INSPECTION ST 13 2UZ-FE STARTING STARTER. Terminal 50. Terminal C. Battery. Disconnect Battery. Terminal C. Disconnect. Battery.

Similar documents
ST 9 1GR-FE STARTING STARTER

1GR-FE STARTING STARTER (for 4WD) DISASSEMBLY

STARTER (for 2WD and Pre-Runner)

STARTING SYSTEM ST 1

STARTING SYSTEM STARTING SYSTEM ST 1

ACC CUT RELAY INSPECTION

OVERHAUL. 1. REMOVE REPAIR SERVICE STARTER KIT (a) Remove the nut, and disconnect the lead wire from the repair service starter kit.

ACC CUT RELAY INSPECTION

STARTER COMPONENTS FOR REMOVAL AND INSTALLATION (3S GTE)

ST- 1 STARTING SYSTEM. Page TROUBLESHOOTING... ST-2 STARTER... ST-3 STARTER RELAY... ST- 12 CLUTCH START SWITCH... ST-1 2

ON-VEHICLE INSPECTION

CHAPTER 22 STARTER Models J05C-TD, J08C-TP and TR

STARTING SYSTEM (1ZZ FE) (April, 2003)

DESCRIPTION & OPERATION

STARTING SYSTEM LOCATION INDEX [LF]

1997 Mazda MX-5 Miata. STARTER - DIRECT DRIVE 1997 STARTING & CHARGING SYSTEMS Mazda - Starters - Direct Drive


1994 Mazda MX-5 Miata. STARTER - DIRECT DRIVE 1994 ELECTRICAL Mazda Starter - Direct Drive

1991 Mazda MX-5 Miata. STARTER - DIRECT DRIVE ELECTRICAL Mazda Starters - Direct Drive ELECTRICAL Mazda Starters - Direct Drive

1994 Mazda MX-5 Miata. STARTER - REDUCTION GEAR 1994 ELECTRICAL Mazda Starter - Reduction Gear

SECTION 9 CRANKING SYSTEM CONTENTS

STARTER - HITACHI Isuzu Trooper II DESCRIPTION TESTING STARTER PERFORMANCE TESTS Starters HITACHI. Isuzu

./#0#. 1"&." 1994 ELECTRICAL Suzuki of America Corp. - Starters. Swift

STARTER SYSTEM TESTING 5.6

STARTER SYSTEM TESTING 5.6

STARTER Mitsubishi Montero DESCRIPTION BENCH TESTING STARTER NO-LOAD TEST ELECTRICAL Mitsubishi Starters. Montero

CHARGING SYSTEM PRECAUTION CH 1

CHARGING SYSTEM PRECAUTION CH 1

2008 Toyota RAV ELECTRICAL Charging (2AZ-FE) - RAV4

OVERHAUL 1. REMOVE GENERATOR PULLEY SST ( , ) HINT:

GENERATOR CH-9 COMPONENTS FOR REMOVAL AND INSTALLATION

STARTING/CHARGING SYSTEMS Brought to you by Eris Studios NOT FOR RESALE

ENGINE ELECTRICAL Click on the applicable bookmark to selected the required model year

Engine Electrical System

SERVICING SPECIFICATIONS (1) ENGINE BODY

PS 37. POWER STEERING POWER STEERING LINK (for 4WD) REMOVAL

PR 3. PROPELLER SHAFT FRONT PROPELLER SHAFT ASSEMBLY (for 4WD) DISASSEMBLY

STARTING SYSTEM (for 0.8 kw Type) > PARTS LOCATION

DF 78. HINT: Face the rough side of the thrust washer marked by # to the differential case. INSPECTION

PS 23. POWER STEERING POWER STEERING LINK (for 2WD)

EM 128 2UZ-FE ENGINE MECHANICAL ENGINE UNIT INSPECTION

SERVICING SPECIFICATIONS (1) ENGINE BODY

SUPERCHARGER. ON-VEHICLE INSPECTION 1. INSPECT SUPERCHARGER OIL LEVEL HINT: With the engine cold, check the oil level on the dipstick.

DF 43 DIFFERENTIAL REAR DIFFERENTIAL CARRIER ASSEMBLY REMOVAL

20. ELECTRIC STARTER 20-1 SYSTEM DIAGRAM 20-2 STARTER MOTOR 20-6 SERVICE INFORMATION 20-3 STARTER RELAY SWITCH TROUBLESHOOTING 20-4 DIODE 20-15

PS 60. POWER STEERING POWER STEERING LINK (for 4WD and Pre-Runner) INSPECTION

DF 47 DIFFERENTIAL REAR DIFFERENTIAL CARRIER ASSEMBLY REMOVAL

ENGINE ELECTRICAL GROUP CONTENTS CHARGING SYSTEM IGNITION SYSTEM STARTING SYSTEM

AXLE SYSTEM PROBLEM SYMPTOMS TABLE AH 1

CAUTION CAUTION CAUTION

ENGINE ELECTRICAL GROUP CONTENTS CHARGING SYSTEM IGNITION SYSTEM STARTING SYSTEM SPECIFICATIONS...

MAINTENANCE STANDARDS TABLE

SERVICING SPECIFICATIONS (1) ENGINE BODY

TIMING CHAIN COMPONENTS

REASSEMBLY MT INSTALL 1ST AND REVERSE SHIFT ARM (a) Install the shift arm and shift arm pivot onto the interlock bracket.

(a) Remove the rear floor service hole cover. (b) Disconnect the fuel pump connector.

GENERATOR REMOVAL OF GENERATOR (4A FE) CH 6

REMOVAL FU 11 2TR-FE FUEL FUEL INJECTOR. Pinch. Checker. Detaching Switch Pull Out. Retainer. Fuel Hose Connector. Pipe. O-ring. Pinch.

Compressor HVAC: Service and Repair

CHARGING SYSTEM ON-VEHICLE INSPECTION

POWER STEERING SYSTEM

CH 10 ALTERNATOR COMPONENTS FOR REMOVAL AND INSTALLATION (3S GTE)

CLUTCH COMPONENT LOCATION INDEX

GENERAL SPECIFICATIONS

20. Install and tighten the cap screws that hold the end frame and field frame together

STEERING LOCATION INDEX

REMOVAL OF ALTERNATOR

GROUP CONTENTS CHARGING SYSTEM IGNITION SYSTEM SPECIAL TOOL GENERAL DESCRIPTION

Engine Electrical System(D4FA - DSL1.5)

ABBREVIATIONS USED IN THIS

ENGINE ELECTRICAL GROUP CONTENTS CHARGING SYSTEM IGNITION SYSTEM STARTING SYSTEM

ALLDATA Online Toyota Truck Tacoma 4WD V6-4.0L (1GR-FE) - Service and... Service and Repair 1. DISCONNECT CABLE FROM NEGATIVE BATTERY TERMINAL

INSPECTION DF 80. Install the rear differential side gear and rear differential spider onto the differential case RH.

ENGINE MECHANICAL (4A FE)

1993 ELECTRICAL Volkswagen Starters - Bosch. Volkswagen; Cabriolet, EuroVan, Golf, GTI, Jetta

OVERHAUL 1. REMOVE CYLINDER BLOCK WATER DRAIN COCK SUB ASSY

OVERHAUL 1. REMOVE OIL FILLER CAP SUB ASSY. 2. REMOVE CYLINDER HEAD COVER SUB ASSY (a) Remove the 10 bolts, 2 nuts, cylinder head cover and gasket.

COOLING SYSTEM ON-VEHICLE INSPECTION CO 1

5. SEPARATE STEERING INTERMEDIATE SHAFT ASSY (a) Fix the steering wheel with the seat belt. Release the 3 springs and separate the dust cover.

TECHNICAL INFORMATION

FUEL SYSTEM PRECAUTION FU 1

COOLING SYSTEM ON-VEHICLE INSPECTION CO 1

FRONT DRIVE SHAFT COMPONENTS DS 1 DRIVE SHAFT FRONT DRIVE SHAFT FRONT DRIVE SHAFT HOLE SNAP RING. w/o ABS: AUTOMATIC TRANSMISSION CASE PROTECTOR

VALVE CLEARANCE ADJUSTMENT EM 7

CHAPTER 6 LOWER UNIT

23. ELECTRIC STARTER (TRX450ER)

DF 15. DIFFERENTIAL 1GR-FE FRONT DIFFERENTIAL CARRIER ASSEMBLY (for 4WD) REMOVAL

2004 Toyota Truck Tundra 4WD V8 4.7L (2UZ FE)

Electric motor testing

IGNITION SYSTEM ON VEHICLE INSPECTION NOTICE:

OVERHAUL. 1. INSPECT 1ST GEAR THRUST CLEARANCE (a) Using a feeler gauge, measure the 1st gear thrust clearance.

INSTALLATION EM 8 1NZ-FE ENGINE MECHANICAL DRIVE BELT INCORRECT CORRECT. Generator Vehicle Front A077960E03. Adjusting Bar. Bolt A. Bolt B.

FUEL PUMP SYSTEM CIRCUIT

Drive/Propeller Shaft: Service and Repair

ENGINE ELECTRICAL GROUP CONTENTS CHARGING SYSTEM STARTING SYSTEM GENERAL INFORMATION SERVICE SPECIFICATIONS...

VALVE CLEARANCE ADJUSTMENT EM 8

REMOVAL AC 67. Using a clip remover, disengage the 6 clips and remove the front fender apron seal upper. (2WD)

ECEg439:-Electrical Machine II

1. General Description

IG 1 1NZ-FE IGNITION IGNITION SYSTEM IGNITION SYSTEM ECM IGNITION COIL NO. 1 CAMSHAFT POSITION SENSOR SPARK PLUG CRANKSHAFT POSITION SENSOR A116185E01

Transcription:

2UZ-FE ARTING ARTER 13 INSPECTION 1. INSPECT ARTER ASSEMBLY NOTICE: These tests must be done within 3 to 5 seconds to avoid burning out the coil. (a) Do pull-in test. (1) Disconnect the field coil lead wire from terminal C. (2) Connect the battery to the magnetic switch as shown. Check that the clutch pinion gear moves outward. Terminal C A074957E01 Do holding test. (1) With battery connected as above with the clutch pinion gear out, disconnect the negative (-) lead from terminal C. Check that the pinion hear remains out. Terminal C Disconnect A074958E01 Disconnect (c) Inspect clutch pinion gear return. (1) Disconnect the negative (-) lead from the switch body. Check that the clutch pinion gear returns inward. A074959E01 Terminal 30 Ammeter A074960E01 (d) Perform the operation test without load. (1) Connect the field coil lead wire to terminal C. Torque: 5.9 N*m (60 kgf*cm, 52 in.*lbf) (2) Grip the starter in a vise. (3) Connect the battery and ammeter to the starter as shown. (4) Check that the ammeter reads the specified current. Specified current (for standard area): 90 A or less at 11.5 V Specified current (for cold area): 100 A or less at 11.5 V

14 2UZ-FE ARTING ARTER 2. INSPECT ARTER ARMATURE ASSEMBLY (a) Inspect commutator for dirty and burnt surface. If the surface of the commutator is dirty or burned, polish the part with sandpaper (#400) or replace the armature. Inspect commutator for open circuit. continuity between the segments, replace the armature. If there is no continuity between any segments, replace the armature. S000054E05 No (c) Inspect commutator for ground. no continuity between the commutator and armature core. If there is continuity, replace the armature S000055E05 (d) Inspect commutator circle runout. (1) Place the armature on the V-blocks. (2) Using a dial gauge, measure the circuit runout. Maximum circle runout: 0.05 mm (0.0020 in.) If the circle runout is greater than maximum, correct it on a lathe. S000056 S000057 (e) Using vernier calipers, measure the commutator diameter. Standard diameter: 35.0 mm (1.378 in.) Minimum diameter: 34.0 mm (1.339 in.) If the diameter is less than minimum, replace the armature

2UZ-FE ARTING ARTER 15 00040 (f) (g) Measure the undercut depth of commutator. Standard undercut depth: 0.7 mm (0.028 in.) Minimum undercut depth: 0.2 mm (0.008 in.) If the undercut depth is less than the minimum, correct it with a hacksaw blade. Inspect the bearings. (1) Check that the bearing rotates smoothly. 3. INSPECT ARTER YOKE ASSEMBLY (a) Inspect field coil for open circuit. continuity between the lead wire and field coil brush lead. If there is no continuity, replace the starter yoke P010588E01 (A) (B) Inspect shunt coil for open circuit. (1) Using an ohmmeter, measure the resistance between shunt coil terminals (A) and (B). Standard resistance: 1.5 to 1.9 Ω at 20 C (68 F) If the resistance is not as specified, replace the starter yoke S002267E02 4. INSPECT BRUSH (a) Using vernier calipers, measure the brush length. Standard length: 15.0 mm (0.591 in.) Minimum length: 9.0 mm (0.354 in.) If the length is less than the minimum, replace the brush holder and starter yoke No 5. INSPECT ARTER BRUSH HOLDER ASSEMBLY (a) Using an ohmmeter, check that there is no continuity between the positive and negative brush holders. If there is continuity, replace the brush holder. P021088E05

16 2UZ-FE ARTING ARTER Take the pull scale reading the instant the brush spring separates from the brush. Standard spring installed load: 21.5 to 27.5 N (2.2 to 2.8 kgf, 4.8 to 6.2 lbf) Minimum spring installed load: 12.7 N (1.3 kgf, 2.9 lbf) If spring load is less than the minimum, replace the brush springs. 00019 Lock Free 6. INSPECT ARTER CLUTCH SUB-ASSEMBLY (a) Rotate the pinion gear clockwise, and check that it turns freely. Try to rotate the pinion gear counterclockwise and check that it locks. If necessary, replace the clutch sub- P010821E05 7. INSPECT ARTER MAGNETIC SWITCH ASSEMBLY (a) Check the pull-in coil continuity. continuity between terminal 50 and C. If there is no continuity, replace the starter magnetic switch Terminal C B012319E02 Check the holding coil continuity. continuity between terminals 50 and switch body. If there is no continuity, replace the magnet starter switch Starter Clutch Sub-assembly B012320E02 Idle Gear Bearing Steel Ball Return Spring Starter Housing A072547E01 REASSEMBLY 1. INALL ARTER CLUTCH SUB-ASSEMBLY (a) Apply grease to the steel ball, return spring, clutch rollers and starter idler pinions. Install the steel ball. (c) Install a new O-ring to the starter housing. (d) Insert the return spring into the magnet starter switch hole. (e) Install the starter clutch sub-assembly, idler gear and bearing.

2UZ-FE ARTING ARTER 17 (f) Install the starter housing to the magnet switch assembly with the 2 screws. Torque: 9.3 N*m (95 kgf*cm, 82 in.*lbf) A074962 P010568 2. INALL ARTER BRUSH HOLDER ASSEMBLY (a) Align the claw of the brush holder with the claw groove of the starter yoke Place the brush holder on the starter yoke (c) Using a screwdriver, hold the brush spring back. (d) Connect the brush into the brush holder. (e) Connect the 4 brushes. NOTICE: Check that the positive (+) lead wires are not grounded. (f) Install an O-ring to the groove of the starter yoke. (g) Install 2 new O-rings and the end cover with the 2 screws. Torque: 3.8 N*m (39 kgf*cm, 34 in.*lbf) B004654 3. INALL ARTER YOKE ASSEMBLY (a) Install a new O-ring to the groove of the starter yoke Align the protrusion of the starter yoke assembly with the groove of the magnetic switch. B012328

18 2UZ-FE ARTING ARTER (c) (d) Install the starter yoke assembly with the 2 through bolts. Torque: 9.3 N*m (95 kgf*cm, 82 in.*lbf) Connect the terminal C wire with the nut. Torque: 5.9 N*m (60 kgf*cm, 52 in.*lbf) A074961