obligations. Should a confl ict arise between the general information contained in this publication and the contents of drawings or supplementary material or both, the latter shall take precedence. QUALIFIED PERSON For the purpose of this manual a qualifi ed person is one who is familiar with the installation, construction or operation of the equipment and the hazards involved. In addition, this person has the following qualifi cations: (a) is trained and authorized to de-energize, clear, ground, and tag circuits and equipment in accordance with established safety practices. (b) is trained in the proper care and use of protective equipment such as rubber gloves, hard hat, safety glasses or face shields, fl ash clothing, etc., in accordance with established safety practices. (c) is trained in rendering fi rst aid. SUMMARY These instructions do not purport to cover all details or variations in equipment, nor to provide for every possible contingency to be met in connection with installation, operation, or maintenance. Should further information be desired or should particular problems arise which are not covered suffi ciently for the purchaser s purposes, the matter should be referred to the local sales offi ce. The contents of this instruction manual shall not become part of or modify any prior or existing agreement, commitment or relationship. The sales contract contains the entire obligation of Siemens Power Transmission & Distribution, Inc. The warranty contained in the contract between the parties is the sole warranty of Siemens Power Transmission & Distribution, Inc. Any statements contained herein do not create new warranties or modify the existing warranty.

Vacuum Circuit Breakers (Vehicle) Table of Contents Introduction and Safety...2 Introduction... 2 Qualifi ed Person... 2 Signal Words...2 Dangerous Procedures...2 Field Service Operation... 2 Receiving, Handling and Storage...3 Introduction... 3 Receiving Procedure...3 Shipping Damage Claims (when applicable)... 3 Handling Procedure (Refer to Figure 1)...3 Storage Procedure...3 Space Heating... 3 Vehicle Description...4 Vehicle Function and Operational Interlocks...4 Alignment...4 Checking in Compartment... 4 Grounding Contact (Refer to Figure 1)... 4 Engagement of Primary and Secondary Contacts...4 Recommended Tools... 4 Installing Circuit Breaker Into Compartment... 4 Circuit Breaker in Disconnect/Test Position (Refer to Figure 2)...4 Trip-Free In Racking Procedure...5 Circuit Breaker in Connect Position (Refer to Figure 3)...5 Adjustment Procedure Trip-Free/Closing Spring Dump...6 Adjustment Procedure Interlock Mechanism (Refer to Figure 4)...6 Continuous Current Interlock... 7 Maintenance... 8 Introduction and Maintenance Intervals...8 Recommended Maintenance and Lubrication... 8 Removal from Switchgear...8 Circuit Breaker Operator Tasks...9 Checks of the Primary Power Path (Refer to Figure 5)...9 Cleanliness Check...9 Primary Disconnects (Refer to Figure 5)...9 Fastener Check...9 Electrical Control Checks...9 Wiring and Terminals Checks... 9 Secondary Disconnect Check...9 Automatic Spring Charging Check...9 Electrical Close and Trip Check...9 Vacuum Integrity Check... 9 High Potential Test... 9 Insulation and Contact Resistance Test...9 Inspection and Cleaning of Circuit Breaker...9 Functional Tests... 10 Periodic Maintenance and Lubrication tasks... 10 Figures: Figure 1. Circuit breaker Side View...3 Figure 2. Circuit Breaker in Disconnect/Test Position...4 Figure 3. Circuit Breaker in Connect Position...5 Figure 4. Interlock Mechanism...7 Figure 5. Primary Power Path...9 Tables: Table 1-Maintenance Tasks...8 Table 2-Periodic Maintenance and Lubrication Tasks...10 1

Introduction and Safety Introduction The AMR family of vacuum circuit breakers is designed to meet all the applicable ANSI, NEMA and IEEE standards. Successful application and operation of this equipment depends as much upon proper installation and maintenance by the user as it does upon the careful design and fabrication by Siemens. The purpose of this Instruction Manual is to assist the user in developing safe and effi cient procedures for the installation, maintenance and use of the equipment. Contact the nearest Siemens representative if any additional information is desired. Signal Words The signal words Danger, Warning and Caution used in this manual indicate the degree of hazard that may be encountered by the user. These words are defi ned as: Danger - Indicates an imminently hazardous situation which, if not avoided, will result in death or serious injury. Warning - Indicates a potentially hazardous situation which, if not avoided, could result in death or serious injury. Caution - indicates a potentially hazardous situation which, if not avoided, may result in minor or moderate injury. Hazardous voltages and high-speed moving parts. Will cause death, serious injury or property damage. Only qualifi ed persons thoroughly familiar with the equipment, instruction manuals and drawings should install, operate and/or maintain this equipment. Dangerous Procedures In addition to other procedures described in this manual as dangerous, user personnel must adhere to the following: 1. Always work on de-energized equipment. Always de-energize a breaker, and remove it from the switchgear before performing any tests, maintenance or repair. 2. Always perform maintenance on the breaker after the springcharged mechanisms are discharged. 3. Always let an interlock device or safety mechanism perform its function without forcing or defeating the device. Qualified Person For the purpose of this manual a Qualifi ed Person is one who is familiar with the installation, construction or operation of the equipment and the hazards involved. In addition, this person has the following qualifi cations: Training and authorization to energize, de-energize, clear, ground and tag circuits and equipment in accordance with established safety practices. Field Service Operation Siemens can provide competent, well-trained Field Service Representatives to provide technical guidance and advisory assistance for the installation, overhaul, repair and maintenance of Siemens equipment, processes and systems. Contact regional service centers, sales offi ces or the factory for details, or telephone Siemens Field Service at 1-800-241-4453. Training in the proper care and use of protective equipment such as rubber gloves, hard hat, safety glasses, face shields, fl ash clothing, etc., in accordance with established safety procedures. Training in rendering fi rst aid. 2

Receiving, Handling and Storage Introduction This manual covers the Receiving, Handling and Storage instructions for vacuum circuit breakers shipped separately from the switchgear. This section of the manual is intended to help the user identify, inspect and protect the circuit breaker prior to its installation. Receiving Procedure Make a physical inspection of the shipping container before removing or unpacking the circuit breaker. Check for shipment damage or indications of rough handling by the carrier. Check each item against the manifest to identify any shortages. Accessories such as the manual charging crank, the racking crank and the split plug jumper are shipped separately. Shipping Damage Claims (when applicable) - Follow normal shipment damage procedures, which should include: 1. Check for visible damage upon arrival. 2. Visible damage must be noted on delivery receipt, and acknowledged with driver s signature. Notation, Possible internal damage, subject to inspection must be on delivery receipt. 3. Notify the Siemens Sales offi ce immediately of any shipment damage. 4. Arrange for carrier s inspection. Do not move the unit from its unloading point. Handling Procedure 1. Carefully remove the shipping carton from the circuit breaker. Keep the shipping pallet for later use if the breaker is to be stored prior to its installation. 2. Inspect for concealed damage. Notifi cation to carrier must take place within 15 days to assure prompt resolution of claims. Heavy weight. Can cause death, serious injury, or property damage. Use of a qualifi ed rigger to hoist the circuit breaker. 4. The palleted circuit breaker can also be moved using a properly rated fork-lift vehicle. The pallets are designed for movement by a standard fork-lift vehicle. Storage Procedure When the circuit breaker is placed on its pallet for storage, be sure the unit is securely bolted to the pallet and covered with polyethylene fi lm at least 10 mils thick. Indoor Storage - Whenever possible, store the circuit breaker indoors. The storage environment must be clean, dry and free of such items as construction dust, corrosive atmosphere, mechanical abuse and rapid temperature variations. Outdoor Storage - Outdoor storage is not recommended. When no other option is available, the circuit breaker must be completely covered and protected from rain, snow, dirt and all other contaminants. Space Heating - Space heating must be used for both indoor and outdoor storage to prevent condensation and corrosion. When stored outdoors, 250 watts per breaker of space heating is recommended. Lift Hooks Ground contact 3. The circuit breaker shall be appropriately lifted with a 6 ft. long lifting sling rated for at least 2,000 lbs. on the two lift hooks (Figure1). Avoid short hitches which could place strain on lifting hooks and could damage it. Figure 1. Circuit breaker Side View 3

Vehicle Description Vehicle Function and Operational Interlocks Type AMR vacuum circuit breakers are comprised of the interrupter/operator module fi tted to a vehicle. This interrupter/operator module is an integral arrangement of operating mechanism, dielectric system, vacuum interrupters, and means of connecting the primary circuit. The vehicle supports the interrupter/operator module, providing mobility and fully coordinated application in the Allis Chalmers Type H switchgear. This manual should be used jointly with the Circuit Breaker Operator manual, SGIM-9918. Alignment All aspects of the circuit breaker structure which impact alignment and interchangeability are checked at the factory. Field adjustment will not normally be required, but variations in existing switchgear may require fi eld adjustment. Hazardous voltages and high-speed moving parts. Will cause death, serious injury, and property damage. De-energize before working on this equipment. Do not by-pass interlocks or otherwise make interlocks inoperative. Checking In Compartment: Check to see that when installing the circuit breaker into cubicle that the lift pins and hooks on circuit breaker frame engage properly with mating parts of the lifting gear. Installing Circuit Breaker Into Compartment The Trip-Free/Spring Dump interlock is of primary importance in the safe and effective operation of the type AMR Vertical Lift Replacement circuit breaker. This interlock provides safety to both personnel and equipment during the racking procedure, as it prevents the electrical or manual closing and/or electrical closing spring charging of the circuit breaker until the circuit breaker is in either the Disconnect/Test position or the Connect position. Inoperative or by-passed interlocks will cause death, serious personal injury and property damage. Mechanical and electrical interlocks are provided as integral components of this equipment to ensure safe use. Interlocks must be in operation at all times. Read this instruction manual. Know and understand correct interlock function. Check interlock function prior to inserting circuit breaker into switchgear cubicle. Circuit Breaker in Disconnect/Test Position (Refer to Figure2) Figure 2 is a picture of the circuit breaker in the Disconnect/ Test position. The Disconnect/Test positions on the AMR circuit breaker are the same. The position is reached when inserting the circuit breaker fully into cubicle to the racking position. Grounding Contact: Check to see that the grounding contact at rear of circuit breaker (Figure1) makes proper contact with stationary contact in cubicle. Engagement of Primary and Secondary Contacts: As the circuit breaker is raised into fi nal position, check to see that the primary and secondary contacts are aligned for proper contact engagement. With circuit breaker fully raised against stop in cubicle there should be 5/16 plus or minus 1/16 clearance between secondary disconnect mounting plates. Recommended Tools Racking crank: Original circuit breaker racking crank may be used. Circuit Breaker closing spring charging crank:15-172- 816-344. Figure 2. Circuit Breaker in Disconnect/Test Position 4

Vehicle Description In this condition, circuit breaker interlock mechanism is not engaged with the cubicle mounted interlock operating cam. It is recommended that the trip-free/closing spring dump interlock be tested while the circuit breaker resides in the Disconnect/Test position. Follow the procedure below to verify the function of the trip-free/closing spring dump interlock: Hazardous voltages and high-speed moving parts. Will cause death, serious injury, and property damage. De-energize before working on this equipment. Do not by-pass interlocks or otherwise make interlocks inoperative. 1. On a de-energized bus, with the circuit breaker in the Disconnect/Test position, manually charge the circuit breaker closing spring, and bring the circuit breaker to a CLOSED condition. 2. Attempt to electrically charge the closing spring. As the motor cutoff switch (normally closed for operation), is being held open by the displacement of the interlock roller, no spring charging should be observed, therefore, no electrical close may be initiated. 3. Attempt to manually charge the closing spring. The closing spring should extend as expected, but fail to latch in the extended position due to the displacement of the close latch lever. As the closing spring can not maintain a latched condition, and the trip latch lever is displaced, it is impossible to charge the closing spring and close the circuit breaker during the racking cycle. Circuit Breaker in Connect Position (Refer to Figure 3) Figure 3 is a picture of the circuit breaker in the Connect position. 2. With the circuit breaker closed and the closing spring charged, start racking the circuit breaker towards connect position. 3. As the interlock roller is actuated by the cubicle mounted interlock cam, the circuit breaker will trip (open). The circuit breaker is now trip-free. The circuit breaker closing spring will discharge during the racking operation. Trip-Free in Racking Procedure During racking the circuit breaker from Disconnect/Test to Connect or Connect to Disconnect/Test, the interlock roller is displaced and rides along the face of the cubicle mounted cam. The effectiveness of the trip-free interlock can and should be tested during the racking procedure by following the steps below: Hazardous voltages and high-speed moving parts. Will cause death, serious injury, and property damage. De-energize before working on this equipment. Do not by-pass interlocks or otherwise make interlocks inoperative. 1. On a de-energized bus, rack circuit breaker to any position were interlock roller touches straight surface of cubicle mounted interlock cam. Figure 3. Circuit Breaker in Connect Position 5

Vehicle Description In this position, the interlock roller resides in the cavity of the cubicle mounted cam. It is important to note that interlock roller shall slightly touch the cubicle mounted cam. In the Connect position with the interlock roller residing in the cavity and touching slightly the cubicle mounted cam, the circuit breaker is now free to perform all required functions. It is important to verify that the circuit breaker will perform as expected in the fully connected position. Follow the following procedure to test the functioning of the operating mechanism in the fully connect position. Hazardous voltages and high-speed moving parts. Will cause death, serious injury, and property damage. De-energize before working on this equipment. Do not by-pass interlocks or otherwise make interlocks inoperative. 1. On a de-energized bus, rack the circuit breaker to the fully Connect position. Successful function of the trip-free/closing spring dump interlock will result in the circuit breaker arriving in the Connect position in an open state with closing spring discharged. 2. Electrically or mechanically charge the circuit breaker. 3. With the circuit breaker charged, electrically or manually perform a close operation on the circuit breaker. The circuit breaker should close, indicated by the sound of circuit breaker closing and the close-open indicator. If the circuit breaker does not close and closing spring charges, contact local Siemens offi ce for information. After successful operation of the circuit breaker, it is important to verify trip-free/closing spring dump operation when racking the circuit breaker from Connect to the Disconnect/Test position. To verify this function follow the following procedure: 4. On a de-energized bus, closed circuit breaker and charged closing spring. 5. Rack the circuit breaker from Connect position to Test/ Disconnect position, circuit breaker will trip in its fi rst 5/16 of movement. 6. Continue to rack circuit breaker downwards. Circuit breaker closing spring will discharge prior to interlock roller moving off cubicle mounted cam. Adjustment Procedure Trip-Free/Closing Spring Dump If the existing manufacturer s cubicle is properly maintained and adjusted, no adjustment to the trip-free/closing spring dump interlock should be necessary. Should problems with this interlock arise the fi rst step is to verify that the cubicle is arranged as required by the original manufacturer s specifi cations. If problems still exist after reviewing this information and making any required adjustments to the cubicle, the trip-free/ closing spring dump interlock can be adjusted by following the steps listed below. Adjustment Procedure Interlock Mechanism (Refer to Figure 4) The mechanical interlock roller located at the front right hand side of the circuit breaker has been properly adjusted at the factory and no further adjustment should be necessary. For reference the circuit breaker should trip within the fi rst 5/16 of movement as the circuit breaker is lowered from its fully raised position in cubicle. Should circuit breaker fail to trip in the fi rst 5/16 as it is lowered from fully raised position in cubicle, slightly earlier tripping can be obtained by lengthening the interlock roller adjusting rod. Hazardous voltages and high-speed moving parts. Will cause death, serious injury, and property damage. De-energize before working on this equipment. Do not by-pass interlocks or otherwise make interlocks inoperative. To adjust the interlock roller, fi rst loosen both locking nuts located on the adjustable rod. When nuts are loosened, the interlock roller may be adjusted in/out by turning the adjustable rod. Interlock roller should slightly touch the cubicle mounted cam. When in adjustment lock in position with the 2 lock nuts. After adjusting interlock mechanism repeat steps 4, 5 and 6 listed in the Circuit Breaker in Connect Position procedure. If the circuit breaker still does not function as required, contact local Siemens offi ce for information. Should any problems arise with the trip-free/closing spring dump interlock, follow the adjustment procedure listed below. 6

Vehicle Description Cam Interlock Roller Adjusting Rod Figure 4. Interlock Mechanism Continuous Current Interlock The continuous current interlock functions to ensure that circuit breakers and cubicle of like continuous rating are applied and that circuit breakers with dissimilar continuous current ratings are excluded from cubicles of unlike continuous current ratings. The continuous current interlocks are designed to match in detail and mounting location those of the interlocks applied on the original manufacturer s circuit breaker. 7

Maintenance Introduction and Maintenance Intervals Periodic inspections and maintenance are essential to obtain safe and reliable operation of the circuit breaker as well as the switchgear. Hazardous voltages and high-speed moving parts. Will cause death, personal injury, and property damage. De-energize before working on this equipment. Read instruction manuals, observe safety in- When circuit breakers and/or the switchgear are operated under Usual Service Conditions, maintenance and lubrication is recommended at ten year intervals or at the number of operations indicated in Table 2. Usual and Unusual service conditions for Medium Voltage Metal-Clad Switchgear are defi ned in ANSI C37.20.2, section 8.1. Generally, usual service conditions are defi ned as an environment in which the equipment is not exposed to excessive dust, acid fumes, damaging chemicals, salt air, rapid or frequent changes in temperature, vibration, high humidity, and extremes of temperature. The defi nition of usual service conditions is subject to a variety of interpretations. Because of this, you are best served by adjusting maintenance and lubrication intervals based on your experience with the equipment in the actual service environment. Regardless of the length of the maintenance and lubrication interval, Siemens recommends that circuit breakers and switchgear should be inspected and exercised annually. Recommended Maintenance and Lubrication Periodic maintenance and lubrication should include all the tasks shown in Table 1. Recommended procedures for each of the listed tasks are provided in this section of the manual. Failure to properly maintain the equipment could result in death, serious injury or product failure, and can prevent successful functioning of connected apparatus. Instructions should be carefully reviewed, understood, and followed. The maintenance tasks in Table 1 must be performed regularly. Table 1 Maintenance Tasks Circuit breaker operator tasks Checks of the primary power path - Cleanliness check - Primary disconnects Fastener check Electrical control checks - Wiring and terminals check - Secondary disconnect check - Automatic spring charging check - Electrical close and trip check Vacuum integrity check High potential test Insulation and contact resistance tests Inspection and cleaning of circuit breaker insulation Interlock mechanism Functional tests Periodic maintenance intervals The list of tasks in Table 1 does not represent an exhaustive survey of maintenance steps necessary to ensure safe operation of the equipment. Particular applications may require further procedures. Should further information be desired or should particular problems arise which are not covered suffi ciently for the Purchaser s purposes, the matter should be referred to the local Siemens sales offi ce. The use of unauthorized parts in the repair of the equipment, or tampering by unqualified personnel will result in dangerous conditions which will cause death, serious injury or equipment damage. Follow all safety instructions contained herein. Removal from Switchgear Prior to performing any inspection or maintenance checks or tests, the circuit breaker must be removed from the switchgear. Principal steps are provided here, but without the details of the preceding Installing Circuit Breaker Into Compartment section. 8

Maintenance 1. De-energize the circuit breaker by pressing the Trip pushbutton to open the circuit breaker prior to removal from the switchgear (Refer to Circuit Breaker Operator / Manual SG-9918). 2. De-energize control power to the circuit breaker by opening control power disconnect device (s). 3. Rack the circuit breaker to the DISCONNECT position. 4. Perform the spring discharge check. This is done by fi rst pressing the red Trip pushbutton. Second, press the black Close pushbutton. Third, press the red Trip pushbutton again, and observe the spring condition indicator. It should read Discharged (Refer to Circuit Breaker Operator / Manual SGIM-9918). Remove the circuit breaker from the switchgear. Circuit Breaker Operator Tasks Perform tests as described in manual SGIM-9918. Checks of the Primary Power Path Refer to Circuit Breaker Operator Manual SGIM-9918 and Figure 5. Primary Disconnects dry lint free cloth. The phase barriers are plates of insulating material which are attached to the circuit breaker to provide suitable electrical insulation between the vacuum interrupter primary circuits and the switchgear. Always re-install the phase barriers carefully to their original location prior to inserting the circuit breaker into the switchgear. Primary Disconnects Figure 5 is a side view of the circuit breaker showing the primary disconnects. Inspect the primary disconnects for physical integrity and absence of mechanical damage. Any evidence of burning or pitting would indicate weakness of the contact fi nger springs. Using a clean cloth saturated with isopropyl or isobutyl alcohol, clean old lubricant from primary disconnects, and apply contact lubricant (part #15-172-791-214) in a thin layer. Fastener Check Inspect all fasteners for tightness. Replace any fasteners that appear to have been frequently removed, show damage or are missing. Electrical Control Checks: Wiring and Terminals Check Secondary Disconnect Check Check the terminals of the secondary disconnect. Automatic Spring Charging Check Electrical Close and Trip Check Vacuum Integrity Check Figure 5. Primary Power Path Cleanliness Check In addition to the circuit breaker operator, Figure 5shows a side view of the circuit breaker with the insulating barriers removed in order to show the circuit breaker components. These components must be clean and free of dirt and any foreign objects. Use a dry lint free cloth. For stubborn dirt, use a clean cloth saturated with isopropyl or isobutyl alcohol (except for the vacuum interrupters). For stubborn dirt on a vacuum interrupter use a damp cloth and then thoroughly dry using a High Potential Test Insulation and Contact Resistance Test Note: Maximum Contact Resistance is read from primary bus stab to primary bus stab with primary disconnects removed. A value of 30 micro-ohms should be added to the maximum contact resistance specifi ed in the Circuit Breaker Operator Manual SGIM-9918. Inspection and Cleaning of Circuit Breaker Insulation 9

Maintenance Functional Tests Periodic Maintenance and Lubrication Refer to Circuit Breaker Operator Manual SGIM-9918 and Table 2. Table 2. Periodic Maintenance and Lubrication Tasks Sub-Assembly Item Inspect For Primary Power Path Primary Disconnects 1. Burnt or damaged fi ngers 2. Lubrication of contact surfaces 3. Tightness of nuts and other locking devices Electrical Controls Wiring 1. Mechanical damage or abrasion High Potential Test Insulation Terminals and Connectors Close and Trip Solenoids, Anti- Pump Relay, Auxiliary Switches, Secondary Disconnect Primary Circuit to Ground and between Primary Disconnects Control Circuit to Ground Barriers and all Insulating Components 1. Tightness and absence of mechanical damage 1. Automatic charging 2. Close and trip with control power 1. 60 second withstand, refer to Circuit Breaker Operator Manual SGIM-9918 for ratings. 1. 60 second withstand, refer to Circuit Breaker Operator Manual SGIM-9918 for ratings. 1. Cleanliness 2. Cracking, crazing, tracking, or other sign of deterioration Interrupter Operator Mechanism Interlock Mechanism Refer to Circuit Breaker Operator Manual. 1. Cleanliness 2. Lubrication of sliding, rotating, and articulating surfaces. Apply Anderol 732 aerosol synthetic fl uid grease (part number 15-172-816-058) or Beacon #325 (part number 15-337-131-001) 10

Siemens Power Transmission & Distribution, Inc. P.O. Box 29503 Raleigh, NC 27626-0503 E50001-U229-A289-X-US00 (10-2006) Printed in U.S.A. 2001 Siemens Power Transmission & Distribution, Inc. SIEMENS is a registered trademark of Siemens AG.