Solar Thermal. Grant Solar Pump Station Installation & Servicing Instructions

Similar documents
ADDENDUM to INSTALLATION INSTRUCTIONS for Grant Solar Pump Station

Grant Vortex Mag One. Magnetic Central Heating Filter. Installation and Servicing Instructions

Vertical Balanced Flue Kit All Internal Grant Boilers

Valves, controls + systems Valves and controls for solar installations Regusol-180

INSTALLATION AND COMMISSIONING MANUAL CONTENTS. Function. Product range. Technical specifications. Characteristic components

OPERATION AND INSTALLATION

CIRCO5SolarCirculationUnit

Grant Vortex Mag One. Universal Magnetic Central Heating Filter. Installation and Servicing Instructions

ZonePlus Z322 zone valve Installation and commissioning instructions

COMPONENTS FOR SOLAR THERMAL SYSTEMS

RESOL SBS 1000 * * Connection Operation

INSTALLATION AND COMMISSIONING MANUAL CONTENTS. Function. Important Product range Technical specifications

ECONOPLATE BV SERIES HOT WATER SERVICE PACKAGED HEAT EXCHANGERS WITH THERMAL STORES

COMPONENTS FOR SOLAR THERMAL SYSTEMS

SBS Manual for the specialised craftsman. Filling and flushing station. Connection Operation. en Manual

Grant Grid-Connected Inverter For Grant Solar PV Systems. Installation & User Instructions

Installation instruction

VT Oil-Free Range Operators Handbook

DCE 100 Series Dust Filter

VIESMANN. Installation instructions VITOSOL 200-T. for contractors. Vitosol 200-T Type SP2 Vacuum tube collector based on the heat pipe principle

Installation and Commissioning Instructions High Temperature Zone Module F31-1" (DN 25)

Compact System NRGS 11-2 NRGS Original Installation Instructions English

Installation & Technical Guide. Domestic & Commercial.

CALEFFI. Solar pump stations 01166/14 NA. 278 and 279 series 01264/16 NA

VIESMANN. Installation instructions VITOSOL-F. for contractors

Duo water control system

Installation Instructions. Vitosol 100. Vitosol 100 Type w 2.5 Flat collector for flat roofs and freestanding installation Part No.

Product and installation manual. Underfloor Heating Composite Manifold

KS Pump Stations. Engineering Submittal Sheet. Installation Sets for Collectors

Operating & Maintenance Manual Compact Domestic Booster Set Model BTAF Arrow Valves

PRESSURE CONTROL VALVES SABS 198

M Series Condensate Recovery Unit

HOT WASHER MODEL NO: KING 125 OPERATION & MAINTENANCE INSTRUCTIONS PART NO: LS1009

HR25 Solo. Installation and User Instructions. Through the Wall Heat Recovery Ventilators

Operating & Maintenance Manual Break Tank & Pump Set Model BTAB Arrow Valves

Mini Twinline Sequential Shower Valves

Navigator ADS551 Low level dissolved oxygen Replacement / Upgrade procedures wet section spares

LK Manifold Shunt VS2

POND PUMP Model Nos:SPP3 & SPP6 0200

BCV30 DN20 - Blowdown Control Valve Installation and Maintenance Instructions

Installation, Operating, Maintenance and Safety Instructions for CW332 Pressurised water system for boats 24 volt d.c.

Breezair TBA 550 Installation Manual

Acura TMV3 Bath Filler AC50010CP and AC50020CP

SUBMERSIBLE WATER PUMP

40 geothermal ground loop manifolds

Solar Thermal Energy Flat & Tube Panel Standard Kits Installation Overview

Clos-o-Mat Lima Lifter installation & user guide

APRICUS PUMP STATION TECHNICAL GUIDE

Taps, Valves & Components. Section 1

Installation, Operation & Maintenance Instructions for MF-Solar Series Solution Feeders

Underfloor heating & cooling solutions by Wavin

INSTRUCTION MANUAL BR 25 FOR RAILWAY APPLICATION 5COR BR25AT REV00

Installation, Operating, Maintenance and Safety Instructions JABSCO & Series 1 40 SIZE UTILITY Pump

INSTALLATION INSTRUCTIONS SERVICE KIT - MONSOON EXTRA S1.4 bar SINGLE Part No MONSOON EXTRA U1.4 bar SINGLE Part No.

Part No: Genuine Mira Accessories

(UK) Date : January 2014

The Mikrofill Electronic Filling Device. (EFD)

Black Teknigas. Powerseat Eco Gas Safety Shut-Off Valve. Technical, Installation and Maintenance Details. WattsIndustries.co.uk

FOR HEATING & PLUMBING SYSTEMS

The Powermatic User Guide Test Sieve Shaker

Hot and Cold Plumbing Manifold Systems

CALEFFI. Distribution manifold for radiant panel systems. 664 series 01260/18 GB. replaces 01260/14 GB

Level Electrode NRG NRG NRG NRG

Operating and Installation Instructions Diaphragm Vacuum Pumps and Compressors

JABSCO & Series 1½ 80 SIZE UTILITY Pump

Model 340i / 680i / 1220i DC drive product manual HG iss 8 1

VIESMANN. Installation instructions VITOSOL 200. for heating engineers. Vitosol 200 Type SD2 Direct flow vacuum tube collector

SUBMERSIBLE WATER PUMPS

EN Operating manual. Motorised zone valve. Three-way, 22 mm & 28 mm 3PV2, 3PV8 & VRMH3

APT10-2 Automatic Pump Trap

INSTRUCTION MANUAL RELAY FOR ON LOAD TAP CHANGER APPLICATIONS OR-25 5COR OR25 REV03

DS Series Solar System

THERMOSTATIC INLINE CONTROL SHOWER VALVES Installation & aftercare instructions

Installation Manual for D154X Series Multi-Indicator, General Purpose Power Supplies

1901 Thermostatic Shower Mixer

Installation, Operation, and Maintenance Manual Outdoor Glycol Feed System JWOP /055/100

CALEFFI. Distribution manifold for radiant panel systems. 664 series 01260/14 GB

Your Guide to the Installation, Care and maintenance of PERFORMA. Electronic Self Closing Fittings - Mains Powered 886V (343029) 885V (343027)

SOLAR AEROLINE. fast simple reliable. The perfect connection technology for solar hot water

MOBILE PRODUCT RECOVERY TANK

Axiom Industries Ltd Wentz Avenue Saskatoon, SK S7K 5J1 Ph: (306) Fax: (306)

Endura AZ10 Oxygen probe Sensor sub-assembly tested spares kit

DYNAFLUID 2000 STEAM & WATER MIXING VALVE INSTALLATION & OPERATING MANUAL

TECHNICAL INFORMATION

Engineering Standard. Fig 707 Safety Relief Valve Installation and Maintenance Instructions

The LOK Range. Models:

Guidance to Installers of Viridian EV Charging Stations

HERZ 7217 V. Integral Fixed Orifice Control Valve HERZ 7217 V. Data sheet 7217 V, Issue Size in mm. STRÖMAX Fig No DN L Lm Rp H SW kv kvs

BATH FILLER & BATH / SHOWER MIXER Installation & aftercare instructions

original operating manual Operating manual Translation of the Item-No.: ,

THERMOSTATIC CONCENTRIC DUAL CONTROL SHOWER VALVES Installation & aftercare instructions

Instruction Manual. Sewage lifting station compli 300

MSC Manifolds - DIN for Steam Distribution and Condensate Collection Installation and Maintenance Instructions

Infrared Control Valve Installation Guide

Infrared Control Valve Installation Guide

CALEFFI. Ball shut-off valve fitted for integrated flow rate measuring sensor. 111 series 01234/13 GB. (kpa) (mm w.g.) G (m 3 /h)

SE RV I CE MANUAL. Page 1 of 13

REX/REX F/REX K/REX K F REX DUAL/REX DUAL F

Pump Stations for Heating Circuits

SRG LPG Liquid Service/Offtake Valve Type /

Transcription:

Solar Thermal Grant Solar Pump Station Installation & Servicing Instructions Part No. DOC 96. Rev 02. October 2012

Important Note Important Note for Installers The Pump Station supplied with your Grant Solar Thermal system differs from that shown in the Installation Instructions supplied. This change is part of our continued product improvement process. The information in these Solar Pump Station Installation Instructions replaces that given in Sections 13 and 14 of the Grant Solar Thermal Systems Installation Instructions (DOC 73. Rev.02). Please read these Pump Station instructions in conjunction with the System Installation Instructions supplied. After commissioning, please leave both the System Installation Instructions and these Pump Station Instructions with the user for future reference. Important: All system pipe connections must use compression fittings with brass olives. Soft soldered joints must NOT be used on the solar primary circuit. Plastic pipe must NOT be used for any part of the solar primary circuit. 2Important Note GRANT ENGINEERING (UK) LIMITED Hopton House, Hopton Industrial Estate, Devizes, Wiltshire SN10 2EU Tel: 01380 736920 Fax: 01380 736991 Email: sales@grantuk.com www.grantuk.com This manual is accurate at the date of printing but will be superseded and should be disregarded if specifications and/or appearances are changed in the interests of continued product improvement. All good sold are subject to our official Conditions of Sale, a copy of which may be obtained on application. Grant Engineering (UK) Limited 2012. No part of this manual may be reproduced by any means without prior written consent.

Contents 1 Introduction 4 1.1 Description 4 2 Technical Specifications 5 2.1 Specification 5 2.2 Pump Performance 5 2.3 Dimensions 6 2.4 Components 6 3 Installation 7 3.1 General 7 3.2 Fitting Procedure 7 3.3 System Connections 8 3.4 Expansion Vessel 8 3.5 Safety Valve Discharge 9 3.6 Electrical Connection 9 4 Commissioning 10 4.1 Expansion Vessel 10 4.2 Filling Valves 10 4.3 Gravity Brakes 11 4.4 Solar Fluid 11 4.5 Filling the System 12 4.6 Filling Procedure 12 4.7 Releasing Trapped Air 13 4.8 Setting the Flow Rate 13 5 Fault Finding 14 5.1 No System Circulation 14 5.2 Pump not Operating 14 5.3 Loss of System Pressure 14 6 Spare Parts 15 Contents 3

1 Introduction 1.1 Description A two-line Solar Pump Station for the circulation of glycol mix solar fluid through Grant solar thermal systems. All components are housed within an insulated enclosure designed to be wall mounted. The pump station provides the following functions: Filling and flushing connection points Fluid flow rate regulation System pressure and temperature readings Check valves (Gravity Brakes) for anti-gravitation circulation Safety pressure relief valve and discharge connection System expansion vessel connection point Isolation valves for upper and lower system levels and pump psi bar OFF ON OFF ON 405421 Flow - from Collectors Return - to Collectors MADE IN ITALY 4Introduction Figure 1-1: Pump station with front cover removed

2 Technical Specifications 2.1 Specification System pipe connections: Safety valve: Safety valve discharge connection: Pressure gauge range: Thermometer gauge range: Maximum run temperatures: Maximum peak temperatures: Maximum glycol (%) in solar fluid: Circulator: Electrical supply: Insulation: Flow and Return valves: Min pressure to open check valve: Check valve activation: ¾" BSP Female 6 bar - certified TUV to SV100 7.7 - Directive 97/23/CE ¾" BSP Female 0-10 bar 0-160 C 130 C 150 C 50% WILO STAR ST 15-6 Eco. 3P connections, 1M-130mm Class F, PN10, TF110, IP44, 2 µf, 230V 50Hz, VDE, CE 230-240V 50 Hz Black PPE density 40kg/m³, plain DN20. ¾" BSP Female connection, integral check valve 2 kpa (200mm w.g./ 20mbar) Closure at 90 and opening at 45 2.2 Pump Performance 6 5 Head (m) 4 3 2 1 0 0 0.5 1 1.5 2 2.5 3 3.5 Water flow (m 3 /h) Figure 2-1: Standard 6m head pump - performance curves 8 7 6 Head (m) 5 4 3 2 1 0 0 0.5 1 1.5 2 Water flow (m 3 /h) Figure 2-2: Optional 8m head pump - performance curves Technical Specifications 5

2 Technical Specifications 2.3 Dimensions 312 Side view of pump station 100 102 38 psi bar 130 430 160 50 75 25 50 Plan view of pump station Technical Specifications 6 2.4 Components 20 21 1 2 3 4 5 6 7 8 19 18 17 16 15 14 13 12 11 10 9 Key No. Description 1 Flow valve (red knob) - ¾" BSP Female connection 2 Thermometer (0-160 C) on flow valve 3 Wall bracket with retaining clip and screw 4 Connection pipe - copper 18mm 5 Manual air vent with hose connection 6 Air separator with integral manual air vent 7 Filling hose connectors (x 2) to fit filling/flushing valve - 15mm dia x ¾" swivel nut 8 System connection - ¾" Female 9 System connection - ¾" Female 10 Filling return valve connection - ¾" BSP Male with safety cap and chain 11 Flow meter range 2-12 l/min 12 Filling flow valve connection - ¾" BSP Male with safety cap and chain 13 Filling/shut-off valve 14 Circulator Wilo STAR ST 15-6 6m head 15 Expansion vessel connection ¾" BSP Male with flat gasket connection 16 Pressure gauge (0-10bar) 17 Safety valve discharge connection 18 Safety valve (6 bar) 19 Return valve (blue knob) - ¾" BSP Female connection. ¾" BSP Male connection always open on right side 20 Thermometer (0-160 C) on return valve 21 Insulated housing

3 Installation 3.1 General Installation of this pump station must be carried out by a competent installer in compliance with all current local Building Regulations, codes of practice, Health & Safety legislation and any relevant bylaws and regulations in force at the time. All electrical installation work must be carried out by a qualified electrician. All wiring and bonding must comply with current IEE wiring regulations (including any amendments). Wall bracket 3.2 Fitting Procedure 1. Remove the front section of the insulated pump station housing. 2. Undo screw and remove retaining clip from wall bracket. 3. Lift out both the flow valve/air separator assembly and the return valve/pump assembly. 4. Position the back section of the insulated housing in the required location. If necessary check the cover is level using a spirit level and mark the two holes for the wall bracket. Note: The solar pump station MUST only be installed vertically, as shown in Figure 1-1. 5. Separate the wall bracket from the back section of the housing. Drill the wall with an 8mm drill and securely fix the wall bracket to the wall using the fixings supplied. 6. Fit the back section of the insulated housing onto the wall bracket, taking care to insert it completely. Refer to Figure 3-1. 7. Re-fit the flow and return assemblies, inserting the body of the flow and return valves into the corresponding fork in the wall bracket. Refer to Figure 3-2. 8. Fit the retaining clip and secure using the screw provided. 8. Connect the flow and return pipes. Refer to figure 3-3. Insulated housing back section Figure 3-1: Fit back section of housing onto wall bracket Retaining clip Installation Figure 3-2: Re-fitting flow and return assemblies to wall bracket 7

3 Installation 3.3 System Connections Solar collectors Note: This is a diagrammatic view showing the connections to the pump station. As such it does NOT include all valves and controls and is NOT intended as a complete system diagram. Important: All system pipe connections must use compression fittings with brass olives. Soft soldered joints must NOT be used on the solar primary circuit. Plastic pipe must NOT be used for any part of the solar primary circuit. OFF ON 405421 OFF ON psi bar Hot water cylinder MADE IN ITALY Solar expansion vessel Safety (pressure relief) valve fluid recovery container Figure 3-3: System connections to solar pump station 8Installation 3.4 Expansion Vessel The correct size of expansion vessel should be used, based on the volume of the system i.e. the number of collectors, the length and diameter of the system pipework, etc. For systems using up to 4 Grant solar collectors, with no more than 50 metres of 15mm pipework (total length of flow and return combined), an 18 litre expansion vessel is supplied as standard. For 5 collectors a 24 litre expansion vessel is used. For larger system configurations, contact the Grant Technical department for guidance on the expansion vessel required. The expansion vessel is connected to the pump station via the ¾ BSP connection on the safety valve manifold, using the 1250mm long flexible corrugated stainless steel pipe. This pipe is supplied with flanged ends, each fitted with a ¾ union nut, and two sealing washers (Grant Part No. GS222074). This flexible pipe cannot be cut and must be used as supplied. The expansion vessel is fixed to the wall using the Vessel Mounting kit (Grant Part No. GS222073). This kit includes an isolation valve union and the vessel mounting bracket. Fix the mounting bracket to the wall, using the screws and wall plugs provided, to position the vessel in the required location. IMPORTANT The expansion vessel must be located BELOW the connection on the pump station with the vessel connection pointing upwards. See Figure 3-3.

Assemble and fit the isolation valve union as follows, referring to Figure 3-4: Fit the small black sealing washer onto the threaded connection of the bleed valve. Screw the bleed valve into the threaded port in the side of the valve union body and tighten. Remove the thin nut from the thread on the valve union. Fit the threaded connection on the expansion vessel up through the hole in the mounting bracket and secure using the thin nut. Using the sealing washer supplied, fit the valve union to the expansion vessel connection. Tighten the union nut to secure the valve union in the required position. Connect the flexible stainless steel pipe to the safety valve manifold and expansion vessel union valve, using the sealing washers provided with the pipe. Ensure that the expansion vessel isolation valve is OPEN this is indicated when the two indicators (on the square end of the valve) are in line with the valve. Ensure that the bleed valve is fully CLOSED before filling the system. 3.5 Safety Valve Discharge A discharge pipe must be fitted to the outlet of the safety valve. It is recommended that the safety valve discharge should be connection to a suitable discharge recovery tank, such as the Grant safety valve liquid recovery container with drain valve (Grant Part No.GS550001). This discharge pipe should be 15mm copper. IMPORTANT Plastic pipe should NOT be used. 3.6 Electrical Connection The pump requires a 230V 50Hz power supply from the Solar Controller to operate. Refer to the Installation instructions provided with the Solar Controller for further information on the electrical control system wiring. IMPORTANT The electrical supply must be isolated before making the connections to the solar pump. After making the connections ensure cover is fitted to enclosure before reconnecting the electrical supply. The power supply should be connected to the solar circulating pump (in the pump station) as follows: Insert the blade of a small flat screwdriver into the retaining clip on the side of the electrical enclosure on the pump. Carefully prise open the clip and pull the cover upwards and remove from the enclosure. Slacken off the cable gland nut and feed the electrical cable through the gland. See Figure 3-5. Prepare the cable cut back the outer sheath and strip the ends of the three wires as required. Fit the wires into the terminals by pushing the black lever away from the enclosure (to open the terminal). See Figure 3-5. Release the lever to secure the wire in the terminal. Fit the three wires into the terminals as follows: Live terminal L Neutral terminal N Earth terminal Tighten the cable gland to grip the cable and re-fit the cover to the enclosure. Flexible stainless steel pipe Bleed valve Union nut Thin nut Pipe union nut Isolating valve Vessel mounting bracket Cable gland Live terminal Neutral terminal Earth terminal Terminal lever Figure 3-4: Expansion vessel connection Expansion vessel Figure 3-5: Solar pump electrical connections Installation Reconnect the electrical supply to test the operation of the pump. 9

4 Commissioning 4.1 Expansion Vessel Ensure that the expansion vessel charge pressure is correct for the system pressure (when cold) and that this, in turn, corresponds to the height of the system. Refer to Table 4-1. The height of the system should be measured from the expansion vessel to the top of the highest collector. NOTE: If the collectors are positioned below the level of the expansion vessel (e.g. if the collectors are mounted at ground level), then measure from the bottom of the collectors to the expansion vessel. This will be a negative height value, e.g. 5 metres. The vessel charge pressure must be checked before filling the system. Height difference Initial expansion System charge pressure (height of the collector vessel charge @20 C (0.2 0.5 bar field minus height pressure (air charge greater than vessel of expansion vessel) setting on valve) charge pressure) - 5m ~ 1.0 bar ~ 1.3 bar < 0m ~ 1.0 bar ~ 1.3 bar < 5m ~ 1.5 bar ~ 1.8 bar < 10m ~ 2.0 bar ~ 2.3 bar < 15m ~ 2.5 bar ~ 2.8 bar > 15m Contact Grant Technical Department for guidance Table 4-1: Expansion vessel pressures 4.2 Filling Valves The Filling flow and return valves, and the Filling/Shut off valve, are used for filling and flushing the solar thermal installation. Refer to Figure 4-1. To enable filling/flushing of the system, the Filling/Shut-off valve must be rotated fully 90 clockwise. Refer to Figure 4-2. This will divert the flow from the filling station, entering the system via the Filling flow valve, through the pump, up to the collectors, through the coil of the cylinder and back to the filling station via the Filling return valve. Filling/ shut-off valve Filling flow valve Figure 4-2: Closing Filling/Shut off valve to prepare to fill system Filling return valve Commissioning Figure 4-1: Filling and flushing valves 10

4.3 Gravity Brakes The gravity brakes (check valves) are incorporated into both the flow and return valve assemblies. These gravity breaks operate at 20 mbar and are operated by turning the valve handle on the valves as follows: Flow and Return valves OPEN markers on valve handles in VERTICAL position To prevent gravity circulation of solar fluid, gravity brakes must be in the operating position (closed), i.e. with markers in vertical position. See Figure 4-3. Gravity Brakes OPEN markers on valve handles at 45 angle To fill or completely empty the solar thermal installation, the gravity brakes must be opened, i.e. by turning the valve handles to the right to an angle of 45. See Figure 4-4. Flow and Return valves CLOSED markers on valve handles in HORIZONTAL position The flow and return valves are closed by turning the valve handles 90 to the right, i.e. until the V markers are horizontal. See Figure 4-5. Figure 4-3: Flow and return valves open Figure 4-4: Gravity breaks open 4.4 Solar Fluid In order to prevent frost and corrosion damage to solar collectors and pipework, the system must only be filled with a high quality solar fluid. The Grant solar fluid is a ready mixed 40% solution of 1,2 propylene glycol/water providing frost protection down to approx. -23 C. To prevent damage to the system the same specification solar fluid should be used when replacing or topping up the solar fluid in the system. If required, a copy of the Material Safety Data Sheet for the Grant solar fluid is available on request from Grant UK. Figure 4-5: Flow and return valves closed Commissioning 11

4 Commissioning Commissioning 4.5 Filling the System Grant Solar Thermal systems should be flushed and filled using a purpose designed closed circuit solar thermal filling station, incorporating a high pressure pump, such as the Grant Solar Filling Station. See Figure 4-6.! WARNING If the pump station is located in the roof space, there must be a suitable flat surface on which to stand the filling station, e.g. floor, loft boarding or similar, capable of carrying the weight of the filling station with a full tank of solar fluid. Figure 4-6: Grant Solar Filling Station 4.6 Filling Procedure IMPORTANT The collectors must be cool before filling the system. They must be covered, to stop solar radiation reaching them, until the filling and commissioning procedure is completed. Before filling the system: Check all system connections and the expansion vessel charge pressure. Refer to Table 4-1 (page 10). Phase 1 Connect the pressure hose from the filling station to the Filling Flow valve connection and open the valve. Refer to Figure 4-1 (page 10). Connect the return hose from the filling station to the Filling Return valve connection and open the valve. Refer to Figure 4-1 (page 10). Using a small spanner, rotate the Filling/Shut-off valve 90 clockwise. Refer to Figure 4-2 (page 10). This will divert the flow from the filling station through the pump, up to the collectors, through the coil of the cylinder and back to the filling station via the filling return valve. Fill the filling station tank with sufficient solar fluid for the system. Check that Flow and Return valves are set to 'half open' position (to open the gravity brakes) as shown in Figure 4-4 (page11). Switch on the filling station to fill and then flush the solar circuit for approx.15 minutes. Phase 2 Whilst the filling pump is running, close the Filling Return valve and allow the system pressure to reach around 4-5 bar. When the pressure reaches 5 bar, close the Filling Flow valve and immediately switch off the filling pump. Check that the system pipework and pump station are leak-free. After leaving the system at about 5 bar for a minimum of 15 minutes, check if the pressure gauge shows any significant drop in pressure. If it does, this points to a leak in the system that must be traced and rectified. Check the operation of pressure relief valve by slowly rotating the valve knob, lifting the valve, until fluid is discharged. This should be collected in a suitable container, e.g. a pressure relief valve fluid recovery container (as shown in Figure 3-3 on page 8). Phase 3 Re-open the Filling/Shut-off valve by turning 90 anti-clockwise. Switch on the circulating pump (by setting the solar controller to manual ) to the highest pumping speed and allow the solar fluid to circulate for at least 15 minutes. Set the solar controller to stand by (pump = OFF). Bleed the air separator using the manual air vent until the solar fluid begins to escape. Refer to section 4.7 (page 13). Set the operating pressure (as in Table 4-1) by carefully opening the Filling Return valve and releasing the fluid back into the filling station tank. Phase 4 Reset Flow and Return valves to fully open position. Refer to Figure 4-3 (page 11). Switch on the circulating pump (solar controller set to manual ). Set the flow rate on the flow rate indicator (refer to section 4.8) by selecting the appropriate pump speed and by using the Filling/Shutoff valve. Remove the filling station hoses from the filling connections and screw the caps on both valves. Release the Filling Return valve first and then the Filling Flow valve. Switch the solar controller to automatic operation and remove covers from the collectors. 12

4.7 Releasing Trapped Air The residual air from the heat transfer fluid is collected in the air separator and manually released via the air vent. There is no need to use an automatic air vent elsewhere on the solar primary circuit, e.g. at high level. To release any air collected in the air separator, push a plastic tube on to the manual air vent outlet and catch the fluid that is released in a suitable container. Open the manual air vent until all air has been vented, i.e. a steady stream of solar fluid is flowing from the air vent.! CAUTION Venting air from the system should only be carried out only by a competent installer. Frequent venting leads to system pressure loss and disruption to the system operation. 4.8 Setting the Flow Rate The setting of the solar fluid flow rate is made via the speed setting of the circulating pump and the Filling/Shut-off valve. For required system flow rates refer to Table 4-2. The flow indicator displays the fluid flow rate. The display range is between 1 and 13 litres per minute. See Figure 4-8. MADE IN ITALY Figure 4-7: Air separator and air vent Manual air vent Air separator! CAUTION Danger of scalding! The temperature of both the escaping air and the solar fluid can exceed 100 C.! NOTE For larger installations, please contact Grant Technical Department for assistance. Read flow rate from bottom edge of bobbin Figure 4-8: Flow rate indicator Number of solar panels Type of connection Flow and return pipe diameter Minimum volume flow rate Table 4-2: System volume flow rates 1 to 5 6 8 9 12 Up to 5 in series 2 x 3 in parallel 2 x 4 in parallel 3 x 3 in parallel 4 x 3 in parallel 15mm 22mm 22mm 22mm 22mm 2-3 l/ min 4-5 l/ min 4-5 l/ min 6-8 l/ min 6-8 l/ min Commissioning 13

5 Fault Finding In the event of a problem occurring with your Grant Solar Thermal system, follow the information given below in order to identify and rectify the matter: 5.1 No System Circulation Check for the following: Pump is not operating (see 5.2 below). If pump is noisy, there may be air in the system. Pump may be air locked and needs venting. Turn off power, remove central screw on pump motor to vent. Valves are closed ensure that Flow, Return and Filling/Shut off valves are all fully open. Refer to Fig 4-3 on page 11. 5.2 Pump not Operating Check for the following: No electrical supply to pump. Controller is not calling for pump to operate (see below). Check power supply to controls (at fused spur). Check wiring to controller and pump is correct. Check for any loose connections. Controller is not calling for pump to operate. Check controller settings and correct as necessary (see Instructions supplied with the Solar Controller). Collectors may be in stagnation mode wait for system to cool down. Collector temperature may be too low (insufficient solar radiation). Cylinder temperature setting may be satisfied. Pump is stuck - Turn off power, remove central screw on pump motor and rotate motor using a screwdriver. Motor capacitor failed replace capacitor or pump motor. 5.3 Loss of System Pressure (on pressure gauge) Check for the following: Leaks on system find and rectify as necessary. Expansion vessel pre-charge lost check and re-charge vessel as necessary. Pressure relief valve discharging fluid check and rectify/replace valve. Fault Finding 14

6 Spare Parts 02 03 01 psi bar OFF ON OFF ON 405421 04 05/06 MADE IN ITALY 07 08 Key No. Description Part No. 01 Flow valve assembly (Red) GSE01 02 Return valve assembly (Blue) GSE02 03 Safety valve assembly (6 bar) GSE03 04 Pressure gauge GSE04 05 Solar circulator (6 metre) GSE05 06 Solar circulator (8 metre) GSE06 07 Air separator assembly GSE07 08 Fill/flush valve and flow regulator assembly GSE08 Spare Parts 15

GRANT ENGINEERING (UK) LTD Hopton House, Hopton Industrial Estate, Devizes, Wiltshire. SN10 2EU Telephone: 01380 736920 Fax: 01380 736991 Email: info@grantuk.com Website: www.grantuk.com