COOPER POWER SERIES. 600 A 15/25 kv class T-OP II connector assembly installation instructions. Deadbreak Apparatus Connectors MN650048EN

Similar documents
COOPER POWER SERIES. Screened Separable Connectors MN650023EN. Effective October 2016 Supersedes March 2012 (IS )

COOPER POWER SERIES. Screened Separable Connectors MN650024EN. Effective October 2016 Supersedes March 2012 (IS )

COOPER POWER SERIES. 600 A 15, 25, and 35 kv Class Cleer Loadbreak Bushing Insert Installation Instructions. Loadbreak/Deadbreak Connectors MN650016EN

COOPER POWER SERIES. 600 A 15 kv and 25 kv class BT-TAP connector system installation instructions. Deadbreak Apparatus Connectors MN650004EN

COOPER POWER SERIES. 200 A loadbreak junction 15 and 25 kv class installation instructions. Loadbreak Connectors MN650015EN

COOPER POWER SERIES. 600 A 15/25 kv class BOL-T and separable splice connector assembly installation instructions

COOPER POWER SERIES. 600 A 35 kv class BT-TAP connector system installation instructions. Deadbreak Apparatus Connectors MN650003EN

COOPER POWER SERIES. 200 A Fused Loadbreak Elbow Connector Replacement Fuse Installation Instructions. Fusing Equipment MN132021EN

COOPER POWER SERIES. S.T.A.R. Hot line voltage indicator installation instructions. Fault Indicators MN320011EN. Indicator boot.

Effective November 2016 Supersedes February 2012 (S )

COOPER POWER SERIES. Edison Modular Fuse (EMF) Installation Instructions. Fusing Equipment MN132031EN

COOPER POWER SERIES. S.T.A.R. type LVR faulted circuit indicator installation instructions. Fault Indicators MN320005EN

COOPER POWER SERIES. K-Limiter back-up current-limiting fuse installation instructions. Fusing Equipment MN132010EN

Effective June 2016 New Issue

COOPER POWER SERIES. Testing a motor capacitor on a voltage regulator procedure instructions. Voltage Regulators MN225064EN

COOPER POWER SERIES. QD5 Quik-Drive tap-changer reversing neutral stationary contact asssembly kit A26 installation instructions

COOPER POWER SERIES. High-voltage primary bushings installation instructions. OEM Equipment MN800008EN

COOPER POWER SERIES. Current-Limiting Type NXC (C-Rated) Fuse Installation Instructions. Fusing Equipment MN132014EN

COOPER POWER. SERIES ELF Current-Limiting Dropout Fuse Installation Instructions. Fusing Equipment MN132028EN. Pull ring. Housing

COOPER POWER SERIES. UltraSIL polymer-insulated D-73P disconnect switches installation instructions. Switches MN008004EN

COOPER POWER SERIES. Fused loadbreak elbow connector installation instructions. Loadbreak Apparatus Connectors MN650014EN

Effective November 2016 Supersedes September 1998 (S )

High-voltage primary bushings installation instructions

COOPER POWER SERIES. ELSG Full-Range Current-Limiting Fuse Re-Fusing Instructions. Fusing Equipment MN132017EN

COOPER POWER SERIES. RTE EL-BAY-O-NET FUSE Re-Fusing Instructions. Fusing Equipment MN132024EN

COOPER POWER SERIES. Expulsion fuse installation instructions. Capacitors MN230005EN. Effective November 2016 Supersedes November 2001 (S )

Effective March 2015 Supersedes S August 2012

COOPER POWER SERIES. KA662R tank-lifting windlass assembly and installation instructions. Recloser Mountings MN280071EN

COOPER POWER. SERIES CMU Medium voltage power fuse installation instructions. Fusing Equipment MN132032EN

COOPER POWER SERIES. Pad-mounted Switchgear MN285019EN. Effective March 2017 Supersedes February 2007 (S )

COOPER POWER SERIES. KA1169R Closing Coil Transfer-Switch Accessory Operation. Reclosers MN280069EN

COOPER POWER SERIES. HX-CB loadbreak fuse cutout installation instructions. Fusing Equipment MN132011EN

COOPER POWER SERIES. Dielectric grease application to recloser cable instructions. Reclosers MN280070EN

ELB ELB

COOPER POWER SERIES. Types 4H single-phase and 6H three-phase vacuum interrupter conversion kits. Reclosers MN280014EN

Effective May 2017 Supersedes December 2004 (S )

Type NR oil switch installation and operation instructions

COOPER POWER SERIES. Surge arrester interchangeable fuse cutout combination installation instructions. Surge Arresters MN235004EN

COOPER POWER SERIES. Quick Connect Assembly (QCA) Retrofit Kit, General Electric Installation Instructions. Voltage Regulators MN225075EN

Effective May 2017 Supersedes January 2003 (S )

COOPER POWER SERIES. KA146W5 single pole-mounting hanger; KA146W2 tank lifting windlass assembly and installation instructions. Reclosers MN280039EN

COOPER POWER SERIES. Electronic control battery testing, charging, and replacement instructions. Reclosers MN280074EN

600 A 15 kv class T-OP II deadbreak connector

COOPER POWER SERIES. KA716L7001 adjustable control valve kit for Types L, E, 4E, V4E, and V4L reclosers installation and adjustment instructions

S Voltage Regulators GENERAL. Contents. Acceptance and Initial Inspection. Handling and Storage. Standards

COOPER POWER SERIES. Mercury switch to microswitch retrofit kit KA349WE installation instructions. Reclosers MN280022EN

600 A 35 kv class BT-TAP deadbreak connector

600 A 25 kv class BT-TAP deadbreak connector

ELB ES. Product Installation Instructions

S Fault Indicators. S.T.A.R. Type TPR Faulted Circuit Indicator Installation Instructions. Contents INSTALLATION PROCEDURES

600 A 15 and 25 kv class deadbreak accessories, tools, and replacement parts

S Voltage Regulators PRODUCT INFORMATION GENERAL. Contents. Acceptance and Initial Inspection. Handling and Storage.

S Voltage Regulators PRODUCT INFORMATION GENERAL. Contents. Acceptance and Initial Inspection. Handling and Storage

COOPER POWER SERIES. Types D and DV recloser installation instructions. Reclosers MN280030EN

S Voltage Regulators GENERAL. PRODUCT INFORMATION Introduction. Contents. Acceptance and Initial Inspection. Handling and Storage.

600 A 35 kv class separable splices

Tests are conducted in accordance with IEEE Standard 386. ac 60 Hz 1 Minute Withstand 50

COOPER POWER SERIES. Instructions for oil-filled, single-phase overhead distribution transformers. Distribution Transformers MN201003EN

Deadbreak Apparatus. connectors. 600 A 15/25 kv Class GENERAL

This Kit Is for Use with Types RE, RVE, WE, WVE, VWE, VWVE27, and VWVE38 Reclosers.

INSTALLATION PRODUCTION TESTS

Installation Instructions LINK---C

600 A 35 kv class deadbreak accessories, tools, and replacement parts

COOPER POWER SERIES. Manually-Operated M-Force Switch Installation and Operation Instructions. Switches and Disconnects MN008003EN

Installation Instructions

200 A 15 kv class loadbreak elbow connector with optional integral jacket seal

COOPER POWER SERIES. Metal-enclosed capacitor banks installation instructions. Power Capacitors MN230010EN

Figure 1. Kearney Type HX cutout.

Installation Instructions K656CY, K656CH and K656I Deadbreak Receptacles

200 A 25 kv and 28 kv class loadbreak elbow connector with optional integral jacket seal-canadian Edition

COOPER POWER SERIES. Metal-enclosed, pad-mounted capacitor banks installation instructions. Power Capacitors MN230009EN

copper stud. If a 900 A rating is desired, specify a C as the 8th digit when determining your part number (See Table 3, page 3.)

Factory Authorized Mechanism Enhancement (FAME)

600 A Deadbreak Connectors

Raychem CSJA Safety Instructions. Safety Instructions. Customer Service. Kit Contents. Installation Instructions

25 kv class fused loadbreak elbow connector

600 A 28 kv class Cleer loadbreak connector system

200 A 15 kv class loadbreak elbow connector with optional integral jacket seal-canadian Edition

3M Cold Shrink QT-III Silicone Rubber Termination

3M Cold Shrink Silicone Rubber Termination QT-III 7600-S-3G Series Three-Core Outdoor Termination

Two-way cable interlock kit for Magnum fixed circuit breakers

QT-III Cold Shrink Silicone Rubber

600 A 15 kv class Cleer loadbreak connector system

CCP2-FLR1-21_ flange-rod operating mechanism

3M Cold Shrink QT-III Silicone Rubber Three-Core Termination Kits

3M Cold Shrink Splice Kit QS-III 5536A

200 A 25 and 28 kv class POSI-BREAK loadbreak elbow connector with optional integral jacket seal-canadian Edition

3M Cold Shrink QT-III Silicone Rubber Termination 7673-S-8-Tape/LC

3M Cold Shrink QT-III Silicone Rubber Termination 7673-S-8-TOW/WOT

Reprogramming guide. Power Defense ICCB. Instructional Leaflet IL EN WARNING WARNING. Instructions apply to:

3M Cold Shrink QT-III Silicone Rubber Termination 7673-S-8(S)-JCN

Edison modular fuse, vault application products

600 A 15 and 25 kv class Cleer grounding elbow

Cold Shrink Silicone Rubber Termination QT-III 7672-S-8-JCN

3-way multi-family drawout cable interlock kit - type 32 - RF

3M Cold Shrink Silicone Rubber Outdoor Termination Kit QT-III 7600-S-3W Series

Two-way cable interlock kit for Magnum drawout circuit breakers

3M Cold Shrink QT-III Silicone Rubber 3/C Cabinet Mount Termination Kit

Installation and removal instructions for Series NRX RF fixed breaker three-way Type 32 cable interlock kit

Installation Instructions for KPS and KPH Circuit Breakers and Molded Case Switches

Transcription:

Deadbreak Apparatus Connectors MN650048EN Effective May 2017 Supersedes April 2008 (S600-12-3) 600 A 15/25 kv class T-OP II connector assembly installation instructions COOPER POWER SERIES

DISCLAIMER OF WARRANTIES AND LIMITATION OF LIABILITY The information, recommendations, descriptions and safety notations in this document are based on Eaton Corporation s ( Eaton ) experience and judgment and may not cover all contingencies. If further information is required, an Eaton sales office should be consulted. Sale of the product shown in this literature is subject to the terms and conditions outlined in appropriate Eaton selling policies or other contractual agreement between Eaton and the purchaser. THERE ARE NO UNDERSTANDINGS, AGREEMENTS, WARRANTIES, EXPRESSED OR IMPLIED, INCLUDING WARRANTIES OF FITNESS FOR A PARTICULAR PURPOSE OR MERCHANTABILITY, OTHER THAN THOSE SPECIFICALLY SET OUT IN ANY EXISTING CONTRACT BETWEEN THE PARTIES. ANY SUCH CONTRACT STATES THE ENTIRE OBLIGATION OF EATON. THE CONTENTS OF THIS DOCUMENT SHALL NOT BECOME PART OF OR MODIFY ANY CONTRACT BETWEEN THE PARTIES. In no event will Eaton be responsible to the purchaser or user in contract, in tort (including negligence), strict liability or other-wise for any special, indirect, incidental or consequential damage or loss whatsoever, including but not limited to damage or loss of use of equipment, plant or power system, cost of capital, loss of power, additional expenses in the use of existing power facilities, or claims against the purchaser or user by its customers resulting from the use of the information, recommendations and descriptions contained herein. The information contained in this manual is subject to change without notice. INSTALLATION INSTRUCTIONS MN650048EN May 2017 i

Contents DISCLAIMER OF WARRANTIES AND LIMITATION OF LIABILITY... I SAFETY FOR LIFE... III SAFETY INFORMATION... III Safety instructions... iii PRODUCT INFORMATION.... 1 Introduction...1 Read this manual first...1 Additional information...1 Acceptance and initial inspection...1 Handling and storage...1 Standards...1 INSTALLATION INSTRUCTIONS.... 2 Equipment required...2 Cable preparation...2 Install T-OP II assembly onto apparatus bushing...4 ii INSTALLATION INSTRUCTIONS MN650048EN May 2017

! SAFETY FOR LIFE Safety for life Eaton s Cooper Power series products meet or exceed all applicable industry standards relating to product safety. We actively promote safe practices in the use and maintenance of our products through our service literature, instructional training programs, and the continuous efforts of all Eaton employees involved in product design, manufacture, marketing and service. We strongly urge that you always follow all locally approved safety procedures and safety instructions when working around high-voltage lines and equipment and support our Safety For Life mission.! SAFETY FOR LIFE Safety information The instructions in this manual are not intended as a substitute for proper training or adequate experience in the safe operation of the equipment described. Only competent technicians who are familiar with this equipment should install, operate, and service it. A competent technician has these qualifications: Is thoroughly familiar with these instructions. Is trained in industry-accepted high- and low-voltage safe operating practices and procedures. Is trained and authorized to energize, de-energize, clear, and ground power distribution equipment. Is trained in the care and use of protective equipment such as flash clothing, safety glasses, face shield, hard hat, rubber gloves, hotstick, etc. Following is important safety information. For safe installation and operation of this equipment, be sure to read and understand all cautions and warnings. Hazard Statement Definitions This manual may contain four types of hazard statements: DANGER Indicates an imminently hazardous situation which, if not avoided, will result in death or serious injury. WARNING Indicates a potentially hazardous situation which, if not avoided, could result in death or serious injury. CAUTION Indicates a potentially hazardous situation which, if not avoided, may result in minor or moderate injury. CAUTION Indicates a potentially hazardous situation which, if not avoided, may result in equipment damage only. Safety instructions Following are general caution and warning statements that apply to this equipment. Additional statements, related to specific tasks and procedures, are located throughout the manual. DANGER Hazardous voltage. Contact with high voltage will cause death or severe personal injury. Follow all locally approved safety procedures when working around high- and low-voltage lines and equipment. G103.3 WARNING Before installing, operating, maintaining, or testing this equipment, carefully read and understand the contents of this manual. Improper operation, handling, or maintenance can result in death, severe personal injury, and equipment damage. G101.0 WARNING This equipment is not intended to protect human life. Follow all locally approved procedures and safety practices when installing or operating this equipment. Failure to comply may result in death, severe personal injury, and equipment damage. G102.1 WARNING Power distribution and transmission equipment must be selected for the intended application. It must be installed and serviced by competent personnel who have been trained and understand proper safety procedures. These instructions are written for such personnel and are not a substitute for adequate training and experience in safety procedures. Failure to properly select, install or maintain power distribution and transmission equipment can result in death, severe personal injury, and equipment damage. G122.3 INSTALLATION INSTRUCTIONS MN650048EN May 2017 iii

600 A 15/25 kv Class T-OP II connector assembly installation instructions DANGER All associated apparatus must be de-energized during any hands-on installation or maintenance. WARNING The 600 A T-OP II Connector System is designed to be operated in accordance with normal safe operating procedures. These instructions are not intended to supersede or replace existing safety and operating procedures. The elbow connector should be installed and serviced only by personnel familiar with good safety practices and the handling of high-voltage electrical equipment. WARNING Optional Capacitive Test Point Operating Instructions: Use only voltage indicating instruments specifically designed for test points. Use of conventional voltage sensing devices may provide false No Voltage indications. The test point must be dry and free of contaminant s when checking for voltage. After indication is taken: clean, dry, and lubricate the test point cap with silicone grease and assemble to the test point. The capacitive test point is not sufficiently accurate, nor is it intended for, actual voltage measurements or phasing operations. A reading of no voltage from the test point should not be the only indication of a de-energized circuit obtained before touching the connector. Other procedures can include direct conductor voltage testing or grounding using a live-line tool. Product information Introduction Eaton s Cooper Power series 600 A 15/25 kv Class T-OP II Deadbreak Connectors are used to terminate highvoltage underground cable on deadfront apparatus such as transformers, switches, and switchgear. They are fully shielded, submersible, and meet the requirements of IEEE Std 386 standard Separable Insulated Connector Systems. Eaton s Cooper Power series 600 A Deadbreak Connectors are fully interchangeable with all other manufacturers that also certify compliance with IEEE Std 386 standard. The T-OP II is rated for 900 A when used with all copper current carrying components. Figure 1. Line illustration of typical 15 kv T-OP II connector assembly Read this manual first Read and understand the contents of this manual and follow all locally approved procedures and safety practices before installing or operating this equipment. Additional information These instructions cannot cover all details or variations in the equipment, procedures, or process described nor provide directions for meeting every possible contingency during installation, operation, or maintenance. For additional information, contact your representative. Acceptance and initial inspection Each T-OP II Deadbreak Connector is in good condition when accepted by the carrier for shipment. Upon receipt, inspect the shipping container for signs of damage. Unpack the connector and inspect it thoroughly for damage incurred during shipment. If damage is discovered, file a claim with the carrier immediately. Handling and storage Be careful during handling and storage of the T-OP II Deadbreak Connector to minimize the possibility of damage. If the connector is to be stored for any length of time prior to installation, provide a clean, dry storage area. Standards ISO 9001Certified Quality Management System 1 INSTALLATION INSTRUCTIONS MN650048EN May 2017

{ 600 A 15/25 kv Class T-OP II connector assembly installation instructions Installation instructions Equipment required T-OP II Connector Assembly Kit including: T-body Cable Adapter Coppertop Compression Connector with 15/16 threaded spade Step 2 Cutbacks for concentric neutral cable If cable is not concentric neutral (metallic tape shielded, longitudinally corrugated, wire shielded, or UniShield ) use Eaton s Cooper Power series SA series adapter kit with the same cutback dimensions as concentric neutral below. If another manufacturer s metallic shield adapter is used, follow the cutback instructions in the shield adapter kit. Take care not to cut into the cable insulation. Loadbreak Reducing Tap Plug (LRTP) and copper alloy extended length stud 200 A Loadbreak Protective Cap (when furnished) CONCENTRIC NEUTRAL WIRES VINYL TAPE MARKER EXTRUDED SEMI-CON INSULATION SHIELD Silicone Lubricant Instruction Sheets Tools 5/16 Torque Tool (Catalog Number TQHD625) 5/16 T-Wrench (Catalog Number TWRENCH) Cable preparation Note: Step 1 If a non-eaton Cooper Power series 600 A T-body is being used, use the stripback lengths given in the T-body kit, then proceed to Step 7 of these instructions. Train cable Position cable so that it is centered between apparatus bushing and parking pocket, parallel to apparatus frontplate. CABLE JACKET CABLE INSULATION 9 3 / 4 " (248 mm) 10 3 / 4 " (273 mm) 12 3 / 4 " (324 mm) Figure 3. Cutback dimensions for concentric neutral cable Step 3 Install CA625 cable adapter Cut a 45 chamfer into the end of the cable insulation. Clean the cable insulation wiping towards the semi-con insulation shield. Apply a thin coating of the supplied lubricant to the cable insulation and to the cable entrance of the cable adapter. Slide cable adapter onto the cable until the black portion of the adapter touches the vinyl tape marker. Provide adequate cable slack for cable movement between standoff bushing and apparatus bushing. TAPE MARKER CHAMFER Support cable as needed to maintain position. EXISTING BUSHING 1 3 / 4 " (45mm) CABLE INSULATION CLEAN AND LUBRICATE Figure 4. Install the cable adapter CA625 CABLE Figure 2. Line illustration for cable training Cut cable 1 3/4 inches (45 mm) from centerline of bushing. (Refer to Figure 2.) Step 4 Cable insulation cutback There should be between 4 3/8 and 4 11/16 of exposed cable beyond the cable adapter. Cut the cable insulation even with the end of the cable adapter and remove the protruding cable insulation. Take care not to cut the cable adapter or nick the conductor. INSTALLATION INSTRUCTIONS MN650048EN May 2017 2

600 A 15/25 kv Class T-OP II connector assembly installation instructions TAPE MARKER CA625 CABLE CONDUCTOR Step 6 Install DT625 T-Body Lubricate entrance of T-body and outside of cable adapter. 4 3 /8" (111 mm) - 4 11 /16" (119 mm) Figure 5. Remove cable insulation Note: Step 5 Alternate Insulation Removal Method The use of certain insulation removal tools may require cutting the insulation back before installing the cable adapter. After removing the semiconducting insulation shield, it is acceptable to first remove 4 1/2 of insulation from the end of the cable. Then put a 1/8 maximum chamfer in the insulation and install the cable adapter. Install compression connector Wire brush aluminum conductor and immediately press compression connector onto the cable until the conductor bottoms. Copper conductors do not need to be wire brushed. Rotate the connector so the spade eye faces the bushing. Crimp the connector using a tool and die combination on the chart packaged with the connector. Start crimping just below the first line from the spade end of the connector. Rotate each successive crimp working towards the cable adapter. Do not overlap crimps. Push T-body onto cable adapter until the compression connector bottoms on the housing. If the cable adapter moved, reposition the adapter until it is flush with the tape marker as shown below. TEST POINT ON ACCESSIBLE SIDE LUBRICATE TAPE MARKER Figure 7. Install T-body Step 7 CA625 DT625 Install LRTP into T-Body Clean and then lubricate the mating 600 A interface of the LRTP and T-body with the lubricant supplied. Remove and recycle the shipping cap from the 200 A LRTP interface and the thread protector from the alignment segment. Insert T-Wrench into throat of LRTP and thru rotating nut and engage alignment segment. (T-Wrench should not rotate without entire LRTP rotating.) Insert the 600 A alignment segment end of the LRTP into the side of T-body opposite the apparatus bushing. (Refer to Figure 8.) Clean excess inhibitor from the compression connector and cable adapter surfaces. T-WRENCH ALIGNMENT SEGMENT T-BODY After crimping, the distance from the cable adapter to the end of the compression connector must be between 6 1/2 and 7 1/4. COMPRESSION CONNECTOR PLACE FIRST CRIMP HERE LRTP CLEAN AND LUBRICATE CA625 6 1 / 2 " 7 1 / 4 " (165 mm-184 mm) CHECK DIMENSION AFTER CRIMPING Figure 6. Install compression connector Figure 8. LRTP installation into T-body Carefully thread the alignment segment into the threads of compression connector by turning the T-Wrench clockwise until a positive stop is felt. Continue applying clockwise force to the T-Wrench until the pin connecting the alignment segment to the LRTP shears allowing the T-Wrench and alignment segment to rotate freely. 3 INSTALLATION INSTRUCTIONS MN650048EN May 2017

600 A 15/25 kv Class T-OP II connector assembly installation instructions Remove alignment segment by applying pressure to the T-Wrench to separate the alignment segment from the LRTP. Recycle the align ment segment. See Figure 9 for illustration of completed LRTP installation. T-WRENCH LRTP T-OP II ASSEMBLY SEPARATED ALIGNMENT SEGMENT Figure 9. LRTP permanently installed into T-body forming the T-OP II assembly Install T-OP II assembly onto apparatus bushing Step 9 Install the T-OP II assembly on the apparatus bushing Clean and lubricate mating interfaces of the apparatus bushing and T-body with the lubricant supplied. Push the T-OP II assembly onto the apparatus bushing until the extended length stud makes contact with the rotating nut in the LRTP. Insert the 5/16 torque tool into the 200 A tap and engage the rotating nut. (Refer to Figure 11.) Place a screwdriver or the T-wrench through the hotstick operating eye of the torque tool (live-line tools can be used to operate the T-OP II when de-energized) and tighten the T-OP II assembly until the tool ratchets. (20-25 ft.-lbs.) Note: If 5/16 hex rod (HD625) is used with customer supplied torque wrench, thighten to 20-25 ft.-lbs. Remove torque tool. TQHD625 TORQUE TOOL T-OP II ASSEMBLY 600 A INTERFACES Step 8 Install stud into apparatus bushing Ensure unit is de-energized. Thread the shorter threaded end of the T-OP II stud into the apparatus bushing until hand tight. (Refer to Figure 10). Engage the flats on the stud with a 1/2 wrench and thread the stud into the bushing an additional 1/4 revolution past hand tight. Remove any shavings that may have been raised during the threading procedure. SHORT THREADS INTO BUSHING T-WRENCH APPARATUS BUSHING Figure 11. Installing the T-OP II assembly onto the apparatus bushing Step 10 Cap the 200 a interface Clean and lubricate 200 A interface of LRTP and mating apparatus (i.e., protective cap, grounding elbow, M.O.V.E. arrester) with lubricant supplied. (Refer to Figure 12.) To cap interface, follow installation instructions supplied with the separable insulated connector used. APPARATUS BUSHING EXTENDED STUD (STUD-T) Figure 10. Line illustration of bushing stud installation INSTALLATION INSTRUCTIONS MN650048EN May 2017 4

600 A 15/25 kv Class T-OP II connector assembly installation instructions 200 A PROTECTIVE CAP LRTP 200 A INTERFACE T-OP II ASSEMBLY CLEAN AND LUBRICATE Figure 12. Line illustration of protective cap installation Step 11 Ground system. (Refer to figure 13.) Connect tie-off tabs of LRTP and T-body with an uninsulated drain wire to cable concentric neutral wires and/or to common ground point. Connect 200 A apparatus (i.e., protective cap, grounding elbow, M.O.V.E. arrester) drain wire to common ground. T-OP II ASSEMBLY DRAIN WIRE Figure 13. Line illustration of grounding 5 INSTALLATION INSTRUCTIONS MN650048EN May 2017

600 A 15/25 kv Class T-OP II connector assembly installation instructions This page intentionally left blank. INSTALLATION INSTRUCTIONS MN650048EN May 2017 6

600 A 15/25 kv Class T-OP II connector assembly installation instructions This page intentionally left blank. 7 INSTALLATION INSTRUCTIONS MN650048EN May 2017

! SAFETY FOR LIFE Eaton 1000 Eaton Boulevard Cleveland, OH 44122 United States Eaton.com Eaton s Power Systems Division 2300 Badger Drive Waukesha, WI 53188 United States Eaton.com/cooperpowerseries 2017 Eaton All Rights Reserved Printed in USA Publication No. MN650048EN May 2017 Eaton is a registered trademark. All trademarks are property of their respective owners. For Eaton s Cooper Power series product information call 1-877-277-4636 or visit: www.eaton.com/cooperpowerseries.