Horns Rev 3 & Kriegers Flak Platform Interfaces

Similar documents
Power Transmission Solutions Grid Access

ABB Wind Power Solution

This tender addendum and clarification forms part of the Request for Proposal and Contract documents, and modifies them as follows:

132/11 kv, 25 MVA MOBILE SUBSTATION

Grid Integration of Large Scale Wind and Solar

Hans Kvarme Nexans Norway AS. Offshore vindkraft Oslo, 14. desember 2010

Offshore Wind: Grid Connection & Technology Options. Dietmar Retzmann Focus on. CO 2 Reduction Green Energy Megacities Security of Supply

Engineering Offshore Wind

Schedules 1 to 4, Lot B: Extension of the Lessos Substation

Article Approach and examples from Denmark

Diversifying into Marine Energy. ABB March 2015

Peter Lundberg, Global Product Manager, November 2016 ABB Power Systems Offshore wind connection

Technical Specifications (In-Cash Procurement)

بتروتك للمقاوالت PETROTEC

Protection with distributed generation, experience with the Mont-Soleil wind farm project

Mikael Dahlgren, ABB Corporate Research, 02 December 2011 ABB Technology providers perspective Energidagen Chalmers Energyinitiative

Fred. Olsen POWER GENERATION AT SEA. Autonomous Sea Power. Fred.Olsen Ltd.

Offshore Wind Connections HVDC for Offshore Grids

DAY 2 Breakouts II and III. POWER CABLE Day 2

Submarine Power Cables

Power From Shore: An introduction to HVDC Light Offshore

ABB POWER SYSTEMS CONSULTING

Offshore Wind China 2010 Bergen, 15th March Olivier Angoulevant Nexans Norway AS

TECHWARE is partner of CONSORZIO ITALIA 2000 (CI2000) Leader in the world for the HHV/HV overhead lines TCW and CI2000 a global

SYSTEM INTEGRATION. Railway and urban transport electrification Energy-efficient and reliable solutions

Krzysztof Rudion. Otto-von-Guericke Universität Magdeburg , Bremerhaven

The relative site locations are detailed below with the main headquarters circled in blue and the new Fiji Airways Aviation Academy in green.

Page 1 of 5. Project : CATERPILLAR CM GENSETS PROJECT (RADIATOR COOLING) 2 x 16CM32, 6.3 kv, 50 Hz. TUS(S)PL Supply. Customer Supply DESCRIPTION

Peter Lundberg, ABB HVDC, Nov 2016 HVDC Light - Power from shore. ABB Group November 16, 2016 Slide 1 1JNL A

Introduction CONTENT Future of offshore wind energy in Europe Offshore wind energy in Spain Alternatives to the transmission system to the grid Compar

OFFSHORE WIND FEASIBILITY STUDY APPENDICES Appendix C.2 Subsea Cable Data Sheets

RES Grid Integration Offshore Wind

Submarine Cable Solutions, Laying and Challenges. Submarine Solutions from the Specialist 15-Apr-11 / 1

HVDC Innovative Technology for Smart Grids and Super Grids. Wilfried Breuer CEO Power Transmission Solutions, Siemens Energy Sector

HIGH POWER RECTIFIER SYSTEMS

Versatile and Powerful. Liduro Wind Frequency Converter System

Service and Rehabilitation Electrical Power Systems

Cables Connect, cover and forget

Switchgear Skid, C1192

Modular Standardized Electrical and Control Solutions for Fast Track Projects

PRAGATI ENGINEERING COLLEGE

Energy storage projects for smart distribution grids

Wind Energy in the Southeast: Offshore and Land-Based Potential

Onshore and onboard. Looking at the shoreside. for standardization in shore-to-ship power

MVDC PLUS Managing the future grid

DISTRIBUTION TRANSFORMERS CATALOGUE

We are IntechOpen, the world s leading publisher of Open Access books Built by scientists, for scientists. International authors and editors

SeaFloat SCC-A65. Technical Solution Information. Unrestricted. Vers.

PLANNING, ELIGIBILITY FOR CONNECTION AND CONNECTION PROCEDURE IN EMBEDDED GENERATION

HVDC Solutions. for Integration of the Renewable Energy Resources. Marcus Haeusler HVDC Lead Engineer. siemens.com/energy/power-transmission

The Smart Way. HVDC PLUS One Step Ahead. Answers for energy.

RULE 21 GENERATING FACILITY INTERCONNECTION APPLICATION SMUD s Distribution System - (SMUD FORM 2655)

Kriegers Flak / Østersø Konference 2017

Title Electrical Technical Maintenance Coding System. Reference Number PMP 01 (RIC Standard: EP SP)

Superconducting Cable Systems for Urban Areas AmpaCity Project - Germany

PPMV, South Africa, Manie Jooste, 22 May ABB Modular Systems

Experience on Technical Solutions for Grid Integration of Offshore Windfarms

CGMCOSMOS. Reliable innovation. Personal solutions. Fully gas insulated modular and compact (RMU)system.

ABB Next Level Big shift in power attractive opportunities

Sales Application Engineering Europe & Russia. Application Engineering Training. Course description and Curriculum

NOTICE TO MARINERS 17 th of May 2017 DUDGEON OFFSHORE WIND FARM CONSTRUCTION WORKS

ERDF an actor in RTE "IPES" PROJECT for insertion of MV wind generation in the French Electrical System Operation.

REQUEST FOR PROPOSALS FOR THE ESTABLISHMENT OF SOLAR PV POWER PLANT ON BUILD, OWN AND OPERATE BASIS. International Competitive Bidding (ICB)

IEEE PES General Meeting, Minneapolis, July 25-29, 2010 HVDC & FACTS Subcommittee. latest Technology Developments and Projects Dietmar Retzmann

1x New Siemens SGT MW 50 / 60Hz (DF) Gas Turbine Mobile Generator Set

MILESTONE SUMMARY REPORT Project funding provided by customers of Xcel Energy through a grant from the Renewable Development Fund

NEPAL ELECTRICITY AUTHORITY (An Undertaking of Government of Nepal)

BU Power Conversion, 03/2013 ABB solar inverters Product portfolio. ABB Group June 19, 2013 Slide 1

SMA Utility Power System

Enabling the power of wind. Competence and expertise for wind power customers

Engineers Ireland Site Visit 23 rd March 2010

Getting Smart Evolution to the Smart Grid April 2008

UniPack compact secondary substations (CSS) upto 36 kv For safe, reliable and space saving power distribution solutions

KONČAR Group. Research and Development

Generation Interconnection Facilities Study For

ABB central inverters PVS to 2091 kva

ABB Wind Industry Sector Initiative Greengrowth Tallinn, 16 September 2011 Cutting-Edge Wind Energy Solutions Challenges and Solutions ABB Viewpoint

RPS Station. Solutions for the North American Solar Market

ABB central inverters PVS to 2000 kva

OBJECTIVES LCC HVDC SYSTEMS VSC HVDC SYSTEMS COMMON EQUIPMENT DIFFERENT OPTIONS ECONOMIC IMPACTS CONCLUSIONS

voltage switchgear ZX ABB ZX Family 1

Connection of Power Generating Modules to DNO Distribution Networks in accordance with EREC G99

MOBILE SUBSTATION GUIDE

Integrating Embedded Generation into distribution networks. Mobolaji Bello and Dr Clinton Carter-Brown Eskom Holdings Limited South Africa

Grid connection of Offshore

Desert Solar in Saudi Arabia Conference Riyadh 13 th November The Impact of desert conditions on inverter performance and lifetime

ABB Group August 27, 2010 Slide 1

Fred. Olsen POWER GENERATION AT SEA. Autonomous Sea Power «POWER AND GATEWAY SUBSEA» Fred.Olsen Ltd.

SF 6 gas insulated RMU SafePlus 24 kv. ABB SafePlus 24 kv SF6 gas insulated RMU 1

2.0 TECHNICAL SPECIFICATION:!

Battery Energy Storage

COMMISSION REGULATION (EU) / of XXX

Functional Specification Revision History

Vattenfall Capital Markets Day 2009

Brochure. Modular Systems wind portfolio Power Collection and Grid Connection products

DC Substation Solutions For Metal Processing Applications

The Smart Way HVDC PLUS One Step Ahead Answers for energy.

TENDER DOCUMENT PART-II

Kontakt. Turnkey solutions for hydropower plants An overview of the ABB portfolio

Neart na Gaoithe Meet the buyer event. Chris Whitehead Facilitator

Transcription:

Horns Rev 3 & Kriegers Flak Platform Interfaces Technical Dialog Meeting 10 September 2013 HR3 and Krigers Flak - AC platforms Technical Dialog Meeting 10 September 2013 1

Agenda 1. Location of platforms at the wind parks 2. Single line diagrams 3. Platform layout 4. Space for concessionaire on the platform 5. What concessionaire, operate and maintain on the platform 6. J-tubes and cable routing 7. Metering 8. Auxiliary power supply for concessionaire 9. Earthing resistors & earthing/bonding of equipment 10. Loading of transformers 11. Communication to shore 12. Back-up diesel generator 13. Cooperation agreements HR3 and Krigers Flak - AC platforms Technical Dialog Meeting 10 September 2013 2

1. Location of platforms at the wind parks - Krigers Flak KFA N Coordinates KFA (200 MW) Easting: 748.250 Nothing: 6.103.800 KFB (400 MW) Easting: 755.000 Nothing: 6.103.100 KFB The two green circles indicate the position of the offshore platforms. HR3 and Krigers Flak - AC platforms Technical Dialog Meeting 10 September 2013 3

1. Location of platforms at wind park Horn Rev 3 N Coordinates in WGS84, UTM zone 32N Easting: 417.400 Northing: 6.172.400 HR3 and Krigers Flak - AC platforms Technical Dialog Meeting 10 September 2013 4

1. Single line diagrams 400 MW platform HR3 and Krigers Flak - AC platforms Technical Dialog Meeting 10 September 2013 5

1. Single line diagrams 200 MW platform HR3 and Krigers Flak - AC platforms Technical Dialog Meeting 10 September 2013 6

3. Platform layout HR3 and Krigers Flak - AC platforms Technical Dialog Meeting 10 September 2013 7

3. Platform layout main deck HR3 and Krigers Flak - AC platforms Technical Dialog Meeting 10 September 2013 8

3. Platform layout mezzanine deck HR3 and Krigers Flak - AC platforms Technical Dialog Meeting 10 September 2013 9

3. Platform layout roof deck HR3 and Krigers Flak - AC platforms Technical Dialog Meeting 10 September 2013 10

4. Space for concessionaire on the platform Rooms for MV switchgear; Room for SCADA and communication equipment Cable routes (trays) for MV cables Space for earthing resistors (close to auxiliary power transformers) Space for splice boxes for optical fibers from the wind turbines Space for radars, VHF-, Tetra-, GSM-antennas etc. Space on met-mast for weather transducers Space is not available/foreseen for: - Emergency power for the wind park (diesel generator, step-up transformer and reactor) - MV reactor for compensation of the MV park grid HR3 and Krigers Flak - AC platforms Technical Dialog Meeting 10 September 2013 11

5. What concessionaire owns, operate and maintain on the platform MV switchgear; (2 or 3 sections) with bays for: array cables and HV/MV transformers Earthing resistors: 2 at 200 MW platform and 3 at 400 MW platform MV Surge arrestors except for HV/MV transformers Communication and SCADA for control and monitoring of wind park, MW switchgear and park controller Sub-distribution panels for 220 V AC, 220 V DC for the MW switchgear and SCADA and communication system Splice boxes for terminating optical fibers from the wind turbines J-tubes in caissons for MV cables *) Cable trays for MV cables incl. supports *) *) A lump sum to be paid HR3 and Krigers Flak - AC platforms Technical Dialog Meeting 10 September 2013 12

6. J-tubes and cable routing J-Tubes: Following numbers of J-tubes will be installed on the platform: At 400 MW platform: MV = 33 kv: 12 J-tubes MV = 66 kv: 6-9 J-tubes At 200 MW platform: MV = 33 kv: 6 J-tubes MV = 66 kv: 3-4 J-tubes The J-tubes will have an inner diameter of 315 mm (14 ) The bending radius will be min. 2200 m (app. 15 times an outer cable diameter of 150 mm) Cable routing: Cable trays will be installed for routing of the array cable from the hang offs to the switchgear Cable between MV Switchgear and hang-off? HR3 and Krigers Flak - AC platforms Technical Dialog Meeting 10 September 2013 13

7. Metering The metering system to fulfill the requirements stated in Energinet.dk s code D2 Tekniske krav til måling which can be down loaded from Energinet.dk s home page via: www.energinet.dk/da/el/forskrifter/tekniske-forskrifter/sider/forskrifter-forsystemdrift.aspx Main and back-up meters will be installed by Energinet.dk. Current measurement: from current transformers built into the MV bushings of the HV/MV transformers Voltage measurement: from voltage transformers connected to the MV busbars Meters will be installed by Energinet.dk on the 0.4 kv side of each auxiliary power transformers for measurement of the energy used for the auxiliary power on the platform HR3 and Krigers Flak - AC platforms Technical Dialog Meeting 10 September 2013 14

8. Auxiliary power supply for concession owner For MV switchgear: 230 V AC secured and 220 V DC (redundant) For SCADA/communication: 230 V AC secured and 220 V DC (redundant) All cables between ENDK s distribution panels and concessionaire s equipment to be installed by concession owner HR3 and Krigers Flak - AC platforms Technical Dialog Meeting 10 September 2013 15

9. Earthing resistors & earthing/bonding Earthing resistors Earthing resistors shall be installed at the star point of the MV side of each auxiliary transformer to reduce earth current in the MV grid. Concession owner is responsible for the design of the resistance, procurement and installation of the earthing resistors. If concession owner decide not to install earthing resistors then will the transformer star point be earthed directly. Earthing/bonding To be established in accordance with ENDK s Technical Standard ETS-04 Earthing, bonding and lighting protection ETS can be down loaded from: www.energinet.dk/en/om-os/indkoeb/technical-standards/sider/technicalstandards.aspx HR3 and Krigers Flak - AC platforms Technical Dialog Meeting 10 September 2013 16

10. Loading of transformers 400 MW platform (Grid connection transmission capacity: 400 MW) The maximum loading of the transformers is: with 3 transformers in operation: 130 MW ± 10 MW (normal operation) with 2 transformers in operation: 200 MW ± 5 MW The switchgear to be designed to allow for switching between 2 or 3 transformers with the requested maximum loading of the transformers 200 MW Platform(Grid connection transmission capacity: 200 MW) The maximum loading of the transformers is: with 2 transformers in operation: One transformer in operation: 100 MW ± 40 MW (normal operation) 200 MW ± 5 MW The switchgear to be designed to allow for switching between 2 or 1 transformers HR3 and Krigers Flak - AC platforms Technical Dialog Meeting 10 September 2013 17

11. Communication to shore Fiber optic cable with 24 fibers will be installed between the platform and the cable station at shore. Up to 3 optic fiber pairs can be rented on commercial condition Back up communication will be established to shore by LOS communication link Limited capacity on the back-up link can be rented on commercial conditions. HR3 and Krigers Flak - AC platforms Technical Dialog Meeting 10 September 2013 18

12. Back-up diesel generator ENDK will install 2 back-up diesel generators on the platform; - one rated app. 100 kva for domestic loads - one rated app. 600 kva for supply of platform crane and fire pumps ENDK s back-up diesel will not be designed for back-up supply for the wind park. HR3 and Krigers Flak - AC platforms Technical Dialog Meeting 10 September 2013 19

13. Cooperation agreements An cooperation agreement shall be established between ENDK and concessionaire. The agreement is to cover following issues during the installation period (but limited to): Exchange of technical data Assignment of MV switchgear contract Access to platform Test and commissioning (onshore and offshore) Marine coordination Safety Time schedule HR3 and Krigers Flak - AC platforms Technical Dialog Meeting 10 September 2013 20