REPORT ON TRAFFIC IMPACT FOR THE LEGITIMISATION OF EXISTING SHORT TERM & TENT SITES KIOLOA BEACH HOLIDAY PARK

Similar documents
TRAFFIC PARKING ANALYSIS

Driveway Entrance Policy for Residential Properties - District 3 - All Wards

TRAFFIC ENGINEERING ASSESSMENT MOUNT EDEN ROAD, MOUNT EDEN

CHAPTER 9: VEHICULAR ACCESS CONTROL Introduction and Goals Administration Standards

Colston Budd Rogers & Kafes Pty Ltd as Trustee for C & B Unit Trust ABN

800 Access Control, R/W Use Permits and Drive Design

ELMORE COUNTY HIGHWAY DEPARTMENT

TRANSPORTATION REVIEW

Access Management Standards

This letter summarizes our observations, anticipated traffic changes, and conclusions.

FREQUENTLY ASKED QUESTIONS

CARPARK, RAMP AND DRIVEWAY CERTIFICATION OF RESIDENTIAL USE DEVELOPMENT. Prepared for: Harvey Property Investments Pty Ltd

Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999

Date of Issue: For: County Engineer. County Road No.: Maintenance Area: Section Forman Payment Required: (Options: Cash Cheque Credit Card)

FREQUENTLY ASKED QUESTIONS

TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA

CITY OF PORTSMOUTH DEPARTMENT OF PUBLIC WORKS (DPW) DRIVEWAY RULES AND PROCEDURES

APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS

54 Parkway Drive, Rosedale Proposed Residential / Commercial Development. Transportation Assessment Report. 30 April 2018

CHAPTER 2 ZONING AND DEVELOPMENT

Technical Memorandum. To: From: Date: October 14 th, 2018 Project #: 1302 Project Name: Subject: Distribution:

Construction Realty Co.

Section 5.0 Traffic Information

CONTENTS I. INTRODUCTION... 2 II. SPEED HUMP INSTALLATION POLICY... 3 III. SPEED HUMP INSTALLATION PROCEDURE... 7 APPENDIX A... 9 APPENDIX B...

Proposed location of Camp Parkway Commerce Center. Vicinity map of Camp Parkway Commerce Center Southampton County, VA

WELLINGTON, NEW ZEALAND. PURSUANT to Section 152 of the Land Transport Act I, Harry James Duynhoven, Minister for Transport Safety,

TRAFFIC IMPACT STUDY. USD #497 Warehouse and Bus Site

Road Condition Assessment and Road Contributions Study. 270 Grants Road, Somersby. June 2015 Our Ref: SY140135

Attachment F: Transport assessment report on implications if Capell Avenue never formed

Appendix J Traffic Impact Study

Re: Addendum No. 4 Transportation Overview 146 Mountshannon Drive Ottawa, Ontario

Per Revised Concept Plan Residential Condo/Townhouse. Proposed Land Use per TIS

Date: February 7, 2017 John Doyle, Z-Best Products Robert Del Rio. T.E. Z-Best Traffic Operations and Site Access Analysis

Purpose: General Provisions:

POLICY FOR THE ESTABLISHMENT AND POSTING OF SPEED LIMITS ON COUNTY AND TOWNSHIP HIGHWAYS WITHIN MCHENRY COUNTY, ILLINOIS

BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

SECTION 500. PARKING, LOADING AND STORAGE REGULATIONS

Continued coordination and facilitation with City of Austin staff on documentation of processes to permit construction activities at the site.

TRAFFIC IMPACT STUDY VICDOM BROCK ROAD PIT EXPANSION

PUBLIC INFRASTRUCTURE PROJECTS

Traffic Engineering Study

2. ELIGIBILITY REQUIREMENTS

PROPOSED RESIDENTIAL & COMMERCIAL DEVELOPMENT (ERF 1692), FRANSCHHOEK. Traffic Impact Assessment

Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS...

Please Read Carefully

PART TRANSPORT AND TRAFFIC. > Traffic Impact Assessment prepared by Cardno

November 1, Mr. Jafar Tabrizi President, Tabrizi Rugs 180 Bedford Highway. Traffic Impact Statement BH-1 and BH-2, Southgate Drive, Bedford, NS

ARTICLE 8 OFF-STREET PARKING AND PRIVATE DRIVEWAY STANDARDS

Summary of the Alcoa Highway Redevelopment Project

5 June 12, 2013 Public Hearing APPLICANT: BARTON HERITAGE, LLC T/A SANDBRIDGE BEACH BUGGIES PROPERTY OWNER: LOWER 40, LLC

HIGHWAY 28 FUNCTIONAL DESIGN

STAFF REPORT # CHANGE OF ZONING

1. INTRODUCTION 2. PROJECT DESCRIPTION CUBES SELF-STORAGE MILL CREEK TRIP GENERATION COMPARISON

EXCEPTION TO STANDARDS REPORT

2 Min. Min. Edge of. Edgeline See Note 3 PLAN VIEW. See Note 3. This distance may vary

PROPOSED BROILER FARMS

Table Existing Traffic Conditions for Arterial Segments along Construction Access Route. Daily

Re: 233 Armstrong Street Residential Condominium Traffic Brief

Dar gues Reef Go ld Pr o ject

IRSCH REEN Hirsch/Green Transportation Consulting, Inc.

The following section summarises the present conditions related to transportation for the proposed development of the Matimba B Power Station:

INDUSTRIAL DEVELOPMENT

TRAFFIC IMPACT ASSESSMENT PART OF AN ENVIRONMENTAL IMPACT ASSESSMENT FOR THE KEBRAFIELD ROODEPOORT COLLIERY IN THE PULLEN S HOPE AREA

Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. HNTB Project File: Subject

DRIVEWAY/APPROACH PERMIT APPLICATION Applicant Type: Architect/Engineer Contractor Owner

TALMONT TOWNHOMES MADISON KENNETH SPA TRAFFIC IMPACT STUDY. Sacramento, CA. Prepared For: MBK Homes. Prepared By:

TRAFFIC IMPACT ANALYSIS

DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Subhas Bhargava. July 9, Overview_1.

# TO: FROM: PREPARED BY: DATE: SUBJECT:

Clean Harbors Canada, Inc.

OFF-STREET PARKING AND LOADING

Traffic Impact Study Speedway Gas Station Redevelopment

Vanier Parkway and Presland Road Residential Development Transportation Impact Study

Designation of a Community Safety Zone in Honey Harbour in the Township of Georgian Bay

Traffic, Transportation & Civil Engineering Ali R. Khorasani, P.E. P.O. Box 804, Spencer, MA 01562, Tel: (508)

ANN ARBOR CITY NOTICE ORDINANCE NO. ORD OFF STREET PARKING CHAPTER 59

King Soopers #116 Thornton, Colorado

ENVIRONMENTAL IMPACT STATEMENT

ANDERSON PROPERTY SITE ANALYSIS

\ ~ u~c 20\3 RM PROPOSED APARTMENT DEVELOPMENT, 2 MATATUA ROAD RAUMATI BEACH - FURTHER INFORMATION REQUEST

Dropped Crossing Service

Brigham City 1200 West Box Elder Creek Bridge - Widening Project Type Reconstruction

BETHLEHEM MISSIONS TRUST CAMPUS

MOTOR VEHICLE ORIENTED BUSINESSES.

OFF STREET PARKING AND LOADING

Town of Londonderry, New Hampshire NH Route 28 Western Segment Traffic Impact Fee Methodology

The minimum number of accessory off-street parking spaces. shall conform to the requirements of the Table of General

IH 35 FEASIBILITY STUDY

THE CORNERSTONE APARTMENTS TRAFFIC IMPACT STUDY R&M PROJECT NO

PLEASE SUBMIT THE CORRECT PERMIT FEE WITH PAGES 1 & 3 OF APPLICATION TO: OCONTO COUNTY HIGHWAY DEPT, P.O. BOX 138, OCONTO, WI 54153

County State Aid Highway 32 (Cliff Road) and Dodd Road Intersection Study

appendix 4: Parking Management Study, Phase II

5.9 TRANSPORTATION AND TRAFFIC

Tomingley Gold Operations. Traffic Management Plan

GASOLINE SERVICE STATION 1618, 1622 ROGER STEVENS DRIVE OTTAWA, ONTARIO TRANSPORTATION IMPACT ASSESSMENT. Prepared for:

SUBMISSION Barton Highway Duplication Planning and Safety Works 15 June 2010

DUNMORE QUARRY. Transport Management Plan. Boral Resources (NSW) Pty Ltd 4/04/2016. Prepared for:

Gisborne District Traffic and Parking Bylaw DOCS_n144966

DRIVEWAY ENTRANCES GENERAL. 1. Description

MEMO VIA . Ms. Amy Roth DPS Director, City of Three Rivers. To:

Transcription:

Engineering & Management Civil and Structural Engineering Environmental Engineering Quality Assurance Project Management Development Consultants 20 July, 2007 Ref. No. 06269 REPORT ON TRAFFIC IMPACT FOR THE LEGITIMISATION OF EXISTING SHORT TERM & TENT SITES KIOLOA BEACH HOLIDAY PARK KIOLOA P. J. Milton For and on behalf of. 25 The Wool Road, VINCENTIA 2540 Telephone: (02) 4441 6869 Fax: (02) 4441 6579 Nowra (02) 4422 5447 Email: pacificem@optusnet.com.au

2 CONTENTS REPORT AUTHOR...3 INTRODUCTION...3 1.0 DESCRIPTION OF SITE...3 2.0 TRAFFIC GENERATION & PARKING REQUIREMENTS...4 3.0 REGULATORY & PUBLISHED TRAFFIC ASSESSMENTS...5 3.1 PEAK VEHICLE MOVEMENTS TO & FROM THE PARK...5 3.2 MURRAMARANG ROAD TRAFFIC...6 3.3 TRAFFIC SUMMARY...6 4.0 INTERSECTION DESIGN...6 4.1 GENERAL...6 4.2 INTERSECTION DESIGN REQUIREMENTS...7 5.0 EXISTING INTERSECTION...7 6.0 INTERNAL ROADS...8 6.1 INTERNAL ROADS...8 7.0 CONCLUSIONS & RECOMMENDATIONS...8

3 REPORT AUTHOR Philip John Milton Bachelor of Engineering (Civil) University of Wollongong 1977 Post Graduate Diploma in Management Sturt University 1989 NPER Registered Professional Engineer; Civil, Structural, Environmental MIEA RABQSA Registered Lead Auditor INTRODUCTION Mr Tony Van Bergen requested review road access and traffic impacts associated with an application to Council to legitimise 23 existing short term sites (providing a total of 240 short term sites) and 93 existing tent sites (providing a total of 143 camp sites) which have been in use for several years. This report has been prepared in accordance with the NSW Department of Planning Director General s Requirements for the Environmental Assessment of the Project, Key Issue 3, Traffic & Access in Attachment 1, dated 15 th August 2006. This report considers all internal park traffic, and the intersection of the park access road with Murramarang Road and identifies any need for intersection or access road upgrading to ameliorate traffic inefficiency and safety impacts. Reference has been made to the RTA Guide To Traffic Generating Developments (version 2.2) and Shoalhaven City Council s DCP 18 Car Parking and DCP 100 Engineering Design Specification. 1.0 DESCRIPTION OF SITE is located between the Pacific Ocean and Murramarang Road at Kioloa. The site is identified as Lot 128 DP 40869, 635 Murramarang Road, Kioloa, NSW, and has been developed as a Tourist Park containing 240 short term sites, 143 camp sites and 3 dwellings. (These fiures include the sites for which approval is sought). Access is directly from Murramarang Rd. This road is the major access from Bawley Point and only sealed road to the village of Kioloa plus a second holiday park at Merry Beach. The existing access is shown on the attached drawing and includes an 8500 mm wide two way sealed road in good condition that intersects with the sealed Murramarang Road (9600 mm wide) and leads to the reception office where boom gates are installed. Inside the park, access roads reduce to 6000 mm two lane sealed and 3500 mm single lane gravel. Parking of a vehicle occurs at each cabin/site with additional vehicle parking located outside the boom gates in a sealed carpark. Disabled parking is provided within the park near the visitor carpark and at an ablution block.

4 2.0 TRAFFIC GENERATION & PARKING REQUIREMENTS The holiday park consists of the following traffic generation sites: 240 short term sites (caravans & cabins) 143 campsites 3 dwellings 386 total Council s DCP18 Car Parking requires a caravan park to provide for the following vehicles: 1 space per caravan site 1 space per 10 long term sites & 1 space per 20 short term sites for visitors The Park includes 240 short term sites, 143 camp sites and no long term sites. This is assessed as follows: 1 vehicle space per short term site, campsite and dwelling provided on each site, or 386 vehicle spaces. These spaces are provided within or very near to each site. 1 space per 20 short term sites for visitors which is equivalent to 12 vehicle spaces 1 space per dwelling for visitors or 3 vehicle spaces Total requirement under Council s Car Parking Guidelines (DCP 18), 398 vehicle spaces The Local Government (Manufactured Homes Estates, Caravan Parks, Camping Grounds and Moveable Dwellings) Regulations clauses 96 to 98 have the following requirements: 1 vehicle per short term site, campsite and dwelling or 386 vehicle spaces. These spaces are provided within or very near to each site. 1 space per 20 short term sites for visitors or 12 vehicle spaces 1 space per 40 camp site or 4 spaces 1 space per 100 sites for disabled persons or 4 spaces (included in the above figures) Typical parking requirement is 402 vehicle spaces for the development, including a visitor parking requirement of 16 spaces. Parking is provided as follows (one space per cabin/site unless noted otherwise): Cabins 1 to 14: Parking adjacent or near to cabin Cabin 15: One space in visitor carpark. Cabin 16: NA Cabins 17 to 20: Parking adjacent or near to cabin Cabins 21 to 22: Parking adjacent or near to cabin Cabin 23: NA Cabins 24 to 26: Parking adjacent or near to cabin

5 Cabin 27: NA Cabin 28: Parking at front (minimum 2 cars) Cabins 28 to 31: Parking adjacent or near to cabin Cabins 40 to 48: Parking adjacent or near to cabin Manager s Residence: Parking at front (minimum 2 cars). Residence: Parking at front (minimum 2 cars). Tent & Caravan Sites: Parking on site. Visitor Parking: 18 spaces. Disabled Driver Spaces: 4 (note these are not included in above). They are shown on the drawing attached. From the above, it is noted that the required parking spaces are provided. 3.0 REGULATORY & PUBLISHED TRAFFIC ASSESSMENTS 3.1 PEAK VEHICLE MOVEMENTS TO & FROM THE PARK Peak vehicle movements to & from the park are considered to occur on peak change over days in school holidays when the occupiers of sites pack up and leave and new occupiers arrive. As Murramarang Road to the south is an unsealed track that traverses a National Park, all peak movements are assumed to enter the park from the north, and similarly, to turn north on leaving the park. From Park records of vehicle entry and exit, the busiest day of 2/1/07 was selected for analysis. The data is attached to this report and is summarised as follows: HOUR ENTRY EXIT 8 to 9 10 19 9 to 10 12 40 10 to 11 16 55 11 to 12 24 56 12 to 13 39 29 13 to 14 37 20 14 to 15 33 17 15 to 16 38 19 16 to 17 48 27 17 to 18 44 22 18 to 19 32 12 The maximum entry vehicles per hour is 48 at 1600 to 1700 hours, and the maximum exit vehicles is 56 at 1100 to 1200 hours. It is noted that this report is for the purpose of legitimising 23 short term and 93 long term sites that already exist in the Park. These represent 30% of the total of all sites plus 3 dwellings.

6 3.2 MURRAMARANG ROAD TRAFFIC Murramarang Road services the township of Kioloa and the Merry Beach Caravan Park, and then continues unsealed into Murramarang National Park. Council has advised that traffic counts from April 2002 recorded 954 vehicles per day on Murramarang Road. The location of the count was at O Brien St, and just north of the park. Assuming 50% travel in each direction, the peak vehicles in each direction are 477 vehicles per day. The dates of the count were not provided, however the NSW School Holidays in 2002 were the 12 th to the 28 th, so it is assumed that these figures represent a holiday period. This would also appear a reasonable assumption in terms of the physical data collection as higher vehicle flows would be of greater interest than lower vehicle flows. Assuming the peak hourly flow is 10% of the peak daily flow (as for dwelling houses, RTA Guide to Traffic Generating Developments), the flow in each direction is 48. Factoring at 7% pa to 2007, the figure becomes 67 peak vehicles per hour. 3.3 TRAFFIC SUMMARY The determined total peak hourly vehicles travelling south on Murramarang Rd is 67 and occurs between the hours of 1600 to 1700. It is the total of traffic to the village, Merry Beach Caravan Park and the National Park. The determined total peak hourly vehicles travelling north on Murramarang Rd is 67 and occurs between the hours of 1100 to 1200. It is the total of traffic from the village, Merry Beach Caravan Park and the National Park. Design peak hourly flows are as follows: DIRECTION ROAD TRAFFIC TURNING TO/FROM PARK Southbound 67 48 (entering park) Northbound 67 56 (exiting park) 4.0 INTERSECTION DESIGN 4.1 GENERAL The posted speed limit for Murramarang Road is 50 kph, however a design speed of 60 kph will be adopted. It is considered that this is a reasonable estimation of the design speed.

7 4.2 INTERSECTION DESIGN REQUIREMENTS Section D1.27 of Council s Engineering Design Specification (DCP 100) specifies that intersections with existing main and local roads are to conform to the layouts shown in figures D1.13 and D1.14 of the specification. Having regard to the turning movements associated with this proposal as outlined in section 4.3 and the warrants for turning movements depicted in Figure.D1.13 Rural Intersection Treatments, the entrance to the proposed site is required to be equivalent to a Type A intersection. These are drawn on the attached plan of the site. Sight distances for Murramarang Road are required to be 180 m (Table D1.17 of Council s DCP100). The Holiday Park entrance is located on a straight stretch of level road and provides adequate sight distances in both dirctions. The entry would be required to accept cars towing caravans plus delivery and garbage collection vehicles, etc, with appropriate radii. The design turning circles are shown on the attached drawing. 5.0 EXISTING INTERSECTION The existing intersection is detailed on the attached plan of the site. The following is noted with respect to the existing intersection: 1. The road is kerb & guttered opposite the park entrance. 2. Opposite the entry is a shop/general store where people park regularly. 3. The existing verge at the front of the park is restricted with respect to parking either side of the entry. Outside this zone, it is well grassed and in a good state of repair. 4. The existing arrangement had adequately handled the peak traffic for several years. 5. The posted speed on the road is 50 kph. 6. The park entry is effectively in an urban area. 7. The existing road drainage is an open table drain that connects with other open drains that lead to creeks. 8. During peak periods, it was observed that parking occurs along the site frontage to Murramarang Road. This is not considered unusual for summer school holdays as the site is located across the road from the local general store and local recreational facilities, and given that the general public gain access to the beach in this location. Murramarang Road is sufficiently wide to accommodate this parking.

8 The parked vehicles appear to be generally associated with people attending the general store, recreation facilities and beach rather than attending the park, 9. The shape of the existing concrete access is very similar to the design turning circles and major reconstruction is not considered required. Some minor asphaltic concrete patching may be utilised where vehicle wheels leave the hardstand and cause potholes in the shoulder. 10. The sight distances are adequate. 11. Council s Traffic Engineer, Mr Brett Williams has advised that no accidents have occurred at the Park access intersection in the last 5 years. 12. As shown on the attached drawing, the existing entrance to the site conforms to a Type A intersection as detailed in section 5.2 of this report. 6.0 INTERNAL ROADS 6.1 INTERNAL ROADS Internal access is via looped two way 6000 mm wide sealed roads serving all camping sites and the majority of cabin sites plus a one way 3500 mm wide cabin access track servicing 8 cabins. These are shown on the attached drawing. Adequate manoeuvring and passing room is available. These are considered adequate for the park. The main access to the park off Murramarang Road is sealed and 8500 mm wide. 7.0 CONCLUSIONS & RECOMMENDATIONS It is considered that the existing intersection is adequate for existing and future peak hourly traffic as detailed above. The existing intersection and roadway is working satisfactorily under peak loading, and any additional treatment to the intersection is not required. The existing on site parking complies with relevant state and local government parking requirements and is considered sufficient for the development.