Fission Winter Program; 26.41% U3O8 over 12.0m (line 855E); Three New High-Grade Holes

Similar documents
PRESS RELEASE INFILL DRILLING EAST OF MISHI PIT BUILDS CONFIDENCE

ORCA GOLD PROVIDES GALAT SUFAR SOUTH UPDATE

IAMGOLD REPORTS FURTHER HIGH GRADE DRILL INTERSECTIONS AT ITS DIAKHA DEPOSIT, SIRIBAYA PROJECT IN MALI

Rio Alto completes 2014 oxide drilling program at La Arena

LSC LITHIUM ANNOUNCES OPERATIONAL UPDATE AND COMMENCEMENT OF ADVANCED EXPLORATION ON POZUELOS, PASTOS GRANDES AND RIO GRANDE

Emerging Lithium Opportunity

Garden Well Gold Deposit Diamond Drilling Confirms Gold at Depth Highlights

Transatlantic Mining Corporation Kearsarge Drilling Update.

LSC LITHIUM ANNOUNCES EXPLORATION UPDATE ON ARGENTINIAN LITHIUM PROJECTS Accelerated Exploration Programs on Five Projects Underway

15 Premier Projects. In the World s Highest-Grade Lithium District

Haoma Mining NL. 7.10g/t, 84 to 86m 6.83g/t, 76 to 100m

FORWARD-LOOKING INFORMATION

15 Premier Projects. In the World s Highest-Grade Lithium District TSX-V: LITH

126m strike length vein averaging 42.37g/t gold

The San Juan Mine has been developed and production will commence during the fourth quarter at a rate of tpd.

ASX RELEASE. PAK receives drilling permit for Elko Coking coal project. Summary

DOING BUSINESS WITH PETROBRAS: PROCUREMENT STRATEGIES

DDH Highlight Results for All Prospects

VICTORIA ADVANCED EXPLORATION PROJECT

FIRST MAJESTIC SILVER CORP.

The Future of Automotive and Industrial Lubricants

The Alliance October 23, 2008

All dollar amounts are in U.S. dollars unless otherwise indicated.

Managing the Challenge of Cost Effective Lubrication & Prolonging Engine Lifetime

Deutsche Bank Auto Industry Conference. January 17, 2018

MONRO MUFFLER BRAKE, INC. PROVIDES FOURTH QUARTER AND FISCAL 2017 FINANCIAL RESULTS

ABATEMENT TECHNOLOGY, RFO vs DISTILLATE - impact on costs & emissions

EESTOR ANNOUNCES HIGH VOLTAGE HIGH PERMITTIVITY DIELECTRIC, COMPLETED MILLION CYCLE TESTING AND INITIAL ENERGY DENSITY RESULTS

MONRO, INC. ANNOUNCES SECOND QUARTER FISCAL 2018 FINANCIAL RESULTS

LSC LITHIUM CORPORATION TO COMMENCE TRADING ON THE TSX VENTURE EXCHANGE AND PROVIDES OPERATIONAL UPDATE

Doing business with Petrobras - Procurement Strategies and Local Content. Policy.

Electrovaya Provides Business Update

Valvoline Fourth-Quarter Fiscal 2016 Earnings Conference Call. November 9, 2016

welcome to the BC Hydro community open house

2010 Interim Results Presentation. August 23, 2010 Hong Kong

For personal use only

SUCCESSFUL GAS TO POWER PLANT DEVELOPMENT CTRG, MOZAMBIQUE

Volkswagen Truck & Bus and Navistar enter into a strategic alliance. September 6, 2016

Investor Presentation. May 16, 2017

REPORT TO THE CHIEF ADMINISTRATIVE OFFICER FROM THE DEVELOPMENT AND ENGINEERING SERVICES DEPARTMENT COMPRESSED NATURAL GAS TRANSIT FLEET UPDATE

ASX/MEDIA RELEASE 5 February 2010 DIAMOND CORE TESTWORK CONFIRMS POTENTIAL FOR HIGH GRADE DIRECT REDUCTION IRON CONCENTRATE AT BEYONDIE IRON PROJECT

Corporate Presentation

KONGSBERG MARITIME. Egil Haugsdal, President

Pão de Açúcar A sweet high-impact discovery! Pão de Açúcar = The Sugar Loaf Mountain

SERVICES INNOVATION. Montreal Symposium March 29, Jack Simpson Director, Generation & Capacity Planning

Third Quarter 2018 Performance and Business Update. October 24, 2018

Technological Pathways to Lower Carbon Transportation

U.S. Crude Exports and Impact on Trade

17 Premier Projects. In the World s Highest-Grade Lithium District

Certification Experience from A Biofuels Processor. ISCC Technical Committee South East Asia Meeting Bangkok, 9 April 2012

Bald Hill on track to start lithium concentrate production this quarter

Third Quarter 2017 Performance and Business Update. October 26, 2017

Refining & Marketing. Mario Taraborrelli COO

Trond-Erik Johansen President ConocoPhillips Alaska

GEOPARK ANNOUNCES FOURTH QUARTER 2017 OPERATIONAL UPDATE

Plug Power and Workhorse Provide FedEx Express With First ProGen Fuel Cell-Powered Electric Delivery Van

Using OutBack Inverters for 3-Phase 480V Applications

Volkswagen Group Capital Markets Day 2017 Volkswagen Truck & Bus

NAVISTAR ANNOUNCES WIDE-RANGING STRATEGIC ALLIANCE WITH VOLKSWAGEN TRUCK & BUS

Volkswagen Brand Financial Results January June 2017 Conference Call and Webcast

Meeting with Platinum Munich, June 07, 2018

Acquisition of Frank Mohn AS 07/04/2014. Alfa Laval 1

What drives silicon demand? Dr. Volker Braetsch Senior Vice President, Global Sales & Marketing September 21, 2017

Intelligent Revolution JANUARY 2019 CSE: XRO OTCQB: EXROF

JP Morgan Clean Energy Corporate Day

ASX ANNOUNCEMENT / MEDIA RELEASE

Mercedes-Benz: Best Sales Result for the Month of June in Company History Up 13 Percent

For personal use onlyabn:

WashTec AG Baader Bank Investment Conference Karoline Kalb WashTec AG

About LMC Automotive. LMC Automotive the company. Global Car & Truck Forecast. Automotive Production Forecasts

EESTOR (ESU:TSXV) Market Capitalization. Market value at $0.31 $19,324,626

Quarterly Activities Report

Monro, Inc. Second Quarter Fiscal 2019 Earnings Call. October 25, 2018

Joint Press Release of BASF, Arsenal and Foosung. BASF acquires Novolyte Technologies. April 26, 2012

Battery Grade Spherical Graphite Produced

The Renewable Energy Market Investment Opportunities In Lithium. Prepared by: MAC Energy Research

QUARTERLY ACTIVITIES REPORT For the Quarter ended 30 June 2018

GEOPARK ANNOUNCES FIRST QUARTER 2017 OPERATIONAL UPDATE

Sinopec Corp. Q Results Announcement. 29 October 2010

17-IAGT-104 Siemens introduces the SGT-A45 mobile unit: superior performance with trusted technology

A renewable energy future driven by vanadium. World Materials Forum, June 28, 2018

Report for Q Mr. Tom Erixon President and CEO Alfa Laval Group.

Energizer Resources Provides Business Update on its Green Giant Vanadium Project, Madagascar

BorgWarner s growing hybrid and electric product portfolio delivers clean, efficient vehicle propulsion

MONTVALE, N.J. Mercedes-Benz USA (MBUSA) today reported combined sales

Conference Call H Düsseldorf August 4, 2016

OSHKOSH CORP FORM 8-K. (Current report filing) Filed 06/24/02 for the Period Ending 06/24/02

POWERING A GREENER FUTURE

Interim statement as of 30 September 2017 Conference call

SEKO RETURNS OUTSTANDING DRILL RESULTS FROM START OF 2018 FIELD SEASON

Annual Press Conference 2011 Results

Investor presentation

2015 Interim Results Announcement

Phönix SonnenStrom AG

Ignition Reliability in SGT-750 for Gas Blends at Arctic Conditions. Magnus Persson Combustion Expert / Distributed Generation / Sweden

GEOPARK ANNOUNCES SECOND QUARTER 2017 OPERATIONAL UPDATE

Siemens A&D: Energy-efficient Automation for Environmentally Compatible Production Siemens Media Summit

Quality Control in Mineral Exploration

best to you all Gail Carbiener Page 1 of 5

Downtown Lee s Summit Parking Study

Transcription:

Suite 700 1620 Dickson Ave. Kelowna, BC V1Y 9Y2 rich@fissionuranium.com www.fissionuranium.com TSX VENTURE SYMBOL: FCU OTCQX SYMBOL: FCUUF August 7, 2014 FRANKFURT SYMBOL: 2FU Fission Winter Program; 26.41% U3O8 over 12.0m (line 855E); Three New High-Grade Holes Eastern half of PLS continues high-grade expansion FISSION URANIUM CORP. ("Fission" or the Company") is pleased to announce 2014 winter assay results from six holes drilled on the R780E zone and one hole on the R00E zone at its Patterson Lake South (PLS) property in Saskatchewan s Athabasca Basin, Canada. Of particular note are holes PLS14-201 (line 855E), which returned composited assay intervals including 26.41% U3O8 over 12.0m within an interval of 12.12% U3O8 over 27.0m and PLS14-213 (line 810E), which returned composited assay intervals of 11.37% U3O8 over 11.0m within a larger interval of 4.05% U3O8 over 34.0m. Ross McElroy, President, COO, and Chief Geologist for Fission, commented, The PLS discovery continues to expand in size and potential along strike. Today s results, headlined by holes PLS14-201 and PLS14-213 in the eastern half of the discovery, are an excellent example of the wide, high-grade mineralization that PLS is becoming renowned for. Assay Highlights PLS14-201 (Line 855E) 12.0m (128.0m to 140.0m) @ 2.51% U3O8, including: o 5.0m (133.0m to 138.0m) @ 5.61% U3O8 27.0m (149.0m to 176.0m) @ 12.12% U3O8, including: o 12.0m (163.5m to 175.5m) @ 26.41% U3O8 PLS14-213 (Line 810E) 34.0m (147.5m to 181.5m) @ 4.05% U3O8, including: o 11.0m (167.0m to 178.0m) @ 11.37% U3O8 PLS14-205 (Line 900E) 10.0m (229.0m to 239.0m) @ 2.65% U3O8, including: o 1.5m (231.5m to 233.0m) @ 11.57% U3O8

More winter assays pending: To date, assay results from 75 holes of the recently completed winter program have now been released; results from 17 holes are pending. Composited % U3O8 mineralized intervals are summarized in Tables 1 and 2 below. Samples from the drill core are split in half sections on site. Where possible, samples are standardized at 0.5m down-hole intervals. One-half of the split sample is sent to SRC Geoanalytical Laboratories (an SCC ISO/IEC 17025: 2005 Accredited Facility) in Saskatoon, SK for analysis which includes U3O8 (wt %) and fire assay for gold, while the other half remains on site for reference. All analysis include a 63 element ICP-OES, uranium by fluorimetry and boron. All depth measurements reported, including sample and interval widths are down-hole, core interval measurements and true thickness are yet to be determined. Table 1: R780E Zone Composited Mineralized Intervals (Down-hole measurements) Zone Hole ID Grid Line Az Dip From (m) To (m) Interval (m) U3O8 (wt%) R780E PLS14-201 855E 128.00 140.00 12.00 2.51 133.00 138.00 5.00 5.60 149.00 176.00 27.00 12.12 163.50 175.50 12.00 26.41 189.50 190.50 1.00 0.15 209.00 211.50 2.50 3.80 264.50 265.00 0.50 0.07 272.50 273.00 0.50 0.06 281.50 282.00 0.50 0.12 284.50 285.50 1.00 0.10 289.00 289.50 0.50 0.06 294.00 295.50 1.50 0.11 R780E PLS14-203 705E 103.50 105.00 1.50 0.12 110.00 138.00 28.00 0.28 140.50 141.00 0.50 0.09 143.00 151.50 8.50 0.12 154.50 156.00 1.50 0.42 161.50 166.00 4.50 0.63 179.00 180.50 1.50 0.06 R780E PLS14-205 900E 101.00 102.00 1.00 0.08 114.00 114.50 0.50 0.05 132.50 175.50 43.00 0.54 167.50 175.00 7.50 1.54 179.50 190.00 10.50 0.50 199.00 202.00 3.00 0.05 213.00 213.50 0.50 0.06 219.50 223.00 3.50 0.97 229.00 239.00 10.00 2.65

231.50 233.00 1.50 11.57 241.50 242.50 1.00 0.06 247.50 248.50 1.00 0.14 251.50 287.00 35.50 0.59 296.00 297.00 1.00 0.06 303.50 306.00 2.50 0.15 309.00 309.50 0.50 0.07 314.00 316.00 2.00 0.05 343.00 343.50 0.50 0.06 346.50 347.50 1.00 0.20 R780E PLS14-207 750E 162.50 163.00 0.50 0.09 165.50 169.50 4.00 0.13 172.00 172.50 0.50 0.07 186.50 188.00 1.50 0.11 190.50 199.00 8.50 0.09 248.00 248.50 0.50 0.07 274.50 275.50 1.00 0.10 281.50 283.00 1.50 0.08 286.00 288.50 2.50 0.19 302.00 303.50 1.50 0.12 306.50 307.00 0.50 0.06 309.00 309.50 0.50 0.07 312.00 313.50 1.50 0.12 325.50 326.50 1.00 0.28 348.00 348.50 0.50 0.08 354.00 355.50 1.50 0.10 384.00 384.50 0.50 0.07 R780E PLS14-210 630E 109.00 116.50 7.50 0.07 119.50 120.00 0.50 0.15 132.00 132.50 0.50 0.08 140.50 151.00 10.50 0.09 156.50 157.00 0.50 0.05 159.00 159.50 0.50 0.08 184.50 185.50 1.00 0.16 190.50 191.00 0.50 0.07 205.00 206.00 1.00 0.13 209.00 215.00 6.00 0.45 219.00 222.50 3.50 0.15 226.00 232.00 6.00 0.91 R780E PLS14-213 810E 120.00 126.00 6.00 0.19 147.50 181.50 34.00 4.05 167.00 178.00 11.00 11.37

Composite Parameters 1. Minimum Thickness: 0.50m 2. Grade Cut-Off: 0.05 U3O8 (wt%) 3. Maximum Internal Dilution: 2.00m 186.50 187.50 1.00 0.36 198.50 199.50 1.00 0.84 212.00 215.50 3.50 0.07 221.00 221.50 0.50 1.77 230.00 230.50 0.50 0.30 239.00 240.50 1.50 1.48 254.00 254.50 0.50 0.18 259.50 261.00 1.50 0.12 266.00 266.50 0.50 0.06 271.00 272.00 1.00 0.08 Table 2: R00E Zone Composited Mineralized Intervals (Down-hole measurements) Zone Hole ID Grid Line Az Dip From (m) To (m) Interval (m) U3O8 (wt%) R00E PLS14-204 135E No significant mineralization Composite Parameters 1. Minimum Thickness: 0.50m 2. Grade Cut-Off: 0.05 U3O8 (wt%) 3. Maximum Internal Dilution: 2.00m PLS Mineralized Trend Summary Uranium mineralization at PLS has been traced by core drilling over 2.24km of eastwest strike length in five separate mineralized zones from line 615W (PLS13-124) to line 1620E (PLS14-196). From west to east, these zones are; R600W, R00E, R780E, R1155E and R1620E. The former R390E, R585 and R945E zones have been merged into the R780E zone by successful winter drilling. Mineralization remains open along strike both to the western and eastern extents. Mineralization is both located within and associated with a metasedimentary lithologic corridor, bounded to the south by the PL-3B basement Electro-Magnetic (EM) Conductor. Fission has received and released assay results on 75 holes from its winter 2014 drill program at PLS. Updated maps and files can be found on the Company's website at http://fissionuranium.com/project/pls/. Patterson Lake South Property The 31,039 hectare PLS project is 100% owned and operated by Fission Uranium Corp. PLS is accessible by road with primary access from all-weather Highway 955, which runs north to the former Cluff Lake mine and passes through the nearby UEX-Areva Shea Creek discoveries located 50km to the north, currently under active exploration and development. The technical information in this news release has been prepared in accordance with the Canadian regulatory requirements set out in National Instrument 43-101 and reviewed

on behalf of the company by Ross McElroy, P.Geol. President and COO for Fission Uranium Corp., a qualified person. About Fission Uranium Corp. Fission Uranium Corp. is a Canadian based resource company specializing in the strategic exploration and development of the Patterson Lake South uranium property and is headquartered in Kelowna, British Columbia. Common Shares are listed on the TSX Venture Exchange under the symbol "FCU" and trade on the OTCQX marketplace in the U.S. under the symbol FCUUF. ON BEHALF OF THE BOARD Investor Relations Rich Matthews "Ross McElroy" TF: 877-868-8140 rich@fissionuranium.com Ross McElroy, President and COO www.fissionuranium.com Cautionary Statement: Certain information contained in this press release constitutes forward-looking information", within the meaning of Canadian legislation. Generally, these forwardlooking statements can be identified by the use of forward-looking terminology such as "plans", "expects" or "does not expect", "is expected", "budget", "scheduled", "estimates", forecasts", "intends", "anticipates" or "does not anticipate", or "believes", or variations of such words and phrases or state that certain actions, events or results "may", "could", "would", "might" or "will be taken", "occur", "be achieved" or has the potential to. Forward looking statements contained in this press release may include statements regarding the future operating or financial performance of Fission and Fission Uranium which involve known and unknown risks and uncertainties which may not prove to be accurate. Actual results and outcomes may differ materially from what is expressed or forecasted in these forward-looking statements. Such statements are qualified in their entirety by the inherent risks and uncertainties surrounding future expectations. Among those factors which could cause actual results to differ materially are the following: market conditions and other risk factors listed from time to time in our reports filed with Canadian securities regulators on SEDAR at www.sedar.com. The forward-looking statements included in this press release are made as of the date of this press release and the Company and Fission Uranium disclaim any intention or obligation to update or revise any forward-looking statements, whether as a result of new information, future events or otherwise, except as expressly required by applicable securities legislation.