Understanding & Calculating the Impact of Oil-Related Traffic

Similar documents
Plug & Abandonment Light Drilling Workover Well Intervention

Prescription Drug Monitoring Program Facts, Figures, and Trends 4 th Quarter 2018

Rig 1 Sky top 4 Axle Carrier 6500 Drilling Depth

SCORPION DC, LLC Rig 1 Sky Top 4 Axle Carrier 6500 Drilling Depth

COUNTY DIVISIBLE LOAD PERMITS ISSUED IN 2013 PERMIT FEES PERMITS?

RIGS LOADCRAFT INDUSTRIES, LTD. WORKOVER. drawworks PARTS/SERVICE. mud systems (80 0 ) L O A D C R A F T I N D U S T R I E S, LT D.

OilRigsNow.com Houston,TX USA (713)

CONSTRUCTION and OFF ROAD EQUIPMENT

Transportation accomplishments

Wheat. Historic Estimates North Dakota. ~~ite MemortaJ Book Colfectior1. Otvision of AgrfcuJwral Economics t ics No.

VDD 200 Super Single Rig - Automated Pipehandling System

VDD 370 Super Single Rig - Automatic Pipehandling System

Truck Axle Weight Distributions

750HP PORTABLE DRILLING RIG W/ WALKING SYSTEM

Rig Equipment List. Substructure. NOV- Slingshot type (2 piece) Clearance: 20 with 18 of clearance. Capacity: 500,000# loading

VDD 400 Offshore Super Single - Automated Pipehandling System

Global hydraulic frac market seen up 19% this year: consultant

Oil Rigs Now Houston, Texas

Oil Rigs Now Houston, Texas

Truck Traffic Impact Analysis

Rotary Snubbing Technology Option for Long Reach

Schedule of Equipment Rates

Auction Ring 1 -Ramp - North Auction Theatre

MUNICIPALITY OF THAMES CENTRE COMMUNITY SERVICES & DEVELOPMENT TRANSPORTATION

APPROACH OPERATING LLC. RIG: Latshaw rig #22 KB: 28

8/28/13: Luchini and Mertz Land Surveying Company staked location. DC: $3,250 TDC: $3,250

Structural Considerations in Moving Mega Loads on Idaho Highways

Rotary Drilling Co. Ltd. Presentation

APPROACH OPERATING LLC. RIG: Latshaw rig # 22 KB: 28

Mast Height ft (45.0 m) Free Working Height 98.4 ft (30.0 m) Mast Base 21.3 ft (6.5 m) x 24.6 ft (7.5 m)

WIM #48 is located on CSAH 5 near Storden in Cottonwood county.

IMPACTS OF ENERGY DEVELOPMENT ON TEXAS ROADS

DRILLING BARGE SS AMEQ CASPIAN SEA

With its new PACE -B Series Rig, Nabors continues to advance industry standards in drilling technology and innovation.

This appendix describes various types of equipment that can

FEMA's Schedule of Equipment Rates

FEMA's Schedule of Equipment Rates

WIM #41 CSAH 14, MP 14.9 CROOKSTON, MINNESOTA MAY 2013 MONTHLY REPORT

WIM #40 is located on US 52 near South St. Paul in Dakota county.

Super 116E Class. Self-Elevating Drilling Unit (SEDU)

McKissick 200mt. Stabbing board

Maersk Venturer. Ultra deepwater drilling and development. Deepwater Advanced

NSRBA 2017 EQUIPMENT DESCRIPTION. Purchase Price 2017 Monthly Rental % Monthly Rate Hourly Rate Daily Rate

HH102. Hydraulic with Caterpillar engine, for drilling oil and gas wells up to 2,000 m. 100 tf hook capacity HP triplex pumps.

6 Hour Backhoe Loader (CAT 415F2/ 415F2 IL, 416F/ 416F2, 420F/420F IT, 420F2/ 420F2 IT, 430F/430F IT, 430F2/ 430F2 IT, 450F or Equiva $32.

Auction Ring 1 -Ramp - North Auction Theatre

Appendix 4-2-C Project Air Emissions Inventory

DRAWWORKS/POWER MAST/SUB STRUCTURE MUD PUMPS

2015 ND Asphalt Conference. March 31, 2015 NDDOT Director Grant Levi, P.E.

Reimpet International Corporation Ingersoll Rand 1500E Land Drilling Rig Technical Specifications

Whatcom County Invitation to Bid Bid #17-09

FLC 503 and 504 Component Shaker System

Ideco - H25 Information Document

WIM #29 was operational for the entire month of October Volume was computed using all monthly data.

COMMITMENT TO EXCELLENCE

THE OFFSHORE Drilling Solution

EQUATORIAL DRILLER : The cost effective solution for efficient deep water drilling in mild environment. REV 1c

Superintendent Rig Checklist

Jackup Strategy Richard Roper Sr. Director Capital Projects. April 11, 2012

WIM #40 US 52, MP S. ST. PAUL, MN APRIL 2010 MONTHLY REPORT

KOOCHICHING COUNTY HIGHWAY DEPT. HEAVY EQUIPMENT OPERATOR International Falls Maintenance Garage

WIM #37 was operational for the entire month of September Volume was computed using all monthly data.

CLASSIFICATION: 1300 H.P. Land Rig rated to 13,500

ExL Petroleum, LP DAILY WELL COMPLETION REPORT DATE: DAY #

SURFACE MINING REPORT

Gulftex Energy III LP DAILY COMPLETION REPORT

NATIONAL 110 UE 1500 HP SCR

WIM #39 MN 43, MP 45.2 WINONA, MN APRIL 2010 MONTHLY REPORT

DEFINITIONS OF VISUAL CLASSIFICATION OF HEAVY COMMERCIAL VEHICLES BY BODY TYPE, INDUSTRY, AND ANY ADDITIONAL DETAILS

Pi PK Information Document

GREAT PLAINS / THE RIGHT PEOPLE / THE RIGHT TOOLS

WIM #31 US 2, MP 8.0 EAST GRAND FORKS, MN JANUARY 2015 MONTHLY REPORT

Schede tecniche Corsair 300 PDB

T.A.T Minimum Wage Scale

UTC Region 5 Meeting. Justin J Kringstad Geological Engineer Director North Dakota Pipeline Authority

FOR MORE DETAILS CONTACT: SPECIFICATIONS OF 1400 HP OR EQUIVALENT ELECTRICAL LAND RIG (NOTIONAL DRILLING CAPACITY OF 4700 MTRS)

SUMMIT FLAME RESISTANT WORK APPAREL

DATE. # OF JSA's RIG SAFETY DAYS G.P.S. COORDINATES NO 0 57 N W SAFETY MEETING TOPICS

MLC Opertating. Released rig at 700 AM on 7/23/2015. Rigging down rig. Breakdown of Operations

CLASSIFICATION: 1300 H.P. Land Rig rated to 13,500

EQUIPMENT HIRE Stawell Road PO Box 241 Horsham Victoria 3400 Phone: (03) Facsimile: (03)

Instructions for filling out the Equipment for Hire Registration Form (Other than Dump Trucks)

Workplace Incident Fatalities Investigated in 2006

LOC 400 Drilling Rig

Table C-1. POLB Middle Harbor Redevelopment Construction/Demolition Activities and Noise Data

19,683 8,

Flo-Line Cleaner 2000 Component Shaker System. Part of the Flo-Line Cleaner Series

Foreword Safety warning General Function Technical parameters: Structure and main components

APPENDIX C AIR QUALITY

PORTABLE DRILLING RIG ***NEW LISTING*** Make an Offer Drill Depth to 6,000'

3/25/15 University DC 1H Devonian Completion

General Decision Number: MN /04/2011 MN15. State: Minnesota. Construction Type: Highway

5 WINCHES a Quantity, make and rating of winches 1) INGERSOLL RAND, Model # D6U, 4Ton. (Rigfloor) 2) INGERSOLL RAND, Model # K6UL, 5Ton.

Eagle Ford Shale Energy Developments. Ioannis Tsapakis, Ph.D. Cesar Quiroga, Ph.D., P.E.

Kansas Department of Transportation

02/01/2013: Surveying, Luchinni & Mertz, University Emilie #3R well to be drilled. DWC: $1, CTD: $1,500.00

KEMTRON Fluid Reclaimer Products Overview Revision J

Maersk Interceptor. Gusto MSC CJ70-X150MD Harsh Environment Jack-up 150 m Water Depth Optimized Drilling Efficiency Subsea Capabilities

2015 Minnesota Power Systems Conference Managing Bakken Oil Field Load Growth From a Transmission Perspective

UNIT OF MEASURE MATERIAL DESCRIPTION MATERIAL DESCRIPTION - LONG TEXT HOUR BACKHOE,Z54 OTHER CONTROLLED EQUIPMENT, BACKHOE, RENTAL

Transcription:

Understanding & Calculating the Impact of Oil-Related Traffic Jack Olson, Asst. Director Planning/Asset Management Division ND Department of Transportation Bismarck, ND October 26, 2011

1. An overview of the oil industry 2. Composition and volume of oil traffic 3. Quantify impacts (flexible/rigid pavements) 4. How information is used by NDDOT

An Overview of The Oil Industry

August 2011 13,825,704

Rig Count 1978 August 2011 142 196

County August 2011 Aug 2011 Ranking Aug 2011 (bbls) Wells Avg Prod/Well Mountrail 1 4,494,644 1,019 4,410 McKenzie 2 2,922,918 1,311 2,229 Dunn 3 2,000,640 622 3,216 Williams 4 1,919,304 780 2,460 August 2008 4,193 Wells 5,518,208 barrels 178,000 barrels per day Bowman 5 849,258 580 1,464 Divide 6 473,912 260 1,823 Billings 7 330,153 545 606 Stark 8 225,136 105 2,144 Burke 9 190,047 437 435 Bottineau 10 159,896 575 278 August Renville 2011 6,708 11 Wells 77,832 Up 2972,515-262 60% McLean 12 64,828 35 1,852 13,825,704 barrels - Up 150% 446,000 barrels per day Golden Valley 13 60,642 77 786 Slope 14 50,310 18 2,795 Ward 15 3,793 27 140 McHenry 16 2,207 18 123 Mercer 17 184 2 92 Totals 13,825,704 6,708 2,061 Year # of Wells 1951 1 1976 1635 2001 3372 2007 3870 2008 4271 2009 4630 2010 5,332 2011?

Composition and Volume of Oil Traffic

8

Composition and Volume of Oil Traffic

10

Early 1990 s 90,000 Pounds 2011 110,000 Pounds 11

Choke Manifold 126,000

Gravel Trucks, Transports, Scrapers, Motor Graders, Dozers, Blades, Bed Trucks, Hauling Trucks, Cement Trucks, Wireline Trucks, Coil Tubing Units, Tankers (fresh water, salt water, acid, hot oil, propane, drilling fluids, fracturing fluids, etc.), Backhoes, Cherry Pickers, Cement Transports, Sand Trucks, Pump Trucks, Roustabouts, Utility Vehicles, Cranes, Fracturing Rigs, Low Boy Trailers, etc. Choke Manifold 126,000

Choke Manifold 126,000 Average One-Way Truckload #s Vertical Well - 400 Horizontal Well - 1150

Over Weight Loads in Pounds Average One-Way Truckload #s Vertical Well - 400 Horizontal Well - 1150 Generator House (3) 111,180 BOP Setting Machine 111,000 Gravel Trucks, Transports, Scrapers, Motor Graders, Shaker Tank/Pit 122,000 Derrick 159,000 Dozers, Blades, Bed Trucks, Hauling Trucks, Cement Suction Tank 131,000 VFD House 130,100 Trucks, Wireline Trucks, Coil Tubing Units, Tankers (fresh Mud Pump (2) 164,000 Mud Boat 114,380 water, salt water, acid, hot oil, propane, drilling fluids, Shaker Skid 111,760 Substructure (2) 136,000 fracturing fluids, etc.), Backhoes, Cherry Pickers, Cement Draw Works 130,880 Centerpiece 139,440 Transports, Sand Trucks, Pump Trucks, Roustabouts, Utility Hydraulic Unit 127,640 Tool Room Junk Box 124,140 Vehicles, Cranes, Fracturing Rigs, Low Boy Trailers, etc. BOP Skid 138,680 MCC House 145,160 Top Dog House 117,000 Crown Section 140,000 Choke Manifold 126,000

Water 3,000,000 gallons 446 One-Way Truckloads per well Sand 4,000,000M pounds 96 One-Way Truckloads per well

2008 Actual 20

2008 Actual 4,266,792 barrels of oil 7,798,967 barrels of salt water 2,408,100 barrels trucked 31% by truck 18,525 truckloads August 2011 13,825,704 barrels of oil Up 224% 224% 224% 12,867,229 barrels of salt water Up 65% 5,184,553 barrels trucked Up 115% 40 % by truck 39,880 truckloads Up 115% 21

Stanley Stanley Ryder New Town

STANLEY MINOT NEW TOWN

TIOGA NEW TOWN SOUTH HEART

Quantify Impacts On Flexible & Rigid Pavements

Job Description Number Of Trucks Trucks Axles Tires Truck in equipment to build location & road including scoria or gravel 20 Tandem w/ tandem & triple axle trailers 18 up to 32 Pipeline materials trucked to location to be installed 25 Tandem w/ tandem axle trailers 18 Crane to unload pipe for pipe line 1 Double front & triple rear axle 16 Roustabouts to help unload pipe 1 Tandem w/ tandem axle trailers 18 Trucks to move in & move out equipment for pipelines 8 Tandem w/ tandem & triple axle trailers 18 up to 32 Trucks deliver culverts 1 Tandem w/ tandem axle trailers 18 Truck equipment to install pit liner In pit & under rig 2 Tandem w/ tandem axle trailers 18 Trucks for Drilling rat & mouse hole, install conductor pipe 4 Tandem w/ tandem axle trailers 18

Generator House - 111,180 Pounds Load Type Number of Loads per Well # of Axels Group Wt. (kips) Steer Group #1 Group #2 Group Flex ESALs Group Rigid ESALs # of Axels Group Wt. (kips) Group Flex ESALs Group Rigid ESALs # of Axles Group Wt. (kips) Group Flex ESALs Group Rigid ESALs Generator House 6 1 12.7 0.399 0.341 3 54.7 1.900 4.630 4 59.4 6.080 2.510 Group #3 Group #4 Type Totals/Well # of Axles Group Wt. (kips) Group Flex ESALs Group Rigid ESALs # of Axles Group Wt. (kips) Group Flex ESALs Group Rigid ESALs Axles Weight (kips) Group Flex ESALs Group Rigid ESALs 2 33.4 1.110 1.920 0 0.0 60 961.2 56.9 56.4

4 3 2 4 1 1 2 1 1 2 1 1 1 0 0 2 1 20 Spacing Units Total X 3.8 wells/unit = 76 wells. 2 1 3 Can t have more than 7 wells per unit so for the two units that have 4 or more, we would max out the unit at 7 so we would subtract 2 wells Final Total = 74 wells

Questions?