Installation. Introduction

Similar documents
Intended Users This manual is meant for Gasboy Authorized Service Contractors (ASCs) who will install this kit on Atlas units.

IMPORTANT INFORMATION

Intended Users This document is intended for Gasboy-certified Authorized Service Contractors (ASCs) and Customer Specified Contractors (CSCs).

Purpose This document provides installation instructions for the Gasboy 9820 Pump Interface Kit.

IMPORTANT INFORMATION

Introduction. Caution. This manual provides installation instructions for installing the Atlas Discharge and Valve Conduit Retrofit Kit.

Purpose This document provides installation instructions for Gasboy 9800A/2600A Pump Interface Kits.

Introduction 1 Important Safety Information 3 Installing TopKAT Series 900 Replacement Report Printer Kit 5

Required Tools and Materials Following tools and materials are required to install the Boot Switch Kit: Nut Driver Heat Gun Thread Lock

Introduction. MDE-4431A Gasboy ATC Kits M05819K00X Installation Manual May 2005

Introduction. Contents

Introduction. Table of Contents. Required Tools

INSTALLATION GUIDE FUELTEC- FUEL POLISHING SYSTEM

Introduction. Related Documents

Purpose Of This Document This manual provides the information to assemble and install Lighted Canopy Conduit Kits on The Advantage Series.

MDE-2833D. Pumps and Dispensers. Site Preparation For Use With: All Gilbarco pumps and dispensers

Installation/Operation Manual

AVRN Vacuum Assist Nozzle

Site Preparation Manual

Manual No: Revision: J. FXV Leak Detectors. Installation Instructions

INSTALLATION & MAINTENANCE MANUAL

FLEX-ING TM DISPENSER HOSES INSTALLATION GUIDE

MANUAL FLUID EXTRACTOR

Prodigy HDLV Pump. Customer Product Manual Part A02

"ELECTRICAL SAFETY IN THE LABORATORY"

PMA INTAKE FILTER SCREEN INSTALLATION GUIDE

LABORATORY SAFETY SERIES: Electrical Safety

FUEL INJECTOR / VAPOR SEPARATOR SEAL KIT, P/N INSTALLATION INSTRUCTIONS

TP300 INDUSTRIAL TRASH PUMP OPERATOR S MANUAL

Site Preparation Manual

Introduction & Owner Information 1 Safety Precautions 2 Parts 2 Installation Instructions 2 Tools 2 Warranty Information 6

STP-MLD. Installation and Owner s Manual

Manual No: Revision: B. CCVP Rain Shield. Installation Guide

JOHN DEERE WORLDWIDE COMMERCIAL & CONSUMER EQUIPMENT DIVISION. Lawn Tractors L100, L110, L120, and L130 TM2026 DECEMBER 2002 TECHNICAL MANUAL

FLEX CONNECTOR HEAT SHRINK SLEEVE INSTALLATION GUIDE

THE SUBMERGED PUMP SYSTEM SUPPLYING THE DISPENSERS MAY TURN ON UNEXPECTEDLY TO PERFORM A LINE LEAK TEST. THIS MAY RESULT

Hydraulic Immediate Need Power Pack

SPECIFICATIONS Horsepower: 1.5 HP Running Maximum PSI: 125 PSI Tank Capacity: 15 Gallons CFM: 6 40 PSI 5 90 PSI

STP-MLD+ Installation and Owner s Manual. Manual # Revision Date Changes from previous revision

STP-MLD Installation and Owner s Manual

JOHN DEERE WORLDWIDE COMMERCIAL & CONSUMER EQUIPMENT DIVISION. Lawn Tractors L100, L110, L120, and L130 TM2026 DECEMBER 2002 TECHNICAL MANUAL

Polypropylene Piston Drum Pumps

Hydraulic PTO Flow Device

Installation Instructions for Remote Mount HMI 211 Display Panel Kit A045J206

Installation Instructions for Aux 101 Kit A044Z055

Tire Bead Seater. Explanation of Safety Signal Words. The safety signal word designates the degree or level of hazard seriousness.

Airless Spray Gun INSTRUCTIONS DP psi (345 bar) Maximum Working Pressure

Prodigy HDLV Generation II Pump Panel

ANTI-SYPHON VALVE INSTALLATION GUIDE

#9040 FUEL TANK SWEEPER

Pro 30 Gas Caddy. Model FC-P30-UL Operator s Manual. JohnDow Industries, Inc. 151 Snyder Ave. Barberton, OH 44203

Fast-Flo Pump INSTRUCTIONS-PARTS LIST. Table of Contents 1:1 RATIO

Trench Filler for Compact Utility Loaders

R18SPL. ORIGINAL INSTRUCTIONS 18V Dual Power LED Spotlight

Owner s Manual Pressure Washer: Machine that cleans dirty surfaces with high pressure water.

1/2" AIR DRIVEN DIAPHRAGM PUMP

Owner s Manual Pressure Washer Pump: For high pressure cleaning machines.

Power Fuse Assembly Replacement (for 3000A 1395 DC Drives)

DIESEL EXHAUST FLUID PUMP MOTOR ASSEMBLY REPLACEMENT GUIDE

STP SUBMERGED TURBINE PUMP IST INTELLIGENT SUBMERSIBLE TURBINE. Variable Length

DIESEL EXHAUST FLUID PUMPING ACCESSORIES INSTALLATION GUIDE

Log Splitter. Owner/Operator Manual. Models HCWP1-26

IMPORTANT SAFETY NOTICE

B-026INT October 6, 1999 FUEL FILTER BRACKET RETROFIT (JAPAN ONLY) GENERAL RETURN THIS TO: INITIAL HERE TECHNICIAN NO.

Stainless Steel Rotary Drum Pump

I. Safety precautions

herkules 338 Air Operated Diaphragm Pump

Voltmaster Centrifugal Trash Pumps

RIGID ENTRY BOOT INSTALLATION GUIDE

Husky 307 Air-Operated Diaphragm Pumps

OPERATOR S MANUAL JUMP STARTER. and DC Power Source. Model No CAUTION: Sears, Roebuck and Co., Hoffman Estates, IL U.S.A.

Pro 30 Plus Gas Caddy

PRODIGY & PRO PLUS Skid Steer Snowplows

Document Library TS Data Sheet Universal Fuel System Cleaner. Data Sheet. Public

Paymentech 005 Credit and Debit Card Networks

Underground Storage Tank. Operator C Training Guide. AAA Trucking Company. 123 Main Street. Atlanta, Georgia John C. Smith - A/B Operator

Instructions Parts List

DC400 Dispensing Cutoff System

HD2 and HDX Skid Steer Snowplows

Todd Gas Caddy Assembly Instructions

Technical Manual. DLM Module. This manual should remain with the unit.

Page 1 of 12. Part# /30/2016

Instructions Parts List

M-3025CB-AV Fuel Pump

Installing a PTV Inlet

High Capacity Submerged Turbine Pumps

Cast Iron Rotary Drum Pump

Installation Instructions

Viscount I Hydraulic Motor and Displacement Pump

75918 Heavy Duty 3-Point Mount

Installing a PTV Inlet

Todd Evacuation Caddy

Installation Using Battery Clips

PORTABLE TRASH PUMPS MDP200

MATERIAL SAFETY DATA SHEET MSDS009. Ultralife Batteries, Inc Technology Parkway Newark, NY

Model: OBD-L On-Board-Diagnostics II Memory Saver Detector

Husky 715 Air-Operated Diaphragm Pumps

Defender Series. Overfill Prevention Valve. Automatic Shutoff for USTs. Installation, Operation and Maintenance Series

AIR CLEANER GENERAL REMOVAL. 1CAUTION Do not run engine without filter element in place. Debris could be drawn into the engine causing damage.

Monicon Instruments Co., Ltd. CHR-1285/2485 CHR-1285/2485 BATTERY CHARGER

Transcription:

Installation MDE-4369 Aviation Tubing Retrofit Kit for Gasboy Q Models Kits M05023K001 & K05023K002 October 2004 Introduction This manual provides installation instructions for Kits M05023K001 & M05023K002 for Gasboy Q Models. These kits contain hardware required for replacing the copper tubing in Gasboy Q series commercial pumps and dispensers. This upgrade will help protect against a possible safety hazard that could be present with contaminated aviation fuel. Required Reading Before installing these kits, the installer must read, understand, and follow: This manual NFPA 30A, The Automotive and Marine Service Station Code NFPA 70, The National Electric Code Applicable federal, state and local codes and regulations. Note: This kit must be installed by a Gasboy Authorized Service Contractor (ASC) to ensure warranty. Required Tools The following tools are needed to install the Gasboy Q Model Kit M05023K001: Socket set or combination box & open end wrenches MDE-4369 Aviation Tubing Retrofit Kit for Gasboy Q Models Kits M05023K001 & K05023K002 October 2004 Page 1

Introduction Parts List The Gasboy Aviation Tubing Retrofit Kit M05023K001 The following table lists the parts for the above kit. Description Part Number Quantity Tubing Assy M04844A001 1 O-Ring 049002 1 O-Ring Q10068 14 1 The Gasboy Aviation Tubing Retrofit Kit M05023K002 The following table lists the parts for the above kit. Description Part Number Quantity Tubing Assy M04845A001 1 O-Ring 049002 1 O-Ring Q10068 14 1 Page 2 MDE-4369 Aviation Tubing Retrofit Kit for Gasboy Q Models Kits M05023K001 & K05023K002 October 2004

Important Safety Information Important Safety Information This section introduces the hazards and safety precautions associated with installing, inspecting, maintaining or servicing this product. Before performing any task on this product, read this safety information and the applicable sections in this manual, where additional hazards and safety precautions for your task will be found. Fire, explosion, electrical shock or pressure release could occur and cause death or serious injury if these safe service procedures are not followed. Preliminary Precautions You are working in a potentially dangerous environment of flammable fuels, vapors, and high voltage or pressures. Only trained or authorized individuals knowledgeable in the related procedures should install, inspect, maintain or service this equipment. Emergency Total Electrical Shut-Off The first and most important information you must know is how to stop all fuel flow to the pump and island. Locate the switch or circuit breakers that shut-off all power to all fueling equipment, dispensing devices, and submerged turbine pumps (STPs).! WARNING The EMERGENCY STOP, ALL STOP, and PUMP STOP buttons at the cashier s station WILL NOT shut off electrical power to the pump/dispenser. This means that even if you activate these stops, fuel may continue to flow uncontrolled. You must use the TOTAL ELECTRICAL SHUT-OFF in the case of an emergency and not only these cashier station stops. Evacuation and Barricading Any procedures performed on or near the pump/dispenser (but not requiring accessing the pump/dispenser or STPs) requires the following actions: An evacuation of all unauthorized persons and vehicles Using safety tape or cones as barricades to the effected units Read the Manual Read, understand and follow this manual and any other labels or related materials supplied with this equipment. If you do not understand a procedure, call a Gasboy Authorized Service Contractor or call the Gilbarco Veeder-Root Support Center at 1-800-800-7498. It is imperative to your safety and the safety of others to understand the procedures before beginning work. MDE-4369 Aviation Tubing Retrofit Kit for Gasboy Q Models Kits M05023K001 & K05023K002 October 2004 Page 3

Important Safety Information Follow the Regulations There is applicable information in: NFPA 30A: Automotive and Marine Service Code; NFPA 70: National Electrical Code (NEC); OSHA regulations; and federal, state, and local codes which must be followed. Failure to install, inspect, maintain or service this equipment in accordance with these codes, regulations and standards may lead to legal citations with penalties or affect the safe use and operation of the equipment. Replacement Parts Use only genuine Gasboy replacement parts and retrofit kits on your pump/dispenser. Using parts other than genuine Gasboy replacement parts could create a safety hazard and violate local regulations. Safety Symbols and Warning Words This section provides important information about warning symbols and boxes. Alert Symbol This safety alert symbol is used in this manual and on warning labels to alert you to a precaution which must be followed to prevent potential personal safety hazards. Obey safety directives that follow this symbol to avoid possible injury or death. Signal Words These signal words used in this manual and on warning labels tell you the seriousness of particular safety hazards. The precautions that follow must be followed to prevent death, injury or damage to the equipment DANGER - This signal word is used to alert you to a hazard to unsafe practice which will result in death or serious injury WARNING - This alerts you to a hazard or unsafe practice that could result in death or serious injury. CAUTION with Alert symbol - This signal word designates a hazard or unsafe practice which may result in minor injury. CAUTION without Alert symbol - When used by itself, CAUTION designates a hazard or unsafe practice which may result in property or equipment damage. Prevent Explosions and Fires Fuels and their vapors will become explosive if ignited. Spilled or leaking fuels cause vapors. Even filling customer tanks will cause explosive vapors in the vicinity of dispenser or island. No Open Flames Open flames from matches, lighters, welding torches or other sources can ignite fuels and their vapors. Page 4 MDE-4369 Aviation Tubing Retrofit Kit for Gasboy Q Models Kits M05023K001 & K05023K002 October 2004

Important Safety Information No Sparks - No Smoking Sparks from starting vehicles, starting or using power tools, burning cigarettes, cigars or pipes can also ignite fuels and their vapors. Static electricity, including an electrostatic charge on your body, can cause a spark sufficient to ignite fuels and their vapors. After getting out of a vehicle, touch the metal of your vehicle to discharge any electrostatic charge before you approach the dispenser island. Working Alone It is highly recommended that someone who is capable of rendering first aid be present during servicing. Be thoroughly familiar with Cardiopulmonary Resuscitation (CPR) methods if you are working with or around high voltages. This information is available from the American Red Cross. Always advise the station personnel about where you will be working, and caution them not to activate power while you are working on the equipment. Use the OSHA Tag-Out and Lock-Out procedures. If you are not thoroughly familiar with this requirement, refer to information in the service manual and OSHA documentation. Working With Electricity Safely Be sure to use safe and established practices in working with electrical devices. Poorly wired devices may cause a fire, explosion or electrical shock. Be sure grounding connections are properly made. Make sure that sealing devices and compounds are in place. Be sure not to pinch wires when replacing covers Follow OSHA Lock-Out and Tag-Out requirements. Station employees and service contractors need to understand and comply with this program completely to ensure safety while the equipment is down. Informing Emergency Personnel Compile the following information for emergency personnel: Location of accident (e.g. address, front/back of building, etc.) Nature of accident (e.g. possible heart attack, run over by car, burns, etc.) Age of victim (e.g. baby, teenager, middle-age, elderly) Whether or not victim has received first aid (e.g. stopped bleeding by pressure, etc.) Whether or not victim has vomited (e.g. if swallowed or inhaled something, etc.) IMPORTANT: Oxygen may be needed at scene if gasoline has been ingested or inhaled. Seek medical advice immediately. MDE-4369 Aviation Tubing Retrofit Kit for Gasboy Q Models Kits M05023K001 & K05023K002 October 2004 Page 5

Installing the M05023K001 Kit for Suction Pumps Installing the M05023K001 Kit for Suction Pumps The following process explains the removal of copper tubing and installation of approved piping for aviation fuel. 1 Read all instructions before beginning installation. 2 Observe and execute all safety precautions and procedures before, during and after installation. 3 Obtain permission from station Operator/Manager to remove pump/dispenser from service and obtain key to the suction pump door. 4 Turn off all power to the pump and use Tag-Out and Lock-Out procedures. 5 Using the key, open the doors on both sides of the pump. 6 Trip the shear valve and test to ensure that the line is completely closed. (Test by turning power back on and verify that no fuel can be dispensed. If unit can still function, again retrip shear valve, making sure that it is completely closed.) Note: In the next step, before loosing any bolts, reduce the pressure in the lines. 7 Station catch basins and absorbent materials in such a way as to catch any fuel still left in any open lines (after reducing pressure in the lines). 8 With eye protection in place, remove the copper tubing between the suction pump and meter. Save all bolts for later use. See Figure 1. Figure 1: Copper Tubing in Suction Pump Unit Copper Tubing Page 6 MDE-4369 Aviation Tubing Retrofit Kit for Gasboy Q Models Kits M05023K001 & K05023K002 October 2004

Installing the M05023K001 Kit for Suction Pumps 9 Install new steel tubing and new O-Rings, (Q10068 14 at meter flange and 049002 at the pumping unit flange) and attach steel tubing using existing bolts. (The use of silicone grease helps to hold O-rings in place during assembly.) 10 Return power to pump and run fuel through the pump and inspect for leaks. 11 Purge all air from unit (usually 10 gallons is recommended). 12 Remove catch basin, tools and absorbent materials. (Dispose of absorbent materials and fuels in a safe manner. Do not dispose of them in station trash receptacles or in the pump pit box.) 13 Re-install the front and back doors to the pump. MDE-4369 Aviation Tubing Retrofit Kit for Gasboy Q Models Kits M05023K001 & K05023K002 October 2004 Page 7

Installing the M05023K002 Kit for Remote Dispensers Installing the M05023K002 Kit for Remote Dispensers The following process explains the removal of copper tubing and reassembly with approved piping for aviation fuel. 1 Read all instructions before beginning installation. 2 Observe and execute all safety precautions and procedures before, during and after installation. 3 Obtain permission from station Operator/Manager to remove pump/dispenser from service and obtain key to the suction pump door. 4 Turn off all power to the dispenser and use Tag-Out and Lock-Out procedures. 5 Using the key, open the doors on both sides of the dispenser. Note: In the next step, before loosing any bolts, reduce the pressure in the lines. 6 Trip the shear valve and test to ensure that the line is completely closed. (Test by turning power back on and verify that no fuel can be dispensed. If unit can still function, again retrip shear valve, making sure that it is completely closed. 7 Station catch basins and absorbent materials in such a way as to catch any fuel still left in any open lines.in the next step, before loosing any bolts, reduce the pressure in the lines. 8 With eye protection in place, remove the copper tubing between strainer housing and meter, loosening bolts slowly so as to relieve any fuel pressure gradually. Save all bolts for later use. See Figure 2. Figure 2: The existing printer mounted on CIM door. Copper Tubing 9 Install new steel tubing and new O-Rings, (Q10068 14 at meter flange and 049002 at the strainer flange) and attach steel tubing using existing bolts. (The use of silicone grease helps to Page 8 MDE-4369 Aviation Tubing Retrofit Kit for Gasboy Q Models Kits M05023K001 & K05023K002 October 2004

Installing the M05023K002 Kit for Remote Dispensers hold O-rings in place during assembly.) 10 Open shear valve. 11 Return power to pump and run fuel through the pump and inspect for leaks. 12 Purge all air from the unit (usually 10 gallons is recommended). 13 Remove catch basin, tools and absorbent materials. (Dispose of absorbent materials and fuels in a safe manner. Do not dispose of them in station trash receptacles or in the pump pit box.) 14 Re-install the front and back doors to the pump. MDE-4369 Aviation Tubing Retrofit Kit for Gasboy Q Models Kits M05023K001 & K05023K002 October 2004 Page 9

Installing the M05023K002 Kit for Remote Dispensers Gasboy is a registered Trademark of Gasboy International Inc. 2004 Gilbarco Inc. 7300 West Friendly Avenue Post Office Box 22087 Greensboro, North Carolina 27420 Phone (336) 547-5000 http://www.gilbarco.com Printed in the U.S.A. MDE-4369 Aviation Tubing Retrofit Kit for Gasboy Q Models Kits M05023K001 & K05023K002 October 2004