Railroad Ball Valves Series 5REB3

Similar documents
Standard Bore Flanged Ball Valves Series 7150, 730S & , 4 & 6 (DN 80, 100 & 150) Class 150 & 300

Tank Car Fire-Tite Top-Loading and Unloading Valves

SERIES CLASS 300 FULL-BORE REACTOR DISCHARGE VALVES. Installation, Maintenance and Operating Instructions

3 AND 4 CLASS 300 STANDARD BORE SERIES 730S AND 7300 REACTOR DISCHARGE VALVES. Installation, Maintenance and Operating Instructions

Reduced Bore Thread-end Ball Valves Series 33R Model C. 1/2 2 (DN 15-50) AAR No. E079024

3, 4 & 6 (DN 80, 100 & 150) CLASS 150 & 300 STANDARD BORE SERIES 7150, 730S & 7300 FLANGED BALL VALVES EQUIPPED WITH KEROTEST HANDLE ASSEMBLIES

Series 7000 Railroad, Standard Bore Flanged Ball Valves

Series 7000 & 9000 Ball Valves

ICV & ICVA Flanged Injection Control Valves 2 (DN 50) Type Installation, Maintenance and Operating Instructions

REACTOR DISCHARGE VALVES S & DIGESTER BLOW VALVES SB & 5300SB B FLANGED BALL VALVES

SERIES 2 4 (DN ) 6300, 2 6 (DN ) 6150, 6 (DN 150) 5300 & 530S, 6 & 8 (DN 150 & 200) 5150 BALL VALVES

JT SERIES ANGLE STEM TANK BOTTOM BALL VALVE DN25 DN150. Installation, Maintenance and Operating Instructions

3-Piece Ball Valves Series 4000 Model A

VALUE-LINE 3-Piece Ball Valves Series 3A & 3C 1/2 2 (DN15-50) Installation, Maintenance and Operating Instructions

3-Way Flanged Ball Valves Series AM150FD & AM150FB Model A

CLINCHER 2-Piece Thread-end Ball Valves Series 2000

3-Way Flanged Ball Valves 6, 8 & 10 (DN150, 200 & 250) Model D Series DM150FD 6 & 8 (DN150 & 200) Series DM150FB Model D

3-Way Flanged Ball Valves 12 (DN300) Series DM150FD Model A

3-Way Flanged Ball Valves Series AM150FD & AM150FB Model A 3 & 4 (DN80 & 100) Class 150. Installation, Maintenance and Operating Instructions

REACTOR DISCHARGE VALVES S AND WITH MD, QA AND QC CONVERSIONS AND ESSD STEM SEAL OPTION

Installation, Maintenance and Operating Instructions

Flanged Ball Valves Series 5000 Model B & C. Series 6000 Model B & C. ½ - 2 (DN15-50) Class 150 & 300. ½ 1 ½ (DN15-40) Class 150 & 300

ICV & ICVA Injection Control Valves Series 4000 Model C. Installation, Maintenance and Operating Instructions

Cryogenic Wafer-Sphere Butterfly Valves

Series 7000 & 9000 Ball Valves Non-Trunnion

VALVCON Universal ADC-Series Sealed Lead Acid Back-Up Battery Upgrade Kits. Installation, Maintenance and Operating Instructions

HAND WHEEL OPERATOR For cylinder actuators Types B1C_K/L/R and B1C_RK/RL/RR Installation, Maintenance and Operating Instructions

Installation, Maintenance and Operating Instructions

M1/M2 POCKET FEEDER. Compact design DESIGN FEATURES. Special ball and seat design. Large ball pocket capacity. Automatic cycling

VALV-POWR VALUE-LINE DOUBLE-OPPOSED PISTON ACTUATORS MODEL A. Installation, Maintenance and Operating Instructions

JAMESBURY EASYFLOW JT SERIES ANGLE STEM TANK BOTTOM VALVES

NELES BO SERIES BUTTERFLY VALVE FOR RECOVERY OF OXYGEN IN VACUUM PRESSURE SWING ADSORPTION (VPSA) PLANTS

NELES SOFT SEATED BALL VALVES, SEAT SUPPORTED, FULL AND REDUCED BORE, SERIES X

Wafer-Sphere 14" 20" Butterfly Valve. Installation, Maintenance and Operating Instructions

Wafer-Sphere Butterfly Valve Series K815W, K815L, K830W & K830L Model A Cryogenic

Delayed Coker Switch Ball Valve

MAPAG Butterfly valve - Type BK For cryogenic applications. Installation, Maintenance and Operating Instructions

Wafer-Sphere Butterfly Valve Series 835W & 835L (DN )

IMO-200EN 09/2010. Trunnion mounted forged ball valves Model FF and GG. Installation, Maintenance and Operating Instructions IMO-200EN 09/2010

Installation, Maintenance and Operating Instructions

Wafer-Sphere Butterfly Valves

Wafer-Sphere Butterfly Valve Model C

Wafer-Sphere, High Performance Butterfly Valves

IMO -272 ISSUE 6/95 SERIES MBV, METAL-SEATED FLANGED BALL VALVES 3", 4" AND 6" CLASS 150 AND 300 STANDARD BORE, MB AND MC

K815W, K815L, K830W, K830L, K860W, & K860L Wafer-Sphere Butterfly Valve. Installation, Maintenance and Operating Instructions

EMERGENCY SHUTOFF AND FIRESAFE VALVES FIGURE 1075

PNEUMATIC CYLINDER UNIT. Series CP Installation, Maintenance and Operating Instructions

VALV-POWR SERIES VPVL MODEL D DOUBLE-ACTING AND SPRING-RETURN RACK- AND-PINION COMPACT PNEUMATIC ACTUATORS

EMISSION-PAK SERIES 7000 AND 9000 BALL VALVES

NELES RE2-SERIES V-PORT SEGMENT VALVE

NELES METAL SEATED BALL VALVES, SEAT SUPPORTED, FULL AND REDUCED BORE, SERIES X

1/4" 2" (DN 8 50) A-STYLE MODEL D THREADED END 2000 CWP BALL VALVE

Polymerization High cycle valves

Control Valves Globe 3-way, Diverting & Mixing type Series GW Installation, Maintenance and Operating Instructions

CAPPING VALVE. Series PZ Installation, Maintenance and Operating Instructions

Valv-Powr VPVL Mod C Value-Line Double-Opposed Piston Actuators. Installation, Maintenance and Operating Instructions

1/4 2 (DN 8 50) ELIMINATOR 2000 CWP AND ASME CLASS 600 THREADED END BALL VALVE

Control Valves Globe 3-way, Diverting & Mixing type Series GW Installation, Maintenance and Operating Instructions

1/4" 2" (DN 8 50) Clincher Series 2000 Threaded-End Ball Valves

NELES RE-SERIES V-PORT SEGMENT VALVE

Jamesbury High-Performance Actuators. Maximizing cycle life. Lowering Costs.

Ceramic Ball Valves. Series E2 and E6. Installation, Maintenance and Operating Instructions

NELES TRUNNION MOUNTED BALL VALVE, FULL BORE Series XH Installation, Maintenance and Operating Instructions

Series VC Pneumatic cylinder actuators

SERIES 835 PROCESS-RATED CLASS 150 WAFER-SPHERE HIGH-PERFORMANCE BUTTERFLY VALVES

JAMESBURY VALVCON QX-SERIES ELECTRIC ACTUATOR

PNEUMATIC CYLINDER UNIT. Series CS Installation, Maintenance and Operating Instructions

Control Valves Globe-Unbalanced Single Seated, Series GU Installation, Maintenance and Operating Instructions

Double Acting Cylinder Actuator Series VC Installation, Maintenance and Operating Instructions

Control Valves Globe-Omega, Multistage trim Series GM Installation, Maintenance and Operating Instructions

1/4" 2" (DN 8 50) ELIMINATOR 2000 CWP AND ANSI CLASS 600 THREADED END BALL VALVE

JAMESBURY VALVCON ESR-SERIES ELECTRONIC SPRING RETURN ELECTRIC ACTUATOR

MANUAL GEAR ACTUATORS

Steam reforming. The product is then ready to be used in refinery applications or for synthesis of ammonia or methanol. APPLICATION REPORT CLOSEOPEN

NELES RA SERIES V-PORT SEGMENT VALVE

5000/6000 SERIES BALL VALVES INSTALLATION - MAINTENANCE MANUAL

VALV-POWR SERIES VPVL MODEL C DOUBLE-ACTING AND SPRING-RETURN RACK- AND-PINION COMPACT PNEUMATIC ACTUATORS

6D15 DIGESTER CAPPING VALVES

Pneumatic Cylinder Actuators Series B1C Installation, Maintenance and Operating Instructions

METSO NELES HIGH PERFORMANCE TRIPLE ECCENTRIC DISC VALVE, METAL SEATED SERIES BW

4" 9RET/REL FULL-PORT BOTTOM- OUTLET VALVES (AAR NO. E079011)

Jamesbury Wafer-Sphere World s Best Gate Crasher

Crude and vacuum distillation

FRP Ball Valves INSTALLATION & MAINTENANCE MANUAL

Installation, Operation and Maintenance Guide II NIBCO High Performance Butterfly Valves Series 6822 and 7822

BETTIS SERVICE INSTRUCTIONS DISASSEMBLY AND REASSEMBLY FOR CB DOUBLE ACTING SERIES PNEUMATIC ACTUATORS

NELES R-SERIES SEGMENT VALVE Flanged RE and Wafer RE1

Fisher TBX Hydro Plug Fixture

ADVANCED AUTOMATION SYSTEM. Installation, Maintenance and Operating Instructions

PFA LINED BALL VALVES Installation, Operation and Maintenance Manual

BETTIS SERVICE INSTRUCTIONS DISASSEMBLY AND REASSEMBLY FOR CB-SR SPRING RETURN SERIES PNEUMATIC ACTUATORS

LOW PRESSURE BALANCED VALVE DIAPHRAGM BALANCED

Scope. Applicability. Caution. I & M CV3000 Series. Storage. Installation & Maintenance Instructions for Marwin CV3000 Series Three Piece Ball Valves

PNEUMATIC CYLINDER ACTUATORS, SERIES B1

Fisher CVX Hydro Plug Fixture

NELES HIGH CAPACITY TRIPLE ECCENTRIC DISC VALVE, METAL SEATED NELDISC SERIES L6

FEATURES. 3 position models can be equipped with special 180 operators offering two 90 steps.

Series A Installation, Maintenance and Operating Instructions

Installation, Operation, and Maintenance Manual

V-port segment valves Series R1L Titanium Series R21L Titanium Series R2_S High consistency. Installation, Maintenance and Operating Instructions

Transcription:

Railroad Ball Valves Series 5REB3 4" (DN 00) Installation, Maintenance and Operating Instructions IMO-R4 /05

IMO-R4 Table of Contents GENERAL.................................... 3. Scope of the Manual........................ 3. Valve Markings............................. 3.3 Safety Precautions.......................... 3 TRANSPORTATION AND STORAGE............. 3 3 INSTALLATION............................... 3 3. General..................................... 3 3. Installing on the Tank car.................... 4 3.3 Commissioning............................. 4 3.4 Steam Jacket Connections................... 4 4 MAINTENANCE............................... 4 4. General..................................... 4 4. Disassembly................................ 4 4.3 Checking Parts.............................. 5 4.4 Assembly................................... 5 4.5 Pressure Testing the Valve................... 6 5 SERVICE KITS................................. 6 6 SERVICE / SPARE PARTS....................... 7 7 HOW TO ORDER.............................. 7 8 EXPLODED VIEW & PART LIST................. 8 READ THESE INSTRUCTIONS FIRST! These instructions provide information about safe handling and operation of the valve. If you require additional assistance, please contact the manufacturer or manufacturer's representative. Addresses and phone numbers are printed on the back cover. See also www.metso.com/valves for the latest documentation. SAVE THESE INSTRUCTIONS! Subject to change without notice. All trademarks are property of their respective owners.

IMO-R4 3 GENERAL. Scope of the Manual This instruction manual contains important information regarding the installation, operation and maintenance of the Jamesbury 4" (DN 00) Series 5REB3 Railroad Ball Valves. Please read these instructions carefully and save them for future reference. AS THE USE OF THE VALVE IS APPLICATION SPECIFIC, A NUMBER OF FACTORS SHOULD BE TAKEN INTO ACCOUNT WHEN SELECTING A VALVE FOR A GIVEN APPLICATION. THEREFORE, SOME OF THE SITUATIONS IN WHICH THE VALVES ARE USED ARE OUTSIDE THE SCOPE OF THIS MANUAL. IF YOU HAVE ANY QUESTIONS CONCERNING THE USE, APPLICATION OR COMPATIBILITY OF THE VALVE WITH THE INTENDED SERVICE, CONTACT METSO FOR MORE INFORMATION.. Valve Markings The valve has an identification plate attached to the body cap (see Figure ). SEAT AND BODY RATINGS! THE PRACTICAL AND SAFE USE OF THIS PRODUCT IS DETERMINED BY BOTH THE SEAT AND BODY RATINGS. READ THE IDENTIFICATION PLATE AND CHECK BOTH RATINGS. THIS PRODUCT IS AVAILABLE WITH A VARIETY OF SEAT MATERIALS. SOME OF THE SEAT MATERIALS HAVE PRESSURE RATINGS THAT ARE LESS THAN THE BODY RATINGS. ALL OF THE BODY AND SEAT RATINGS ARE DEPENDENT ON VALVE TYPE AND SIZE, SEAT MATERIAL, AND TEMPERATURE. DO NOT EXCEED THESE RATINGS! BEWARE OF BALL MOVEMENT! KEEP HANDS, OTHER PARTS OF THE BODY, TOOLS AND OTHER OBJECTS OUT OF THE OPEN FLOW PORT. LEAVE NO FOREIGN OBJECTS INSIDE THE TANK CAR. WHEN THE VALVE IS ACTUATED, THE BALL FUNCTIONS AS A CUTTING DEVICE. FAILURE TO DO THIS MAY RESULT IN DAMAGE OR PERSONAL INJURY! TRANSPORTATION AND STORAGE Check the valve and the accompanying devices for any damage that may have occurred during transport. Store the valve carefully. Storage indoors in a dry place is recommended. Identification plate markings:. Ball/Stem material. Valve catalog code 3. Seat Material 4. Body Material 5. Maximum operating pressure 6. Maximum/minimum shut-off pressure/temperature 7. Approvals/Special Service marking 8. Model 9. Assembly date.3 Safety Precautions Figure Identification Plate DO NOT EXCEED THE VALVE PERFORMANCE LIMITATIONS! EXCEEDING THE PRESSURE OR TEMPERATURE LIMITATIONS MARKED ON THE VALVE IDENTIFICATION PLATE MAY CAUSE DAMAGE AND LEAD TO UNCONTROLLED PRESSURE RELEASE. DAMAGE OR PERSONAL INJURY MAY RESULT. Do not remove the flow port protectors until installing the valve. Move the valve to its intended location just before installation. The valve is usually delivered in the open position. If the valve(s) will be stored for a long period, follow the recommendations in IMO-S to maintain the valve s integrity. 3 INSTALLATION 3. General Remove the flow port protectors and check that the valve is clean inside. Clean valve if necessary. Flush the tank car carefully before installing the valve. Foreign objects, such as sand or pieces of welding electrodes, will damage the ball and seats.

4 IMO-R4 3. Installing on the Tank car THE VALVE SHOULD BE TIGHTENED ON FLANGES USING APPROPRIATE GASKETS AND FASTENERS COMPATIBLE WITH THE APPLICATION, AND IN COMPLIANCE WITH APPLICABLE PIPING CODES AND STANDARDS. CENTER THE FLANGE GASKETS CAREFULLY WHEN FITTING THE VALVE ON FLANGES. DO NOT ATTEMPT TO CORRECT ANY MISALIGNMENT BY MEANS OF FLANGE BOLTING! Open the valve The valve offers tightness in both directions; however, the large diameter flange must be installed towards the tank car. Refer to the Section 4, MAINTENANCE for stem seal adjustment. If there is weepage past the stem seals upon installation, it means the valve may have been subject to wide temperature variations in shipment. Leak-tight performance will be restored by a simple stem seal adjustment described in the MAINTENANCE section. 3.3 Commissioning Ensure that there is no dirt or foreign objects left inside the valve or tank car. Flush the tank car carefully. Make sure that the valve is fully open when flushing. Ensure that all nuts, fittings, and cables are properly fastened. 3.4 Steam Jacket connections The steam-jacketed valve should be firmly attached to the tank car prior to fitting and welding of steam jacket connections. See Section 3.. The valve does not need to be disassembled prior to fitting or welding of steam jacket connections; however the valve must be in either the fully open or fully closed position. Carefully fit the steam lines to the valve's steam jacket connections. There should be no side loads on the valve's steam jacket connections due to misalignment of the steam line piping. Welded connections should only be made by ASME, Section IX qualified welders. Additional AAR welder qualifications may apply. An AAR certified welding inspector should inspect the steam jacket connection welds prior to pressure testing. Following approval of the welds, pneumatically test the pressure tightness of the steam jacket connections at 90-00psig (6. - 6.9barg). Cover the welds with a leak detection fluid and observe for three (3) minutes. Any indication of leakage is cause for rejection. 4 MAINTENANCE 4. General Good operating procedure requires periodic observation to ensure that the valve is functioning well. The frequency of observation will depend on the application. Routine maintenance consists of tightening the lower stem nut (item 5 in Figure 3) periodically to compensate for stem seal wear. Overhaul maintenance consists of replacing seats and seals. A standard service kit consisting of these parts may be obtained through your authorized Metso Distributor. NOTE: Service kits include stem seals (8), secondary stem seal (7), seats (5), and body seal (6). FOR YOUR SAFETY IT IS IMPORTANT THE FOLLOWING PRECAUTIONS BE TAKEN PRIOR TO REMOVAL OF THE VALVE FROM THE TANK CAR OR BEFORE ANY DISASSEMBLY:. WEAR ANY PROTECTIVE CLOTHING OR EQUIPMENT NORMALLY REQUIRED WHEN WORKING WITH THE FLUID INVOLVED.. DEPRESSURIZE THE TANK CAR AND CYCLE THE VALVE AS FOLLOWS: A. PLACE THE VALVE IN THE OPEN POSITION AND DRAIN THE TANK CAR. B. CYCLE THE VALVE TO RELIEVE RESIDUAL PRESSURE IN THE BODY CAVITY BEFORE REMOVAL FROM THE TANK CAR. C. AFTER REMOVAL AND BEFORE ANY DISASSEMBLY, CYCLE THE VALVE AGAIN SEVERAL TIMES. 4. Disassembly NOTE: lf complete disassembly becomes necessary; it is recommended to replace all seats and seals. Refer to the Service Kit information in Section 5, SERVICE KITS. NOTE: Always use original OEM parts to make sure that the valve functions properly.. Follow the steps in all the sections above before performing any work on the valve.. Open and close the valve and leave in the closed position. Valve needs to be raised above the working surface slightly because the ball protrudes slightly from either end of the valve when in the closed position. BE CAREFUL NOT TO SCRATCH THE BALL.

IMO-R4 5 3. Remove the outer stem nut (5) and handle (7). 4. Remove the lower stem nut (5) and indicator stop (). INDICATOR STOP ADJUSTMENTS ARE FACTORY SET. THEREFORE, THE INDICATOR STOPS ARE NOT INTERCHANGEABLE BETWEEN DIFFERENT VALVES. REPLACE THE SAME INDICATOR STOP TO THE VALVE IT WAS REMOVED FROM. FAILURE TO DO SO MAY RESULT IN UNCONTROLLED PRESSURE RELEASE. DAMAGE OR PERSONAL INJURY MAY RESULT. 5. Remove the compression ring (). 6. Mark the body joint flanges to assure correct body () and body cap () orientation during assembly. Remove body bolts (0) and remove body cap (). BE CAREFUL NOT TO SCRATCH THE BALL. 7. Remove the body seal (6) and the first seat (5) from the body cap. 8. If the ball (3) does not swing free from the body, with the ball in the fully closed position, use a piece of wood or some other soft material to gently tap the ball (from the end opposite the body cap). This should loosen the ball so that it can be pivoted free of the stem (4). 9. Carefully remove the bottom seat (5) out of the body, BEING CAREFUL NOT TO SCRATCH THE BODY SEALING SURFACE BEHIND THE SEAT. 0. Press the stem (4) from the top into the valve body and remove it through the body cap end of the body.. Remove and discard the bottom stem seal (8) and secondary stem seal (7), BEING CAREFUL NOT TO SCRATCH ANY SEALING SURFACES IN THE BODY.. Remove the top stem seals (8) for Model A version or V-ring set (4) for Model B version, BEING CAREFUL NOT TO SCRATCH ANY SEALING SURFACE INSIDE THE STEM BORE. NOTE: Refer to Section, Valve Markings. Your valve s mode version will be found in area 8 on the identification plate. 4. Replace any damaged parts. NOTE: When ordering spare parts not included in the spare part set, always include the following information: a. Valve catalog code from Identification plate. b. If the valve is serialized the serial number (stamped on the indentification plate). c. From Figure 3, the ballooned part number, part name and quantity required. 4.4 Assembly It is advisable to replace seats and seals if complete disassembly and reassembly become necessary. Service Kits can be found in Section 5.. Clean all valve components if not done previously.. Re-inspect all components for damage before reassembling the valve. Look for damage to the sealing areas of the stem, body and body cap; and look for wear in the bearing areas. Replace any damaged parts. 3. Carefully clean and polish the ball (3) sealing surface: It should be free of all scratches and grooves. 4. If the ball is slightly damaged, it may be possible to smooth the sealing surface with crocus cloth or equivalent. If deep scratches are present, replace the ball. 5. The valve needs to be raised above the working surface slightly because the ball protrudes slightly from either end of the valve when in the closed position. With the body cap side facing up, slide one valve seat (5) sideways into the body () to below the stem bore, and tilt it into place so that the proper surface (see Figure ) will be adjacent to the ball (3), being careful not to cut or scratch the seat. Stem must be centered in ball slot as shown at assembly Seats must be in this position at assembly 4.3 Checking Parts NOTE: For detailed instructions on visual inspection of critical components, refer to IMO-R6.. Clean all disassembled parts.. Check the stem (4) and ball (3) for damage. Pay particular attention to the sealing areas. 3. Check all sealing and gasket surfaces of the body () and body cap (). Figure Proper Seat and Ball Orientation 6. From inside the body (), insert the secondary stem seal (7) and the bottom stem seal (8) into the body (see Figure 3).

6 IMO-R4 7. Insert the stem (4) through the body cap end of the body (), being careful not to scratch the stem sealing surface; and press it gently up into the stem bore until resistance is felt from the bottom stem seal (8). 8. Hold the stem in place from the bottom and insert the top stem seals (8), for Model A version, or (4) for Model B version (see Figure 3 for proper v-ring orientation), over the stem (4). 9. Place compression ring () and indicator stop () over stem (4). NOTE: Make sure that the side of the indicator stop () marked BOTTOM is towards the compression ring (). 0. Place the lower stem nut (5) on the stem (4). NOTE: Make sure that the side of the stem nut (5) marked TOP is facing away from the indicator stop ().. Tighten the stem nut (5) until the stem seal(s) are fully seated. Then tighten an additional /8 to /4 turn.. Insert the ball (3) rotating it onto the stem (4) in the closed position. If necessary, turn the stem blade to align with the ball slot. Make certain that the stem blade is in the middle of the ball slot; i.e. equal distance from the ends of the slot. Rotate the ball if necessary (see Figure ). THE BALL WILL PROTRUDE FROM THE VALVE IN THE CLOSED POSITION. CARE MUST BE TAKEN TO PREVENT DAMAGING THE BALL SEALING SURFACE. NOTE: Make sure that the side of the stem nut (5) marked TOP is facing away from the handle (7). 8. Tighten the stem nut (5). 9. Cycle the valve slowly with a gentle back and forth motion building gradually to the full quarter turn. By cycling slowly, the seat lips will seat against the ball. Take care to avoid scratching the ball O.D. 4.5 Pressure Testing the Valve WHEN PRESSURE TESTING, EXERCISE CAUTION AND MAKE SURE ALL EQUIPMENT USED IS IN GOOD WORKING CONDITION AND APPROPRIATE FOR THE INTENDED PRESSURE. If the valve is to be tested prior to returning to service make sure the test pressures are in accordance with an applicable standard. When testing the valve for external tightness, keep the ball in the half open position. If testing the valve seat tightness, please contact Metso for advice. WHEN PERFORMING ANY TESTS, NEVER EXCEED THE MAXIMUM OPERATING PRESSURE OR MAXIMUM SHUT-OFF PRESSURE LISTED ON THE IDENTIFICATION PLATE! 3. Gently place the body seal (6) into the machined recess of the body (). 4. Place the second seat (5) into the body cap () with the proper surface adjacent to the ball, (see Figure ). 5. Place the body cap () in the body () being careful to properly orient body cap and body as originally assembled by matching orientation marks made prior to disassembly. Take care not to damage body seal (6) or seat (5) during this operation. 6. Lubricate the threads of body bolts (0) with NeverSeez or equivalent. Install body bolts (0) and tighten sequentially as shown in the diagram in (Figure 3), to the recommended values as shown in the BODY BOLT TORQUES chart in (Figure 3). 7. Aligning the slot in the handle with drive on the stem, lower handle (7) straight down in line with the valve stem (4) until it is completely engaged. Place the second stem nut (5) on the stem (4). 5 SERVICE KITS Service kits contain one pair of seats, a body seal, stem seals and a secondary stem seal. When ordering service kits for your 5REB3 valve order RKN-80TT or RKN-80MT depending on your valve s seat material. Refer to Section., Valve Markings and check area 3 on your valve s identification plate to determine the correct seat material for your valve.

IMO-R4 7 6 SERVICE / SPARE PART For further information on spare parts and service or assistance visit our web-site at www.metso.com/valves. NOTE: When ordering spare parts not included in the spare part set, always include the following information: a. Valve catalog code from identification plate, b. If the valve is serialized the serial number (from identification plate) c. From Figure 3, the ballooned part number, part name and quantity required. 7 HOW TO ORDER 5REB3 BALL VALVES Carbon steel body with 36 stainless steel trim: 4" 5REB3HBTT 4" 5REB3SJHBTT 36 stainless steel body and trim: 4" 5REB336HBTT 4" 5REB3SJ36HBTT SJ signifies valve with integral steam jacket. For filled PTFE seats, simply substitute MT for TT

8 IMO-R4 0 5 6 5 3 3 4 8 7 PARTS LIST ITEM PART NAME QTY Body Body Cap 3 Ball 4 Stem 5 Seat 6 Body Seal 7 Secondary Stem Seal 8 Stem Seal * 0 Hex Head Cap Screw 4 Indicator Stop 3 Socket Head Set Screw 5 Stem Nut 7 Handle Compression Ring Identification Tag 3 Drive Screw 4 Upper Stem Seal Set* *Model A versions use #8 for stem sealing. Model B versions use one #8 and one set of #4 for stem sealing. Service Kit includes both configurations, therefore a leftover #8 or #4 is expected. BODY BOLT TORQUES Bolt Mat l Bolt ID Body Cap Ass y.torque FT LBS (N m) 0 B7 80 90 (44 58) CAP SCREW TIGHTENING SEQUENCE 3 4 OR 8 5 7 4 3 5 BODY CAP Figure 3 Exploded View & Part List Subject to change without prior notice. Metso Flow Control Inc. Europe, Vanha Porvoontie 9, P.O. Box 304, FI-030 Vantaa, Finland. Tel. +358 0 483 50. Fax +358 0 483 5 North America, 44 Bowditch Drive, P.O. Box 8044, Shrewsbury, MA, 0545, USA. Tel. + 508 85 000. Fax + 508 85 87 South America, Av. Independência, 500-Iporanga, 8087-0, Sorocaba-São Paulo, Brazil. Tel. +55 5 0 9700. Fax +55 5 0 9748/49 Asia Pacific, Haw Par Centre #06-0, 80 Clemenceau Avenue, Singapore 399. Tel. +65 65 0. Fax +65 650 0830 China, /F, China Youth Plaza, No.9 North Rd of East 3rd Ring Rd, Chaoyang District, Beijing 0000, China. Tel. +86 0 6566 6600. Fax +86 0 6566 583 Middle East, Roundabout 8, Unit AB-07, P.O. Box 775, Jebel Ali Freezone, Dubai, United Arab Emirates. Tel. +97 4 883 6974. Fax +97 4 883 6836 www.metso.com/valves