ARAI/TA(4G)/GEN-MAINT/EXOSCAN-V/ Dated 26 th Mar 2009 CERTIFICATE FOR COMPLIANCE TO THE CENTRAL MOTOR VEHICLES RULES

Similar documents
ARAI/TA(4G)/SMS/D680/ Dated 28 Jan 2010

ARAI/TA (4G)/AIRVISOR/AVG500/ Dated 17 th Apr 2017

ARAI/TA(4G_RV)/HORIBA/MEXA 584L/ Dated 25 Mar 2014

ARAI/TA(4G_RV)/SMS/D680/ Dated 21 st Mar 2015 CERTIFICATE FOR COMPLIANCE TO THE CENTRAL MOTOR VEHICLES RULES

one filter having K between 1.5 and 2.5 m -1

AGREEMENT. done at Vienna on 13 November Addendum 1: Rule No. 1. Revision 1

1 [94. NOISE LIMIT FOR GENERATOR SETS RUN WITH DIESEL

Technical Requirements of Fuel Tanks for Agricultural Tractors

Requirements of Ballast Mass for Agricultural Tractors

ECE/RCTE/CONF/4/Add.1/Rev.2

Automotive CNG/LPG Vehicles Test Method to Evaluate the Range

Requirements of Load Platforms of Agricultural Tractors

REQUEST FOR INFORMATION (RFI) : LIGHT BULLET PROOF VEHICLE (LBPV)

Driver-Perceived Noise Level of Agricultural Tractors - Method of Measurement

EDS REPLY. Point No.2 Past-production details duly authenticated by DMG since Reply

To facilitate the extension of departmental services through third party testing organizations as provided for by CRS (b)

Reference: C.N TREATIES-2 (Depositary Notification) DRAFT RULE NO. 1

Date of hosting on website: 30 th August 2018 Last date for comment: 14 th September 2018

AUTOMOTIVE INDUSTRY STANDARD

Electric Power Train Vehicles - Method of Measuring the Range

Chapter 16. This chapter defines the specific provisions regarding type-approval of hybrid electric vehicles.

TECHNICAL SPECIFICATION FOR 11 KV CAPACITOR BANK

Electric Power Train Vehicles - Method of Measuring the Range

THE BATTERIES (MANAGEMENT AND HANDLING) RULES, 2001 NOTIFICATION

Electric Power Train Vehicles Measurement of Net Power and The Maximum 30 Minute Power

MINISTRY OF ENVIRONMENT AND FORESTS NOTIFICATION New Delhi, the 16 th May, Amended by notification S.O.1002(E), dated 4 th May, 2010)

Central Electronics Limited Materials Management Division

(LAST DATE OF SUBMISSION: ) QUOTATION FOR ANNUAL MAINTENANCE CONTRACT OF SERVERS, COMPUTERS, PRINTERS, NETWORKING AND LAN

Electric Power Train Vehicles Measurement of Net Power and The Maximum 30 Minute Power

CMVR Type Approval for Hybrid Electric Vehicles

SPECIFICATION FOR REWIRABLE FUSES (KITKAT FUSES) 100A & 200A SPECIFICATION NO.: DIST/ A- KIT /

SAKHALIN ENERGY INVESTMENT COMPANY LTD. INVITATION TO TENDER

Every manufacturer of an agricultural tractor shall meet the following requirements for the tractor model before granting the type approval.

CITY OF SALEM, ILLINOIS ALTERNATIVE TRANSPORTATION APPLICATION AND INSPECTION REPORT (GOLF CARS) Applicant Name:

TECHNICAL SPECIFICATION FOR 11 KV AUTOMATIC CAPACITOR SWITCH

Section 1 Scope of application

Date of hosting on website: 22 nd December 2016 Last date for comments: 6 th January 2017

HARYANA POWER GENERATION CORPORATION LIMITED Regd. Office C-7, Urja Bhawan, Sector-6, Panchkula Corporate Identity Number: U45207HR1997SGC033517

CITY OF HAMILTON BY-LAW NO

Battery Operated Vehicles - Method of Measuring the Range

LCB File No. R PROPOSED REGULATION OF THE STATE ENVIRONMENTAL COMMISSION

E/ECE/324/Rev.2/Add.102/Rev.1 E/ECE/TRANS/505/Rev.2/Add.102/Rev.1

7 The revised IS 8034:2002 and revised STI be implemented w.e.f. 1 Feb 2005.

Requirements of Driver s Field of Vision for Agricultural Tractors

Agricultural Tractors - Rear View Mirrors - Installation Requirements

As Introduced. 132nd General Assembly Regular Session S. B. No

THE EMPIRE DISTRICT ELECTRIC COMPANY P.S.C. Mo. No. 5 Sec. 4 1st Revised Sheet No. 23

Requirements for Metallic Fuel Tanks of Automotive Vehicles

TERMS AND CONDITION OF USE FOR THE AUTHORISED VEHICLE AREA

PART X SUB PART (B): DETAILS OF STANDARDS OF VISIBLE AND GASEOUS POLLUTANTS FROM DIESEL ENGINES FOR CONSTRUCTION EQUIPMENT VEHICLES

KAUAI ISLAND UTILITY COOPERATIVE KIUC Tariff No. 1 RULE NO. 17 NET ENERGY METERING

SANDAG Vanpool Program Guidelines as of February 2018

PRINTED BY THE AUTOMOTIVE RESEARCH ASSOCIATION OF INDIA P. B. NO. 832, PUNE ON BEHALF OF AUTOMOTIVE INDUSTRY STANDARDS COMMITTEE

DEALER REGISTRATION PACKAGE

Solar Energy Corporation of India Limited New Delhi Expression of Interest for Setting up of Solar PV Manufacturing Capacities in India

Forensic Sciences Chapter ALABAMA DEPARTMENT OF FORENSIC SCIENCES ADMINISTRATIVE CODE CHAPTER IGNITION INTERLOCK RULES

भ रत य रज़वर ब क RESERVE BANK OF INDIA. RBI/ /103 DPSS.CO.PD No.1463/ / January 08, 2019

PETROLEUM PRODUCTS INSPECTION OPERATIONS MANUAL

Amendment No July 2015 AIS-050: 2004

COMHAIRLE CONTAE DHÚN LAOGHAIRE - RÁTH AN DÚIN DÚN LAOGHAIRE RATHDOWN COUNTY COUNCIL

Economic and Social Council

DEPARTMENT OF HEALTH

SIAM Viewpoint for improved Inspection & Maintenance in India GITE Regional Workshop on Transport Sector Inspection & Maintenance Policy

No. TE/F-814/16/WO- 145/ Dt

BYD B-Box Limited Warranty Letter

HOW TO ADD A NEW CLASS OF VEHICLE TO THE EXISTING DRIVING LICENCE? i. ADDRESS PROOF: (To produce any ONE of the following)

CONTENTS. Introduction. Thank you for purchasing the AlcoSense Precision+ breathalyser.

Abu Dhabi Department of Transport Application Form Non Objection Certificate (NOC)

Supply of Batteries

For IS: (Part 4): 1987 General requirements for rims for Automotive Vehicles - Part 4 - Scooters and scooter derivative rims

DEPARTMENT OF REVENUE. Division of Motor Vehicles Title and Registration Section

Automotive Vehicles Bumper fitment on M1 Category of Vehicles Test Methods

This Part applies to the emissions of visible pollutants from compression ignition engined (diesel) vehicles, effective from 1st April 1991.

REGIONAL MANAGER (VADODARA REGION)

New Ulm Public Utilities. Interconnection Process and Requirements For Qualifying Facilities (0-40 kw) New Ulm Public Utilities

4.1 Type of the valve and materials of construction of body and trim shall be as specified in valve Data sheet.

THE GENERAL ASSEMBLY OF PENNSYLVANIA SENATE BILL REFERRED TO ENVIRONMENTAL RESOURCES AND ENERGY, FEBRUARY 6, 2017 AN ACT

DEPARTMENT OF STATE POLICE TRAFFIC SAFETY DIVISION TESTS FOR BREATH ALCOHOL

PORT AUTHORITY OF THE CAYMAN ISLANDS

v.meku rfkk fudksckj iz kklu ANDAMAN & NICOBAR ADMINISTRATION ifjogu funs kky; DIRECTORATE OF TRANSPORT Guidelines

Decree of the Ministry of Transport and Communications

COUNTY ROAD COMMISSION RULES FOR THE MOVEMENT OF OVERSIZE OR OVERWEIGHT VEHICLES AND LOADS

TENDER FOR DG SET. Tender for DG SET. POCKET-14, SECTOR-8, PHASE-1, DWARKA, NEW DELHI Website: TENDER DOCUMENTS FOR

THE CORPORATON OF THE TOWN OF MIDLAND VEHICLE TOWING AND POUND SERVICES 2018/2019 TENDER L

Changes in technical requirement to add Off Vehicle Charging range.

NCC Leisure Battery Verification Scheme. Leisure Accommodation Vehicles

Adam Equipment LHS SERIES. (P.N , Revision A March 2012)

EUROPEAN COMMISSION DIRECTORATE-GENERAL TAXATION AND CUSTOMS UNION Customs Policy, Legislation, Tariff Customs Legislation TRANSIT MANUAL AMENDMENT

TRANSMISSION LICENCE NO. 1 OF 2011 LICENCE FOR TRANSMISSION OF ELECTRICITY IN THE STATE OF MAHARASHTRA

AMENDMENT NO April AIS-071(Part 2):2009. Automotive Vehicles - Control Location and Operation Requirements

Rule No. 1. Scope Definitions Periodicity of technical inspections Technical inspection Inspection requirements...

Date of hosting on website: 26 th October 2017 Last date for comments: 25 th November 2017

AMENDMENT NO. 2 To AIS 018/2001. Automotive Vehicles -Speed Limitation Devices Specifications 1. Page No. 1, clause No.

Amendment No August 2014 To AIS-070: Requirements of Temporary Cabin for Drive-Away-Chassis Configuration Vehicles

Amendment No th September 2016 To AIS 037: Procedure for Type Approval and Establishing Conformity of Production for Safety Critical Components

Amendment No August, 2015 To AIS-037 Procedure for Type Approval and Establishing Conformity of Production for Safety Critical Components

Application for Operation of & Net Metering for Member-Owned Generation Name: Mailing Address: City: County: State: Zip Code: _

WELLINGTON, NEW ZEALAND. PURSUANT to sections 152 and 155(a) and (b) of the Land Transport Act 1998

PULAU UBIN VEHICLE SCHEME

Transcription:

CERTIFICATE FOR COMPLIANCE TO THE CENTRAL MOTOR VEHICLES RULES M/s Gen-Maint 106-107, New Diamond Premises Coop. Soc. Ltd. Off. Western Express Highway Goregaon (E) Mumbai 400 063 Cert Annex Drg Tot al 1 6 0 7 pgs Exhaust Gas Analyser Model EXOSCAN-V from M/s Gen-Maint, Mumbai, was examined and tested as per the test procedure approved by Ministry of Shipping, Road Transport and Highways, Government of India, New Delhi, and specified in MoRTH/CMVR/TAP-115/116, Issue No.3, Part-VIII for 4-gas analyser. Based on the above, it is certified that the 4-Gas Analyser Model EXOSCAN-V manufactured and marketed by M/s Gen-Maint, Mumbai, meets the requirements of the provisions of Rule 116(3) of the Central Motor Vehicles Rules 1989, as amended up-to-date, for the 4-gas analyser. The 4-Gas Analyser Model EXOSCAN-V is suitable for measurement of idling CO and HC of in-use vehicles fitted with SI engines as per CMVR 115(2), subject to following conditions : i. The supplier shall abide by the Code of Practice attached herewith as Annexure-A. The supplier has already submitted an affidavit to this effect. ii. The supplier shall enter into AMC agreement on annual basis with the authorized PUC Test Centres to whom this model is supplied. The AMC terms shall be as per the Code of Practice referred in (i) above. This Type Approval certificate is valid for the period of 5 years from the date of its issue or any amendment in the test procedure, whichever is earlier. The first Conformity of Production testing will be due on or before 25 th Mar 2011 or production of 200 units from 26 th Mar 2009, whichever is earlier. Authorised Signatory A. B. Komawar Shrikant R.Marathe Sr. Deputy Director Director Place of Issue : Pune Ref : i) Type Approval Test Report No.ARAI/AED/CT/OC-0809-20/194 Dated 26 th Mar 2009 Page 1 of 7

ANNEXURE - A (1 Page) CODE OF PRACTICE FOR PUC EQUIPMENT MANUFACTURER / SUPPLIER 1. PUC equipment manufacturer / supplier should include the description of the test procedure described in Part I or Part II, whichever is applicable, amended from time to time of the document MOST/CMVR/TAP 115/116 in the user s manual of the PUC equipment. PUC equipment manufacturer / supplier shall keep PUC operator informed about the changes in the test procedure in future. 2. PUC equipment manufacturer/ supplier shall supply copy of type- approval certificate with date of validity along with the PUC equipment. 3. The validity of the type approval certificate of the PUC equipment shall be 5 years, after the expiry of which the PUC equipment manufacturer/ supplier shall get it re-validated from the test agency. 4. PUC equipment manufacturer / supplier shall provide the status of production/ supply of PUC equipment at a regular interval of 1 year to the test agency from where the equipment has been certified. 5. PUC equipment manufacturer / supplier shall submit the equipment for COP as per procedure mentioned above. 6. PUC equipment manufacturer / supplier shall enter into AMC on annual basis with the authorised PUC test agency based on charges as approved and finalized in EECG meeting as per Annexure-4. This AMC contract shall include 3 visits and equipment as per field procedure given in Annexure-1. PUC equipment manufacturer/ supplier shall provide certificate as per format given in the Annexure-2. 7. PUC equipment manufacturer / supplier shall train minimum 3 operators of PUC test agency and shall provide training certificate as per format given in Annexure 3. *********** Page 2 of 7

ANNEXURE 1 TO ANNEXURE A (2 Pages) FIELD CALIBRATION PROCEDURE FOR TESTING OF GAS ANALYSERS 1.0 INTRODUCTION This procedure has to be carried out on gas analysers after they are commissioned in the field and for the subsequent. 2.0 TESTING The test procedure for gas analysers is as follows: i) Check that the power supply is as per specifications of the manufacturer and electrical earthing is proper. ii) iii) iv) Check that all the accessories as per manufacturer are available and are functioning properly. Check the span and zero using sample gas of suitable value for CO as well as HC. Check the electrical. v) Check that the sampling system is leak proof. vi) vii) The printer is working correctly and the print out details are correct. Checking of 1 no. of vehicle for idling emission measurement using this analyzer. ************ Page 3 of 7

1.0 INTRODUCTION 2.0 TESTING ANNEXURE 1 TO ANNEXURE A (2 Pages) (contd..) FIELD CALIBRATION PROCEDURE FOR TESTING OF SMOKE METERS This procedure has to be carried out on meters after they are commissioned in the field and for the subsequent. The test procedure for smoke meters is as follows: i) After the warm-up of the meter, the of the meter has to be checked at zero and midscale point with the neutral density filter available. The value must lie within 0.1 m -1. ii) iii) iv) The meter shall have the standard accessories as specified by the manufacturer. It shall be checked that the sample hose, internal pipes etc are not deteriorated or damaged to ensure that there is no leakage. The functionality of oil temperature and RPM sensor. The heating system for the optical chamber is functioning. v) The purge air system is working correctly. vi) vii) viii) ix) Visual displays are functioning correctly. The printer is working correctly and the printout details are correct. The instrument casing is proper and has proper electrical earthing. Free acceleration test is carried out using a vehicle and the print out details are checked. ************ Page 4 of 7

ANNEXURE 2 TO ANNEXURE A (1 Page) CALIBRATION CERTIFICATE FORMAT 1.0 Component: PUC equipment model: Sr. No. 2.0 PUC Center Registration No.: 3.0 Objective of the test: To carry out Physical check and of gas Analyser / Smoke meters as per the test procedure specified in Annexure 1 of CMVR / TAP 115-116 Part-8. 4.0 4.1 Detailed Observations Checking of supply/ earthing 4.2 Checking of accessories: 4.3 Span Calibration Details of accessories checked. OR 1. Details of span gas concentration % 2. Calibration gas cylinder No.: 3. Calibration gas cylinder make: 4. Calibration gas validity date: 5. Details of Natural Density filters used for mid point 4.4 Electrical Calibration OK/ Not OK 4.5 Leak test: Passed/ Failed 5.0 One no of petrol / diesel vehicle checked for idling Emission / Free acceleration, measurement 6.0 Conclusion: 7.0 Next Calibration Due Date: Signature & Seal of manufacturer/ Supplier Page 5 of 7

ANNEXURE 3 TO ANNEXURE A (1 Page) TRAINING CERTIFICATE PUC Operator Photograph It is to certify that Mr. / Mrs. has attended the training and knows all required operation of the smoke meter / Gas Analyser model to perform PUC tests. Training is given in the following areas: Understanding of procedure for testing of Idling emission/ free acceleration smoke as CMVR/ TAP/ 115/116 procedure. 1. Normal thermal condition of the vehicle 2. Actual testing procedure 3. Procedural understanding of issue of PUC certificate Operation of smoke meter / Gas analyzer 1. Vehicle testing mode 2. Zero Calibration 3. Span 4. Electronic 5. Leak test Maintenance 1 Replacement of filters 2 General maintenance ************* Authorized Signature & seal of manufacturer / supplier Page 6 of 7

ARAI/TA(4G)/GEN-MAINT/EXOSCAN-V/0809-13 Dated 26 th Mar 2009 ANNEXURE-4 TO ANNEXURE-A (1 Page) AMC CHARGES Sr. No. Details 4 Gas Analyser 2 Gas Analyser Smoke Meter 1. Maintenance done at centralized station of PUC equipment manufacturer Rs.5,700/- + Rs.750/- per Rs.3,750/- + Rs.750/- per Rs.4,500/- 2. Maintenance done at PUC center s place Rs.9,500/- + Rs.1,500/- per Rs.6,250/- + Rs.1,500/- per Rs.7,500/- Note: 1. For 2/4-gas anlyser, PUC equipment manufacturer shall provide the gases required for. 2. For smoke meter, the AMC charges include with neutral density filter (NDF) by PUC equipment manufacturer. *************** ARAI issues Type Approval Certificates for vehicles / components / parts / assemblies etc., based on the documents produced / submitted by the customer and on these basis, the vehicles / components / parts / assemblies, etc., are examined and if approved, the certificate is issued. ARAI is in no way responsible for any misuse of copying of any design / type / system in connection with entire vehicle / components / parts and assemblies. Breach of any statutory provision of Indian laws or laws of other countries, will be the sole responsibility of the customer and ARAI shall not be liable for any claims or damages, made by the party, whatsoever. The customer shall alone be liable for the same and undertakes to indemnify ARAI in this regard. Further, the ARAI has the right to initiate cancellation / withdrawal of the certificate issued, in case of any fraud, misrepresentation, when it surfaces and comes in the knowledge of ARAI. The appropriate local courts at Pune shall have the jurisdiction in respect of any dispute, claim or liability arising out of this certificate. Page 7 of 7