EXCEPTION TO STANDARDS REPORT

Similar documents
WELCOME PUBLIC OPEN HOUSE FOR US-64 FROM THE SH-18 INTERSECTION EAST 6.5 MILES JANUARY 10TH, 2017 PAWNEE CITY HALL, 5:30 PM

Highway 18 BNSF Railroad Overpass Feasibility Study Craighead County. Executive Summary

800 Access Control, R/W Use Permits and Drive Design

Technical Memorandum. To: From: Date: October 14 th, 2018 Project #: 1302 Project Name: Subject: Distribution:

APPENDIX A Basis of Design and Design Criteria Memorandum

June WASHINGTON STATE DEPARTMENT OF TRANSPORTATION Alaskan Way Viaduct and Seawall Replacement Program Seattle, Washington

IMPROVEMENT CONCEPTS

Horizontal Alignment

IH 35 FEASIBILITY STUDY

ANDERSON PROPERTY SITE ANALYSIS

DESIGN STANDARDS SECTION DS 3 STREETS

Over-Dimensional Vehicle Restriction Study for US 129 in TN

Dixie Transportation Planning Office

2.0 Development Driveways. Movin Out June 2017

VDOT 2008 Road and Bridge Standards Section Transition Curves

The Design-Builder shall meet local road criteria provided by the local governing agencies.

Plainfield, Indiana Speed Limit Study

SC Highway 41 Existing Conditions

Corridor Sketch Summary

a. A written request for speed humps must be submitted by residents living along the applicable street(s) to the Public Works Department.

Plan Check Policies and Guidelines

S. WEST STREET EXTENSION ALTERNATIVES STUDY

Rocky Mount. Transportation Plan. Transportation Planning Division. Virginia Department of Transportation

Street Lighting Policy. Revision

Plan Check Policies and Guidelines

JCE4600 Fundamentals of Traffic Engineering

2 Min. Min. Edge of. Edgeline See Note 3 PLAN VIEW. See Note 3. This distance may vary

AASHTO Policy on Geometric Design of Highways and Streets

Tulsa Transportation Management Area. Urbanized Area Surface Transportation Program

Figure 1 Map of intersection of SR 44 (Ravenna Rd) and Butternut Rd

TRAFFIC CALMING PROGRAM

Harlem Avenue between 63 rd and 65 th

Clearlake Road (State Road 501) Project Development & Environment (PD&E) Study

US 81 Bypass of Chickasha Environmental Assessment Public Meeting

CHAPTER 9: VEHICULAR ACCESS CONTROL Introduction and Goals Administration Standards

Speed Limit Study: Traffic Engineering Report

Conventional Approach

Subarea Study. Manning Avenue (CSAH 15) Corridor Management and Safety Improvement Project. Final Version 1. Washington County.

Recommendations for AASHTO Superelevation Design

PLEASE SUBMIT THE CORRECT PERMIT FEE WITH PAGES 1 & 3 OF APPLICATION TO: OCONTO COUNTY HIGHWAY DEPT, P.O. BOX 138, OCONTO, WI 54153

Support: The Crossbuck (R15-1) sign assigns right-of-way to rail traffic at a highway-rail grade crossing.

1400 MISCELLANEOUS Traffic Engineering Manual

Purpose and Need Report

Study Area and Location District PSA Ward ANC Phase Description C Planned Suitland Parkway Westbound at Stanton Road Southeast

Southern Windsor County 2016 Traffic Count Program Summary April 2017

Workshop Agenda. Bransford Roundabout. Bedford Intersection/Roundabout. Section 3 Revisions (Left turn lanes) Roadway Section/Curb Type Discussion

STAFF REPORT # CHANGE OF ZONING

TRAFFIC IMPACT STUDY. USD #497 Warehouse and Bus Site

Reduced Speed Limits or Curve Warning Signs? Northeast Traffic Safety Conference Cromwell, Connecticut October 24-25, 2017

High Risk Rural Road Program Road Safety Audit Report

Chapter III Geometric design of Highways. Tewodros N.

Public Information Workshop

Brent Spence Bridge Design Exceptions - Alternative I

POLICY AND PROCEDURE FOR SPEED HUMP INSTALLATION. Effective Date: July 10, 2013

TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY Prepared for:

March 2, 2017 Integrating Transportation Planning, Project Development, and Project Programming

The major roadways in the study area are State Route 166 and State Route 33, which are shown on Figure 1-1 and described below:

Brigham City 1200 West Box Elder Creek Bridge - Widening Project Type Reconstruction

COUNTY ROAD SPEED LIMITS. Policy 817 i

COUNTY ROAD SPEED LIMITS. Policy 817 i

Citizens Committee for Facilities

Existing Traffic Conditions

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS

YELM HWY AND MERIDIAN RD INTERSECTION IMPROVEMENTS PROJECT CONTEXT

Fire Apparatus Access Roads in Marysville

Current Corridor Characteristics. MN 62 Corridor Performance

NORTHWEST HIGHWAY S-CURVE PEDESTRIAN/BICYCLE ACCESS FEASIBILITY STUDY. Northwest Highway (US 14) From Seegers Road to Western Avenue

Traffic Engineering Study

2016 Congestion Report

City of Houston Fondren Road Paving and Drainage

DRIVEWAY STANDARDS EXHIBIT A. The following definition shall replace the definition of driveway in Section 62:

CHAPTER 15 STREET LIGHTING TABLE OF CONTENTS

Location Concept Plan Amendment Recommendation Approved 2011 Concept Plan

VIADUCT LOCATION STUDY. October 19, 2009

November 1, Mr. Jafar Tabrizi President, Tabrizi Rugs 180 Bedford Highway. Traffic Impact Statement BH-1 and BH-2, Southgate Drive, Bedford, NS

Appendix "A" Transit Bus Stop Accessibility Criteria & Guidelines

VOA Vista Drive Residential housing Development TIA Project #13915 TABLE OF CONTENTS

2018 NDACE CONFERENCE

Slow Down! Why speed is important in realizing your Vision Zero goals and how to achieve the speeds you need

South Lexington Transportation Study Lexington, Massachusetts

County State Aid Highway 30 (Diffley Road) and Dodd Road Intersection Study

Transportation accomplishments

FREQUENTLY ASKED QUESTIONS

County State Aid Highway 32 (Cliff Road) and Dodd Road Intersection Study

SAFARI HIGHLANDS RANCH STREET DESIGN DEVIATION REQUESTS

Engineering Report: Shasta-Trinity National Forest. South Fork Management Unit. Analysis of. National Forest System Road 30N44

STH 60 Northern Reliever Route Feasibility Study Report

CATEGORY 500 PAVING SECTION 535 PAVEMENT SURFACE PROFILE

Study Area and Location District PSA Ward ANC Phase Description B Existing 600 Block New York Avenue Northeast Westbound

4.5 TRANSPORTATION AND CIRCULATION

Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS...

Metropolitan Freeway System 2013 Congestion Report

ACTION TRANSMITTAL No

TALMONT TOWNHOMES MADISON KENNETH SPA TRAFFIC IMPACT STUDY. Sacramento, CA. Prepared For: MBK Homes. Prepared By:

Wentzville Parkway South Phase 2 & 2A

King County Metro. Columbia Street Transit Priority Improvements Alternative Analysis. Downtown Southend Transit Study. May 2014.

2030 Multimodal Transportation Study

SN01 STANDARD NOTES CITY OF SAMMAMISH 2018 FLASHING YELLOW ARROW SIGNALS PROJECT NO. DATE BY APPR REVISION COSA0023 KING COUNTY WASHINGTON

Public Information Packet FY Fargo-Moorhead Metropolitan Transportation Improvement Program (TIP)

APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS

Transcription:

EXCEPTION TO STANDARDS REPORT PROJECT DESCRIPTION AND NEED The project is located in Section 6, Township 23 North, Range 9 East and Section 31 Township 24 North, Range 9 East, in the Town of Stockton, Portage County, Wisconsin. See the attached Project Location Map. The project includes the reconstruction of Old Highway 18 from approximately 600 feet west of the CN railroad track to approximately 550 feet east of the Burbank Road intersections and Burbank Road from the Old Highway 18 intersection to approximately 500 feet south. This project has received funding from the Highway Safety Improvement Program (HSIP) to address the safety issues associated with this crossing. The existing geometrics of the Old Highway 18/Burbank Road intersection and CN Railroad crossing cause safety issues. The CN Railroad crosses Old Highway 18 at a 55 angle with approach grades ranging from 4% to 8%. A sharp curve is located on the north approach and the intersection of Burbank Road is located on the south approach. Although the crossing is safeguarded by cross bucks and stop signs in both directions, the skew, approach geometrics, and steep grades make it difficult to see the railroad tracks. The average number of trains per day at this location is 25 and the can travel up to 60 mph. The fast train speed and poor roadway approach geometrics contribute to safety concerns at this intersection. See the attached site photos. EXISTING CONDITIONS The functional classification and access control for Old 18/Burbank Road are as follows: Corridors Roadway Name Functional Class (Arterial, Collector or Local) Rural, Urban or Transitional 2020 or Backbone (No or State which) NHS Route (Yes or No) Long Truck Route(No or state Federal or State) Access Control Tier On Ped. Trans. Plan (Yes or No) On Bike Trans. Plan (Yes or No) Old Hwy 18 Local Rural No No No N/A No Yes Burbank Road Local Rural No No No N/A No No The design speed and posted speeds are: Roadway or Roadway Segment Design Speed Posted Speed Old Highway 18 (west) 40 mph 35 mph Old Highway 18 (east) 30 mph 25 mph Burbank Road 40 mph Not posted. The projected AADT on Old 18 in 2013 is 375 with a percentage of trucks at 3.3%. The existing typical cross section on Old 18 is as follows: Number of roadways: One Number of lanes: Two Median width: None * Lane width: 10 feet * Shoulder width (Total and Paved or Curb & Gutter): Varies 0 to 4-feet (0 feet paved) Bicycle Facility Type: None Sidewalk and curb ramps: None * Cross slope: Varies 2% - 4%

* Super-elevation: 9.1% Max * Horizontal clearance: There are trees within 10-feet of the driving lane. Clear Zone: There are slopes steeper than 4:1 within 5-feet of the driving lane * Vertical clearance: No overhead obstructions Side-slopes and Ditch sections: Normal 4:1 Maximum 2:1 * Controlling Criteria See Attachment 2: Preliminary Plans. SUBSTANDARD FEATURES The following features will be improved but remain substandard as part of this project: Horizontal Curve Superelevation The following horizontal curves will remain outside of desirable standards: * Horizontal Feature (Curve, P.I. Deflection, etc.) Location (Stationing) * Size (Radius, P.I. Deflection, etc.)* * Super- Elevation (s.e.) Speed Rating Curve P.I. 15+41.26 154 Radius 1 4.0% 25 mph Curve P.I. 4+25.28 485 Radius N.C. 25 mph * Controlling Criteria 1 The superelevation runout for this curve occurs within the curve in order to transition to the existing slope of the CN railroad tracks. There will be no adverse superelevation within the curve. The minimum radius to meet a 40 mph design speed is 485 feet with a 6% superelevation. This radius cannot be achieved at P.I. Station 15+41.26 due to the restrictions of the railroad tracks to the south and the Stockton District No. 10 school house to the northeast. The Stockton District No. 10 school house has been determined to be eligible for the register of National Historic Places. The curve at P.I. Station 4+25.28 is approaching an intersection and will transition from the longitudinal grade of Burbank Road to a normal crown through the curve. Superelevation cannot be achieved do to the proximity of the curve to the intersection. This will result in adverse superelevation, however, the proximity to the intersection will result in slower traffic. CRASH DATA The following crash rates occurred near the intersection between 2001 and 2010: Location or Pattern Old Highway 18 Year 2001 2010 Number & Severity of Crashes Property Fatal Injury Damage Total Crash Rate (2) 1 6 1 8 6.0 (2) Crashes per million entering vehicles (MEV) Possible Factors Contributing to Crashes Poor sight distance across the tracks, poor alignment approaching the intersection from the north. ADVERSE UPGRADING IMPACTS Improving the horizontal curve to meet a 40 mph design speed would have adverse environmental

impacts. This alternative would require that the Stockton District No. 10 school house (eligible for the National Register of Historic Places) be demolished to provide enough tangent length north of the tracks to construct the 40 mph curve and cross the railroad tracks at 90 degrees. It would also result in additional property acquisition. The only possible way to meet a 40 mph design speed and avoid impacts to the school house would be to relocate the railroad crossing. This option was not considered due to the impact it would have on the railroad, as well as the right of way impact it would have on neighboring property owners. The proposed 25 mph curve is a prudent and feasible alternative to avoid impacting the Stockton District No. 10 school house. The proposed curve has the largest possible radius while avoiding the historic boundary. PROPOSED SAFETY ENHANCEMENTS The project will include the following safety enhancements: Increasing the radius of the horizontal approach curve north of the CN crossing to a 25 mph design speed. Improving the angle of the railroad crossing from the current 55 degree skew to approximately a 90 degree crossing. Moving the intersection of Old 18 east to the south to provide additional separation from the crossing. Reducing approach grades to 0.5 to 3 percent from the current 4 to 8 percent. Installing railroad gates and signals. Providing 12 foot driving lanes with 3-foot paved shoulders for bicyclists. Providing advisory signs including curve ahead with 25 mph, railroad crossing ahead, and chevron signing. CONCLUSION Although the curve north of the tracks does not fall within the desirable limits for the design speed of this roadway, it is a prudent and feasible alternative to avoid environmental factors. This curve is an improvement over existing conditions. The curve is not a contributing factor to the crashes at the railroad, but rather the lack of visibility, which has been addressed to the maximum extent possible. In addition, the safety at the new crossing will be enhanced by new signals and gates. Additionally, the curve east of the Burbank Road intersection, is also substandard. However, this curve is nearing a tee intersection which will result in lower vehicle speeds. The lack of superelevation through this curve will provide for a smoother transition from the longitudinal grade of Burbank Road to the cross slope of Old Highway 18. This curve also allows the intersection to be shifted south, away from the railroad crossing, which will improve sight distance for vehicles in all directions.

± BEGIN PROJECT STOCKTON SCHOOL OLD HWY 18 CN RAILROAD CN RAILROAD OLD HWY 18 END CONSTRUCTION END PROJECT BJ COURT 0 250 500 1,000 Feet LEGEND Proposed Asphalt Proposed Gravel Slope Intercepts BURBANK ROAD 6808-01-00 OLD HWY 18 (CN RAILROAD/BURBANK RD INTERSECTION) ENVIRONMENTAL REPORT LOCATION MAP TOWN OF STOCKTON FILE NAME: DRN PROJECT NO. DATE FIGURE NO. LOCATION_MAP.MXD 6808-01-00 Apr 2013

Railroad Approach, looking southeast Eastbound Old Highway 18

Railroad Approach, looking north Northbound Burbank Road