If it ain t broke, don t t fix it. HMA Thin Lifts for Pavement Preservation in Tennessee 2008 SEAUPG CONFERENCE-BIRMINGHAM, ALABAMA

Similar documents
HMA Thin Lifts for Pavement Preservation in Tennessee

I.D.O.T. Update Version -

Commercial-in-Confidence Ashton Old Baths Financial Model - Detailed Cashflow

Up and Down Months of the Stock Market

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*

A Crack is a Crack Mn/DOT s Perspective on Cracking in Asphalt Pavements

All Regional Engineers. Omer M. Osman, P.E. Special Provision for Hot-Mix Asphalt Mixture Design Composition and Volumetric Requirements July 25, 2014

Louisiana s Experience

Use of New High Performance Thin Overlays (HPTO)

Ultra-Thins 2019 CEW. Tim O'Rourke RCRC Manager

Innovative Warm Mix Asphalt Projects: The Contractor s Perspective

ANCR CRU Statistics February 2007 to December 2007

San Diego Community College District. Proposition S and N Program Schedule

Development of long life structural asphalt

Northeast Pavement Preservation Partnership Burlington, Vermont. Rhode Island DOT

NCAT/MnROAD Cracking Group Update. March 29, 2018

TRAFFIC VOLUME TRENDS July 2002

Asphalt Pavement Construction Update

NEWS Release. U.S. Manufacturing Technology Orders. Year-to-date U.S. manufacturing technology orders up 4.1% over 2011

2017 Local Roads Workshop Local Agency HMA Acceptance Specification

University of Michigan Eco-Driving Index (EDI) Latest data: October 2017

WIM #37 was operational for the entire month of September Volume was computed using all monthly data.

M onthly arket. Jan Table of Contents. Monthly Highlights

Local Market Update 2012 Year In Review

The Peoples Gas Light and Coke Company

DESCRIPTION This work consists of measuring the smoothness of the final concrete or bituminous surface.

Design Criteria Data

Total Production by Month (Acre Feet)

Energy Conservation Efforts

Design Criteria Data

Table Standardized Naming Convention for ERD Files

OPERATIONS TOTALS ,135 7,511 8,823 8,056 8,021 8,319 8,039 8,283 8,001 8,738 8,219 8,094 98,239

Design Criteria Data

Past Due. Account Charges. Contract Charges Security Deposit Due - Jun 09, , Customer Service. Jun 19, PAST DUE $1,693.

Van Ness Transit Corridor Improvement Project. Engineering, Maintenance and Safety Committee March 25, 2015

Design Criteria Data

Design Criteria Data

Balance from your previous bill $0.00 Meter # Basic Charge: 17 $ /day 3.23* Energy charge:¹ 2

Capital Project Tracking Report

RE: S.P (T.H. 210) in Crow Wing County Located on T.H. 210 from Brainerd (R.P ) to Ironton (R.P )

Preliminary Steel Imports, Down 14% in June, Increase 35% in First Half of Year; Import Market Share 21% in Second Quarter 2010

Performance Measures 4 th Quarter/Year End 2010

Long Life Asphalt Performance Testing January 17, 2018

Draft Results and Recommendations

METROPOLITAN COAL ENVIRONMENTAL PROTECTION LICENCE MONITORING SUMMARY

TABLE C-43. Manufacturers' new and unfilled orders, {Amounts in millions of dollars] Nondurable. Capital goods. Total. goods.

ScoreCard Jun 2014 [May 14 Data] Ridership

2014 Fall Asphalt Conference October 7, 2014 Richmond, VA Review of Virginia s 2013 Work Zone Crash Statistics

Construction Sector Indices

The INDOT Friction Testing Program: Calibration, Testing, Data Management, and Application

D G A G R I D A S H B O A R D : A P P L E S

Glendale Water & Power Smart Grid Project

ANCR CRU Statistics Februa.. to December 2007

Port Botany. Trade Statistics Bulletin 1 July June 2018

THE CENTRAL MARIN SANITATION AGENCY TREATMENT PLANT INITIAL ANALYSIS OF CO THICKENING PRIMARY AND SECONDARY SOLIDS

NJ Solar Market Update As of 6/30/15

TRAFFIC VOLUME TRENDS

Performance Measures Second Quarter 2012

FOR IMMEDIATE RELEASE

/ Preliminary Steel Imports Increase 6% in May Import Market Share at 21%

Appendix E Water Supply Modeling

Performance Tests of Asphalt Mixtures

D G A G R I D A S H B O A R D : A P P L E S

/ PRELIMINARY STEEL IMPORTS INCREASE 2% IN MAY Import Market Share 23% in May

Preston s Edmond Market Report

Wednesday, April 20, 2016

PDR Energy Baseline Alternative. Proposal for Discussion October 27, 2015

Macroeconomic Outlook. Presented by Dr. Bruce A. Scherr Chairman of the Board Chief Executive Officer Emeritus

MUNICIPALITY OF MONROEVILLE

STEEL IMPORTS DOWN 10% YEAR-TO-DATE Finished Import Market Share YTD at 25%

Presentation to the Customer Service, Operations and Safety Committee OPERATIONS PERFORMANCE INDICATORS

FOR IMMEDIATE RELEASE

WIM #29 was operational for the entire month of October Volume was computed using all monthly data.

ScoreCard November 2013 [Oct 13 Data] Ridership

FOR IMMEDIATE RELEASE

Design Criteria Data

Greater Las Vegas Snapshot by Sale Type Last Month's Sold

HELICOPTER OPERATIONS WITHIN THE LONDON HEATHROW AND LONDON CITY CONTROL ZONES

The Honorable Connie Bernardy, DFL Lead House Transportation & Regional Governance Policy Committee 253 State Office Building Saint Paul, MN 55155

NE (SE) Beam

Sunrise: 05:48 N (S) Beam

CREDIT UNION ESTIMATES

ScoreCard February 2014 [Jan 14 Data] Ridership

Preliminary Steel Imports Decline 9% in September Import Market Share at 20%

DRAFT. Total Month Average Point (MAP) A Massage 4/30/2014 8/1/2015 A CENTER E

CREDIT UNION ESTIMATES

Greater Las Vegas Snapshot by Sale Type Last Month's Sold

Greater Las Vegas Snapshot by Sale Type Last Month's Sold

Ultra-thin Bonded Wearing Course Performance Update, Minnesota

Developing Affordable GTR Asphalt Mixes for Local Roadways

FALL 2017 ADVERTISING SCHEDULE

CREDIT UNION ESTIMATES

IMPROVING OUR NETWORK PERFORMANCE. BNSF Service Update

North Eastern States Materials Engineers Association (NESMEA) October 18 th 19 th, 2016 Newark, DE

FOR IMMEDIATE RELEASE

Automated Occupancy Detection October 2015 (Phase I) Demonstration Results Presented by Kathy McCune

Overview of California Advanced Clean Car Regulations and Meeting Air Quality Needs in the South Coast Air Basin

Big Red Wraps Big Flavor, Small Price

Pavement Performance Prediction Symposium July 17, 2008 University of Wyoming Laramie, Wyoming

Transcription:

$9 $8 $7 $6 $5 $4 $3 $2 $1 Month-Year Ton Tonne 2008 SEAUPG CONFERENCE-BIRMINGHAM, ALABAMA The Tennessee Program HMA Thin Lifts for Pavement Preservation in Tennessee Mark Woods TDOT 5,109 Interstate Lane Miles 26,244 State Route LM 31,353 Total The Tennessee Program Received 5 th APA Perpetual Pavement Award last week. The Tennessee Program Historically, resurfacing practices involved milling the surface and replacing with 3-4 3 binder and 1-1/41 1/4 surface. The Worst First approach. The Tennessee Program If it ain t broke, don t t fix it. IT S S BROKE!! Jan-05 Feb-05 Mar-05 Apr-05 May-05 Jun-05 Jul-05 Aug-05 Sep-05 Oct-05 Nov-05 Dec-05 Jan-06 Feb-06 Mar-06 Apr-06 May-06 Jun-06 Jul-06 Aug-06 Sep-06 Oct-06 Nov-06 Dec-06 Jan-07 Feb-07 Mar-07 Apr-07 May-07 Jun-07 Jul-07 Aug-07 Sep-07 Oct-07 Nov-07 Dec-07 Jan-08 Feb-08 Mar-08 Apr-08 Cost, $$$ May-08 Jun-08 Jul-08 Aug-08 Sep-08 Oct-08 Nov-08 Bituminous Materials Index Bituminous Adjustments Bituminous Adjustments* Interstates - $4,984,504.33 State Routes - $8,268,530.42 Total - $13,253,034.75 Approximately 10% of TDOT s resurfacing program. * - As of 10/30/2008 1

Interstate LM s Paved State Route LM s Paved 900 800 700 600 500 400 300 200 100 0 1987 1988 1989 1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 4000 3500 3000 2500 2000 1500 1000 500 0 1989 1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 * - 5,109 Total Interstate LM s statewide * - 26,244 Total State Route LM s statewide Tennessee Pavement Preservation Initiative The department has made the decision to increase our use of preventive maintenance treatments on state routes to approximately $10 million (10%) of the budget for pavement management/resurfacing in 2008. Tennessee Pavement Preservation Initiative A July 25 th Letter to TN FHWA Office A List of Preventive Maintenance Activities... Ultra-Thin (<1 ) ) and Thin (1 & & 1-1/21 1/2 ) Asphalt Overlays March 27, 2008 July 25, 2008 SR-50, Robertson Co. 2.5 miles 1 lane 15% Rap, 1 lane virgin Average core thickness 0.91 Range 0.73 1.25 July 2006 Phase One Draft Report: 2

Design Virgin Recycle Opt. AC 6.8 6.8 Design Air Voids 6 6 VMA 21 20.8 VFA 70 72 Vbe 15.0 14.8 Stability (lb) 3677 3677 Flow (0.01 in) 16.0 15.2 DAR 1.78 1.78 Produced Virgin Recycle Placement Date 6/17/2008 6/18/2008 %AC 6.41 6.62 Prod. Air Voids 3.5 2.5 VMA 17.9 17.4 VFA 80.4 85.4 Vbe 14.4 14.9 Stability (lb) 4283 3950 Flow (0.01 in) 19.1 16.7 DAR 1.91 1.90 N des = 50 gyrations APA Rut Depths: Virgin 6.3 mm RAP 5.3 mm Prior to 2008, TN s s smallest surface mix was ½ NMAS, typically placed at 1-1/41 1/4 Two new gradations were developed, for 3/8 (9.5mm) and ¼ (4.75 mm) Marshall Mix Design 3

Tennessee s s New Thin Lift The FIRST new mix specification: Titled 411 TL ¼ (4.75-mm) NMAS 75-blow Marshall spec Developed based on: 4.75-mm SP specification from the Pooled Fund Phase One draft report Local materials TDOT s current specification for 307-Cs leveling course. 10 9 8 for TDOT 307 Cs Leveling Course 10 10 4.75-mm 9 Phase One 8 Report 4.75-mm 9 Phase One 8 Report for TDOT 307 Cs Leveling Course for TDOT 307 Cs Leveling Course Typical TN #10 Screening 411 TL Specification Gradation limits for 411-TL were set essentially the same as TDOT 307-Cs leveling course This specification allowed for less #4 and no 3/8, to permit lighter application rates. 411 TL Specification ¼ (4.75-mm) NMAS 6.0-8.0 allowable optimum AC% VTM: 4.0±0.2%* 0.2%* Minimum 16% VMA Minimum Stability: 2000 lb DAR: 1.0-2.0 Maximum 15% natural sand Maximum 15% RAP (Processed -5/16 ) Minimum 50% approved non-polishing surface aggregates 4

411 TL Specification 4 Projects were let in June under this specification at prescribed spread rates of 85, 65, and 45 lbs/yd 2 (Approx. thickness of 7/8, 5/8,, and ½,, respectively) 2 project were awarded: Greene Co. 45 lbs/yd 2 65 lbs yd 2 Tennessee s s New Thin Lift The SECOND new mix specification: Titled 411 TLD 3/8 (9.5-mm) NMAS 75-blow Marshall spec Developed based on current c TDOT specification for 411-D, typical ½ (12.5-mm) NMAS surface mix 10 10 9 8 9 8 9.5-mm SP for TDOT 411D ½ NMAS surface mix for TDOT 411D ½ NMAS surface mix 10 10 9 9 8 8 5

411 TLD Specification 10 9 8 3/8 (4.75-mm) NMAS 5.3-7.0 allowable optimum AC% VTM: 3.8±0.3%* Minimum 14% VMA Minimum Stability: 2000 lb DAR: 0.6-1.2 Maximum 15% RAP (Processed -5/16 ) 411 TLD Specification 3 Projects were let in June under this specification at a prescribed spread rates of 85 lbs/yd 2 (Approx. thickness of 7/8 ) 1 project was awarded in Campbell Co. Thin-lift Letting 7 total thin lift projects were let in June of this year. 3 projects were awarded based on cost per square yard. Thin-lift Letting Existing Surface ALICATION PROJECT TYPE MIX NMAS COST ($/ton) COST ($/yd2) RATE (lbs/yd2) MICRO* Micro 1/4" (4.75-mm) 22 (Agg) 173.28 2.13 CNG203 411TL 1/4" (4.75-mm) 45 112.00 2.52 CNG098 411TL 1/4" (4.75-mm) 65 84.50 2.75 CNG088 411TL 1/4" (4.75-mm) 65 98.25 3.19 CNG195 Micro 1/4" (4.75-mm) 32 (Agg) 173.28 3.20 CNG202 411TLD (9.5-mm) 85 76.25 3.24 CNG174 411TLD (9.5-mm) 85 82.00 3.49 CNG081 411TLD (9.5-mm) 85 92.50 3.93 CNG204 411TL 1/4" (4.75-mm) 85 99.00 4.21 411D* 411D (12.5-mm) 132.5 75.53 5.00 *Hypothetical data collected from previous lettings 6

Existing Surface 65 lb/yd 2 ¼ Mix 65 lb/yd 2 ¼ Mix 65 lb/yd 2 ¼ Mix 65 lb/yd 2 ¼ Mix Test Performed by TDOT Road Profiler Direction and Measured Roughness Test Limits ( HC-IRI Number Per Mile ) Mile Pre Ride Final Ride Percent Number Number Improvement From To NSEW 1.00 E 52 31 40 1.00 2.00 E 56 29 48 2.00 3.00 E 56 31 45 3.00 4.00 E 57 31 46 4.00 5.00 E 60 32 47 5.00 6.00 E 62 35 44 6.00 6.26 E 72 45 38 --- --- --- --- --- --- 1.00 W 68 41 40 1.00 2.00 W 55 32 42 2.00 3.00 W 64 38 41 3.00 4.00 W 56 32 43 4.00 5.00 W 56 30 46 5.00 6.00 W 61 32 48 6.00 6.27 W 58 33 43 Greene Co. 45 lb/yd 2 ¼ Mix Test Performed by TDOT Road Profiler Test Limits Direction and Measured Roughness ( HC-IRI Number Per Mile ) Mile Pre Ride Final Ride Percent NSEW From To Number Number Improvement 1.00 N 62 31 50 1.00 2.00 N 57 29 49 2.00 3.00 N 64 39 39 3.00 3.63 N 75 37 51 --- --- --- --- --- --- 1.00 S 86 43 50 1.00 2.00 S 71 30 58 2.00 3.00 S 66 32 52 3.00 3.63 S 72 35 51 7

APA Rut Depths Campbell Co (3/8 NMAS) 3.97 mm Greene Co. (¼ NMAS) 5.67 mm Conclusions / Recommendations All thin mixes are best accompanied by a proper application of tack coat, preferably polymer modified. The >2*NMAS lift thickness rule of thumb should still apply. TDOT currently plans on limiting these mixes to lower volume routes. TDOT will be placing a 4.75-mm, 25% RAP, WMA under maintenance contract in the near future. 8