ED 100, ED 250 ESR. Mounting instructions

Similar documents
RTS 85. Transom concealed door closer

TS 73 EMF. Hold-open system

BTS Accessories. Floor Spring Accessories

Drive shaft Operating Instructions BA 42/07

Door Closer DORMA TS 72

ts 90 impulse en 3/4 Cam-action door closer

CS 80 MAGNEO. Automatic sliding door operator. Technical Documentation Read the manual before the assembly carefully!

MUTO Comfort for demanding system solutions. MUTO The compact, flexible manual sliding door system

KTC 2. Revolving door

ts 97 Cam-action door closer in Contur design

TS 83. Easy-action Door Closer

AM-676, AM , AM-690-R, AM-692, AM-693-R, AM-762, and AM-763

UNIVERSAL. products will be phased out by UNIVERSAL. Technical brochure Patch fittings for toughened glass assemblies

SPORTSTER SADDLEBAG KIT. i i02212

ED900. Low energy operator. Installation instructions: T/slide channel/pull arm mounting

multifunctional convenience MUTO the manual sliding door system with self-closing action and concealed locking.

UNIQUE DESIGN FOR BOUNDLESS POSSIBILITIES. MUNDUS glass patch fittings. Discover their new, inspiring clean design and unique ease of installation.

TS 92 TS 91. Cam-action door closers in Contur Design

Pressure chlorine changeover unit C 7520

SEAL REPLACEMENT SeaStar ATM, Inboard Steering Cylinders, -3 Models

Self-propelled Chipper Shredder Vacuum

Pull out clutch E snap ring and withdraw complete clutch pack of clutch E. 6 HP 26 ZF Getriebe GmbH Saarbrücken CD

Layout S. 6 DORMA CI-2012 Englisch Stand

ED900. Low energy operator. Customizing Features: Book 3 of 3

Deubl Alpha door frames

The ideal solution for doors up to 1100 mm wide tested and approved to EN 1154

Fig Variable Speed Valve Parts

Franking system PostBase One Service documentation

ED 100 ED 250. Swing door operators in modular design

LADDERBRACE. Strut 6A

MUnDUs premium MUnDUs Comfort

3/6/2017 Timing Chain Service and Repair, Removal and Replacement: Valve Timing, Installing and Adjusting

Wheeler Mfg. Div Rex Intl USA Inc Jefferson Road Ashtabula, OH Tel: Fax:

Model 4360 Teardown and Reassembly Instructions

Sachs shock manual. ( ) 2 & 4 Stroke RR Enduro. ( ) RS Dual Sport

Maintenance Information

Operating instructions Actuator and Emergency exit AZ/AZM 200-B30 AZ/AZM 201-B About this document. Content

User and Fitting Manual June 2008

POWER STEERING PUMP (3VZ FE) POWER STEERING PUMP REMOVAL AND INSTALLATION Remove and install the parts as shown.

DORMA GmbH + Co. KG DORMA Platz ENNEPETAL DEUTSCHLAND Tel Fax

UNA 13 UNA 15 UNA 15 Stainless Steel Design. Installation Instructions Steam Traps UNA 13, UNA 15

Technical Manual DICTAMAT 304 AZ. Door Drive Unit. for hinged lift landing doors. Technical Data

ENGINE CHAIN SAW Model CS 40EA

METERING VALVE 2" STEM GUIDED

LOW PRESSURE BALANCED VALVE DIAPHRAGM BALANCED

Schedule 80 CPVC Industrial Products & Accessories True Union 2000 Industrial Ball Check Valves

Hydraulic Rotary Hammer Drill

TIMING BELT REPLACEMENT. Removal Procedure. Tools Required J Timing Belt Alignment Kit J Crank Hub Torx Socket

COIL-OVER SUSPENSION SYSTEM

Material: Hinge Parts: zinc die, matt chrome plated, or zinc die, matt black. Pin: stainless steel Nut plate: steel, zinc plated

LIST NO. F071 ENGINE ENGINE CUTTER. Model CM 75EBP (E1)

Timing-Belt Reverse Unit 8 80 R50 II Notes on Use and Installation

3 Axles and brakes. 3.1 Function and construction of the axles Construction Function

BTS Accessories. Floor Spring Accessories

ENGINE. ENGINE CHAIN SAW Model TCS 33EB (TANAKA BRAND) (E2) LIST NO. E A A 32A 33 31B 31A 31 36A 37A 39A 38A 48A 40A

- MK7 Mirror Integration Kit - Installation Instructions

Installation Guide Rollerdor RD55 Econ Roller Garage Door

Subject: Align-Trac Procedures. Lit No: LIT1004 Date: 05/30/2015 Revision: A

Midwest Industries, Inc. Ida Grove, IA Page 1

LAND ROVER DISCOVERY 3 ARB BULL BAR AND WINCH BAR WARNING

Made in USA with U.S. PATENT #6,808,223; #6,845,547; #7,140,075; #7,059,655 and other patents pending.

Onderdelen voor CS33ET

SERVICE PARTS LIST 1-1/8" ROTARY HAMMER MILWAUKEE ELECTRIC TOOL CORPORATION W. LISBON RD., BROOKFIELD, WI Drwg.

AgriWheel Single Gate Kit Low Voltage & Solar. Installation & Operating Instructions

2017 TigerStop, LLC. Installation Guide AUTOMATION. February 2017 Mk1

Inserting Tools for Screwdrivers

Increased Performance for Turbo Gears BHS AeroMaXX

DORMA BEYOND. Anti-Pinch Glass Door System

Exchange of rollers from the XTS-Mover

User manual for pneumatic systems

Rhino-Rack Hybrid Bike Carrier (RBC050)

SATURN SKY 2006 AND UP

Hood. Hood, removing, installing and adjusting. Page 1 of 11

Installation Instructions : Ford Focus MK3 RS : Page 1 Tools Required: Philips screwdriver, trim removal tool, Torx, 10mm socket

Property of American Airlines

Installation Instructions

Disassembling and assembling transmission

Instruction Manual DP03 Plastic paddle-type flow switch with cable

The EFL 2000/1 & 2 User Guide Test Sieve Shaker. Contents

Drive Unit e-drive1. Installation instructions 04/2014. English translation of the original German installation instructions

Q-04: Replace Brake Shoes/Adjust Brakes

2010+ Audi B8 S4/S5 3.0T S-FLO Intake Kit INSTALLATION GUIDE FOR RACING USE ONLY

James Barone Racing Aftermarket Parts and Accessories

REPAIR PROCEDURES MANUAL

LOCKN LOAD. MAX VEHICLE ROOF LOAD RATING: 100KG (2 Leg Pairs) 150KG (3 Leg Pairs) TOTAL LOAD EQUALS WEIGHT OF ROOF RACKS + ACCESSORIES + CARGO

Panic Hardware DORMA PHA 2000 PHB 3000

Simplex Pump and Socket Ball Valves Pump and Socket Ball Valves

TECHNOLOGY IN MOTION MACO MULTI-TREND TU.-ON. AND T&T FITTINGS. Installation instructions TIMBER WINDOWS

Cam-action door closers DORMA TS 92 TS 91

Operating & Maintenance Instructions Thermobend Elite Range

Servicing the Tool. Service Kit SERVICE KIT. For all servicing we recommend the use of the service kit (part number (S)).

Introduction. Installation. Maintenance. Bill of Materials

Swiveling gripper finger GFS 16-40

Reverse Idler Gear Shaft

ORIGA SYSTEM PLUS Guides, Brakes and Valves for Modular Linear Drive Systems OSP Appendix to the Operating Instructions

Operating Instructions for Paddle Flowswitch Model: PPS-...

AmTryke Adult Recumbent Model HP1000 #50-HC-1000

Automation Swing Gate Opener

Meter FMT II. Operating manual. original operating manual. Translation of the

AR28.10-P-1004SYZ Disassemble, assemble and seal MODEL /18, /28 with TRANSMISSION 722.9

Transcription:

Mounting instructions

These instructions may only be used in conjunction with the mounting instructions for the ED 100/ED 250 (WN 057698-45532). Especially the safety instructions on page 3 of the ED 100/ED 250 mounting instructions have to be considered! Contents Page 1. Preparation of operator at passive leaf 3 2. Preparation of operator at active leaf 4 3. Installation of operators 4-5 4. Linking the operators 5-6 Translation of the original operating instructions 2 DORMA

1. Preparation of operator at active leaf Put the operator onto the ground or a table to prepare it.. 1 Install the brake inside the system girder depending on the respective way of mounting (on hinge side/opposite hinge side) before mounting the motor shaft. With mounting on the hinge side, the letter "B" must be visible when you look at the system in direction of the arrow. You must see the letter "G" in direction of the arrow if the system is mounted on the opposite hinge side. Slip the brake onto the motor shaft until it locks in position. 2 Insert the opening piston into the provided hole at the brake. 3 Insert the coupling piece for the active leaf onto guide "A" inside the system girder. A 4 DORMA 3

Fix the opening piston inside the respective hole of the coupling piece in accordance with the prevailing way of mounting. 13 mm 9 mm 5 Fix the reset spring unit on the face side of the system girder with screws. Ensure that pressure plate "A" is in the correct position. Torx T20 A 6 Insert the rod for the active leaf (GF) from the face side through the remaining hole in the pressure plate into the respective openings of the system girder. You can distinguish the rod for the active from the rod for the passive leaf (SF) as follows: The rod for the passive leaf is longer and has an additional groove. GF SF 7 Use an open end spanner to fix the rod until it locks in position inside the coupling piece. 4 mm 8 4 DORMA

2. Preparation of operator at passive leaf Put the operator onto the ground or a table to prepare it. 9 Insert the coupling piece for the passive leaf onto bar "A" and guide "B" inside the system girder. A B 10 Turn the coupling piece while fitting it inside the system girder; then put it into the provided opening at the system girder. 11 Slip the rod for the passive leaf from the face side onto the guide inside the system girder. 12 Use an open end spanner to fix the rod until it locks in position inside the coupling piece. 4 mm 13 DORMA 5

3. Installation of operators Fix the carry bar (not included in scope of delivery) at the passive leaf. Fix the mounting plates for both operators. Please consider the mounting instructions for the ED 100/ED 250 (WN 057698-45532) accompanying the operators. Connect the 230 V supply at one of the mounting plates. Work on electrical equipment may only be performed by properly qualified staff (electricians). L1 N Connect earthing (grounding) cable. 14 Lay the mains cable for the second operator inside the groove of the mounting plates. Also lay the cable for the program switch and, if required, further cables inside the provided groove. 15 Mount both operators. Then mount the standard arm or the slide channel. Connect all required cables. Please consider the mounting instructions for the ED 100/ED 250 (WN 057698-45532) accompanying the operators. 16 4. Linking the two operators 1. Move the joint socket at the passive leaf towards the operator. A + 5mm A 2. Measure the clearance between the two joint sockets (dimension A). 3. Cut the threaded rod to length (dimension A + 5 mm). 17 6 DORMA

Fix the counter nut and the ball end loosely onto the threaded rod (at the side where you cut it to length). 18 Clip the ball ends into the joint sockets. First insert the preinstalled ball end into the joint socket at the side of the active leaf, and then clip the other ball end into the joint socket at the side of the passive leaf. 1. 2. 19 Length adjustment is realised by turning the rod. A clearance of 1-2 mm is required between the collar of the coupling bolt and the brake. Open both door leaves and then trigger a closing cycle in order to check if the passive door leaf remains in waiting position. Lock the coupling bolt with the aid of the nut. 1-2 mm 20 Perform mechanical adjustments (such as spring force adjustment) and the commissioning; then mount the cover. Please consider the mounting instructions for the ED 100/ED 250 (WN 057698-45532) accompanying the operators. 21 With fire doors: mount the tapped as indicated in instructions 054859 45532. F Passive leaf Active leaf 22 DORMA 7

DORMA Deutschland GmbH DORMA Platz 1 58256 Ennepetal germany Tel. +49 2333 793-0 Fax +49 2333 793-4950 www.dorma.com WN 058174 45532, 05/14, Subject to change without notice