AIRWORTHINESS DIRECTIVE

Similar documents
SB-GA Issue 6

Airworthiness Directive Schedule

Ayres service bulletin Corporation

Airworthiness Directive Schedule

Nose Wheel Leg Attachment Angles - Replacement

Airworthiness Directive Schedule

Service Bulletin. SB-GA Issue 1. Subject: Horizontal Stabiliser Attachment Area Inspection and Reinforcement. Applicability: Amendments:

Airworthiness Directive Schedule

Airworthiness Directive Schedule

aileron rib inspection

Airworthiness Directive Schedule

Airworthiness Directive Schedule

Page: REV 1: In Step 4 "a minimum of 1/16 [1.6 mm] gap" was "an approximately 1/16 [1.6 mm] gap."

Airworthiness Directive Schedule

AEROPRAKT SERVICE BULLETIN. No. SB A22LS-17 REPLACEMENT OF RUDDER CONTROL SYSTEM CABLES AND FAIRLEADS OF A-22, A-22L, A-22L2 AND A-22LS AIRCRAFT

Hangar 6, Halfpenny Green Airport, Bobbington, Stourbridge, West Mids. DY7 5DY Tel: +44 (0) or SERVICE BULLETIN

Airworthiness Directive Schedule

VAN S AIRCRAFT, INC.

Cal Pacific Airmotive, Inc.

1154B. Piper Aircraft, Inc Piper Drive Vero Beach, Florida, U.S.A Date: March 28, 2007 (S)

TEMPORARY REVISION NUMBER

Please replace any copy of SEB07-2 with the attached copy of SEB07-2 Revision 1 which is printed in its entirety.

MAIN ROTOR BLADE ABRASION STRIP DAILY INSPECTION REQUIREMENTS

Airworthiness Directive Schedule

Airworthiness Directive Schedule

Nomad WINGS FUEL TANK BAYS FRONT AND REAR SPARS CORROSION INSPECTION

Single Engine. Service Bulletin TITLE ENGINE MOUNT BRACKET INSPECTION

Airworthiness Directive Schedule

Nomad FLIGHT CONTROLS AILERONS INSPECTION AND INCORPORATION OF MOD N634. All spare ailerons with the above part numbers.

Service Bulletin No: Ref No: 331 Modification No: EC , EC ATA Chapter: 27

Airworthiness Directive Schedule

CSB Technical Portions FAA Approved Aileron Pushrod to Aileron Control Circuit Clearance Inspection & Rework

Airworthiness Directive Schedule

Airworthiness Directive

TEMPORARY REVISION NUMBER

Airworthiness Directive Schedule

Airworthiness Directive

Airworthiness Directive Schedule

Nomad FLIGHT CONTROLS -FITMENT OF MASS BALANCE TO RUDDER TAB

Airworthiness Directive Schedule

Airworthiness Directive Schedule

Airworthiness Directive Schedule

Airworthiness Directive Schedule

MAINTENANCE RECORD (THIS FORM IS TO BE RETAINED IN THE AIRCRAFT LOG)

SB-GA Issue 1

FLAP, AILERON, FLAP/FUSELAGE AND STABILATOR GAP SEAL INSTALLATION AND MAINTENANCE MANUAL

Airworthiness Directive Schedule

Seabee Annual Inspection Procedures

Airworthiness Directive Schedule

P68 VARIANTS SERVICE INSTRUCTION. No. 88

PA Archer 28-E13; thru PA Archer II thru ; ; ; thru

SERVICE BULLETIN SB0017 Rev A Page 1 of 5

Airworthiness Directive Schedule

Date: August 23, 2017 (S)

Airworthiness Directive Schedule

P.O. Box 3149 Albany, GA Phone (229) Fax (229) March 7, 2006 FLAP CONTROL TORQUE SHAFT REPLACEMENT

Service Bulletin No: Ref No: 170 Modification No: EC ATA Chapter: 53

TEMPORARY REVISION NUMBER

Issued: 21 April 2017 SUPERSEDED. Revision: This AD supersedes EASA AD dated 02 December 2016.

Airworthiness Directive Schedule

R1 Raytheon Aircraft Company: Amendment ; Docket No. FAA ; Directorate Identifier 2006-CE-33-AD.

BULLETIN. Piper Aircraft, Inc Piper Drive Vero Beach, FL, U.S.A Date: October 29, 2015 (S) (M)

Airworthiness Directive Schedule

Airworthiness Directive Schedule

SERVICE BULLETIN THIS BULLETIN IS FAA APPROVED FOR ENGINEERING DESIGN

SUBJECT: TRANSMISSION FAIRING INSTALLATION, IMPROVEMENT OF. HELICOPTERS AFFECTED: Serial numbers through

GlaStar / Sportsman Service Bulletin 64- MANDATORY

Airworthiness Directive Schedule

TECHNICAL BULLETIN May 2013 SUBJECT: TAIL ROTOR GEARBOX 3 PIECE FAIRING, MODIFICATION OF

P68 VARIANTS SERVICE INSTRUCTION. No. 89

SUBJECT: MAIN ROTOR DRIVE, ENGINE-TO- TRANSMISSION DRIVE SHAFT RETAINING NUTS INSPECTION/REPLACEMENT

Service Bulletin SB 07-03

TECHNICAL BULLETIN May 2013 Revision A, 11 July 2013 SUBJECT: TAIL ROTOR GEARBOX 3 PIECE FAIRING, MODIFICATION OF

SB-GA Issue 4. Subject: Applicability: Amendments: Background: Compliance: Weight and Balance: Approval: MANDATORY

Airworthiness Directive Schedule

SERVICE BULLETIN. No. SB-AG-54 Revision IR; 6/6/2011 S2R-T660 ELEVATOR PUSH-PULL TUBE END FITTING INSPECTION

Nomad RUDDER CONTROL SYSTEM STRENGTHENING OF CABLE PULLEY MOUNTING AT STA (MOD N630)

2. MODEL: F-28A, F-28C, F-28F, 280, 280C, 280F, and 280FX

Airworthiness Directive Schedule

Airworthiness Directive Schedule

SERVICE LETTER. SERIAL NUMBERS 210 & T thru P thru P

GlaStar and Sportsman Service Bulletin 67

1. SUBJECT: F-28A and 280 Left Side Tail Rotor Installation

Airworthiness Directive Schedule

JABIRU AIRCRAFT PTY LTD P.O. Box 5186 Phone: Bundaberg West Fax: Queensland, Australia.

AVIAT AIRCRAFT INC. P.O. Box South Washington Afton, WY USA Fax:

Section 75-ZA-3 Fin & Rudder Cable Fairing Installation

SERVICE BULLETIN MANDATORY. SB , Rev Planning Information

SERVICE LETTER. Multi-engine TITLE NACELLES/PYLONS - NACELLE FITTING INSPECTION EFFECTIVITY

SERVICE LETTER REVISION TRANSMITTAL

CIRRUS AIRPLANE MAINTENANCE MANUAL

performance S T O L Installation Instructions Manual No. PSTOL-013 Double Slotted Flaps for Piper PA-18 Series Aircraft

JSC SPORTINĖ AVIACIJA Page 1

nd STREET, MENOMINEE, MICHIGAN 49858

12.0 CONTROLS 3/3/2006. Page 1

Airworthiness Directive Schedule

SERVICE BULLETIN THIS BULLETIN IS FAA APPROVED FOR ENGINEERING DESIGN

Airworthiness Directive Schedule

R66 SERVICE BULLETIN SB-13

ATTACHMENT DAMAGE REPORT FORM. Page: 1 of Pages Includes this cover sheet Date: (month/day/year) This form is for the: Left Wing: Right Wing: Other:

Transcription:

AIRWORTHINESS DIRECTIVE On the effective date specified below, and for the reasons set out in the background section, the CASA delegate whose signature appears below revokes Airworthiness Directive (AD) AD/GA8/5 and issues the following AD under subregulation 39.001(1) of CASR 1998. The AD requires that the action set out in the requirement section (being action that the delegate considers necessary to correct the unsafe condition) be taken in relation to the aircraft or aeronautical product mentioned in the applicability section: (a) in the circumstances mentioned in the requirement section; and (b) in accordance with the instructions set out in the requirement section; and (c) at the time mentioned in the compliance section. AD/GA8/5 Amdt 1 Horizontal Stabiliser Inspection 3/2007 Applicability: All GA8 aircraft, serial numbers GA8-00-004 and up. Requirement: 1. Daily inspection (Stabiliser attach bolt) Visually inspect the integrity of the rearmost vertical Horizontal Stabiliser attach bolt and nut on both left and right sides, see Figure 1 below. This inspection can be carried out externally to the aircraft without removing any fairings or structure. Figure 1 - Horizontal Stabiliser Attach Bolt 2. External Inspection (Lower flange, Stabiliser rear spar) (a) Visually inspect for cracking externally along the rear spar lower flange in the vicinity of the Horizontal Stabiliser rear pivot attachment, particularly just inboard and outboard of the elevator pivot attachment. Check also for working rivets on the inboard elevator pivot attachment to the Horizontal Stabiliser rear spar. Page 1 of 6

(b) Unscrew the lower Horizontal Stabiliser fairing and allow it to drop into the cover. With the aid of an assistant, rock the Horizontal Stabilizer tip vertically up and down by approximately 1/2 an inch whilst watching the Horizontal Stabiliser rear pivot attachment. Look for any movement between the pivot attachment and the stabilizer lower skin, and any excessive local deflection or movement of the lower skin surrounding the pivot attachment. Repeat procedure on the other side. Re-attach the lower Horizontal Stabilizer fairing. 3. Rear Pivot Attachment Inspection (a) Remove the lower Horizontal Stabiliser fairings. (b) Unscrew the two front bolts from each pivot attachment, leaving the rear two bolts done up tight, as shown in Figure 2 below. Anchor nuts were used to retain these bolts on early aircraft. Later aircraft have loose nuts and washer, access to which can be gained through the upper Horizontal Stabiliser access panel. Figure 2 - Rear Pivot Attachment (c) If a gap appears, as indicated in Figure 2 above, manufacture a tapered packer from 2024-T3 Aluminium sheet metal, 1.25 wide and as long as required to fill the gap. Page 2 of 6

(d) Coat the packer with suitable primer and paint, as specified in the GA8 Service Manual. (e) Install the packer and reinstall bolts. Torque bolts to 20-25 in lb. Follow instruction as recommended by AC43.13-lb, Section 7.40 in torquing bolts with friction locking nuts. (f) Replace the lower Horizontal Stabiliser fairings. 4. Internal Inspection (a) Remove the upper Horizontal Stabiliser fairings. (b) If the Horizontal Stabiliser contains a centreline upper skin access panel, remove the panel and skip to part (e). (c) Unscrew the lower Horizontal Stabiliser fairings. Disconnect the control cables from the Rudder and the pushrods from the Elevators. Remove Dorsal Fin and disconnect Fin electrical wiring. Remove the Rudder and then the Fin. Restrain the Elevators in the neutral position and carefully remove Horizontal Stabiliser/elevators assembly from the aircraft. (d) Cut an access hole as per the figure 3 below. Figure 3 - Access hole (e) Visually inspect for cracking in the lower flange of the rear spar splice plate and in the inboard ribs around the Horizontal Stabiliser rear pivot attachment. Page 3 of 6

(f) If cracking is found, contact the manufacturer immediately. (g) If no cracking is found, attach anchor nuts as per the figure 4 below. Attach access panel with bolts (or screws) and washers specified. Figure 4 - Access hole with anchor nuts installed (h) If the Horizontal Stabiliser was removed from the aircraft, with reference to the GA8 Service Manual, replace components in the opposite order to that removed. Re-rig aircraft and carry out dual inspection. 5. Rear Attach Bolt Replacement (a) Remove the rearmost vertical Horizontal Stabiliser attach bolt and nut from both left and right sides as indicated in figure 1. (b) Ensure the bolt and nut mating faces are square. Spotface either side as required. (c) Install new NAS6603-8 bolt and MS21042-3 nut. Ensure both bolt and nut sit square to surrounding material. Use AN960-10 washers under the nut as required. Torque bolts to 20-25 in lb. Follow instruction as recommended by AC43.13-lb, Section 7.40 in torquing bolts with friction locking nuts. Caution - do not over torque the bolt. (d) Compliance with this part and part 3 (Rear Pivot Attachment Inspection) cancels the requirement to perform the Daily Visual Inspection of this area. Page 4 of 6

After accomplishing this Airworthiness Directive, complete the Document Compliance Notice contained in Gippsland Aeronautics Mandatory Service Bulletin SB-GA8-2002-02 Issue 3, and forward to Gippsland Aeronautics at the address provided. Note: The requirements of this AD are fully contained in Gippsland Aeronautics Mandatory Service Bulletin SB-GA8-2002-02 Issue 4, dated 4 January 2007. Parts required to perform this Airworthiness Directive Item Part Number Description Qty 1 NAS6603-8 Bolt 2 2 MS21042-3 Nut 2 3 AN960-10 Washer (as required) The following parts are required only when performing internal inspection and only if the access panel is not already fitted. 4 GA8-551021-75 Access Cover 1 AN3-3A (or AN525-10R6) Bolt (Screw) 10 AN960-10L Washer 10 MS21047L3 Or equivalent Anchor Nut 10 NAS1097AD3-4 Countersunk rivet 20 Compliance: 1. For all aircraft not incorporating the changes identified in Requirement 3 and 5, carry out the Daily Inspection prior to the first flight of each day. This inspection requirement is cancelled when Requirements 3 and 5 are completed at the next *periodic inspection. 2. For all aircraft, carry out the specified External Inspection by the next periodic inspection and at every periodic inspection thereafter. 3. For all aircraft not incorporating the CNC machined elevator hinges, carry out Rear Pivot Attachment Inspection by the next periodic inspection. 4. For all aircraft, an Internal Inspection shall be carried out by the next periodic inspection and at every periodic inspection thereafter. Page 5 of 6

5. Unless already fitted, for all applicable aircraft, perform Rear Attach Bolt Replacement by the next periodic inspection. *Note: a periodic inspection is defined as a 100 hourly or annual inspection, whichever comes first. This Amendment becomes effective on 15 March 2007. Background: Inspection of a high time aircraft has revealed cracks in the Horizontal Stabiliser rear spar splice plate and inboard main ribs around the area of the Horizontal Stabiliser rear pivot attachment. Additionally, failure of some attach bolts in service may be due to improper assembly. This Airworthiness Directive addresses the problem using 5 separate inspections. The first is a brief daily external inspection. The other 4 inspections are a mixture of internal and external inspections as well as some parts replacement to be carried out at the next periodic inspection. This amendment is issued to correct the Horizontal Stabiliser rear attach bolt part number to specify a new NAS6603-8 bolt. Requirement 5 (c) of this AD refers. The original issue of this AD became effective on 15 February 2007. David Villiers Delegate of the Civil Aviation Safety Authority 24 January 2007 Page 6 of 6