REQUEST FOR INFORMATION ON ENVIRONMENTAL CONTROL (EC) WITH AUXILIARY POWER UNIT (APU) IN TANK T-72

Similar documents
INPUTS FOR FEASIBILITY STUDY FOR MAKE PROJECTS : AUXILIARY POWER UNIT (APU) FOR TANK T-90 S/SK

Weapons and Equipment (WE-8/9) Room No 208G, South Block Integrated HQ of MoD (Army) DHQ PO, New Delhi Jun 2010

REQUEST FOR INFORMATION (RFI) : LIGHT BULLET PROOF VEHICLE (LBPV)

REQUEST FOR INFORMATION (RFI) : MINI TRUCK

REQUEST FOR INFORMATION FROM VENDORS FOR DESIGNS FOR A FUTURE READY COMBAT VEHICLE FOR INDIAN ARMY

1 Indian Army is planning to procure single telescopic boom type Light Recovery Vehicles

1 [94. NOISE LIMIT FOR GENERATOR SETS RUN WITH DIESEL

ARAI/TA(4G_RV)/HORIBA/MEXA 584L/ Dated 25 Mar 2014

Bharat Heavy Electricals Limited, Electronics Division, Bangalore, India.

Reference Number PDS 18 - (RIC Standard: EP SP)

and excellence Effectiviness XA-series Armoured Wheeled Vehicle Family

ARAI/TA(4G)/SMS/D680/ Dated 28 Jan 2010

ARAI/TA(4G_RV)/SMS/D680/ Dated 21 st Mar 2015 CERTIFICATE FOR COMPLIANCE TO THE CENTRAL MOTOR VEHICLES RULES

ARAI/TA (4G)/AIRVISOR/AVG500/ Dated 17 th Apr 2017

ARAI/TA(4G)/GEN-MAINT/EXOSCAN-V/ Dated 26 th Mar 2009 CERTIFICATE FOR COMPLIANCE TO THE CENTRAL MOTOR VEHICLES RULES

4.1 Type of the valve and materials of construction of body and trim shall be as specified in valve Data sheet.

Inviting Tenders for Supply, Installation, Testing and Commissioning of 500 KVA DG Set for Temperature Controlled Warehouse at Medchal, Hyderabad.

Bharat Heavy Electricals Limited (High Pressure Boiler Plant) Tiruchirappalli , TAMIL NADU, INDIA CAPITAL EQUIPMENT / MATERIALS MANAGEMENT

MARAUDER LAND SYSTEMS ELECTRONIC SYSTEMS AEROSPACE LEADERS IN DEFENCE AND SECURITY INNOVATION

HARYANA POWER GENERATION CORPORATION LIMITED Regd. Office C-7, Urja Bhawan, Sector-6, Panchkula Corporate Identity Number: U45207HR1997SGC033517

BOXER for the Danish Armed Forces short briefing

STR-1415 SPECIFICATION FOR BATTERY CHARGERS 220V, 30A FOR SUBSTATIONS ANNEXURES B

SPECIFICATION FOR AUTOMATIC PRIMING AND OPERATING SYSTEM FOR CENTRIFUGAL PUMPS.

DPA UPScale RI kw The modular UPS for customized solutions

ABB life cycle services Uninterruptible power supplies

SUPPLY OF HYDRAULIC AERIAL LADDER PLATFORM

017: 1998 CEB STANDARD RING MAIN UNIT CEYLON ELECTRICITY BOARD SRI LANKA

Supply of Batteries

013 : 2009 CEB SPECIFICATION MOULDED CASE CIRCUIT BREAKERS

THE T IN DETAIL

TABLE OF CONTENTS FOREWORD...3 INTRODUCTION SCOPE NORMATIVE REFERENCES DEFINITIONS AND ABBREVIATIONS REQUIREMENTS...

TECHNICAL SPECIFICATION FOR 11 KV CAPACITOR BANK

UNIVERSITY OF CALCUTTA Centre for Research in Nanoscience and Nanotechnology JD-2, Sector-III, Salt Lake City Kolkata

Unified requirements for systems with voltages above 1 kv up to 15 kv

UT30MK2 & MT30 Unmanned and Manned Turrets

Casspir Mine Protected Vehicle with Steel Wheels and VAMIDS

Major Customer Connections. Preliminary Enquiry Form Embedded Generation > 30 kw

Modular three-phase UPS system. DPA UPScale RI kw The modular UPS for customized solutions

Abu Dhabi Department of Transport Application Form Non Objection Certificate (NOC)

Amendment to Schedule 15 for Ballasts Electromagnetic & Electronic ballasts

BID DOCUMENT FOR PURCHASE OF STATION WAGONS

Guidelines for Registration of Private / Transport Vehicles

Proposed Special Condition for limited Icing Clearances Applicable to Large Rotorcraft, CS 29 or equivalent. ISSUE 1

Power Converter Products. For Naval, Aviation and Land Applications

شركة كهرباء محافظة القدس المساهمة المحدودة

7 The revised IS 8034:2002 and revised STI be implemented w.e.f. 1 Feb 2005.

Septembre Presentation of the "VAB" Armoured Vehicle

Technical Specification for 12kV and 24kV Current Limiting Fuse- Links for Overhead Applications

TECHNICAL SPECIFICATION FOR 11 KV AUTOMATIC CAPACITOR SWITCH

Technical Specification for 12kV Powder Filled Current Limiting Fuse-Links for Use in Switchgear (In Oil)

020: 2013 CEB SPECIFICATION MINIATURE CIRCUIT BREAKER (MCB)

STATEMENT OF TECHNICAL REQUIREMENTS FOR GT/GTG STARTING RECTIFIER EED May 2005

TECHNICAL SPECIFICATIONS

INTER PLANT STANDARD STEEL INDUSTRY NO CORRESPONDING IS

ANNEXURE XI. (Ni Cd Battery Bank) TECHNICAL SPECIFICATIONS OF 125V STATION BATTERY BANK OF GTG I.

PUD ELECTRIC SYSTEM INTERCONNECTION

Centerwide System Level Procedure

MINIATURE CIRCUIT BREAKER


Informal document No. 2

Electric buses Solutions portfolio

TILLER SYSTEMS HEAVY TILLER MINEBREAKER 2000/2

What action is expected to take place in the foreseeable future in ADRs with regard to seat belts on school buses?

Doc:TED 11(794)W Dec Draft Standard Automotive Vehicles - Windscreen Wiping System for 3 Wheeler Vehicles - Specification

OPERATOR S MANUAL. DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. HEADQUARTERS, DEPARTMENT OF THE ARMY

The following document was obtained from the State of Indiana. This document may have changed since it was obtained. Please refer to the State's

The European Commission s science and knowledge service. Joint Research Centre. VECTO - Overview VECTO Workshop Ispra, November, 2018

Module 4: Weights and Dimensions

High Lift - 50mm to 150mm (Design) CODE LS9

Type Acceptance Report

The Modernized Green Commercial Vehicle Program

Low voltage AC drives. ABB component drives ACS to 2.2 kw / 0.25 to 3 hp Catalog

FMF Foods Limited. Particulars. RSPO Annual Communications of Progress About Your Organisation. Membership. Particulars Form Page 1/1

I N D I A N S T A T I S T I C A L I N S T I T U T E

TENDER FOR DG SET. Tender for DG SET. POCKET-14, SECTOR-8, PHASE-1, DWARKA, NEW DELHI Website: TENDER DOCUMENTS FOR

Application Description

THE ORIENTAL INSURANCE CO.LTD. REGIONAL OFFICE: IDA Building 4 th Floor, 7,Race Course Road, Indore (M.P.) REQUIREMENT

B kv T&D GAS INSULATED SWITCHGEAR

Date Issued: 10 August 2009 Status: ISSUED Review Date: 10 August 2011 Ref: NS5.3 DISTRIBUTED GENERATION TECHNICAL REQUIREMENTS TABLE OF CONTENTS

Switching DC Power Supply

MODULAR THREE-PHASE AND SINGLE-PHASE UPS SYSTEM

RESOLUTION MEPC.95(46) Adopted on 27 April 2001 AMENDMENTS TO THE ANNEX OF THE PROTOCOL OF 1978 RELATING TO THE INTERNATIONAL CONVENTION FOR THE

IMPORTANT NOTE (C) SENIOR ADVISER(CONTRACT & PURCHASE), OIL INDIA LIMITED, PLOT NO. 19 SECTOR 16A NOIDA

INDIAN INSTITUTE OF TECHNOLOGY, KANPUR DEPARTMENT OF ELECTRICAL ENGINEERING

THE T IN DETAIL

Defender Mini Online Emergency Central Lighting Inverter (CLI) Technical Specifications

High-voltage motors TOSHIBA MITSUBISHI-ELECTRIC INDUSTRIAL SYSTEMS CORPORATION

Euroload Changeover Switch

ARAI Date of hosting on website: 27 th October 2015 Last date for comments: 27 th November 2015

NIT for Tender No. GCO 8644P13

KEOR HP. THREE-PHASE UPS from 100 to 800 kva GLOBAL SPECIALIST IN ELECTRICAL AND DIGITAL BUILDING INFRASTRUCTURES

Material Description Quantity UOM

REDUNDANT PROPULSION SHIPS RULES FOR CLASSIFICATION OF NEWBUILDINGS DET NORSKE VERITAS SPECIAL EQUIPMENT AND SYSTEMS ADDITIONAL CLASS PART 6 CHAPTER 2

The Experience. Another supersonic FUR pod is flying with the US Navy on an A-6E Intruder aircraft in an extensive trials program.

स त ष क म र उप मह प रब धक (पररवहन व य प र एव प रण ल सम ह) Santosh Kumar Dy GM (TBSG) Ref: ID/TSG/RB/KF/03 Dtd. : 4 th August 2016

56-SDMS-07 REV. 01 SPECIFICATIONS FOR

Cross Flow Heat Exchanger H352

Comfort Without Compromise

KEOR HP. THREE-PHASE UPS from 100 to 800 kva GLOBAL SPECIALIST IN ELECTRICAL AND DIGITAL BUILDING INFRASTRUCTURES

Transcription:

REQUEST FOR INFORMATION ON ENVIRONMENTAL CONTROL (EC) WITH AUXILIARY POWER UNIT (APU) IN TANK T-72 1. The Indian Army is in the process of upgrading T-72 tank fleet with Environmental Control (EC) with Auxiliary Power Unit (APU). 2. A large fleet of T-72 tanks would require to be fitted with Environmental Control with APU and hence the information may be specifically provided in the reply to the request for information (RFI):- (a) Original Equipment Manufacturer (OEM) status of the equipment. (b) Names of the firms (if any) that have been authorized by the OEM to deal with the Indian MoD. Willingness of the firm to provide the equipment for trials on No Cost No Commitment basis. (d) Level of technology that the firm would be willing to transfer to a firm that will be nominated by Indian MoD. (e) Willingness of the firm to accept the offset clauses as enshrined in the DPP-2008. (f) Willingness of the firm to participate in the procurement process in accordance with DPP 2008/amendment to the DPP 2008 issued from time to time. 3. A questionnaire giving specific inputs for the proposed upgradation is given in Appendix A and in addition a Performa to be filled by the vendors is attached as Appendix B. 4. You are requested to respond to this RFI within one month from the date of placing the same on the Website.

Appendix A (Ref RFI for Environmental Control (EC) with Auxiliary Power Unit (APU) for tank T- 72) PHYSICAL CHARACTERISTICS 1. Is the environmental control system with APU an integrated and compact system? 2. Can the main assemblies of APU, heat exchangers and pump etc be placed in the present location of SPTA/assembly box outside the tank with only the cooling units and ducts inside the air compartment to direct cool air at entire crew station viz driver, gunner and commander and electronic systems/subsystem in the vicinity. 3. Does the system change the silhouette of the tank in vertical plane or foul with existing features on the tank? 4. Does the system operate from the mains, 24V output? 5. Is the system protected from small arms fire and splinters? 6. Is the system rugged enough to withstand the normal hazards of cross country move in plains, semi desert and desert terrain? 7. What is the min life of the system? 8. Does the system comprise sealed units and is water resistant upto 1.5 meter depth (when tank is carrying out medium fording operations)? 9. Is the system dust proof and fully tropicalised? 10. Does the fitment of the system jeopardize the combat effectiveness of the tank in any way? 11. Does the air conditioner conform to the following specifications:- (a) Type : Split? (b) Air Circulation : Closed cycle with air intake from crew compartment? Final inside temperature desired : 25º±5ºC? (d) Relative Humidity of cooled air (%) : 30 to 75? (e) Maximum air speed in the operator s area (m/s) : 0.5? 12. Does the power unit (APU) conform to the following specifications :- (a) Rating capable of catering to the power requirement of air conditioner designed to maintain a temperature differential of 25º± 5ºC? (b) Capable of operating the following system of the tank in silent mode :- (i) Operation of night vision Devices and Thermal Imaging Sights / Fire Control System? (ii) Operation of Day Gunner Sight and LRF? (iii) Operation of Gun Control Equipment including power traverse? (iv) Operation of Radio Sets including tank intercom? (v) Battery charging? (vi) ALNS/GPS? T-72? (d) Does the power unit run on the same fuel, oil and lubricants as used by the tank Does APU give output of min 10 KW?

OPERATIONAL AND MAINTENANCE CHARACTERISTICS Essential Characteristics of Environmental Control with Auxiliary Power Unit (The System) 13. Is the system compact and easily stored on the turret with minimum components inside the crews compartment? 14. Does the system foul with existing features of the tank or hinder the movement of gun during normal mode or in stabilized mode? 15. Is the system protected from small arms fire? 16. Is the system capable of operating without loss of sealing for an underwater depth of 1.5 metres while medium fording? 17. Does the system involve any cutting of armour or compromise the overpressure system of the tank? 18. Does the system operate efficiently in a temperature range from -10ºC to ± 55ºC? 19. Is the system light and robust and capable of all weather operation? Environmental Control Unit (ECU) 20. Is the ECU capable of providing the final inside temperature of 25º± 5ºC in closed down condition? 21. Does it provide adequate cooling inside the crew compartment for efficient functioning of the electric system / sub systems in the ambient temperatures obtaining in our deserts, semi deserts and plains in all seasons? 22. Is the ECU capable of operating continuously for minimum 10 hrs without affecting its efficiency? 23. Is the ECU easy to retrofit onto a T-72 tank at field workshop level? APU 24. Is the APU capable of concurrently operating all systems of the tank in silent mode as mentioned at Para 12 (b) for a minimum period of five minutes. 25. Is the APU capable of operating NVDs, Gunner Sight, ECU and radio set including intercom for four hours followed by a rest of 30 minutes and again an operation of four hours? 26. Is the APU compact and fitted outside? Is if the capable of being installed in the field. Does the APU :- (a) Increase the height of the tank? (b) (d) Protrude beyond the hull dimensions? Protected from splinters and Small Arms Fire? Foul with the azimuth and vertical move of gun tube and turret? 27. Is the APU air cooled / water cooled and diesel driven? 28. Is the APU compatible with concerned assemblies of the T-72 tanks? 29. MTBF of APU should not be less than 6000 hours of operation and MTTR should be 4 hours. 30. Does the APU have an inbuilt overload protection system? 31. Does the APU provide at least two spare output jacks to facilitate connection of additional equipment that may be installed on the tank after the APU has been installed?

32. Does the APU system have adequate test/inspection points/lights and built in gauges for checking performance fault findings? 33. Does the APU have a standby starting system apart from the main starting system? 34. Do the generator, accessories and cables cause EMI to other electrical equipment fitted in the tank? Maintenance 35. Does the system involve minimum maintenance and are the parts easily replaceable by the tank crew? 36. Is the equipment modular in design? 37. Is adequate literature and informative material for reference by user and EME for preparation for Engineering Support Documents available? Will the following be provided :- (a) User s manual? (b) (d) (e) (f) (g) (h) (j) Technical manual? Field Repair manual? Base repair manual? ISPL? MRLS and expected wastage data assembly /PCBs, spare for two years? Fault diagnosis manual? Two sets of drawing/circuit diagnose drawings? Soft ware documents? (k) CBT on CDROM for assembly / sub assembly and fault finding procedure for training of EME tradesmen? 38. What are the numbers of SMTs/STE/Gauges required for maintenance at unit and field workshop level? 39. Is the comprehensive software for fault diagnosis upto component level in sub and PCBs described? 40. Will the training of maintenance personnel for repair and maintenance of equipment be provided? 41. Will the system be offered to undergo MET alongwith the proposal containing compact details? 42. Will the system be offered to undergo EMITEE alongwith the proposal containing complete details? Miscellaneous Aspects 43. Any other information of relevance that can be provided by the vendor.

Appendix B (Ref RFI for Environmental Control (EC) with Auxiliary Power Unit (APU) for tank T- 72) INFORMATION PERFORMA (FOREIGN VENDORS) 1. Name of the Vendor/Company/Firm (Company profile, in brief, to be attached) 2. Type (Tick the relevant category) Original Equipment Manufacture (OEM) Government sponsored Export Agency Authorised Representatives of OEM Yes/No Yes/No (Details of registration to provided) Yes/No (Attach details) Other (give specific details) 3. Contact Details. Postal Address: City Province : Country Tele : Pin/Zip Code : Fax URL/Web Site : 4. Local Branch/Liaison office/authorised Representatives, in Delhi (if any). Name & Address : City : Pin Code Tele 5. Financial Details. (a) Province : Annual turn over : USD. Fax (b) Number of employees in firm : Details of manufacturing infrastructure available :. (d) Earlier contracts with India Ministry of Defence/Government agencies : Agency Contract Number Equipment Quantity Cost

6. Certification by Quality Assurance Orgainsation (If applicable). Name of Agency Certificate Applicable from (Date & Year) Valid till (date & year) 7. Equipment / Product Profile (to be submitted for each product separately) (a) Name of Product : (Should be given category wise for e.g all products under might vision devices to be mentioned together). (b) Description (attach technical literature) : Whether OEM or Integrator : (d) Status (in Service / Design development state) : (e) Production capacity per annum : (g) Countries where equipment is in service : (h) Whether export clearance is required from respective government : (j) Any collaboration/joint venture/co product/ authorized dealer with Indian Industry (give details) :- Name & Address : Tele No Fax : 8. Any other relevant information : -