PM Light Tactical Vehicles

Similar documents
PM Light Tactical Vehicles

Project Manager COL Dave Bassett

Establishment of Light Tactical Vehicles Program Office

PM Medium Tactical Vehicles

NDIA Tactical Wheeled Vehicles (TWV) Conference 8 February 2010 COL Mark Barbosa, G-8

LtCol Tom Atkinson Program Manager

How Does Aging Manifest Itself?

JPO JLTV 2016 NDIA Tactical Wheeled Vehicle Conference Brief COL Shane Fullmer

PM Medium Tactical Vehicles

Integrated Trailer-ECU-Generator (ITEG)

JPO JLTV 2016 ARNG Sustainment Task Force COL Shane Fullmer

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 11 R-1 Line #130

2011 NDIA TWV Conference

MTV Overview. Product Manager Medium Tactical Vehicles. LTC Frank Bridges. DISTRIBUTION STATEMENT A: Approved for Public Release

Deputy Program Manager

Solar Power Adapters and Deployable and Renewable Alternative Energy Module

M-ATV/COUGAR/BUFFALO

PM Individual Weapons Ms. Barbara Muldowney

Transparent Armor Cost Benefit Study

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

Product Manager Crew Served Weapons Overview For the Small Arms Symposium & Exhibition National Defense Industrial Association

LAV PROGRAM UPDATE COMBAT VEHICLE CONFERENCE 22 SEPTEMBER

DDG 51 Program. Sea, Air, Space Exposition Washington, DC 04 April Presented by: CAPT Casey Moton, USN DDG 51 Program Manager PMS 400D

Commercial-in-Confidence Ashton Old Baths Financial Model - Detailed Cashflow

DMO REPORT Bushmaster Vehicles

Transparent Armor Cost Benefit Study

Caltrain Modernization EMU Procurement

UNCLASSIFIED. Total Prior to FY 2008 Cost. FY 2008 Cost. FY 2008 Award Date. Subtotal Product Development Continuing TBD TBD

ROUTINE. MWO effective date is 1 January 1996 and completion date is 31 December MODIFICATION WORK ORDER

PROTECTED FAMILY OF VEHICLES

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE A: Family of Heavy Tactical Vehicles

Muni Forward: Get On Board! Siemens S200 SF Light Rail Vehicle

Mega Engineering vehicles. the next generation of advanced apc

Navy League - Sea Air Space. Ship to Shore Connector (SSC) 3 May 2010

UNCLASSIFIED UNCLASSIFIED

TWV Conference. MG Mike Lenaers. 6 February Sustaining the Joint Force/Improving the Future Force. Unclassified

Alternative and Renewable Fuel and Vehicle Technology Program. Advisory Committee Meeting

M234 / M235 / M236 SELF-DESTRUCT FUZES

Solar Electric Propulsion Benefits for NASA and On-Orbit Satellite Servicing

NDIA TWV Conference. DISTRIBUTION STATEMENT A: Approved for Public Release

NAVAL POSTGRADUATE SCHOOL THESIS

Joint Assault Bridge (JAB)

TARDEC OVERVIEW. Tank Automotive Research, Development and Engineering Center. APTAC Spring Conference Detroit 27 March, 2007

PHASE 4 OVERLANDER PROTECTED MOBILITY VEHICLE LIGHT

Too Good to Throw Away Implementation Strategy

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

DMO REPORT Bushranger Vehicles

MODIFICATION WORK ORDER

Program Manager Light Armored Vehicles Expeditionary Warfare Conference 12 October 2016

ARMY TM AIR FORCE TO 36A12-1A MARINE CORPS TM /6B

Ensuring Future Effective Amphibious Assault Capability

Joint Light Tactical Vehicle Power Requirements

UNCLASSIFIED. Cost To Complete Total Program Element MQ1: MQ-1 Gray Eagle - Army UAV (MIP) FY 2016 Base

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

Mobilehome Park Utility Upgrade Program

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

Advancing the TWV Fleet 10 May 2016

STAFF REPORT ACTION REQUIRED

Gaining Ground. Michael Fabey/AW&ST

Exhibit R-2, RDT&E Budget Item Justification

RIGGING HIGH-MOBILITY MULTIPURPOSE WHEELED VEHICLES

Exhibit R-2, RDT&E Budget Item Justification

USMC Hybrid Power Efforts Jennifer Gibson

Aviation S&T: Future Vertical Lift & JMR Tech Demonstrator

Electric Vehicle Program

UNCLASSIFIED R-1 ITEM NOMENCLATURE

the High Mobility Multi-purpose Wheeled Vehicle (HMMWV) has served soldiers around the world. From peacekeeping operations to combat, the HMMWV has

CASED TELESCOPED SMALL ARMS SYSTEMS

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

Mine Resistant Ambush Protected (MRAP) Safety

RIGGING HIGH-MOBILITY MULTIPURPOSE WHEELED VEHICLES

Exhibit R-2, RDT&E Budget Item Justification February 2004

DEFENSE LOGISTICS AGENCY AMERICA S COMBAT LOGISTICS SUPPORT AGENCY

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*

Port Yard Hostler Demo Projects: Assessing LNG & Hybrid Yard Hostlers at POLB & POLA

Crew integration & Automation Testbed and Robotic Follower Programs

UNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base

UNCLASSIFIED FY 2017 OCO. FY 2017 Base

Presentation to the Customer Service, Operations and Safety Committee OPERATIONS PERFORMANCE INDICATORS

ARDEC Rapid Design Projects for Field Support Part 1

Draft Results and Open House

ANCR CRU Statistics February 2007 to December 2007

Shaping the future of the TWV Fleet

Washington Metropolitan Area Transit Authority Recommended Contracting Actions For Up To 217 Hybrid Electric & Clean Diesel Buses

UN Requirements for Aviation, Vehicles and/ in Peacekeeping Missions

PATH Integrated Railcar and Signal System Replacement Program

CLS Update European OMG Meeting 13 February 2008

UNCLASSIFIED 3/29/02. xxxgr.xx.02 46PMSW.1.02

Alvin Upgrade Project

U N I T E D S T A T E S M A R I N E C O R P S. U.S. Marine Corps (Ground) Liaison Report. 11 September L. Salzano

TITAN ON-BOARD VEHICLE POWER (OBVP) Dependable Power Where and When You Need It.

The Single Spool Core: A proven design for performance and simplicity

INVESTING IN GLOBAL GROWTH OPPORTUNITIES AND CHALLENGES FOR UK SUPPLY BASE.

Manufacturing Implications within. new DODI (Dec 8, 2008) Summary for Industry. National Center For Advanced Technologies.

TECHNICAL MANUAL UNIT MAINTENANCE

Pilot Study for Plug-In Hybrids

UNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base

Public Works Department

Glendale Water & Power Smart Grid Project

Transcription:

January 2010 PM Light Tactical Vehicles 1 Product Manager Mr. Dennis Haag MISSION ACAT 1C The lifecycle management of light battlefield distribution systems enabling the Modular, Joint and Expeditionary Ground Forces. Distribution Statement A: Approved for public release: Distribution is unlimited

Purpose and Agenda Purpose: HMMWV Updates Agenda: Opportunities for Business HMMWV Background HMMWV Fleet Overview HMMWV Evolution HMMWV Production & Improvements HMMWV Recap Light Tactical Trailer Production Challenges HMMWV Path Forward 2

10 Jul 08 HMMWV Business Opportunities 3 Full & Open Competition on HMMWV UAH RECAP RFI released in December 2009 Additional RFIs as material is developed. Goal is RFP release in March 2010 for ~60K vehicle fleet. Reduction of Sole Source Parts Would like 3 suppliers for every part. Continued emphasis on getting more suppliers qualified. Help from Industry Armor Weight Reduction Fire Suppression Survivability Reliability & Safety Upgrades

HMMWV Program Background ACAT 1C Program Milestone C 1983 As of 30 Dec 09, 162,589 trucks and 34,845 trailers have been fielded Contract Status: Completing deliveries on 2009 FY Contract by Dec 2010 Follow on Production Contract Competitive RECAP We will reach the Army AAO shortly (166,154 HMMWVs & 44,275 LTTs) Army will have greatly reduced demands for new production. 4

HMMWV Fleet Overview 5 M966 HMMWV TOW CARRIER M1025 HMMWV ARMAMENT CARRIER M998 HMMWV CARGO TROOP CARRIER M1037 HMMWV SHELTER CARRIER M1038 HMMWV SHELTER CARRIER M1097 HMMWV CARGO CARRIER M1097 HMMWV SHELTER CARRIER M1097R1 HMMWV RECAP M1035 HMMWV AMBULANCE 2 LITTER M996 HMMWV AMBULANCE 2 LITTER M997 HMMWV AMBULANCE 4 LITTER M1113 HMMWV EXPANDED CAPACITY VEHICLE (ECV) M1114 UP-ARMORED HMMWV (UAH) M1151 ENHANCED ARMAMENT CARRIER M1152 ENHANCED CARGO/TROOP CARRIER M1165 ENHANCED COMMAND AND CONTROL CARRIER M1167 ENHANCED TOW CARRIER UAH RECAP

HMMWV Evolution Block upgrades to increase payload and versatility 1984 Present Payload vs. Performance Tradeoffs 6 A0 Series (1984-93) 6.2L Diesel Engine 3 Spd Transmission 2,500 3,632 lb. Payload GVW: 7,700 lb. A1 Series (1991-95) Improved Driveline Improved Suspension 2,500 3,632 lb. Payload GVW: 10,000 lb. A2 Series (1994-Present) 6.5L Diesel Engine 4 Spd Electronic Trans 3,520-4,400 lb. Payload GVW: 10,300 lb. ECV (1993-Present) 6.5L Turbo Diesel Engine Suspension Upgrade Armor Capable 1,800 5,100 lb. Payload GVW: 12,100 lb. Current Op: >16,500 lb. ECV = Expanded Capacity Vehicle RECAP Payload: TBD GVW: TBD

HMMWV Production 7 Fielding to CONUS after SWA Requirement filled: 162,589 fielded to date (CONUS) Production rate: 64/day average Introduction model: M1167 (TOW Variant) Reliability & Safety Enhancements, to include: Armor coverage, Load range E wheel/tire assembly, Electrical upgrades, Lightweight doors, Suspension upgrades, LED lights, Mending Plate improvements, Fire Suppression System upgrades...

Reliability Enhancements Vehicle (REV) MAJOR CHASSIS MODS SINCE 2005 8

HMMWV Unarmored and UAH RECAP 9 Program Intent: Extend useful life of fleet at fraction of new production p cost Current Program (Since FY04) Convert early models to M1097R1 and M1025R1 models respectively providing: Models Eligible: M998/A1, M1025/A1, M1026/A1, M1037, M1038/A1, M1097/A1 more payload capacity (drive-train and suspension upgrades) extending economic useful life by 15 years Executed at Red River Army Depot - 21,895 complete to date Letterkenny Army Depot - 18,227 complete to date Maine Military Authority - 1,519 complete to date Total Recap Vehicles Produced - 41,641; Handed-Off (fielded) - 40,167 Un-armored RECAP ends FY10 due to meeting goal of 45K systems, with no future funding LEAD May / June FY10 MMA and RRAD Sep FY10 M1097R1s at 10 Mtn Div

HMMWV Fleet Path Forward 10 Future: Competitive RECAP UAH M-ECV

HMMWV Model Evolution 11

10 Jul 08 UAH HMMWV RECAP Modernization 12 Up-armored HMMWVs (UAH) RECAP Pilot Program Converts unarmored production configuration models with enhanced reliability components to UAH HMMWV s Conducting UAH RECAP / Modernization pilots at RRAD and LEAD 2QFY09 2 each M1113 s s and M1097 s s converted to assess viability of each to carry Armor Competitive UAH HMMWV RECAP Modernization Program planned for FY11 and beyond

HMMWV ECV RECAP MODERNIZATION RFI/RFP Milestones Initial Request For Information (RFI) Released - 8 Jan 10 RFI update with Automotive Tank Purchase Description (ATPD) and Survivability Specification (classified ) - 15 Jan 10 RFI Close - 22 Feb 10 DRAFT Request for Proposal (RFP) early Mar 10 Final Request for Proposal 31 Mar 10 Contract Award 4 th Quarter FY10 13

Light Tactical Trailer Production 14 Over 34,845 LTTs fielded to date New production contracts awarded in Aug 08 (2 Contractor awards) Production: 1600 / month combined 14