Sustainable Urban Transport Project (SUTP) Moving people and not vehicles 22-23 September, 2015 Name, Designation, Authority
Introduction Parveen Kumari, Desk Officer, Ministry of Urban Development, Government of India Date: August 2014- February 2015 Batch: LUTP 3rd Batch
Program learnings Key Learnings- Singapore and Hong Kong are models for public transport Multimodal integration of all transport modes Quality, punctuality and cleanliness of bus services Comprehensive approach that integrates Transport and land use planning etc Technical sessions such as Delhi Airport Metro Case Study, Public Visits Transport Council & Fare Regulation, Singapore Electronic Road Pricing System was very informative Ahmedabad: BRTS Corridor International Tour- Singapore Land Transport Gallery Integrated Transport Hub at Sengkang ITS Centre, River Valley Road Kim Chuan Depot & OCC Shift People from Private Vehicle to Public transport/nmt to reduce pollution, fuel, congestion etc. HongKong Tsing Ma Bridge Control Centre, Tsingi Kowloon Motor Bus Co. Ltd Mass Transit Railway (MTR) Tsing Yi Operations Control Centre (OCC)
Utilisation of experience gained Proposed any project, policy, immediate action taken (letters shared, made proposals) Research and Projects/Studies: Initiated the following Environmental Impact of CNG buses and metro in Delhi How to decongest Delhi- Draft Report of High Powered Committee Developing eco-system for Metro Gate Validation Terminal Promoting Non Motorized Transport (NMT): Occupy less Road space/eco Friendly Implementation of PBS at Metro Stations and adjoining areas Stakeholder consultation meetings.
Contd. As an administrator of MoUD, following activities have been initiated Capacity Building SUTP- Key activities involved are: Development of Toolkits 4 new toolkits developed in last 1 year Training of City Officials 8 training programs held since January 2015 wherein about 250 middle and senior level city officials have been trained. UMI- Special Session on Smart Mobility for Smart Cities: for Ministers in UMI, 2014 and Working on Special Session Challenges in Implementing Mobility in Smart Cities for UMI 2015-24 th to 27 th November, 2015, New Delhi..
Draft Report of High Powered Committee on How to decongest Delhi available on www.moud.gov.in Courtesy UTTIPEC
Project Proposal : Development of Metro Gate Validation Terminal- Hon ble Prime Minister s Dream-Make in India Objective: Create Interface Documents for: Interaction between Gate [Validation Terminal] and the Card Interaction between SAM and Gate [Validation Terminal] Gate Man Machine Interface Interaction between the Gate and the Station Server Providing Configuration information Design, Develop and Test the metro gate Validation Terminal- Source- CDAC
Hon ble Prime Minister s Mann Ke Baat Promoting Non Motorized Transport Implementation of PBS at Metro Stations and adjoining areas Stakeholder consultation meetings with Delhi Government, NDMC, MCD, DDA, UTTIPEC, CPWD, Delhi Traffic Police, DMRC, MOUD, and Cycle companies held under the chairmanship of Additional Secretary(UD) Cycle Share System & Dwarka Bicycle Share program 8 /
Contd. Key features of cycle sharing systems A dense network of stations across the coverage area, with a spacing of approximately 300 m between stations for access within 2-min walk Cycles with specially designed parts and sizes to discourage theft A fully automated locking system at stations that allows users to check cycles in or out with no need for staffing at the station Radio frequency identification devices (RFIDs) to track where a cycle is picked up, where it is returned, and the identity of the user Real-time monitoring of station occupancy rates through General Packet Radio Service (GPRS), used to guide the redistribution of cycles Real-time user information provided through various platforms, including the web, mobile phones, and/or on-site terminals Pricing structures that incentivise short trips, helping to maximize the number of trips per cycle per day. Cycle Share System & Dwarka Bicycle Share program Source-DDA
- NMT cell - space - approvals, budget Source: MOUD Toolkit on Public Bicycle Sharing, 2012
CSS Components Operations Control Centre Source: UMTC CSS Policy
Any projects/proposal Any projects/proposal (you wish to propose to Central govt Building capacities amongst the various stakeholders through workshops, training programs and study tours Promoting the need and awareness for developing the Ropeways Systems, BRT System, integrated Transport and land use development, PBS To decongest the cities Model Report How to decongest Delhi Advisory to cities for promoting NMT Promote Common Mobility Card for Fare Integrated across all modes of transport for smooth access and transfer from one system to another. Need to strengthen Technical Hands of MoUD- SUTP, IUT
Utilisation of experience gained Participated as a Key Representative on Behalf of MoUD for Capacity Building Program held in Bhopal on 17 th to 20 th March 2015 Programme helped in : Better understanding of transportation problems within cities. Analysing remedial measures for urban transport problems in cities. Smoother approvals of proposals relating to urban transport solutions, with better understanding of the problem.
Thank You MoUD SUTP TEAM CEPT AHMEDABAD TEAM, LTA Academy, Singapore Hong Kong Polytechnic University, Hong Kong All other individuals, organizations who gave their valuable time to the participants.