International Journal of Emerging Technology in Computer Science & Electronics (IJETCSE) ISSN: Volume 13 Issue 1 MARCH 2015.

Similar documents
Optimal Power Flow Formulation in Market of Retail Wheeling

International Journal of Emerging Technology in Computer Science & Electronics (IJETCSE) ISSN: Volume 13 Issue 1 MARCH 2015.

Management of Congestion in the Deregulated Energy Market

ECONOMIC EXTENSION OF TRANSMISSION LINE IN DEREGULATED POWER SYSTEM FOR CONGESTION MANAGEMENT Pravin Kumar Address:

Optimal placement of SVCs & IPFCs in an Electrical Power System

Electrical Power Systems

Module 7 : Power System Structures. Lecture 33 : Structure of a Deregulated Industry. Objectives. Overview of A Deregulated Industry

IMPACT OF THYRISTOR CONTROLLED PHASE ANGLE REGULATOR ON POWER FLOW

Electric Power Research Institute, USA 2 ABB, USA

Available Transfer Capacity with Renewable Energy

Complex Power Flow and Loss Calculation for Transmission System Nilam H. Patel 1 A.G.Patel 2 Jay Thakar 3

Master Slave Control Of Interline Power Flow Controller Using PSO Technique

IMPROVEMENT OF BUS VOLTAGES AND LINE LOSSES IN POWER SYSTEM NETWORK THROUGH THE PLACEMENT OF CAPACITOR AND DG USING PSO

TRANSMISSION LOSS MINIMIZATION USING ADVANCED UNIFIED POWER FLOW CONTROLLER (UPFC)

Transient Stability Assessment and Enhancement in Power System

Comparison of Wheeling Cost using Power Flow Tracing Methods in Deregulated Electric Power Industry.

Islanding of 24-bus IEEE Reliability Test System

Application Method Algorithm Genetic Optimal To Reduce Losses In Transmission System

CASE STUDY OF POWER QUALITY IMPROVEMENT IN DISTRIBUTION NETWORK USING RENEWABLE ENERGY SYSTEM

OPTIMAL Placement of FACTS Devices by Genetic Algorithm for the Increased Load Ability of a Power System

Enhanced Genetic Algorithm for Optimal Electric Power Flow using TCSC and TCPS

Pricing Of System Security through Opf and Scopf Methods with N-1 Contingency Criteria in Deregulated Electrcity Market

Simulation of Security Constraint Optimal Power Flow Using Power World Simulator

Optimal sizing and Placement of Capacitors for Loss Minimization In 33-Bus Radial Distribution System Using Genetic Algorithm in MATLAB Environment

ECE 740. Optimal Power Flow

Particle Swarm Intelligence based allocation of FACTS controller for the increased load ability of Power system

Maximization of Net Profit by optimal placement and Sizing of DG in Distribution System

Available online at ScienceDirect. Procedia Technology 21 (2015 ) SMART GRID Technologies, August 6-8, 2015

Effect of Load Variation on Available Transfer Capability

Reactive Power Optimization with SVC & TCSC using Genetic Algorithm

The Optimal Location of Interline Power Flow Controller in the Transmission Lines for Reduction Losses using the Particle Swarm Optimization Algorithm

Solar Project Development in Regulated Markets. Smart and Sustainable Campuses Conference 2017

A Novel Approach for Optimal Location and Size of Distribution Generation Unit in Radial Distribution Systems Based on Load Centroid Method

VOLTAGE STABILITY CONSTRAINED ATC COMPUTATIONS IN DEREGULATED POWER SYSTEM USING NOVEL TECHNIQUE

Islanding of 24-bus IEEE Reliability Test System

JCHPS Special Issue 1: February Page 275

POWERWORLD SIMULATOR. University of Texas at Austin By: Mohammad Majidi Feb 2014

EEEE 524/624: Fall 2017 Advances in Power Systems

RECONFIGURATION OF RADIAL DISTRIBUTION SYSTEM ALONG WITH DG ALLOCATION

Optimal Power Flow (DC-OPF and AC-OPF)

Enhancement of Power Quality in Transmission Line Using Flexible Ac Transmission System

Steady-State Power System Security Analysis with PowerWorld Simulator

Electric Power Transmission: Research Needs to Sustain a Critical National Infrastructure

CONGESTION MANAGEMENT FOR COMPETITIVE ELECTRICITY MARKETS

Power Consump-on Management and Control for Peak Load Reduc-on in Smart Grids Using UPFC

Proposed Solution to Mitigate Concerns Regarding AC Power Flow under Convergence Bidding. September 25, 2009

Congestion Management in Fourteen Bus System Using Thyristor Controlled Series Capacitor

Deploying Power Flow Control to Improve the Flexibility of Utilities Subject to Rate Freezes and Other Regulatory Restrictions

Optimal generation scheduling strategy for profit maximization of genco in deregulated power system

LOCATIONAL MARGINAL PRICING APPROACH FOR A DEREGULATED ELECTRICITY MARKET

Test bed 2: Optimal scheduling of distributed energy resources

Operational Objectives

Simulation of real and reactive power flow Assessment with UPFC connected to a Single/double transmission line

Iranian Journal of Hydrogen & Fuel Cell 1(2014) Iranian Journal of Hydrogen & Fuel Cell IJHFC. Journal homepage://ijhfc.irost.

Power System Economics and Market Modeling

ELECTRIC POWER TRANSMISSION OPTIMIZATION

Adaptive Power Flow Method for Distribution Systems With Dispersed Generation

Energy Systems Operational Optimisation. Emmanouil (Manolis) Loukarakis Pierluigi Mancarella

THE NECESSITY OF THE 500 KV SYSTEM IN NWE S TRANSMISSION SYSTEM TO MAINTAIN RELIABLE SERVICE TO MONTANA CUSTOMERS

Performance Analysis of Transmission Line system under Unsymmetrical Faults with UPFC

Smart Grid 2.0: Moving Beyond Smart Meters

LAW OF THE REPUBLIC OF KAZAKHSTAN # 588-II DATED JULY 9, 2004 ON THE ELECTRIC POWER INDUSTRY

The Role of Electricity Storage on the Grid each location requires different requirements

2015 Grid of the Future Symposium

Microgrids Optimal Power Flow through centralized and distributed algorithms

A Method for Determining the Generators Share in a Consumer Load

Redesign of exhaust protection cover for high air flow levelling valve

Voltage Sag Mitigation in IEEE 6 Bus System by using STATCOM and UPFC

*Author for Correspondence

Design Modeling and Simulation of Supervisor Control for Hybrid Power System

POWER FLOW SIMULATION AND ANALYSIS

ATC Computation with Consideration of N-1 Contingency and Congestion Removal Using FACTS Devices

Computer Aided Transient Stability Analysis

Moment-Based Relaxations of the Optimal Power Flow Problem. Dan Molzahn and Ian Hiskens

Analysis of Low Tension Agricultural Distribution Systems

Assessing Feeder Hosting Capacity for Distributed Generation Integration

Electricity System Reform in Japan and the Significance of International Grid Connection

New York Science Journal 2017;10(3)

Non-wire Methods for Transmission Congestion Management through Predictive Simulation and Optimization

A Novel Distribution System Power Flow Algorithm using Forward Backward Matrix Method

Energy Economics. Lecture 6 Electricity Markets ECO Asst. Prof. Dr. Istemi Berk

DC Voltage Droop Control Implementation in the AC/DC Power Flow Algorithm: Combinational Approach

Master of Engineering

Differential Evolution Algorithm for Gear Ratio Optimization of Vehicles

Parameters Optimization for Extended-range Electric Vehicle Based on Improved Chaotic Particle Swarm Optimization

Introduction to PowerWorld Simulator: Interface and Common Tools

NETSSWorks Software: An Extended AC Optimal Power Flow (AC XOPF) For Managing Available System Resources

Power System Economics and Market Modeling

ELEN E9501: Seminar in Electrical Power Networks. Javad Lavaei

Optimization of Stopping Patterns and Service Plans for Intercity Passenger Railways

Transmission Planning using Production Cost Simulation & Power Flow Analysis

6545(Print), ISSN (Online) Volume 4, Issue 1, January- February (2013), IAEME & TECHNOLOGY (IJEET)

Cost Benefit Analysis of Faster Transmission System Protection Systems

Developing tools to increase RES penetration in smart grids

STOCHASTIC ESTIMATION OF FEEDER-SPECIFIC DISTRIBUTED GENERATION (DG) HOSTING CAPACITY

Consulting Agreement Study. Completed for Transmission Customer

Tiruchengode, Tamil Nadu, India

SPEED AND TORQUE CONTROL OF AN INDUCTION MOTOR WITH ANN BASED DTC

TABLE OF CONTENTS. Table of contents. Page ABSTRACT ACKNOWLEDGEMENTS TABLE OF TABLES TABLE OF FIGURES

Fuzzy based STATCOM Controller for Grid connected wind Farms with Fixed Speed Induction Generators

Transcription:

CONGESTION MANAGEMENT BY GENERATOR RESCHEDULING IN DEREGULATED POWER SYSTEMS BY PSO T.Harish kumar 1 and V.Uma 2 (Ph,D) 1 PG Scholar,M.E (power systems engg), St.Joseph s college ofengineering,chennai,tamilnadu,india 2 Associate professor,st.joseph s college ofengineering,chennai,tamilnadu,india Abstract: The electricity industry through the world, which has long been dominated by vertically integrated utilities, is undergoing enormous changes. The electricity industry is evolving into a distributed and competitive industry in which market forces drive the price of electricity and reduce the net cost through increased competition. The objective of deregulated power system is to provide a reliable power at competitive price. Congestion in the system would cause the objective failure. To overcome this effective congestion management s required. Congestion management is one of the key features of System Operator. There are many congestion management techniques available like operation of FACTS devices, ages of congested lines, Re-dispatching of generators, load curtailment, etc. whenever an raise in load at particular bus or an age of line due to fault occurs in the system the line flow in the system hit its transfer limits thus causing the system to be in a congested state. In this work minimizing the line flows are taken as objective function and thus the generators are re-scheduled to elevate congestion in the system. I. INTRODUCTION The electrical power supply industry around the world has experienced a period of rapid and irreversible change since the middle of 1980. The need for more efficiency in power production and delivery has led to a restructuring of the power sectors in several countries traditionally under control of federal and state governments. The privatization process in Great Britain is the best known example, followed by others such as Spain, New Zealand, Argentina and Chile. Even in countries with privately own utilities, such as the U.S., there has been a strong drive towards deregulation and a more intense participation of third-party generation. Other countries also considering the restructuring of their electricity power sector so as to introduce more competition among producers and to offer more choices for customers. Those changes are concerned with the ownership and management of the industry.under Deregulation, the former vertically integrated utility, which performed all the functions involved in power i.e. generation, transmission, distribution and retail sales, is dis-aggregated into separate companies devoted to each function. The electricity bill for end consumer now involves at least two components: one from the distribution and transmission network-operator responsible for the network and services, and the other from the company that generates the electrical energy. This for many decades, vertically integrated electric utilities (VIU) monopolized the way they controlled, sold and distributed electricity to customers in their service territories. This monopoly involves three main sectors namely: Generation Company (GENCO), Transmission Company (TRANSCO) and Distribution Company (DISCO). Monopolies could not provide services as efficiently as competitive firms. The electric power industry plans to improve its efficiency by providing a more reliable energy at least cost to customers. A competition is guaranteed by establishing a restructured environment in which customer could choose to buy from different suppliers and change suppliers as they wish in order to pay market-based rates. II. CONGESTION Whenever the physical or operational constraints in a transmission network become active, the system is said to be in a state of congestion. The possible limits that may be hit in case of congestion are, line thermal limits, transformer emergency ratings, us voltage limits, transient or oscillatory stability, etc. These limits constrain the amount of electric power that can be transmitted between two locations through a transmission network. Flows should not be allowed to increase to levels where a contingency would cause the network to collapse because of voltage instability.etc. The peculiar characteristics associated with electrical power prevent its direct comparison with other marketable commodities. First, electrical energy cannot be stored in large chunks. In other words, the demand of electric power has to be satisfied on a real time basis..due to other peculiarities, the flexibility of directly ring this commodity through a desired path is very limited. The flow of electric current obeys laws of physics rather than the wish of traders or operators. Thus, the system operator has to decide upon such a pattern of injections and take-offs, that no constraint is 426

violated. Congestion, as used in deregulation parlance, generally refers to a transmission line hitting its limit. The ability of interconnected transmission networks to reliably transfer electric power may be limited by the physical and electrical characteristics of the systems including any or more of the following. Thermal limits Voltage limits Stability limits III. IMPORTANCE OF CONGESTI0NMANAGEMENT IN THE DEREGULATED ENVIRONMENT If the network power carrying capacity is infinite and if there are ample resources to keep the system variables within limits, the most efficient generation dispatch will correspond to the least cost operation Kirchoff s laws combined with the magnitude and location of the generations and loads, the line impedances and the network topology determine the flows in each line. In real life, however, the power carrying capacity of a line is limited by various limits as explained earlier. These power systems, security constraints may therefore necessitate a change in the generator schedules away from the most efficient dispatch. In the traditional vertically integrated utility environment, the generation patterns are fairly stable. From a short term perspective, the system operator may have to deviate from the efficient dispatch in order to keep line flows within limits. However, the financial implication of such redispatch does not surface because the monopolist can easily socialize these costs amongst the various participants, which in turn, are under his direct control. From planning perspective also, a definite approach can be adopted for network augmentation. However, in deregulated structures, with generating companies competing in an open transmission access environment, the generation/flow patterns can change drastically over small time periods with the market forces. In such situations, it becomes necessary to have a congestion management scheme in place to ensure that the system stays secure; however, being competitive environment, the re-dispatch will have direct financial implications affecting most of the market players creating a set of winners and losers. Moreover, the congestion bottlenecks would encourage some strategic players to exploit the situation. EFFECTSS OF CONGESTION Market inefficiency Market power Economic efficiency CONGESTION MANAGEMENT SCHEME MUST SATISFY THE FOLLOWING Non discriminative Be transparent IV. OPF BASED CONGESTION MANAGEMENT The general idea of nodal pricing is to model an electricity market with its various economical and technical specifications, such as generators cost functions, demand elasticity, generation limits, line power flow limits and optimize the system for maximizing social welfare. This problem represents one of the commonly employed formulations of Optimal Power Flow (OPF). The name OPF does not stand for any specific optimization problem, rather a number of optimization problems falls onto the OPF category, the basic aim of an OPF analysis is to reach an optimum power transfer situation with violating the network constraints. In other words, the congestion management problem, with a set of constraints representing network constraints. The practical OPF uses a formulation wherein ac power flow equations are added to the economic dispatch as equality constraints with inequality constraints involving the flow MW, MVA or current on a transmission line and voltages at a substation bus. A version of OPF is developed that takes into account various contingencies referred to as security constrained OPF or SCOPF. OPF problems are formulated with a number of objectives. A brief list is lined here: Minimize the total cost of production Maximize total social welfare Minimize total system loss Minimize the re-dispatch cost Minimize the total adjustment V. PARTICLE SWARM OPTIMIZATION Particle swarm optimization (PSO) is a population based stochastic optimization technique developed by Dr. Eberhart and Dr.Kennedy in 1995, inspired by social behavior of bird flocking or fish schooling. PSO shares many similarities with evolutionary computation techniques such as Genetic Algorithms (GA). The system is initialized with a population of random solutions and searches for optima by updating generations. However, unlike GA, PSO has no evolution operators such as crossover and mutation. In PSO, the potential solutions, called particles, fly through the problem space by following the current optimum particles. The detailed information will be given in following sections. Compared to GA, the advantages of PSO are that PSO is easy to implement and there are few parameters to adjust. PSO has been successfully applied in many areas: function optimization artificial neural network training, fuzzy system control, and other areas where GA can be applied. THE ALGORITHM As stated before, PSO simulates the behaviors of bird flocking. Supposes the following scenario: a group of birds are randomly searching food in an area. There is only one piece of food in the area being searched. All 427

the birds do not know where the food is. But they know how far the food is in each iteration. So what s the best strategy to find the food? The effective one is to follow the bird which is nearest to the food. PSO learned from the scenario and used it to solve the optimization problems. In PSO, each single solution is a bird in the search space; we call it particle. All of particles have fitness values which are evaluated by the fitness function to be optimized; and gave velocities which direct the flying of the particles. The particles fly through the problem space by following the current optimum particles. PSO is initialized with a group of random particles (solutions) and then searches for optima by updating generations. In every iteration, each particle is updated by following two best values. The first one is the best solution (fitness) it has achieved so far. (The fitness value is also stored.).the value is called pbest. Another best value that is tracked by the particle swarm optimizer is the best value, obtained so far by any particle in the population. This best value is a global best and called the gbest. When a particle takes part of the population as its topological neighbors, the best value is a local best and is called lbest. After finding the two best values, the particle updates its velocity and positions with following equations. v[]=v[]=c1*rand()*(pbest[]- present[]+c2*rand()*(gbest[]-present[] present []=present]+v[] where v [] is the particle velocity, Present [] is the current particle (solution). Pbest [] and gbest [] are defined as stated before. Rand () is a random number between (0,1) c1, c2 are learning factors. Usually c1=c2=2. VI. SOLUTION METHODOLOGY The mathematical formulation is given the line flows are taken as objective function. Whenever a fault or overload contingency occurs in the system then some lines hit their limits causing congestion in the system. The generators are re-dispatched such that the congestion in the system is elevated. ASSUMPTIONS The following assumptions are made so as to reduce the complexity of the presentation problem Bus voltage assumed to be constant at 1 p.u. PV buses are numbered from 1 to N-1 where N is the total no. of buses. 428 Nth bus is taken as a reference bus where phase angle =0 PROBLEM FORMULATION To determine: Optimal scheduling of generators i=1, 2...NG Objective function Minimize line flow i=j=1,2, nbs Subject to: Equality constraint: Load angle mismatch = 0 Load balance equation = Inequality constraint: Line flow constraint : 0 Limits: i=1, 2 NG Where = [,,, ] Represents the voltage phase angle. g() is the vector of the active power flow carried by transmission lines. Is the vector of the transmission line rating. Is the real power generation of ith generator. P "#$%&, P "#$#' are minimum and maximum generation limits. Nbs is the number of bus. NG number of generators. line flow. VII. RESULTS AND DISCUSSION CONTINGENCY CONDITIONS CASE A Load at bus 14 raised by 80% Load at bus 19 raised by 55% LOADED S 1 3 153.077 141.094 153.567 141.522 LIMITS VIOLA TION 34.171 35.089

CASE B LOADED S LIMITS VIOLA Generator TION Generator Generator load at bus 14 raised by 80% 146.9 135.764 G1= 61.8019 G2= 31.4515 22.664 G3= 35.2538 G4= 24.9058 G1= 54.3771 G2= 33.6175 G3= 38.0149 G4= 20.6371 G1= 59.377 G2= 31.317 G3= 37.014 G4= 18.637 G5= 17.9127 G5= 21.7172 G5= 19.717 G6= 35.2879 G6= 34.456 G6= 28.148 CASE A Load at bus 14 raised by 80% line 1 2 Load at bus 19 raised by 55% line 1 2 CASE B load at bus 14 raised by 80% line 1 2 RESULT AFTER SCHEDULING LOADE D S 1 3 LOADE D S 153.077 141.094 153.567 141.522 146.9 135.764 AFTER RESCHEDU LING 129.41 120.27 AFTER RESCHEDU LING 129.45 120.30 GENERATOR RESCHEDULED VALUES CASE A(1) CASE A(2) CASE B VIOL ATIO N VIOL ATIO N VIII. CONCLUSION The base case load flow is performed and the line flows are identified as within the limits. A contingency condition whit overloading and age of line is created and the load flow analysis is performed and the overloaded lines are identified and this result are shown.the data s are loaded to the optimization problem as given and the particle swarm optimization technique which uses the generators as population and are first evaluated and the local best termed as pbest is updated for all particles and then the local best termed as gbest is updated. This process is continued until the global best is achieved. The global best gives the generator d and thus the load flow is performed and the line limit violations are identified to be within the thermal limits. Thus the generators are d for the contingency condition and the puts are verified. IX. REFERENCES [1]EttoreBompard, Member, IEEE, Pedro Correia, George Gross, Fellow, IEEE, and Mikael Amelin Congestion-Management Schemes: A Comparative Analysis Unified Framework,IEEE transactions on power systems, vol. 18, no. 1, February 2003 [2] TulikaBhattacharjee, Ajoy Kumar Chakraborty Congestion Management In Deregulated power System By Rescheduling Of Sensitive Generators And Load Curtailment Using PSO, IJETAE Volume 2,Issue 3, March 2012, [3] Naresh Acharya, N. Mithulananthan Locating Series FACTS Devices For Congestion ManagementIn Deregulated Electricity Markets Electric Power System Management, Energy Field of Study, Asian Institute of Technology, 2 May 2006. [4] Management Of Multiple Congested Conditions In Unbundled Operation Of A Power System, Hans Glavitschswiss federal institute of technology zurich, Switzerland, Fernando Alvarado The University of Wisconsin Madison, Wisconsin, USA, IEEE Transactions on Power Systems, Vol. 13, No. 3, August 1998. 429

[5]Transmission Congestion Management In An Electricity Market R.S. Fang A.K. DavidDepartment Of Electrical Engineering Hong Kong Polytechnic Universitykowloon, Hong Kong, IEEE Transactions on Power Systems, Vol. 14,No. 3, August 1999. Bibliography Harish kumar T has received BE Electrical and Electronics Engineering from DMI College of Engineering chennai, and currently pursuing ME Power Systems Engineering in St joseph s college of engineering chennai his area of interest includes Congestion Management, Deregulated Power System. Uma Velayutham is working as an Associate Professor in St.joseph s College of Engineering. She is currently doing her research in Power Systems Engineering from College of Engineering Guindy, Anna University, chennai. She received her B.E degree in Electrical and Electronics from Madras University in 2001. She received her M.E from College of Engineering Guindy, Anna University, Chennai in the year 2004.Her research interest includes Power System operation and Control, Congestion Management and Optimization techniques. 430