WELCOME PUBLIC OPEN HOUSE FOR US-64 FROM THE SH-18 INTERSECTION EAST 6.5 MILES JANUARY 10TH, 2017 PAWNEE CITY HALL, 5:30 PM

Similar documents
EXCEPTION TO STANDARDS REPORT

SH 249 IN GRIMES COUNTY. Open House April 3, 2014

US 81 Bypass of Chickasha Environmental Assessment Public Meeting

FREQUENTLY ASKED QUESTIONS

FREQUENTLY ASKED QUESTIONS

IH 35 FEASIBILITY STUDY

PUBLIC MEETING. Bear Creek Park Community Center. January 24, :30 pm to 7:30 pm

Public Meeting. SD Highway 28 From US81 W 11 miles through Lake Norden Hamlin County PH 0028(37)329 PCN 04JY

VIADUCT LOCATION STUDY. October 19, 2009

COUNTY ROAD SPEED LIMITS. Policy 817 i

Characterization of Combined Use of County Road Segment

Highway 18 BNSF Railroad Overpass Feasibility Study Craighead County. Executive Summary

Purpose and Need Report

Rolling Road (Route 638) Widening Project

STH 60 Northern Reliever Route Feasibility Study Report

PUBLIC INFRASTRUCTURE PROJECTS

MAP OR PHOTO. Public Meeting & Open House July 23, Project Roadway Limits From: FM 1957 To: FM 471. Counties Bexar & Medina

TRAFFIC DEPARTMENT 404 EAST WASHINGTON BROWNSVILLE, TEXAS City of Brownsville Speed Hump Installation Policy

The Design-Builder shall meet local road criteria provided by the local governing agencies.

COUNTY ROAD SPEED LIMITS. Policy 817 i

IMPROVEMENT CONCEPTS

STATE ND PROJECT NO. CP 0883 (14) & CP 1152 (14) SHEET NO. TOTAL SHEETS 9 31 SIGN NUMBER SIGN SIZE DESCRIPTION AMOUNT REQUIRED UNITS PER AMOUNT UNITS

Construction Noise Memorandum

June WASHINGTON STATE DEPARTMENT OF TRANSPORTATION Alaskan Way Viaduct and Seawall Replacement Program Seattle, Washington

Request for Design Exception (#1) S.M. Wright Phase IIB

City of Houston Fondren Road Paving and Drainage

Public Meeting Summary And Responses to Comments

2 Min. Min. Edge of. Edgeline See Note 3 PLAN VIEW. See Note 3. This distance may vary

Brent Spence Bridge Design Exceptions - Alternative I

Over-Dimensional Vehicle Restriction Study for US 129 in TN

Brigham City 1200 West Box Elder Creek Bridge - Widening Project Type Reconstruction

Final Series of Public Meetings

Corridor Sketch Summary

800 Access Control, R/W Use Permits and Drive Design

Rocky Mount. Transportation Plan. Transportation Planning Division. Virginia Department of Transportation

Tulsa Transportation Management Area. Urbanized Area Surface Transportation Program

PLEASE SUBMIT THE CORRECT PERMIT FEE WITH PAGES 1 & 3 OF APPLICATION TO: OCONTO COUNTY HIGHWAY DEPT, P.O. BOX 138, OCONTO, WI 54153

Workshop Agenda. Bransford Roundabout. Bedford Intersection/Roundabout. Section 3 Revisions (Left turn lanes) Roadway Section/Curb Type Discussion

U.S. 81 Realignment Around Chickasha, Oklahoma Benefit-Cost Analysis Narrative

Engineering Report: Shasta-Trinity National Forest. Shasta McCloud Management Unit. Analysis of. National Forest System Road 37N79

APPENDIX A Basis of Design and Design Criteria Memorandum

PERFORMANCE ACTIVITY 603 SIGNS

Interstate Drive Extension

APPENDIX C. Existing Utilities

1. INTRODUCTION 2. PROJECT DESCRIPTION CUBES SELF-STORAGE MILL CREEK TRIP GENERATION COMPARISON

DESIGN STANDARDS SECTION DS 3 STREETS

FRESNO COUNTY SUBSECTION OF THE CALIFORNIA HIGH- SPEED TRAIN (HST)

OPEN HOUSE PUBLIC INVOLVEMENT MEETING. Stark County Garage Ohio Department of Transportation 4505 Atlantic Boulevard, Canton, OH 44705

The Eastern Connector Study November, 2007 planning for the future

Stormwater and sanitary sewer lines 8 inches in diameter or greater

DRIVEWAY STANDARDS EXHIBIT A. The following definition shall replace the definition of driveway in Section 62:

Turnpike Mitigation Program Application

Figure 1 Map of intersection of SR 44 (Ravenna Rd) and Butternut Rd

Turnpike Mitigation Program Application

Slow Down! Why speed is important in realizing your Vision Zero goals and how to achieve the speeds you need

CROW WING COUNTY HIGHWAY DEPARTMENT APPLICATION FOR PERMIT TO CONSTRUCT DRIVEWAY ACCESS TO ROADS UNDER COUNTY JURISDICTION CONSTRUCTION INFORMATION

CITY OF POWAY MEMORANDUM

WOLVERINE TO BHP JANSEN NEW TRANSMISSION LINE PROJECT FALL 2017

YELM HWY AND MERIDIAN RD INTERSECTION IMPROVEMENTS PROJECT CONTEXT

Lake County Building Department

1400 MISCELLANEOUS Traffic Engineering Manual

ODOT Transportation Safety. It All Starts With Crash Data

SPEED CUSHION POLICY AND INSTALLATION PROCEDURES FOR RESIDENTIAL STREETS

SH 249 PUBLIC MEETING DESIGN CHANGES FROM FM 2920 TO HARDIN STORE ROAD

S. WEST STREET EXTENSION ALTERNATIVES STUDY

Access Management Standards

Public Information Workshop

STATE LOOP 195 PUBLIC MEETING. Footer Text

REVIEW OF THE DRAFT 2011 VA WORK AREA PROTECTION MANUAL. December 14, 2010 David Rush VDOT WZS Program Manager

Challenges in a Post-Katrina Environment East-West Corridor Project Overview February, 2007

NCDOT Report on Improving Safety on Secondary Roads

Undergrounding Utilities on Grandview Ave.

New Jersey Turnpike Authority Interchange 6 to 9 Widening Program

Engineering Report: Shasta-Trinity National Forest. South Fork Management Unit. Analysis of. National Forest System Road 30N44

Exposition Corridor Transit Project

Traffic, Transportation & Civil Engineering Ali R. Khorasani, P.E. P.O. Box 804, Spencer, MA 01562, Tel: (508)

Western ND Meeting. February 19, 2014 Grant Levi, NDDOT Director

BOARD OF SUPERVISORS BUSINESS MEETING ACTION ITEM. Design Endorsement for Sterling Boulevard Extension

This corridor section will carry commuter trains from Portland to Longview/Kelso, CHSR inter-city and inter-city express trains.

Wentzville Parkway South Phase 2 & 2A

CITY OF TORRANCE PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION INFRASTRUCTURE UPDATE

ANDERSON PROPERTY SITE ANALYSIS

Open House. Highway212. Meetings. Corridor Access Management, Safety & Phasing Plan. 5:30 to 6:30 p.m. - Southwest Corridor Transportation Coalition

Clearlake Road (State Road 501) Project Development & Environment (PD&E) Study

West Broadway Reconstruction/LRT Design. March 19, 2015

Maintaining Pavement Marking Retroreflectivity

Section 6H.01 Typical Applications

TRAFFIC CALMING PROGRAM

RTID Travel Demand Modeling: Assumptions and Method of Analysis

SC Highway 41 Existing Conditions

Location Concept Plan Amendment Recommendation Approved 2011 Concept Plan

Due Diligence Review of Proposed Roads Pavement Rehabilitation in Baiyin District. PRC: Gansu Baiyin Urban Development Project

CHAPTER 15 STREET LIGHTING TABLE OF CONTENTS

SKIFFES CREEK CONNECTOR STUDY

Benefit-Cost Analysis Technical Memo

Guam Transportation Program Project Updates. Joanne M.S. Brown Director Carl Dominguez Deputy Director February 6, 2012

Traffic Engineering Study

CITY OF PORTSMOUTH DEPARTMENT OF PUBLIC WORKS (DPW) DRIVEWAY RULES AND PROCEDURES

Dockless Micromobility Regulatory Framework

Plan Check Policies and Guidelines

Transcription:

WELCOME PUBLIC OPEN HOUSE FOR US-64 FROM THE SH-18 INTERSECTION EAST 6.5 MILES JANUARY 10TH, 2017 PAWNEE CITY HALL, 5:30 PM 1

PURPOSE OF THIS OPEN HOUSE Present information about the proposed improvements to this section of US-64 2

PURPOSE OF THE PROJECT Improve safety on US-64 by adding shoulders, increasing sight distance and correcting unsafe curves 3

CURRENT PROJECT AREA INFORMATION General Data 2-Lane Roadway No Shoulders Steep side slopes Areas of limited sight distance Areas of substandard horizontal and vertical curves 4

CURRENT PROJECT AREA INFORMATION Traffic Data Current Traffic (2016): 1,500 Vehicles Per Day Future Traffic (2036): 2,100 Vehicles Per Day 15% Heavy Trucks Collision Data (2006-2016) Total: 28 Documented Accidents 8 Personal Property Damage 19 Injuries 1 Fatality Statewide Collision Rate Comparison (Rate = No. of Collisions per 100 Million Vehicle Miles) Overall Collision US-64 = 98.25 Statewide = 82.23 (For similar highways) Fatal Collision US-64 = 3.51 Statewide = 2.96 (For similar highways) Visible Injury US-64 = 28.07 Statewide = 24.59 (For similar highways) 5

COLLISION DATA 6

PROJECT CONSTRAINTS Property Use Residential Structures Commercial Structures Utilities Overhead Electric Underground Communication Lines Underground Water Lines Underground Oil and Gas Pipelines Potential Waters/Wetlands Potential Historical/Archaeological Resources Tribal Trust Property 7

PROPOSED IMPROVEMENTS 65 mph design speed Reconstruct substandard horizontal and vertical curves Constructed with 8 shoulders Flatten side slopes for improved safety Extend or replace drainage structures 8

ALTERNATIVE ALIGNMENTS SH-18 TO CAMP CREEK Alternative 1 Along Existing Impractical Construction Temporary Roadway Costs 38 Mile Detour Alternative 2 South Offset Crossovers at curves Difficult Construction Temporary Pavement and Easements Increased Construction Cost Increased Utility Relocations Right-of-Way Acquisition Commercial Buildings/Traditional Homes Tribal Trust Property Alternative 3 North Offset Simplified Construction Reduced Construction Cost Fewer Utility Relocations Right-of-Way Acquisition Mobile homes/shop building Tribal Trust Property 9

ALTERNATIVE ALIGNMENTS CAMP CREEK TO SKEDEE ROAD Alternative 1 Along Existing Impractical Construction Temporary Roadway 48.7 Mile Detour Alternative 3 North Offset Stream Impacts About 1,500 feet west of Skedee Road Alternative 2 South Offset Crossovers at curve Near old Railroad Crossing Impractical Construction Increased Construction Cost Increased Utility Relocations Alternative 4 Far North Offset (East of Camp Creek) Avoid Stream Impacts Simplified Construction Reduced Construction Cost Minimal Utility Relocations 10

OFFSET ALIGNMENT 11

OFFSET ALIGNMENT 12

OFFSET ALIGNMENT 13

SH-18 14

CAMP CREEK 15

FURTHER NORTH OFFSET AT UNNAMED TRIBUTARY TO CAMP CREEK 16

SKEDEE ROAD 17

PROJECT IMPACTS Potential Impacts Some acquisition of private property Some farmland loss Some acquisition of tribal trust property Residential and commercial property relocations 18

DURING CONSTRUCTION Maintain traffic during construction 19

CONSTRUCTION SCHEDULE 20

NEXT STEPS Receive comments from public Complete environmental studies document and obtain approval from FHWA Preliminary design Right-of-way acquisition and utility relocation Final design Construction 21

THANK YOU! Thank You For Attending Today s Open House For More Information on the Project, Contact David Saulsberry, CPM Division 8 Environmental Project Manager Okla. Dept. of Trans. (405) 521-2315 Environmental Programs DE Okla. Dept. of Trans. 200 NE 21 st Street Oklahoma City, OK 73105 (405) 521-3050 EMAIL: ODOT-Environment@odot.org Please submit all comments by Tuesday, January 24 th, 2017 For more information about ODOT Public Meetings, visit www.odot.org/publicmeetings Publicmeetings@odot.org 22