Prince William County Department of Transportation Quarterly Joint Mobility Report June 13, 2018

Similar documents
Prince William County Department of Transportation 1st Quarter Joint Mobility Report March 13, 2018

Prince William County Department of Transportation 4th Quarter Joint Mobility Report January 8, 2019

Infrastructure and Facilities Plan Comprehensive Plan Unfunded Projects

Update on Transportation Activities in Fairfax County

Janice Fortunato Senior Director Business Partnerships

I-820 (East) Project Description. Fort Worth District. Reconstruct Southern I-820/SH 121 Interchange

US 29 Bus Rapid Transit Planning Board Briefing. February 16, 2017

Maryland Gets to Work

Wentzville Parkway South Phase 2 & 2A

Rolling Road (Route 638) Widening Project

Appendix B. Tier 2 Final Environmental Assessment I-66 Transit/TDM Technical Report

SOUTHERN GATEWAY. Transportation and Trinity River Project Committee 11 May 2015

NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP): SEGMENT 3. April 19, 2018 NHHIP April 19, 2018

IMPROVEMENT CONCEPTS

Basic Project Information

FY 2018 I-66 Commuter Choice Program Presentation to the Northern Virginia Transportation Commission May 3,

Transportation Improvement Program (TIP) Candidate Project List for Public Review

ANDERSON PROPERTY SITE ANALYSIS

Richmond Area MPO Regional Priority Transportation Projects

VIRGINIA RAILWAY EXPRESS MANASSAS PARK STATION PARKING EXPANSION. Public Meeting June 20, 2017

MOTION NO. M Preferred Alternative for the Puyallup Station Access Improvement Project

Kendall Drive Premium Transit PD&E Study Project Kick-Off Meeting SR 94/Kendall Drive/SW 88 Street Project Development and Environment (PD&E) Study

Valley Metro: Past, Present and Future. September 11, 2014

NVTA SIX YEAR PLAN PROJECTS BY MODE

Help shape your community investment in Wake Transit. Fiscal Year 2019 Draft Work Plan Summary

Transit Project Delivery Status Report. Significant Issues

Leadership NC. November 8, 2018

Agenda. Utility Undergrounding Strategies & Laguna Canyon Road Master Plan

Balancing the Transportation Needs of a Growing City

I-4 Beyond the Ultimate. Florida Transportation Builders Association January 18, 2019

Reston Transportation Strategy July 9, 2018

Project Status Update January 2017

MWAA FY /16/2008 NORTHERN VIRGINIA TRANSPORTATION IMPROVEMENT PROGRAM CAPITAL COSTS (in $1,000) Source Source Total Fed/St/Loc.

Committee Report. Transportation Committee. Business Item No

W&OD TRAIL BRIDGE OVER LEE HIGHWAY I-66 EASTBOUND WIDENING INSIDE THE BELTWAY FROM THE DULLES CONNECTOR ROAD (ROUTE 267) TO FAIRFAX DRIVE (ROUTE 237)

Denver Metro Association of Realtors

STH 60 Northern Reliever Route Feasibility Study Report

Harlem Avenue between 63 rd and 65 th

FREQUENTLY ASKED QUESTIONS

The Eastern Connector Study November, 2007 planning for the future

Rocky Mount. Transportation Plan. Transportation Planning Division. Virginia Department of Transportation

VAN NESS AVENUE BUS RAPID TRANSIT

West LRT. Alignment Update and Costing Report May Calgary Transit Transportation Planning Clifton ND Lea Consultants

VIRGINIA RAILWAY EXPRESS MANASSAS PARK STATION PARKING EXPANSION. Site Evaluation & Recommendation. October 18, 2016

Develop ground transportation improvements to make the Airport a multi-modal regional

Section III Transportation and Stormwater Projects Receiving Additional Funding Project Detail Sheets Alphabetical Listing by Project Name Five Year

METRO Orange Line BRT American Boulevard Station Options

SH 249 IN GRIMES COUNTY. Open House April 3, 2014

Pole Mounted Speed Display Pilot Program Study. January, 2016

FREQUENTLY ASKED QUESTIONS

SamTrans Business Plan Update May 2018

Challenges in a Post-Katrina Environment East-West Corridor Project Overview February, 2007

Bi-County Transitway/ Bethesda Station Access Demand Analysis

Utility work, road construction substantially done on Fourth Street

New Jersey Turnpike Authority Interchange 6 to 9 Widening Program

Elected Officials Briefing North Metro Rail Line Update. November 10, 2016

Draft Results and Open House

Public Meeting. City of Chicago Department of Transportation & Department of Housing and Economic Development

Click to edit Master title style

Brigham City 1200 West Box Elder Creek Bridge - Widening Project Type Reconstruction

Executive Summary. Draft Environmental Impact Statement/Environmental Impact Report ES-1

Delaware County Engineer s Office

Transit Access to the National Harbor

Valley Metro Overview. ITE/IMSA Spring Conference March 6, 2014

Georgia Department of Transportation 2006 Fact Sheet Lovejoy to Atlanta Rail Line visit the website at

Corridor Management Committee. March 7, 2012

Major Widening/New Roadway

Business Advisory Committee. July 7, 2015

Waco Rapid Transit Corridor (RTC) Feasibility Study

Expansion Projects Description

Draft Results and Recommendations

BINGHAMTON METROPOLITAN TRANSPORTATION STUDY

FREQUENTLY ASKED QUESTIONS

HDR Engineering. HART North / South. Tampa Bay Applications Group Meeting May 14, 2009

Mobility Corridor Updates. Transit & Active Transportation Projects

Arterial Bus Rapid Transit. System Policy Oversight Committee April 7, 2014

Transportation Infrastructure Investment Program moving

Mobility Corridor Updates. Transit & Active Transportation Projects

BOARD OF SUPERVISORS BUSINESS MEETING ACTION ITEM. Design Endorsement for Sterling Boulevard Extension

Naval Station Norfolk Transit Extension Study. October 2014

Chicago to St. Louis High-Speed Rail. IDOT District 8 Crossings. July 29, 2015

SOUTH ACCESS TO THE GOLDEN GATE BRIDGE DOYLE DRIVE DOYLE DRIVE. Doyle Drive Presentation Golden Gate Bridge Board Meeting July 24, 2009

Public Information Packet FY Fargo-Moorhead Metropolitan Transportation Improvement Program (TIP)

WARES. October, 2018

Point A Point B Point C Point D. Fulton County Board of Commissioners and Mayors Meeting December 14, 2017

Harlem Avenue between 63 rd and 65 th

Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS...

I-35W Past, Present, and Future: METRO Orange Line

Broward County Intermodal Center And People Mover. AASHTO Value Engineering Conference Presentation. September 1, 2009 San Diego, CA

Energy Technical Memorandum

Public Advisory Committee Meeting #3. February 11, 2014

BART Silicon Valley. Berryessa Extension Project Community Update. October 27, 2010

Van Ness Transit Corridor Improvement Project. Engineering, Maintenance and Safety Committee March 25, 2015

Tempe Streetcar. March 2, 2016

Community Meeting Station Elements

CTfastrak Expansion. Stakeholder Meeting #4 Manchester Town Hall June 3, 2016

West Broadway Reconstruction/LRT Design. March 19, 2015

CITY OF LONDON STRATEGIC MULTI-YEAR BUDGET ADDITIONAL INVESTMENTS BUSINESS CASE # 6

Mountainland Association of Governments SPRINGVILLE-SPANISH FORK AREA TRANSPORTATION STUDY APRIL 2012

CITY OF PORT TOWNSEND, WASHINGTON CAPITAL IMPROVEMENT PLAN

Transcription:

Prince William County Department of Transportation Quarterly Joint Mobility Report June 13, 2018 1

Prince William County Strategic Plan MOBILITY THE COMMUNITY WILL HAVE AN ACCESSIBLE, COMPREHENSIVE, MULTI MODAL NETWORK OF TRANSPORTATION INFRASTRUCTURE THAT SUPPORTS LOCAL AND REGIONAL MOBILITY. ROBUST ECONOMY THE COMMUNITY FOSTERS A DIVERSE LOCAL ECONOMY THAT CREATES A CULTURE OF INNOVATION AND ACHIEVES MORE QUALITY JOBS, ECONOMIC OPPORTUNITIES AND AN EXPANDED COMMERCIAL TAX BASE. SAFE & SECURE COMMUNITY PRINCE WILLIAM COUNTY IS A COMMUNITY WHERE PEOPLE ARE SAFE AND SECURE. WELLBEING THE COMMUNITY WILL SUPPORT VULNERABLE INDIVIDUALS AND FAMILIES TO ENSURE THE WELLBEING OF THE ENTIRE COMMUNITY. QUALITY EDUCATION & WORKFORCE DEVELOPMENT THE COMMUNITY FOSTERS A RICH, LIFELONG LEARNING ENVIRONMENT TO INCREASE EDUCATIONAL OPPORTUNITIES AND WORKFORCE READINESS TO MEET EVOLVING MARKET DEMANDS. CONNECTIVITY PRINCE WILLIAM COUNTY IS COMMITTED TO THE IMPLEMENTATION AND UTILIZATION OF TECHNOLOGY AND INFRASTRUCTURE REQUIRED FOR A CONNECTED COMMUNITY. 2

Burwell Road (Rural Rustic) Plans were submitted to VDOT and PWC for review and comment on December 11, 2017. Comments from all reviewing agencies were received on January 29, 2018. Final plans will be submitted to VDOT and PWC for review/approval for mid May 2018. Status: Under Design Construction advertisement June 2018. Construction begins June 2018. Construction ends November 2018. Brentsville Magisterial District Purpose: Pave Burwell Road from the existing paved road to the Fauquier County line 3

Broad Run Station and Yard Improvements Purpose: Expand station and train storage capacity Selection of preferred location for parking expansion pending. Preliminary engineering (PE) design and NEPA analyses for station platform, train storage expansion underway. Ongoing coordination with Norfolk Southern, Manassas Regional Airport, Federal Transit Administration. Status: Under design PE and NEPA complete November 2018. Final design begins Late 2018. Construction complete December 2022. Related projects: Transform 66/Manassas Line Capacity Expansion. Route 28, Phase III. Brentsville Magisterial District VIRGINIA RAILWAY EXPRESS 4

Discovery Boulevard Extension Purpose: Construct 2 lane roadway to Hornbaker Road 100% of the design plans were submitted to the reviewing agencies for comment or approval in February 2018. Status: Under Design Construction award Spring 2018. Brentsville Magisterial District 5

Innovation Pedestrian Improvements 90% of design plans will be submitted to the reviewing agencies in April 2018. Status: Under Design Construction award May 2018. Brentsville Magisterial District Purpose: Construct sidewalks on Discovery Boulevard, Innovation Drive, and University Boulevard 6

OMNIRIDE Western Maintenance Facility Purpose: Construct bus storage yard and maintenance facility Funding for the project is in the Commonwealth s budget and awaiting the three funding agreements from DRPT. Status: Under Design Once funds are released to OMNIRIDE, Notice to Proceed will be issued to construction contractor. Brentsville Magisterial District 7

Route 28, Phase II Brentsville Magisterial District Purpose: Four lane widening of Route 28 from Fitzwater Drive to Vint Hill Road (2.4 miles) Construction activities are ongoing. Aden Road will close between July and October; however, VDOT has a project in close proximity that will close Aden Road from April until September. The County will meet with the two contractors to reduce the amount of time Aden Road will be closed. Status: Under Construction Construction ends October 2019. 8

Route 28, Phase III Brentsville Magisterial District Purpose: Six lane widening of Route 28 from Linton Hall Road to Pennsylvania Ave (1.3 miles) Contract award to Shirley Contracting Company, LLC was submitted to the BOCS for approval on March 6, 2018. Status: Under Design Construction begins June 2019. Construction ends June 2021. 9

Vint Hill Road Extension Brentsville Magisterial District Purpose: Construct a turn lane on Vint Hill Road from Sudley Manor Drive to Kettle Run Road All utility plans and estimates were reviewed and approved. Status: Under Design Design ends May 2018. Construction starts August 2018. Construction ends September 2019. 10

Balls Ford Road Interchange Project Summary: The project includes the following: A grade separated overpass crossing of relocated Balls Ford Road over line B of the Norfolk Southern Railroad. Balls Ford Road will be a new four lane facility with a raised median between Devlin Road and Doane Drive. A 10 ft. shared use path along relocated Balls Ford Road. Status: VDOT signed agreement received on 5/17/2018 Brentsville/Gainesville Magisterial Districts Purpose: Construct a Diverging Diamond Interchange at Route 234 Bypass and relocated Route 621 (Balls Ford Road) 11

Balls Ford Road Interchange Brentsville/Gainesville Magisterial Districts 12

Balls Ford Road Widening Project Summary: The project includes the following: A 10 ft. shared use trail and a 5 ft. sidewalk on the entire length of the facility. Extension to the proposed interchange project at Route 234 and Balls Ford Road to enhance accessibility to I 66 at the western end of Balls Ford. Status: VDOT signed agreement received on 5/17/2018 Brentsville/Gainesville Magisterial Districts Purpose: Widening from two to four lanes from Groveton Rd to Route 234 Business (2 miles) 13

Balls Ford Road Widening Brentsville/Gainesville Magisterial Districts 14

Route 646 Aden Road Bridge Brentsville Magisterial District Purpose: Construct bridge replacement over railroad Construction restart anticipated for summer 2018. Detour planned. Status: Under Construction Construction completion Late Summer 2018. 15

Dumfries Road Sidewalk Project Purpose: Construct a sidewalk from Counselor Road to Tayloe Drive All underground utilities were inspected for depth, functionality, and spacing. Geotechnical investigation and utility tests are in progress. Advanced design plans were submitted in early March 2018. Status: Under Design Design ended February 2018. Construction begins July 2018. Construction ends December 2018. Coles Magisterial District 16

Minnieville Road Mild winter has allowed continuation of storm sewer installation and earthwork. New signal poles being installed at Howison Park and Dumfries Road. Signal work to continue. Foundations for second phase of Conspan Bridge are being installed. Status: Under Construction Contract Construction Completion December 2018. Spriggs Road intersection improvements may extend the schedule into 2019. Coles and Potomac Magisterial Districts Purpose: Four lane widening from Spriggs Road to Route 234 (2.2 miles) 17

I-66 Park and Ride Haymarket Notice to Proceed in December 2017. Public Meeting to be held on March 21, 2018 at Battlefield High School. Status: Under Design Construction began April 2018. Construction ends Spring 2019. Gainesville Magisterial District Purpose: Construct an approximately 230 space lot in the northeast quadrant of I 66 and Route 15 Quarterly Quarterly Mobility Mobility Report Report Wednesday, Tuesday, June March 13, 2018 13, 2018 18

Route 1596 Williamson Boulevard Purpose: Construct turn lane and install traffic signal at Stonehouse Drive Posting of willingness is anticipated for early 2018. Status: Under Design ROW begins Fall 2018. Gainesville Magisterial District 19

Transform 66 Outside the Beltway Construction activities are underway. Barrier installation/lane shifts. Status: Construction began December 2017. Gainesville/ Brentsville Magisterial Districts Purpose: Construct two new express lanes in each direction on I 66 from I 495 to Gainesville (University Boulevard) and multimodal improvements to address current congestion and future needs. 20

OMNIRIDE I-66 Strategies PRTC will provide the following as part of the Transform 66 Outside the Beltway TMP: Half fares on all western County express and MetroRail feeder bus routes. Additional bus trips as needed to ensure sufficient capacity. Vanpool formation incentives. All strategies are fully funded through the TMP. Status: Implementation in March/April 2018 through the completion of Express Lanes construction (2022). Gainesville/ Brentsville Magisterial Districts Purpose: Strategies to minimize congestion as part of the Transportation Management Program (TMP) for construction of the I 66 Express Lanes 21

Neabsco Mills Road Neabsco and Woodbridge Magisterial Districts Purpose: Four lane widening from Route 1 to Dale Boulevard As directed by the BOCS, the proposed roundabout in front of Freedom High School has been eliminated from the design plans. Preliminary Field Inspection (PFI) Plan was submitted to VDOT on January 16, 2018. Status: Under Design Design began June 2017. Design ends October 2020. Construction begins October 2020. Construction ends August 2022. 22

Smoketown Road/ Opitz Boulevard Pedestrian Improvements Neabsco and Occoquan Magisterial Districts Purpose: Reconstruction of ADA ramps and crosswalk at the intersection of Smoketown Road and Opitz Boulevard ROW plans will be advanced for approval with the exclusion of the improvements to the north east corner of the project. Status: Under Design Construction advertisement April 2018. Construction begins Spring 2018. 23

Old Bridge Road Sidewalk FHWA authorization to advertise the project was obtained on February 5, 2018. Status: Under Design Construction advertisement March 2018. Construction began May 2018. Construction ends October 2018. Occoquan Magisterial District Purpose: Construct a sidewalk and bus shelter from Mohican Road to Antietam Road 24

Dumfries Road North Shared Use Path Utility relocations are complete. Preparing design plan comment revisions and responses for VDOT. Status: Under Design Construction advertisement March 2018 Construction award April 2018. Construction begins June 2018. Construction ends December 2018. Potomac Magisterial District Purpose: Construct a Shared Use Path from Country Club Drive to Exeter Drive 25

Fuller Heights Road Potomac Magisterial District Purpose: Intersection improvements at Fuller Heights Road (Quantico Marine Corps Base Entrance) PWC and VDOT will construct a mini roundabout at the intersection of Fuller Heights and Triangle Street to relieve congestion and improve safety; stop bars will marked on the pavement east and west of the intersection of Fuller Heights and Fuller Road to prevent that the intersection in blocked at any time. A dedicated left turn lane will be constructed on Joplin Road for eastbound traffic heading north on Route 1. The County project is being re designed to better operations at Fuller Heights Rd and Old Triangle Rd. 26

Quantico Station Improvements Final design at 90%. Potomac Magisterial District Purpose: Construct station improvements (new second platform, new third mainline track, bridge access between platforms, and extension of existing platform) Status: Under design Design complete Fall 2018. Construction advertisement Fall 2018. Construction begins Early 2019. Construction complete TBD. Related projects: Arkendale to Powell s Creek 3 rd track by DRPT. VIRGINIA RAILWAY EXPRESS 27

Route 1 Widening- Town of Dumfries Potomac Magisterial District Purpose: Widen Route 1 (Fraley Boulevard NB) from 2 to 6 lanes to serve two way traffic with pedestrian/bike facilities Design is underway, and additional surveys are being conducted. Value engineering was conducted in February 2018. Public meeting anticipated for Summer 2018. Only design has received funding (NVTA). Status: Under Design Design began Fall 2017. 28

Route 234 Pedestrian Improvements Potomac Magisterial District Purpose: Construct a sidewalk from Four Seasons Drive to 0.11 miles north of Four Seasons Drive. Construction contract awarded in January 2018. Status: Under Design Construction begins Early 2018. Construction ends Summer 2018. 29

Blackburn Road Pedestrian Improvements Purpose: Construct a sidewalk/multi use trail from Route 1 to the back of the entrance of Rippon Lodge VSMP permit attained in February 2018. Application for VDOT s land use permit was submitted on February 12, 2018. Bid documents are being reviewed by PWC Purchasing. Status: Under Design Construction advertisement March 2018. Construction begins June 2018. Construction ends October 2018. Woodbridge Magisterial District 30

Horner Road Sidewalk Project 100% of the design plans were submitted to VDOT on January 26, 2018. They are currently under review. Status: Under Design Design ended January 2018. Construction begins May 2018. Construction ends September 2018. Woodbridge Magisterial District Purpose: Construct a sidewalk from Forest Glen Road to Kilby Elementary School 31

Opitz Boulevard Sidewalk Project VDOT has provided concurrence on a design waiver to decrease the buffer width that will reduce ROW impacts. Status: Under Design Design ends June 2018. Construction begins July 2018. Construction ends January 2019. Woodbridge Magisterial District Purpose: Construct a sidewalk from Potomac Library to Potomac Center Boulevard 32

Powell s Creek Pedestrian Footbridge County consultant completed a corrective design for the caissons in February 2018. The caisson improvements were reviewed by VDOT and approved on February 7, 2018. Construction has resumed. Status: Under Construction Construction ended June 2018. Woodbridge Magisterial District Purpose: Construct a sidewalk and pedestrian footbridge over Powell s Creek at Route 1 33

Rippon Station Improvements Preliminary engineering (PE) design and NEPA analyses underway for side and island platform Ongoing coordination with CSXT, DC2RVA third track PE design Status: Under design PE design complete Fall 2018 Final design complete Fall 2019 Construction complete 2022 Woodbridge Magisterial District Purpose: Construct station improvements (platform improvements and new pedestrian overpass with stairs and elevators on each platform) Related projects: DC2RVA 3 rd track by DRPT VIRGINIA RAILWAY EXPRESS 34

Rippon Landing Neighborhood Park Parking Lot Purpose: Construct a parking lot at Rippon Landing The project involves relocating the existing gravel parking lot at the intersection of Rippon Blvd/Blackburn Rd 800 feet south of Blackburn Rd across from Admiral Black Dr. The project will add capacity to accommodate approximately 100 parking spaces to serve the new/proposed Boardwalk. (90%) Pre final design was submitted January 2018. Status: Under Design Design completed June 2018. Construction begins July 2018. Construction ends December 2018. Woodbridge Magisterial District 35

Route 1 Featherstone to Mary s Way Utility duct bank work is anticipated to begin in Spring 2018. Demolition of businesses impacted by construction will begin in March 2018. Status: Under Construction Utility relocations begins August 2018. Construction ends November 2021. Woodbridge Magisterial District Purpose: Six lane widening on Route 1 from Featherstone Road to Mary s Way (1.4 miles) 36

Route 1/123 Interchange Woodbridge Magisterial District Purpose: Construct grade separated interchange Construction activities continue. Traffic switch to northbound lanes occurred recently. Bridge deck and retaining walls are underway. Status: Under Construction Phase I Route 1 widening from Annapolis Way to Mary s Way. Phase II Interchange, unfunded ($100M). 37

Route 638 Blackburn Road at Rippon Boulevard Woodbridge Magisterial District Purpose: Intersection improvements Will continue with the original scope of work. ROW acquisition will begin in late Spring 2018. Status: Under Design Construction advertisement Summer 2019 38

Southampton Street Sidewalk Purpose: Construct a sidewalk from Montgomery Avenue to Pine Lane Design was recently completed. Status: Under Design Design ended March 2018. Construction begins Summer 2018. Woodbridge Magisterial District 39

Neabsco Mills Commuter Garage Purpose: Construct a 1,414 space garage within the vicinity of the Neabsco Mills Widening Project. Project Summary: Construction of the garage will serve as a park and ride lot for commuters, relieving the capacity needs at the Route 1 and Route 234 park and ride lots. PWC DOT will conduct a location study. The agreement was approved by the BOCS on February 20, 2018. Status: Under Design Location study began March 2018. Location study ends July 2018. Design begins September/October 2018. Design ends Spring 2020. Various Magisterial Districts 40

OMNIRIDE I-66 Commuter Choice Purpose: Additional AM and PM bus service (Linton Hall Metro Direct), Flexible Vanpool Program and Commuter Lot Shuttles OMNIRIDE had three projects selected for inclusion in 2018 I 66 Commuter Choice Program of Projects. Projects are funded by I 66 Inside the Beltway toll revenues Additional morning and evening trip on Linton Hall Metro Direct Flexible Vanpool Program program funds software, hardware, promotion Commuter Lot Shuttles microtransit, neighborhood based, on demand Status: Awaiting CTB approval summer 2018 Various Magisterial Districts 41

OMNIRIDE Vehicle Purchases 31 new OMNIRIDE MCI buses were authorized for purchase at the May 2018 PRTC Commission Meeting. Will replace 2002 vintage buses New passenger amenities such as charging ports for electronic devices Feature full camera system for interior and exterior of the vehicle Some older vehicles will remain for contingency use 6 more buses will be purchased in the fall using recent Federal grant funding Status: Buses will arrive in Fall 2018 Various Magisterial Districts Purpose: Purchase replacement vehicles to replace aging buses, improving service reliability and provide resources for future growth 42

Route 28 Corridor Improvements NEPA Process Various Magisterial Districts Purpose: Complete the NEPA process to determine the best alternative to relieve congestion on Route 28 Project Summary: Project consists of completing the National Environmental Policy Act (NEPA) process to select and identify the impact/benefits of a preferred alternative to alleviate the congestion around the Route 28 Corridor. The initial feasibility study began by identifying and evaluation 14 preliminary alternatives. NEPA Process began Spring 2018. NEPA Process ends Spring 2021. 43

Future Project: Route 234 and University Boulevard Intersection Improvements Brentsville Magisterial District Purpose: Construct a quadrant intersection at the intersection of Route 234 and University Boulevard. Project Summary: This intersection was reviewed under the VDOT Strategically Targeted Affordable Roadway Solutions (STARS) Program. Funding requested as part of NVTA Six Year Program. 44

Future Project: Route 234 and Sudley Manor Drive Intersection Improvements Brentsville Magisterial District Purpose: Construct a continuous flow intersection at the intersection of Sudley Manor Drive and Route 234. Includes Wellington Road overpass. Project Summary: This intersection was reviewed under the VDOT Strategically Targeted Affordable Roadway Solutions (STARS) Program. Funding requested as part of NVTA FY18 23 Six Year Program. 45

Future Project: Route 234 and Brentsville Road / Dumfries Road Intersection Improvements Coles Magisterial District Purpose: Construct a bridge to grade separate the eastern intersection of Prince William Parkway/Dumfries Road and convert Prince William Parkway/Bradley Cemetery Way to a continuous green T intersection. Project Summary: This intersection was reviewed under the VDOT Strategically Targeted Affordable Roadway Solutions (STARS) Program. Funding requested as part of NVTA FY18 23 Six Year Program. 46

Future Project: Route 234 and Clover Hill Road Intersection Improvements Coles Magisterial District Purpose: Construct a bowtie intersection at the intersection of Route 234 and Clover Hill Road. Project Summary: This intersection was reviewed under the VDOT Strategically Targeted Affordable Roadway Solutions (STARS) Program. Funding requested as part of NVTA FY18 23 Six Year Program. 47