Horns Rev 3 & Kriegers Flak Platform Interfaces Technical Dialog Meeting 10 September 2013 HR3 and Krigers Flak - AC platforms Technical Dialog Meeting 10 September 2013 1
Agenda 1. Location of platforms at the wind parks 2. Single line diagrams 3. Platform layout 4. Space for concessionaire on the platform 5. What concessionaire, operate and maintain on the platform 6. J-tubes and cable routing 7. Metering 8. Auxiliary power supply for concessionaire 9. Earthing resistors & earthing/bonding of equipment 10. Loading of transformers 11. Communication to shore 12. Back-up diesel generator 13. Cooperation agreements HR3 and Krigers Flak - AC platforms Technical Dialog Meeting 10 September 2013 2
1. Location of platforms at the wind parks - Krigers Flak KFA N Coordinates KFA (200 MW) Easting: 748.250 Nothing: 6.103.800 KFB (400 MW) Easting: 755.000 Nothing: 6.103.100 KFB The two green circles indicate the position of the offshore platforms. HR3 and Krigers Flak - AC platforms Technical Dialog Meeting 10 September 2013 3
1. Location of platforms at wind park Horn Rev 3 N Coordinates in WGS84, UTM zone 32N Easting: 417.400 Northing: 6.172.400 HR3 and Krigers Flak - AC platforms Technical Dialog Meeting 10 September 2013 4
1. Single line diagrams 400 MW platform HR3 and Krigers Flak - AC platforms Technical Dialog Meeting 10 September 2013 5
1. Single line diagrams 200 MW platform HR3 and Krigers Flak - AC platforms Technical Dialog Meeting 10 September 2013 6
3. Platform layout HR3 and Krigers Flak - AC platforms Technical Dialog Meeting 10 September 2013 7
3. Platform layout main deck HR3 and Krigers Flak - AC platforms Technical Dialog Meeting 10 September 2013 8
3. Platform layout mezzanine deck HR3 and Krigers Flak - AC platforms Technical Dialog Meeting 10 September 2013 9
3. Platform layout roof deck HR3 and Krigers Flak - AC platforms Technical Dialog Meeting 10 September 2013 10
4. Space for concessionaire on the platform Rooms for MV switchgear; Room for SCADA and communication equipment Cable routes (trays) for MV cables Space for earthing resistors (close to auxiliary power transformers) Space for splice boxes for optical fibers from the wind turbines Space for radars, VHF-, Tetra-, GSM-antennas etc. Space on met-mast for weather transducers Space is not available/foreseen for: - Emergency power for the wind park (diesel generator, step-up transformer and reactor) - MV reactor for compensation of the MV park grid HR3 and Krigers Flak - AC platforms Technical Dialog Meeting 10 September 2013 11
5. What concessionaire owns, operate and maintain on the platform MV switchgear; (2 or 3 sections) with bays for: array cables and HV/MV transformers Earthing resistors: 2 at 200 MW platform and 3 at 400 MW platform MV Surge arrestors except for HV/MV transformers Communication and SCADA for control and monitoring of wind park, MW switchgear and park controller Sub-distribution panels for 220 V AC, 220 V DC for the MW switchgear and SCADA and communication system Splice boxes for terminating optical fibers from the wind turbines J-tubes in caissons for MV cables *) Cable trays for MV cables incl. supports *) *) A lump sum to be paid HR3 and Krigers Flak - AC platforms Technical Dialog Meeting 10 September 2013 12
6. J-tubes and cable routing J-Tubes: Following numbers of J-tubes will be installed on the platform: At 400 MW platform: MV = 33 kv: 12 J-tubes MV = 66 kv: 6-9 J-tubes At 200 MW platform: MV = 33 kv: 6 J-tubes MV = 66 kv: 3-4 J-tubes The J-tubes will have an inner diameter of 315 mm (14 ) The bending radius will be min. 2200 m (app. 15 times an outer cable diameter of 150 mm) Cable routing: Cable trays will be installed for routing of the array cable from the hang offs to the switchgear Cable between MV Switchgear and hang-off? HR3 and Krigers Flak - AC platforms Technical Dialog Meeting 10 September 2013 13
7. Metering The metering system to fulfill the requirements stated in Energinet.dk s code D2 Tekniske krav til måling which can be down loaded from Energinet.dk s home page via: www.energinet.dk/da/el/forskrifter/tekniske-forskrifter/sider/forskrifter-forsystemdrift.aspx Main and back-up meters will be installed by Energinet.dk. Current measurement: from current transformers built into the MV bushings of the HV/MV transformers Voltage measurement: from voltage transformers connected to the MV busbars Meters will be installed by Energinet.dk on the 0.4 kv side of each auxiliary power transformers for measurement of the energy used for the auxiliary power on the platform HR3 and Krigers Flak - AC platforms Technical Dialog Meeting 10 September 2013 14
8. Auxiliary power supply for concession owner For MV switchgear: 230 V AC secured and 220 V DC (redundant) For SCADA/communication: 230 V AC secured and 220 V DC (redundant) All cables between ENDK s distribution panels and concessionaire s equipment to be installed by concession owner HR3 and Krigers Flak - AC platforms Technical Dialog Meeting 10 September 2013 15
9. Earthing resistors & earthing/bonding Earthing resistors Earthing resistors shall be installed at the star point of the MV side of each auxiliary transformer to reduce earth current in the MV grid. Concession owner is responsible for the design of the resistance, procurement and installation of the earthing resistors. If concession owner decide not to install earthing resistors then will the transformer star point be earthed directly. Earthing/bonding To be established in accordance with ENDK s Technical Standard ETS-04 Earthing, bonding and lighting protection ETS can be down loaded from: www.energinet.dk/en/om-os/indkoeb/technical-standards/sider/technicalstandards.aspx HR3 and Krigers Flak - AC platforms Technical Dialog Meeting 10 September 2013 16
10. Loading of transformers 400 MW platform (Grid connection transmission capacity: 400 MW) The maximum loading of the transformers is: with 3 transformers in operation: 130 MW ± 10 MW (normal operation) with 2 transformers in operation: 200 MW ± 5 MW The switchgear to be designed to allow for switching between 2 or 3 transformers with the requested maximum loading of the transformers 200 MW Platform(Grid connection transmission capacity: 200 MW) The maximum loading of the transformers is: with 2 transformers in operation: One transformer in operation: 100 MW ± 40 MW (normal operation) 200 MW ± 5 MW The switchgear to be designed to allow for switching between 2 or 1 transformers HR3 and Krigers Flak - AC platforms Technical Dialog Meeting 10 September 2013 17
11. Communication to shore Fiber optic cable with 24 fibers will be installed between the platform and the cable station at shore. Up to 3 optic fiber pairs can be rented on commercial condition Back up communication will be established to shore by LOS communication link Limited capacity on the back-up link can be rented on commercial conditions. HR3 and Krigers Flak - AC platforms Technical Dialog Meeting 10 September 2013 18
12. Back-up diesel generator ENDK will install 2 back-up diesel generators on the platform; - one rated app. 100 kva for domestic loads - one rated app. 600 kva for supply of platform crane and fire pumps ENDK s back-up diesel will not be designed for back-up supply for the wind park. HR3 and Krigers Flak - AC platforms Technical Dialog Meeting 10 September 2013 19
13. Cooperation agreements An cooperation agreement shall be established between ENDK and concessionaire. The agreement is to cover following issues during the installation period (but limited to): Exchange of technical data Assignment of MV switchgear contract Access to platform Test and commissioning (onshore and offshore) Marine coordination Safety Time schedule HR3 and Krigers Flak - AC platforms Technical Dialog Meeting 10 September 2013 20