The Rollover Request customer accepts a reservation term for the rollover at least as long as that offered by any competing customer.

Similar documents
ROLLOVER RIGHTS OF LONG TERM FIRM TRANSMISSION SERVICE

CHAPTER 25. SUBSTANTIVE RULES APPLICABLE TO ELECTRIC SERVICE PROVIDERS.

THE EMPIRE DISTRICT ELECTRIC COMPANY P.S.C. Mo. No. 5 Sec. 4 1st Revised Sheet No. 23

MISSOURI SERVICE AREA

Portland General Electric Company Fourteenth Revision of Sheet No P.U.C. Oregon No. E-18 Canceling Thirteenth Revision of Sheet No.

Proposed Incorporation of Merced Irrigation District into ISO Balancing Authority Area in Stakeholder Webconference February 28, 2013

BC Hydro OATT - Balancing Area Transmission Service Workshop. January 20, 2014

Schedule SP SOLAR PURCHASE (Experimental)

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

D.P.U A Appendix B 220 CMR: DEPARTMENT OF PUBLIC UTILITIES

Procedure in the case of connection requests by power plant operators for the purpose of feeding into the Amprion grid

Overview of S.L Competitive Energy Solutions for North Carolina

SYNOPSIS OF PROPOSED GEORGIA DEPARTMENT OF PUBLIC SAFETY RULES CHAPTER TRANSPORTATION NETWORK COMPANIES AND TAXI SERVICES

CHAUFFEUR PERMIT AND REGULATION BYLAW, 2016, NO. 3002

JEA Distributed Generation Policy Effective April 1, 2018

Decision on Merced Irrigation District Transition Agreement

RAPPAHANNOCK ELECTRIC COOPERATIVE SCHEDULE NEM-8 NET ENERGY METERING RIDER

Participation of Beacon Power s Flywheel Energy Storage Technology in NYISO s Regulation Service Market

FITCHBURG GAS AND ELECTRIC LIGHT COMPANY NET METERING SCHEDULE NM

MISSOURI SERVICE AREA

TERMS AND CONDITIONS

INTERCONNECTION STANDARDS FOR CUSTOMER-OWNED GENERATING FACILITIES 25 kw OR LESS PUBLIC UTILITY DISTRICT NO. 1 OF CHELAN COUNTY

SCE s 2017 Integrated Distributed Energy Resources Request for Offers ( IDER RFO ) Market Awareness Webinar. August 30, 2017

Merger of the generator interconnection processes of Valley Electric and the ISO;

Senate Substitute for HOUSE BILL No. 2101

University of Alberta

Department of Market Quality and Renewable Integration November 2016

FITCHBURG GAS AND ELECTRIC LIGHT COMPANY NET METERING SCHEDULE NM

1. Reference: BC Hydro Evidence - Page 5, line 12

Commercial Driver s License Drug and Alcohol Clearinghouse Frequently Asked Questions

(2) Scope. 220 CMR applies to all Distribution Companies subject to the jurisdiction of the Department.

WASHINGTON ELECTRIC COOPERATIVE, INC. NET METERING TARIFF POLICY BULLETIN NO. 38 NM

BC Hydro writes in compliance with Exhibit A-4 to provide its Final Submission in respect of the Application (Exhibit B-1).

Southern California Edison Original Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Cal. PUC Sheet No.

H 7366 S T A T E O F R H O D E I S L A N D

California s RPS Program: Progress Towards California s 33% RPS Goal and the Role of Concentrating Solar Power CSP Conference

Review of Reliability Must-Run and Capacity Procurement Mechanism BBB Issue Paper and Straw Proposal for Phase 1 Items

RATE 765 RENEWABLE FEED-IN TARIFF

24. SOLAR INCENTIVE PROGRAM II

Ch. 60 PERMANENT REGISTRATION CHAPTER 60. PERMANENT REGISTRATION OF FLEET VEHICLES

Frequently Asked Questions New Tagging Requirements

As Introduced. 132nd General Assembly Regular Session S. B. No

Reactive Power Requirements and Financial Compensation. Addendum to Draft Final Proposal

Application for Commission Approval to Construct a Generating Station Pursuant to Public Utilities Article Section and

Legal Considerations Related to Distributed Energy Resources

Interconnection and Net Metering Service in Ohio

1065 Woodman Drive Twelfth Revised Sheet No. T8 Dayton, Ohio Page 1 of 5

RULES ENABLING THE NET- METERING PROGRAM FOR RENEWABLE ENERGY

EXTRA ORDINARY 16 AASHAADHA, 1937(S) BIHAR ELECTRICITY REGULATORY COMMISSION

STATE CORPORATION COMMISSION DIVISION OF PUBLIC UTILITY REGULATION. May 22, 2018

Renewable Portfolio Standard Procurement Plan. November 12, 2013 Docs No:

WASHINGTON ELECTRIC COOPERATIVE, INC. NET METERING TARIFF POLICY BULLETIN NO. 38 NM

CN is offering our Fleet Integration Program for grain shippers who are using privately owned, covered hopper cars for

P.S.C.U. No. 50 Original Sheet No ROCKY MOUNTAIN POWER ELECTRIC SERVICE SCHEDULE NO. 136 STATE OF UTAH

Proxy Demand Resource FERC Order. Margaret Miller Manager, Market Design & Regulatory Policy August 24, 2010

Thank you for your time and attention to this matter. Please feel free to contact me if you have any questions regarding the filing.

THE PUBLIC SERVICE COMMISSION OF WYOMING

NSTAR ELECTRIC COMPANY M.D.P.U. No. 28 EASTERN MASSACHUSETTS CAMBRIDGE SERVICE AREA GENERAL SERVICE

MMP Investigation of Arthur Kill 2 and 3

The Commonwealth of Massachusetts

E/ECE/324/Rev.1/Add.48/Rev.6/Amend.3 E/ECE/TRANS/505/Rev.1/Add.48/Rev.6/Amend.3

Service Requested 150 MW, Firm. Table ES.1: Summary Details for TSR #

Policy Bulletin No. 25 Net Metering. Public Utility District No. 1 of Klickitat County 1313 South Columbus Goldendale, WA 98620

City of, Kansas Electric Department. Net Metering Policy & Procedures for Customer-Owned Renewable Energy Resources

Umatilla Electric Cooperative Net Metering Rules

PUBLIC SERVICE ELECTRIC AND GAS COMPANY PROPOSAL FOR BASIC GENERATION SERVICE REQUIREMENTS TO BE PROCURED EFFECTIVE JUNE 1, 2016

Bihar Electricity Regulatory Commission Vidyut Bhawan, J.L.Nehru Marg, Patna

RENEWABLE ENERGY PROGRAM Step 1, Section 1 ENROLLMENT FORM FOR LEASED RESIDENTIAL AND SMALL COMMERCIAL PHOTOVOLTAIC AND WIND TURBINE SYSTEMS

DEPARTMENT OF TRANSPORTATION. Hours of Service; Electronic Logging Devices; Limited 90-Day Waiver; Truck Renting and Leasing Association, Inc.

Official Journal of the European Union. (Non-legislative acts) REGULATIONS

Net Metering & Compensation Seminar

NOTICE OF REGULARLY SCHEDULED BOARD MEETINGS

September 9, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E., Room 1A Washington, DC 20426

Net Energy Metering and Interconnections. Community Solar in the District of Columbia

MENARD ELECTRIC COOPERATIVE POLICY MANUAL. SECTION IV Operating Rules for Cooperative Members

A Guide to the medium General Service. BC Hydro Last Updated: February 24, 2012

Southern California Edison Rule 21 Storage Charging Interconnection Load Process Guide. Version 1.1

City of Washington, Kansas Electric Department. Net Metering Policy & Procedure For Customer-Owned Renewable Energy Resources

ECOMP.3.A EUROPEAN UNION. Brussels, 12 December 2018 (OR. en) 2018/0220 (COD) PE-CONS 67/18 ENT 229 MI 914 ENV 837 AGRI 596 PREP-BXT 58 CODEC 2164

RIDER NM NET METERING

We are filing these changes now to allow affected third parties sufficient lead time to prepare their systems for this change.

Southern California Edison Revised Cal. PUC Sheet No. Withdrawn Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Renewable Energy Interconnection Manual for Small Size Systems ( 10kW in NM 20kW in TX) Renewables and Emergent Technologies Group

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

E/ECE/324/Rev.2/Add.102/Rev.1 E/ECE/TRANS/505/Rev.2/Add.102/Rev.1

Ohio Legislative Service Commission

STATE OF NEW HAMPSHIRE PUBLIC UTILITIES COMMISSION DE LIBERTY UTILITIES (GRANITE STATE ELECTRIC) CORP. d/b/a LIBERTY UTILITIES

First Revision of Sheet No P.S.C.U. No. 50 Canceling Original Sheet No ROCKY MOUNTAIN POWER ELECTRIC SERVICE SCHEDULE NO.

STATE LOAD DISPATCH CENTRES (SLDC)

To complete the process for a net metering interconnection, please follow the steps below:

Merchant Network Upgrade Proposed Solution

FERC NOPR on Integrating Renewable Energy Resources into the Transmission Grid

Agricultural Internal Combustion (IC) Engine Conversion Incentive Program Questions and Answers

Edi tor's note: T his version of paragraph (a) is effective until January 1, 2009.

KAUAI ISLAND UTILITY COOPERATIVE KIUC Tariff No. 1 RULE NO. 17 NET ENERGY METERING

P.L. 2007, c.348 Approved January 13, 2008

COMMUNITY SOLAR PROGRAM

REGISTRATION OF SPECIFIED EQUIPMENT (Adopted 5/21/97; Rev. Effective 11/15/00) (1) This rule applies to the following emission units:

EASTERN ILLINI ELECTRIC COOPERATIVE REGULATION NO. 26A

Transcription:

XX.X xx.xx ROLLOVER RIGHTS FOR LONG TERM FIRM SERVICE Overview Pursuant to Section 2.2 of the Tariff, long term firm transmission service customers (Network Integration Transmission Service ( NITS ) customers and Long Term Firm Point to Point ( LTFPTP ) customers) with contracts of five years or longer have a right to rollover their service for any number of years provided that: xx.xx Transition British Columbia Transmission Corporation determines at the time of the initial request that there is sufficient capacity available to accommodate the request beyond the term of the initial service request as described in Section xx.xx of this Business Practice. The Rollover Request is considered as a new service request with the exception that (a) a rollover request does not need to be studied in the same manner as a new request and (b) the customer requesting to rollover existing service request has the Right of First Refusal (ROFR) in the event of a competing request. The Rollover Request customer accepts a reservation term for the rollover at least as long as that offered by any competing customer. This business practice will be in effect on <insert date (Date 1)>, in accordance with the British Columbia Utilities Commission (BCUC) approval on <insert date (Date 2)> of BCTC s <insert title of BCTC compliance filing to implement the reforms to the pro forma OATT under FERC Order No. 890> to comply with the reforms to the pro forma OATT contained under FERC Order No. 890. This section defines the transition rules in the intervening period prior to when all firm transmission service customers will be governed by the same rollover rights provisions in Section 2.2 of the OATT [<effective Date 1>]. xx.xxx Transition Rules Customers with long term firm transmission service requests currently in BCTC s transmission queue as of <Date 1> that subsequently execute contracts of one year or longer have a right to rollover their service for any number of years, but subject to the conditions provided above in Section xx.xx Overview. For such customers, the five year contract commitment requirement and one year notice will not apply until the first rollover. Customers with existing long term firm transmission service as of <Date 1> have a right to rollover their service for any number of years provided British Columbia Transmission Corporation determines at the time of the initial request that there is sufficient capacity available to accommodate the request beyond the term of the initial service request. The following conditions apply to the roll over of such services: Page 1 of 6

Any customer with an existing contract that has less than five years left in its term as of <Date 1>, is required to give 60 day notice of whether it intends to exercise its roll over right. Any customer with an existing contract that has five or more years left in its term as of <Date 1>, is required to give one year notice of whether it intends to exercise its roll over right. Whether an existing long term firm transmission customer is required to give 60 days or one year notice when exercising its rollover right under its existing contract, the customer must enter into a minimum of five years of service and meet any of the other requirements of the reformed rollover right in order to retain a rollover right going forward. Any existing long term firm transmission customer that has given 60 days notice prior to <Date 1> to begin its rollover of service subsequent to <Date 1> will retain its rollover right on service of one year or longer, but subject to the conditions provided above in Section xx.xx Overview. For such customers, the five year contract commitment requirement and one year notice will not apply until the next applicable rollover date associated the service. xx.xx Evaluation of Initial Requests When a customer requests LTFPTP transmission service, British Columbia Transmission Corporation will evaluate the request for periods beyond the Stop Time of the request to determine if rollover will be available for future periods based on existing long term firm commitments. If this evaluation determines that insufficient capacity is available to accommodate the request in potential future rollover periods, the Service Agreement will stipulate that the customer will not be permitted to rollover its service beyond the period where sufficient capacity exists. The above evaluation includes situations where a transmission service request is analyzed before a higher queued priority competing request if the two requests cover different request periods. For example, British Columbia Transmission Corporation received two requests, an earlier queued request (A) for yearly service in 2008 (one year) and the later queued request (B) for service in 2007 (one year) and transmission capacity is available for each request in their respective time periods but not available for both transactions to occur simultaneously. Under this situation, British Columbia Transmission Corporation will offer service to B with no rollover right subject to the condition that service to A is confirmed. xx.xx Rollover Request The customer requesting to rollover existing service must submit a Rollover Request on OASIS pursuant to Section 17.1 or Section 29.2 of the Tariff, as applicable to LTFPTP or NITS customers, respectively. The Rollover Request must be received by BCTC no less than one year prior to the date on which the reservation expires, rolls over, or is renewed. Page 2 of 6

xx.xx Competing Request A new request for LTFPTP service submitted on OASIS to British Columbia Transmission Corporation by an Eligible Customer is considered a Competing Request for the same capacity with the Rollover Request of either a LTFPTP customer or a NITS customer if: 1. the new request has the same Start Time as the Rollover Request and extends beyond the Stop Time of the Rollover Request; 2. the new request is submitted prior to the Rollover Request; and 3. there is insufficient ATC to accommodate both the new request and the Rollover Request. A new request is not a Competing Request if it was determined by British Columbia Transmission Corporation that service cannot be granted to the new request due to constraint(s) not applicable to the Rollover Request. xx.xx Competing Upon deeming an application for a Rollover Request complete, British Columbia Transmission Corporation shall immediately notify the Rollover Request customer by e mail that the Rollover Request is accepted on the condition that the Rollover Request customer may be required to match on term to any Competing Request. British Columbia Transmission Corporation will identify all Competing Requests as described in Section xx.xx of this Business Practice and establish their Competing Priority. The Competing Priority determines the sequence of Competing Requests, whose terms the Rollover Request has to match and is established according to their service queue priority. British Columbia Transmission Corporation will post Rollover Requests and Competing Requests with their Competing Priority on its website. British Columbia Transmission Corporation shall start the Competing as soon as practicable. British Columbia Transmission Corporation shall notify Rollover Request customer(s) and Competing Request customer(s) of the date the Competing begins. British Columbia Transmission Corporation will process the Competing Requests, one at a time, starting with the Competing Request with the highest Competing Priority on OASIS as follows: 1. British Columbia Transmission Corporation shall notify the Competing Request with the highest Competing Priority via e mail of a counter offer. The counter offer will contain the following conditions: i) MW amount does not exceed the capacity held by the existing Rollover Request customer; and ii) Rollover Request does not exercise its ROFR. Page 3 of 6

2. The Competing Request customer shall confirm its acceptance of the counter offer within 15 Calendar Days via e mail. If the Competing Request customer does not confirm the counter offer within the specified time period, British Columbia Transmission Corporation shall consider that the Competing Request customer has refused the counter offer and remove the Competing Request from the Competing. British Columbia Transmission Corporation shall then make a counter offer to the Competing Request with the highest Competing Priority amongst the requests that remain in the Competing. 3. Once the counter offer is accepted by a Competing Request customer, British Columbia Transmission Corporation shall within one (1) Business Day notify the Rollover Request customer of a required match to the Competing Request via e mail. The Rollover Request customer may: i) submit on OASIS a Rollover Matching Request which is a new request that has the same attributes of the initial Rollover Request, except with a term matching that of the Competing Request and PRECONFIRMED Yes. ii) submit the Rollover Matching Request within three (3) Business Days after the day notification is made. 4. If the Rollover Request customer: i) submits a Rollover Matching Request, within the specified time period, the Rollover Matching Request will be granted. The Rollover Request customer will be required to execute a Service Agreement for the Rollover Matching Request. ii) does not submit a Rollover Matching Request within the specified time period, British Columbia Transmission Corporation will grant the capacity held for the Rollover Request customer to the Competing Request. The Competing Request customer will be required to execute a Service Agreement for the capacity granted. If there is more than one Rollover Request, then British Columbia Transmission Corporation shall subject the Rollover Requests to competition based on the time the rollover request is submitted i.e., the Rollover Request submitted last in time is the first to be asked to match a new Competing Request. A LTFPTP customer with redirected service on a non firm basis can only request to rollover the firm service as specified in its Service Agreement. xx.xx Examples For the following examples, it was assumed that any Competing Request can be accommodated up to 100 MW held by the Rollover Request without constraints. Page 4 of 6

xx.xxx Example 1 Rollover Request, A, requested to rollover a 100 MW service for 1 year, from January 1, 2009 to December 31, 2009. Competing Request, B, submitted earlier than A, requested a 100 MW service for five (5) years, from January 1, 2009 to December 31, 2013. Competing Request, C, submitted earlier than A but later than B, requested a 100 MW service for ten (10) years, from January 1, 2009 to December 31, 2018. Step 1 2. A matched the term of B. 3. A was granted to rollover its service of 100 MW for five years with further rollover right. 4. The Competing was concluded. xx.xxx Example 2 Rollover Request, A, requested to rollover a 100 MW service for five (5) years, from January 1, 2009 to December 31, 2013. Competing Request, B, submitted earlier than A, requested a 50 MW service for fifteen (15) years, from January 1, 2009 to December 31, 2023. Competing Request, C, submitted earlier than A but later than B, requested a 50 MW service for ten (10) years, from January 1, 2009 to December 31, 2018 Step 1: 2. A refused to match the term of B. 3. B was granted service of 50 MW for fifteen (15) years with rollover right. Step 2 1. A was asked to match the term of C. 2. A matched the term of C. 3. A was granted to rollover 50 MW of its service for 10 years with rollover right. 4. The Competing was concluded. Page 5 of 6

xx.xxx Example 3 Rollover Request, A, requested to rollover a 100 MW service for 1 year, from January 1, 2009 to December 31, 2009. Competing Request, B, submitted earlier than A, requested a 25 MW service for ten (10) years, from January 1, 2009 to December 31, 2018. Competing Request, C, submitted earlier than A but later than B, requested a 50 MW service for five (5) years, from January 1, 2009 to December 31, 2013. Step 1: 2. A refused to match the term of B. 3. B was granted service of 25 MW for ten years with rollover right. Step 2 1. A was asked to match the term of C. 2. A refused to match the term of C. 3. C was granted service of 50 MW for five years with rollover right. Step 3 1. A was granted to rollover 25 MW of its service for one year without rollover right. 2. The Competing was concluded. xx.xxx Example 4 Rollover Request, A, requested to rollover a 100 MW service for 1 year, from January 1, 2009 to December 31, 2009. Competing Request, B, submitted earlier than A, requested a 1000 MW service for ten (10) years, from January 1, 2009 to December 31, 2018. Step 1 2. A refused to match the term of B. 3. 100 MW was granted to B as part of its partial interim service for ten years pending the result of its System Impact Study. 4. The Competing was concluded. Page 6 of 6