Turbo-Cool Stand-Off 6" Recirculating Evaporative Cooling Installation & Operator s Instruction Manual

Similar documents
Turbo-Cool 6" Recirculating Evaporative Cooling Installation & Operator s Instruction Manual

Turbo-Cool 6" Recirculating Evaporative Cooling Installation & Operator s Instruction Manual

Turbo-Cool Stand-Off With Open Top 6" Recirculating Evaporative Cooling Installation & Operator s Instruction Manual

VANGUARD Series 36" Slant Wall and Cone Direct Drive Fans Installation & Operator s Instruction Manual

48" and 52" Hyflo Fans Installation and Operators Instruction Manual

Turbo-House Air Inlet Installation & Operator s Instruction Manual

48" Vanguard Slant Wall and Cone Belt Drive Fans Installation & Operator s Instruction Manual

36" Galvanized Direct Drive Hyflo Fan Installation and Operators Instruction Manual. Fan and Framing Dimensions

Feed Scale Installation & Operator s Instruction Manual

Linear Actuator. Installation Manual. warranty installation parts list. Linear Actuator Installation Manual Page 1

14", 18" & 24" Fiberglass Turbo Fans Installation & Operator s Instruction Manual

Potentiometer Thrust Plate Kit (50421) Installation & Operator s Instruction Manual

Part Number Mini Linear Lift Assembly Installation & Operator s Instruction Manual

Model 90 Twin Control Unit

Extension Hopper Installation & Operator s Instruction Manual for Model 55, 75, 90, & HMC FLEX-AUGER Feed Delivery Systems

48 Belt Drive Turbo with Tensioner Cone and Grill Fan Installation and Operators Instruction Manual

54" Galvanized Hyflo Fan Installation & Operator s Instruction Manual

52" Turbo Fan with Hyflo Door

Two Motor Tandem. Installation Instructions. for Model 108 F LEX-AUGER Feed Delivery Systems. Model 108 Two Motor Tandem Installation Instruction

30Deg.Two Motor Tandem

Swivel Top Linear-Lift Installation & Operator s Instruction Manual

Swivel Top Linear-Lift

Extension Boot System

Strap Winch Installation and Operators Instruction Manual

52" TURBO Fan with HYFLO Door Installation & Operator s Instruction Manual

Curtain Timer Control

Strap Winch Installation and Operators Instruction Manual

Two Motor Tandem. Installation Instructions. for Model 108 F LEX-AUGER Feed Delivery Systems

AS-57FMH Flush Mount Kit AS-57EBDBP

Light Duty Winch. Part #25800 Installation & Operator s Instruction Manual

52" TURBO Fan with HYFLO Door and One Piece Cone Installation & Operator s Instruction Manual

57" Endura Flush Mount Fan

HS583 Sprocket Models- Curtain/Vent Machine

WET WALL. EvApORATIvE COOLINg SySTEm. 10" x 8" Tee INSTALLATION INSTRUCTIONS

Volume III (December 1995 to January 2007)

Cage Nipple Watering. Installation & Operator s Manual. warranty installation operation parts list maintenance

UNIVERSAL CUSTOMIZABLE MUD FLAP INSTALLATION INSTRUCTIONS

HS593 Feed Line Control Unit 230V Single Phase

Swivel Top Linear-Lift Installation & Operator s Instruction Manual

SUBMERSIBLE SUMP PUMPS

ALITA LINEAR AIR PUMP OPERATION & MAINTENANCE MANUAL. AL- Model Number Date Code / Serial Number Date of Purchase

36" Hyflo Retrofit Kit Installation & Operator s Instruction Manual

HALLMARK INDUSTRIES INC

SUBMERSIBLE SUMP PUMPS

48" and 52" Hyflo TM Un-Assembled Fans Assembly Manual

Swivel Top Winch Installation & Operator s Instruction Manual

Nipple Watering Installation & Operators Instruction Manual

Intended Use: Explanation of Signal Word Consequences

StormPro BA Series Sump Pump

57" Endura Flush Mount Fan

Dual Phase Extraction Inlet. Patent No Installation Manual. P/N Rev

Instruction Sheet SRSR SERIES. Rotating Sliding Rail System

Feeder Strap Winch. Part Number 54812

INSTALLATION INSTRUCTIONS

CRD610 Automatic Fitting Inserter

INSTALLATION INSTRUCTIONS

Matala. VersiFlow Series. Instruction and Maintenance Manual

Operating and Installation Instructions

HM860 FLOWMETER OPERATOR S MANUAL DO NOT USE OR OPERATE THIS EQUIPMENT UNTIL THIS MANUAL HAS BEEN READ AND THOROUGHLY UNDERSTOOD

PRE-PLUMBED SEWAGE SYSTEM

EASY CONNECT CRANE KIT Festoon Conductor Systems

CLEAN ROOM DEVICES, LLC "WHERE TUBING AND FITTINGS COME TOGETHER"

SAFETY INFORMATION & INSTRUCTION MANUAL

36" Hyflo Retrofit Kit Installation & Operator s Instruction Manual

ESE Series Cast Iron Sewage Pumps

GC-1. Roof and Gutter De-Icing Control Installation and Operating Instructions FOR EXTERIOR INSTALLATION ONLY

SEWAGE PUMP MODEL # Zoeller is a registered trademark of Zoeller Co. All Rights Reserved. Español p. 14

Adjustable Angled Incline Conveyor Owners Manual with Operating Instructions

1-BUTTON DISPENSER INSTALLATION INSTRUCTIONS

Model 8317 Combination Shower Eye/Face Wash

CRD600 Automatic Fitting Inserter

TBM Series 3-Way Ball Valve

Air Storm Fans AS-57EBDBP AS-57EBDBP-HE

Instruction Manual. Fudge Puppy Display Case

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS AND OWNER S MANUAL

GeyserMax-Flow Series

TABLE 1-1 GPM FLOW RATE PROPORTIONER, 1/4 I.D. TUBING Injection Rates For Viscosities Shown Metering Tip Color

idrive Power Cord Extender Installation Instructions MODELS: 3960M/3961S (1) 25 POWER CORD DRILL WITH 3/32 DRILL BIT

G8 Portable Fuel Transfer Pump Owner s Manual

PeroxiDraw Dispenser

Installation Instructions

GRINDER PUMP MODEL # Zoeller is a registered trademark of Zoeller Co. All Rights Reserved. Español p. 13

The 606T-2 unit is designed to be used as a spray or foam unit where up to two chemicals can be attached to the unit along with a clean water rinse.

CLEAN ROOM DEVICES, LLC "WHERE TUBING AND FITTINGS COME TOGETHER"

JOHN DEERE 9970 COTTON PICKERS

PEDESTAL SUMP PUMP. MODEL # Español p. 11. Zoeller is a registered trademark of Zoeller Co. All Rights Reserved.

450250/ ROOSTER WINCH Installation Manual

Universal Installation Instructions

Model 8346/8346CRP Shower & Eye/Face Wash

RAM 1500, 2019 CLASSIC & 2010-ON 2500/3500 INSTALLATION INSTRUCTIONS

Installation, Operation & Maintenance Manual. For Pro-Fill kits with part numbers beginning in BG

Installation Instructions

General Medium Duty KLM C&C 2-Stage Rear Air Suspension Installation Instructions

S33 Sump Pump INSTRUCTIONS AND SERVICE MANUAL VERTICAL FLOAT SWITCH S33V1 & S33V1C AUTOMATIC S33P1 & S33PC-1 (CONTROL WITH SERIES PLUG) NOT SHOWN

TECHNICAL ASSISTANCE TOLL FREE TELEPHONE NUMBER TECHNICAL ASSISTANCE FAX:

DEMA BLEND CENTER MODELS: 633GAP INSTALLATION INSTRUCTIONS

Pressurized Bead Filters

Installation Instructions

Operating Instructions and Parts Manual AHR-50 Auto Rewind Hose Reel

Transcription:

Turbo-Cool Stand-Off " Recirculating Evaporative Cooling Installation & Operator s Instruction Manual MV-00 June 00

Chore-Time Warranty " Recirculating Evaporative Cooling Chore-Time Warranty Chore-Time Equipment ( Chore-Time ) warrants each new Chore-Time product manufactured by it to be free from defects in material or workmanship for one year from and after the date of initial installation by or for the original purchaser. If such a defect is found by the Manufacturer to exist within the one-year period, the Manufacturer will, at its option, (a) repair or replace such product free of charge, F.O.B. the factory of manufacture, or (b) refund to the original purchaser the original purchase price, in lieu of such repair or replacement. Labor costs associated with the replacement or repair of the product are not covered by the Manufacturer. Conditions and Limitations. The product must be installed by and operated in accordance with the instructions published by the Manufacturer or Warranty will be void.. Warranty is void if all components of the system are not original equipment supplied by the Manufacturer.. This product must be purchased from and installed by an authorized distributor or certified representative thereof or the Warranty will be void.. Malfunctions or failure resulting from misuse, abuse, negligence, alteration, accident, or lack of proper maintenance shall not be considered defects under the Warranty.. This Warranty applies only to systems for the care of poultry and livestock. Other applications in industry or commerce are not covered by this Warranty. The Manufacturer shall not be liable for any Consequential or Special Damage which any purchaser may suffer or claim to suffer as a result of any defect in the product. Consequential or Special Damages as used herein include, but are not limited to, lost or damaged products or goods, costs of transportation, lost sales, lost orders, lost income, increased overhead, labor and incidental costs and operational inefficiencies. THIS WARRANTY CONSTITUTES THE MANUFACTURER S ENTIRE AND SOLE WARRANTY AND THIS MANUFACTURER EXPRESSLY DISCLAIMS ANY AND ALL OTHER WARRANTIES, INCLUDING, BUT NOT LIMITED TO, EXPRESS AND IMPLIED WARRANTIES AS TO MERCHANTABILITY, FITNESS FOR PARTICULAR PURPOSES SOLD AND DESCRIPTION OR QUALITY OF THE PRODUCT FURNISHED HEREUNDER. Chore-Time Distributors are not authorized to modify or extend the terms and conditions of this Warranty in any manner or to offer or grant any other warranties for Chore-Time products in addition to those terms expressly stated above. An officer of CTB, Inc. must authorize any exceptions to this Warranty in writing. The Manufacturer reserves the right to change models and specifications at any time without notice or obligation to improve previous models. Effective: June 00 Chore-Time Equipment A Division of CTB, Inc. P.O. Box 000 Milford, Indiana -000 U.S.A. Phone (9) 8-0 Fax (877) 70-88 Email: ctb@ctbinc.com Internet: http//www.ctbinc.com Thank You The employees of Chore-Time Equipment would like to thank your for your recent Chore-Time purchase. If a problem should arise, your Chore-Time distributor can supply the necessary information to help you.

Contents Topic Page User Chore-Time Warranty................................................ Support Information....................................................... General............................................................. DANGER: Electrical Hazard............................................ Technical Information................................................ Materials and Tools Required for Installation................................... Planning Information................................................. 7 System Layout:...........................................................7 Framing Information................................................. 8 Framing Continued........................................................ 0 Evaporating Cooling System Installation................................. Top Cover Support Bracket Assembly........................................ Right End Stand-Off Cover Installation....................................... Stand-Off Top Cover Installation (Notched)................................ Sump Back Support Brace Installation.................................... Stand-Off Bottom Brackets Installation................................... Trough Support x Installation........................................ Securing The Trough Support x Ends.................................. Sump Preparation........................................................ Sump Overflow Installation............................................. Sump End Tape Application................................................ 7 Sump Installation........................................................ 8 Trough Installation....................................................... 8 Trough Installation Continued............................................... 9 Sump End Insert Assembly................................................. 9 End Panel Installation..................................................... 0 Distribution Pipe Installation............................................... Pad Support Installation................................................... Caulking of End Panel.................................................... Evaporative Cooling Pad and Cover Installation................................ Cooling Pad and Cover Installation Continued.................................. Cooling Pad and Cover Installation Continued.................................. Trough End Insert Installation.............................................. 7 Sump Components Installation.............................................. 8 C,D C,D,I C,C,I C,I C,I I * Legend: C = Customer (end user), D = Distributor (sales), I = Installer of equipment

Contents - continued Topic Page User System Start-Up..................................................... 9 System Operation & Maintenance...................................... 0 Parts Lists and Kits.................................................. Turbo-Cool Pad Frame with Stand-Off Kit P/N -XX........................ Sump Kit Part No. 0.................................................. Distribution Kit Part No s. 8- and 8-0.............................. End Panel Kit Part No. 8 and Center Panel Kit Part No.................. Miscellaneous Components................................................ C,I C C,D,I

" Recirculating Evaporative Cooling General General Support Information The Turbo-Cool '' Recirculating Evaporative Cooling System is designed to help cool livestock and poultry houses. The system is shipped unassembled. Using this equipment for any other purpose or in a way not within the operating recommendations specified in this manual will void the warranty and may cause personal injury. This manual is designed to provide installation, operation, and parts listing information. The Table of Contents provides a convenient overview of the information in this manual. The Table of Contents also specifies which pages contain information for the sales personnel, installer, and consumer (end user). Safety Information DANGER: Electrical Hazard Ground all electrical equipment for safety. All electrical wiring must be done by a qualified electrician in accordance with local and national electric codes. Disconnect electrical power before inspecting or servicing equipment unless maintenance instructions specifically state otherwise.

Technical Information " Recirculating Evaporative Cooling Technical Information Materials and Tools Required for Installation Socket Wrench / /8, and 7/" Sockets Teflon Tape PVC Cement Utility Knife Saw Tape Measure Chalk Line Pressure Treated Lumber for Framing See Figure Required fresh water supply Outside Air Water Required in Gallons/Minute Temp in F % Relative Humidity Per 00 sq. ft. of Pad * 0 0. 0 0. 00 0. 00 0.9 00 0. 9 0. *Assumes 80% pad efficiency and fpm air velocity through pad Supply water pressure: 0-00 psi Water Quality: - 9 PH, salt concentration less than 0,000 ppm Pump Part No. Model HP Submersible Pump Options Electrical Specifications Start Run Volts HZ PH Amps Amps Maximum Pad Length 00 E-CIM / 0 0 7.8 0 No 98 9E-CIM /0 0 0 9 0 No 987 0E-CIM / 08/0 0 0 70 No 987 0E-CIM / 08/0 0 0 0 No Automatic Water Level Shut- Off Switch Important! Chore-Time Equipment strongly recommends that a good alarm system should be installed in confinement buildings to warn of power failure and high temperature. Chore-Time Equipment also recommends that an alternate power source be available for confinement buildings in case of power failure.

" Recirculating Evaporative Cooling Planning Information Planning Information System Layout: The Sump Assembly may be installed at either end of the system or in the middle. Maximum Length - 70' MV-00 Maximum length = 70 Figure. Optional Sump locations The maximum length of Cooling Pad on either side of the Sump Assembly is 70', if the cooling system is longer than 70' the sump must be installed in the middle of the system. The maximum amount of slope is -/"[8 mm] per system. The Sump must be level with, or lower than the rest of the trough. 7

Framing Information " Recirculating Evaporative Cooling Framing Information Figure shows two options for installing the cooling pad relative to the tunnel curtain and provides information for the Evaporative Cooling System opening with Sump on either end. See Figure for opening information for Evaporative Cooling System with Sump in the middle It is recommended to frame the Pad opening using treated lumber.. Determine the location of the bottom stringer. (See Figure, Item ) Use Wood or Lag Screws with Washers to secure the bottom Stringer to the Studs at a minimum of every ". The Lower Stringer must be capable of supporting 0 lbs/ft [ kg/m] plus lbs/ft [ kg/m] for each foot of Cooling Pad Height. Example: A ' Cooling Pad requires a Stringer capable of supporting 0 lbs/ ft + ( lbs/ft x ') = 8 lbs/ft.. Determine the location of the top stringer. See Figure, Item 8. The distance between the top and bottom stringers should be approximately -/'' [8 mm] less than the height of the Evaporative Cooling Pads. Note: Example: For a 0'' [ mm] tall Evaporative Cooling Pad the distance between the stringers would be 0'' [ mm] - -/'' [8 mm] = 8-/ '' [8 mm]. The slope (if any) of the top stringer must be the same as the bottom stringer.. Snap a chalk line on the lower stringer -/" below the top edge ( Figure, Item 9). This chalk line will determine the location of the lag screws for the Bottom Stand-Off Brackets.. Snap a chalk line on the top stringer at the locations specified in Figure, Item. This chalk line will determine the location of the Top Cover Mounting holes.. A short section of x lumber (Figure, Item 0) is required beneath the bottom stringer at the sump end to provide a back support for the sump assembly. 8

" Recirculating Evaporative Cooling Framing Information 7 8 9 0 7 9 9 7 9 8 9 0 MV-00 09/00 Curtain -/" [7 mm] Minimum Clearance -/" [9 mm] x [8 mm x 89 mm] Minimum Top Stringer Top Stringer Chalk Line Pad Height plus " [7 mm] 7 Pad Height plus " [8 mm] Maximum 8 Pad Height minus " [0 mm]minimum 9 Bottom Stringer Chalk Line 0 8" [0 mm] Pad Height Plus 9-/" [0 mm] Minimum -/" [9 mm] Minimum Width of Pad Bank x [8 mm x 0 mm] Sump Back Support -/" [ mm] Minimum Stud Spacing " [0 mm] Recommended 7 Wall Studs 8 9" [ mm] Minimum 9 x [8 mm x 89 mm] End Framing 0 " [ mm] for Trough End Insert x 8" [8 x 9 mm] Bottom Stringer Figure. Framing overview diagram (Sump at either end) 9

Framing Information " Recirculating Evaporative Cooling Framing Continued... MV98- /99 " [. mm] Minimum Clearance for Trough End Insert Cover this opening 8" [8 mm] / Total System Length rounded to nearest ' increment Remainder of Total System Length Total System Length plus 8" [8 mm] Note: See Figure for all other framing information Figure. Frame opening dimensions for Sump in middle 0

" Recirculating Evaporative Cooling Evaporating Cooling System Installation Evaporating Cooling System Installation Top Cover Support Bracket Assembly Use the /-0 hex flange nuts to attach two Top Cover Support Brackets to each Top Cover (See Figure Below). Top Cover Support Bracket /-0 Hex Nut Stand-Off Top Cover MV-008 08/00 Figure. Right End Stand-Off Cover Installation Identify the Right-End Stand-Off Cover. This Cover does not have a notch in the end of the cover. Beginning at the right end of the system, install the (Right-End) Top Stand-Off Cover ( Figure, Item ) with the right edge of the cover flush with the right edge of the framed opening, and the mounting holes in the Cover aligned with the chalk line on the top stringer (Figure ). Use three /" x -/" Lag Screws (Item ) to mount the Right-End Top Stand-Off Cover (Item ) to the Top Stringer through the first three mounting holes from the right end of the Cover. (Figure ) Edge of Cover Flush With End of Framed Opening MV-00 Figure. Right End Stand-Off Cover Installation Top Stringer Stand-Off Top Cover (Right End) Stand-Off Top Support Chalk Line End Framing / x -/" Lag Screws

Evaporating Cooling System Installation " Recirculating Evaporative Cooling Stand-Off Top Cover Installation (Notched) Attach a Notched Stand-Off Top Cover (Item, Figure ) to the top stringer with the hook on the end of the cover fully engaged with the Right End Stand-Off Cover. Use three /"x-/" Lag Screws to attach the Notched Stand-Off Cover to the Top Stringer through the first three mounting holes from the right end of the Cover (See Figure ). Repeat this process until all of the Top Covers are installed. Use two #0-/" Screws to close the gap between adjacent Stand-Off Top Covers (See Figure ). 7 Figure. Right End Stand-Off Cover Installation MV-0 08/00 Stand-Off Top Support Stand-Off Top Cover (Right End) Stand-Off Top Cover (Notched) #0-/" Screw /-0 Lag Screw Bottom Stringer 7 ChalkLine

" Recirculating Evaporative Cooling Evaporating Cooling System Installation Sump Back Support Brace Installation Install the Right Hand and Left Hand Sump Back Support Braces with the top mounting holes aligned with the Chalk Line and -/8" [7 mm], and -/" [98 mm] away from the inside edge of the framed opening respectively (See Figure 7). Use three / x -/ Lag Screws to fasten each Brace to the building with two Lag Screws in the top two holes in each brace. Stand-Off Bottom Brackets Installation Install the first Stand-Off Bottom Bracket (Item, Figure 7) with the top mounting hole 0" away from the edge of the framed opening and aligned with the Chalkline. Use two / x -/" Lag Screws (Item, Figure 7) to fasten each Bracket. Install the remaining Brackets, except for one, 0" apart and also aligned with the Chalkline. Install the last Bracket " beyond the inside edge of the framed opening and aligned with Chalkline (See Item Figure 7). 9 8 7 0 MV-00 Figure 7. Sump End Support Bracket Installation (Right) Sump Back Brace (Left) Sump Back Brace Stand-Off Bottom Bracket Chalk Line x Sump Back Support 0" [08 mm] Between Brackets 7 0" [ mm] 8 -/8" [79 mm] 9 -/" [98 mm] 0 x 8 [8 mm x 9 mm] Bottom Stringer /" x -/" Lag Screw Inside Edge of Framed Opening at Sump End End of Framed Opening Opposite Sump End " [0 mm]

Evaporating Cooling System Installation " Recirculating Evaporative Cooling Trough Support x Installation Mount the Trough Support x (Item, Figure 9) to the face of the Bottom Brackets. On the Sump End of the system the Trough Support x should extend " to "[7 mm to 0 mm] beyond the outer Stand-Off Sump Support Bracket ( See Item 7, Figure 9). Fasten thetrough Support x to the Sump Support Brackets and the Bottom Brackets with /" x -/" Lag Screws (Item, Figure 9). Use Lag Screws through the top and bottom Holes of the Bottom Brackets. At the end opposite the Sump the Trough Support x should extend " beyond the edge of the framed opening (Item, Figure 9). If necessary, trim the Trough Support x to length so that the seam between the adjacent x s is at least " [7 mm] away from each Bottom Bracket. 8 7 9 Stand-Off Bottom Bracket Trough Support x [8 mm x 0 mm] /" x -/" Lag Screw End Framing (Opposite End Of Sump) " [ mm] (Right) Sump Back Brace 7 x 8 [ mm x 9 mm] Bottom Stringer 8 "-" [7 mm - 0 mm] 9 (Left) Sump Back Brace MV-0 08/00 Figure 9. Trough Support Stringer Installation

" Recirculating Evaporative Cooling Evaporating Cooling System Installation Securing The Trough Support x Ends Align and secure the adjacent ends of the Trough Support x s with Connecting Brackets and two /" x -/" Lag Screws ( See Figure 0). The Connecting Brackets are required on top. If a Trough Support x is twisted, use a Bracket on bottom as well (See Figure 0). Two Connecting Brackets are provided for a seam every 0 [08 mm] on the Trough Support x Connecting Bracket /" x -/" Lag Screw Trough Support x Optional Connecting Bracket Optional Lag Screws MV-08 08/00 Figure 0. Securing Trough Support x Ends

Evaporating Cooling System Installation " Recirculating Evaporative Cooling Sump Preparation Determine which side of the Sump will need to be modified before installation. If the Sump is to be installed to the right of the Trough, the left side of the Sump will need to be cut at the indicated cut line. If the Sump is to be installed to the left of the Trough, the right side of the Sump will need to be cut at the indicated cut line. To install the Sump in the middle of the system, cut both /" Sump End Caps off the Sump (See Figure ). Decide which side of the Sump will be used for the drain and cut off that end. NOTE: Make cut for one drain only. Install the -/'' Drain Plug. 7 MV-008 07/00 Sump End Cap Cut Line Sump /" Sump End Cap Side of sump mounted to wall Optional Drain Plug Locations -/" Drain Plug 7 Drain Cut Line Figure. Cutting the Sump Sump Overflow Installation An Overflow can be installed on either side of the Sump in the location shown. To install an overflow, drill a /" [9 mm] hole in the location shown in Figure, and then tap the hole using a /- NPT tap. Apply teflon tape to a /" PVC Male Adapter and screw it into the tapped hole. /" PVC pipe can be routed from this fitting to a drain location if desired. Sump " Hole for Overflow Drain /" PVC Male Adapter MV-0 0/00 Figure. Cutting the Sump

" Recirculating Evaporative Cooling Evaporating Cooling System Installation Sump End Tape Application Place the " x " self adhesive tape on the Sump as shown in Figure. MV-08 0/00 Sump Foam Tape Figure. Sump End Tape Application Sump Support Assembly Use two /-0 x 7/8" Bolts (Item, Figure ) and two / x 0 Nuts (Item, Figure ) to mount the Sump Support to the Sump Back Braces as Shown. MV-0 0/00 Figure. Sump Support Assembly Sump Support Assembly (Left) Sump Back Brace (Right) Sump Back Brace /-0 x 7/8 Bolt /-0 Nut 7

Evaporating Cooling System Installation " Recirculating Evaporative Cooling Sump Installation Align the two /'' holes in the rear of the Sump with the two /" holes in the Sump Support. Attach the Sump to the Bottom Stringer with the two /x-/" Lag Screws and Washers. The Lag Screws should line up with the chalk line on the Botton Stringer and the edge of the Sump should line up with the edge of the framed opening (See Figure Below). 7 9 Figure. Mounting the Trough MV-00 07/00 8 Sump Support Trough end of Sump Sump Edge of framed opening Bottom Stringer Chalk Line / x -/ Lag Screw 7 Washer /" x " 8 x Sump Back Support 9 Cable loop Trough Installation Unroll the Trough and orient it with the top holes offset to the left of the bottom holes, and with the creases at the top (See Figure ). At the Sump End cut two, " slits in the Trough and bend the Trough at the two creases as shown in Figure. Hang the Trough from the Trough Support x beginning with one end of the Trough material against the Sump, and the top holes in the Trough aligned with the Chalk Line. The top holes in the Trough and the Chalk Line mark the location for the Trough Supports. Use the / x -/" Lag Screws to attach the Trough Supports and Trough to the Trough Support x as shown in Figure. Be sure the creases are formed in the Trough before mounting it to the x. Wipe the inside of the Trough at each end to remove debris that may prevent sealing. 8 7 0 MV-0 0/00 Sump Chalk Line Trough Support x Trough Support / x -/" Lag Screw Top Holes Offset to Left of Bottom Holes 7 " Slits cut for Clamp Straps 8 " 9 " 0 Trough 9 8 Figure. Mounting the Trough 8

" Recirculating Evaporative Cooling Evaporating Cooling System Installation Trough Installation Continued... Form the Trough into a "U" shape as shown in Figure 7 and hook the holes, in the front of the Trough, over the /" studs in the Trough Supports. Use the /" Hex Washer Nuts to secure the front of the Trough to the Trough Supports. Repeat the process for each Trough Support.. Trough Support x /" Stud Formed Creases in Trough Trough Material / Hex Washer Nut Trough MV-07 Figure 7. Forming the Trough Sump End Insert Assembly Slide the Sump End Insert Into the Slit in the Sump. Route the Clamp Strap through the " slits cut in the Trough as shown in Figure 8.. 7 Sump End Insert Sump /" x -/" Clamp Bolt -/" Clamp Nut Trough Clamp Strap 7 " Slit Figure 8. Sump End Insert Assembly MV-00 0/00 9

Evaporating Cooling System Installation " Recirculating Evaporative Cooling End Panel Installation Install the End Panels flush with the inside of the opening (at both ends).. Locate the top mounting hole (in the flange of the Upper End Panels) on the chalk line. This will properly align the hole for the Distribution Pipe with the Pipe Hangers (See Figure 9). Secure the Upper End Panels to the top stringer using the #0 x -/'' Screws, as shown in Figure 9.. Use #0 x /" Screws (Item, Figure 9) to attach Upper End Panel to Top Cover.. The Lower End Panels should overlap on the outside of the Upper End Panels to provide proper watershed.. Align mounting holes in the upper and lower end panels and secure the end panels to the frame using the #0 x -/'' Screws (Item, Figure 9). Chalk Line on top stringer 0 x -/'' S.S. Screw Upper End Panel Lower End Panel Notched Standoff Top Cover #0 x /" Screw MV-0 Figure 9. End Panel Installation 0

" Recirculating Evaporative Cooling Evaporating Cooling System Installation Distribution Pipe Installation. Set a Distribution Pipe on the Pipe Hangers above the inlet end of the Trough. Note: The belled end must be away from the sump end (See Figure 0).. Assemble the Distribution Pipes by inserting the straight end of one pipe into the belled end of another. It is not necessary to glue the Distribution Pipes together. IMPORTANT: The spray holes, in the Distribution Pipes, MUST all be aligned and pointing straight up.. Verify that the spray holes are in alignment, then install a #0 x /'' S.S. Screw at each bell to secure the pipes together.. At the Sump End of the system the Distribution Pipe should extend 8"[0. cm] beyond the edge of the End Panel (See Item 9, Figure 0). The Pipe should extend past the opposite end End Panel.. Install a / x /'' Screw in each spray hole that falls outside the End Panels (at either end).. Bleed-Off Valve and sediment trap installation: At the end of the Distribution Pipe, opposite the sump end, install the PVC fittings as shown in Figure 0. Use two pieces of -/" PVC pipe cut "-" long. For systems with the Sump in the center of the system, Bleed-Off Valve fittings are installed only at one end of the Distribution Pipe. 7. Bleed-Off Hose: Route the Bleed-Off Hose (Item 8, Figure 0)to a drain for waste water. Do not run the Bleed-Off Hose back into the Trough. 0 0 9 7 MV98-0 /00 Figure 0. Distribution Pipe Installation 8 7 8 #0 x /'' S.S. Screw ' Distribution Pipe -/'' Mechanical Gripper Plug Framing Upper End Panel (R.H) Upper End Panel (L.H.) 7 Lower End Panel (R.H.) 8 Lower End Panel (L.H.) 9 8" [0. cm] Approximately at Sump End 0 / x /" Screw " x -/" PVC Tee -/" PVC Pipe Sediment Trap Adapter, " PVC SPIG x FIPT Plug " PVC MPT Bushing Reducer -/" x /" /" Water Bleed-off Valve 7 Hose Barb Cap 8 /" Bleed-off Hose

Evaporating Cooling System Installation " Recirculating Evaporative Cooling Pad Support Installation Set the Pad Supports on the Trough Supports, as shown in Figure. The front edge of the Trough should be captured inside the cavity on the front of the Pad Support. Butt the Pad Supports end to end, beginning at one End Panel. It may be necessary to trim the length of the last Pad Support. The Pad Supports should extend to both End Panels. Note: Sump components and End Panels not shown for clarity. MV-00 08/00 Pad Support Pad Supports butted together Trough Front Edge of Trough Figure. Pad Support Installation

" Recirculating Evaporative Cooling Evaporating Cooling System Installation Caulking of End Panel Fill the joint at the rear of each end panel with caulking (not supplied) as shown in Figure Below. MV-00 09/00 Figure. Caulking of rear joint of end panel

Evaporating Cooling System Installation " Recirculating Evaporative Cooling Evaporative Cooling Pad and Cover Installation Beginning at one end, set the Evaporative Cooling Pads on the Pad Supports (See Figure ). The top of the Pads should be against the Splash Plate and directly below the Distribution Pipe. Make sure the Pads are properly oriented. MUNTERS and GENERAL SHELTERS Pads: Refer to the directional arrows on the side of the pads. GLACIER COR Pads: May have a black stripe which indicates the bottom end of pads and the air inlet side of the pads. If no stripe is present, refer to Figure to determine the proper pad orientation based on the direction of the pad flutes vs. direction of incoming air flow. Make sure the first pad is against the End Panels. Push Pads tightly together and keep as vertical as possible. Munters Pad and General Shelters Glacier Cor Pad Figure. Pad Installation MV98-7/98 MV8- /9 Figure. Pad Orientation (cut-away view of side of Pad)

" Recirculating Evaporative Cooling Evaporating Cooling System Installation Cooling Pad and Cover Installation Continued... Set the Covers on the Pipe Hangers, as shown in Figure, Step. Slide the Cover Locks onto the Pipe Hangers, as shown in Figure, Step. If a hole in the Distribution Pipe aligns with a seam between covers install a Jet Deflector over the hole as shown in Figure. Repeat steps - until all the Evaporative Cooling Pads are installed. The Covers should butt end to end. The Evaporative Cooling Pads may be trimmed as required using a handsaw, to fit inside the End Panels. MV98-9 0/99 Jet Deflector Distribution Pipe Cover Figure. Jet Deflector Step Step MV8- /9 Figure. Cover and Cover Lock Installation

Evaporating Cooling System Installation " Recirculating Evaporative Cooling Cooling Pad and Cover Installation Continued... If the last Cover is too long, trim the Cover as shown in Figure 7 and overlap it with the previous Cover. Use () 0x/" Screws to join the Covers together. Figure 7. Cover Trimming and Assembly Required Length of last Cover ''( cm) Cutting line #0 x /'' Screw Cover

" Recirculating Evaporative Cooling Evaporating Cooling System Installation Trough End Insert Installation On the Trough end opposite the Sump, cut off the Trough leaving "-" of Trough extending beyond the End Panel. Assemble the Trough End Insert assembly as shown in Figure 8. Be sure the Insert is centered on the Clamp Strap before tightening the Clamp Bolt. Install two #0 x /" Screws through the Clamp Strap into the Trough as shown in Figure 8. Be sure the Screws are on the exterior side of the Trough End Insert. Screw the Trough to thetrough Support x using a /"x-/" Lag Screw and a /"x " Washer (Items and, Figure 8). 9 9 /" x -/" Clamp Bolt " Slit in Trough Trough End Insert Trough /" x " Washer /" x -/" Lag Screw 7 Trough Support x 8 /8" Rubber Edge Trim 9 Clamp Strap 0 #0 x /" Screw "-" Trough beyond End Panel -/" Clamp Nut 0 7 8 Figure 8. Trough End Insert Installation 7

Evaporating Cooling System Installation " Recirculating Evaporative Cooling Sump Components Installation Assemble the Sump Components as shown in Figure 9, beginning at the Pump. The lengths of -/'' PVC Pipe Item will vary depending on desired Valve height, pad height, etc. Use teflon tape on threads as required. Use PVC glue on slip connections. Attach an electrical plug (if not supplied) to the Sump Pump electrical cord. Note: Sump in Center For pumps with water level safety switch make sure the vent hose inside the electrical cord is not obstructed. Flush all dirt from the water supply lines. Install the Garden Hose to the water supply and connect to the inlet on the Sump. Sump on End 7 9 7 9 8 8 9 0 9 MV98- /00 0 -/ x x '' PVC Tee 0 Sump Pump Adapter, " PVC Sump Plug " PVC Pipe MPT -/'' Mechanical Gripper Plug -/" Union Garden Hose to /" Pipe Adapter Water Level Adj. Hose Clamp Water Supply Inlet Hose -/'' PVC Pipe Sump Water Inlet 7 Strainer 8 -/'' Ball Valve 9 -/'' PVC Adapter Figure 9. Distribution Pipe Installation 8

" Recirculating Evaporative Cooling System Start-Up System Start-Up. Partially fill Trough with water.. Flush dirt and debris from the Trough by removing the Sump Drain Plug.. Refill system with water. With the Hose Clamp loose, raise/lower the /" Pipe to adjust the Initial Water Level. Check that the Float Ball is not rubbing against the side of the Sump. The Initial Water Level should be " -" below the Mounting Screws in the back of the Sump. Retighten the Hose Clamp. ( See Figure 0. Below) 8 7 "-" Initial Water Level PVC Float Valve Hose Clamp /" PVC Pipe Sump 7 Sump Mounting Screws 8 Float Ball 9 Figure 0. Adjusting Initial Water MV-0 09/00 After the system runs for a while and turns off the water level will rise.-.0'' above the level it was initially set at.. Open the valve in the pump discharge pipe.. Flush dirt and debris out of the Distribution Pipe by running the Pump with the -/" Pipe Plug removed from the end of the Distribution Pipe. Replace the -/"' Pipe Plug.. With the Sump Pump running, adjust the -/" Ball Valve so the height of the water jets is " to " [0 mm to mm] above the top of the Distribution Pipe. 7. If bleed-off is to be used, Adjust the Bleed Off Valve to a flow rate of 0. gpm per 00 sq ft. of Evaporative Cooling Pad. The correct amount of bleed-off depends on the amount of minerals and chemicals in the water. The bleed off rate can be adjusted over time, but should be maintained high enough to prevent mineral deposits from accumulating on the face of the Evaporative Cooling Pad. 9

System Operation & Maintenance " Recirculating Evaporative Cooling System Operation & Maintenance. Reduce the mineral and chemical build-up in water by; a). Bleeding water off the system. Begin by adjusting the Bleed-Off Valve to drain. gpm/00 sq ft. of Cooling Pad while the Pump is running. Increase the bleed-off rate if minerals build up on the face of the Cooling Pad b). Draining all the water from the system once a week during operating season. Increase the frequency if minerals build up on the face of the Cooling Pad.. Shade the pads as much as possible to minimize algae growth.. Allow the pads to dry out completely once every hours to kill algae.. Reduce the number of times the pad is wetted and dried out each day to maximize pad life.. Clean the strainer regularly to maintain a sufficient supply of water to the pads.. Periodically check the jets of water from the top of the Distribution Pipe. The jets should spray approximately " to " [0 mm to mm] straight upward. 7. Keep the Distribution Pipe holes free of debris. Use a /" drill bit to clean plugged holes. Clogged holes may cause dry streaks and lead to clogging of the pad. 8. Every three months, the entire water system should be drained, disinfected and flushed to help prevent algae growth. 9. Regularly flush the Distribution Pipe by removing the.'' plug at the end of the sediment trap (See Item, Figure 9) and allowing the pump to run. 0. Periodically, gently hose and brush deposits from the face of the pads.. Completely drain the system for winter storage. Remove the Sump Drain Plug. Remove the Pump.. Avoid contaminants such as dust, fertilizers, and harsh cleaners.. The ph of the water being circulated through the system should be maintained at between and 9 to prevent premature pad softening.. Check that Cooling Pads are installed correctly (See Figure and ). Periodically check and clean the Screen on the inlet of the Water Float Valve. If the Water Float Valve fails to shut off the flow of water, disassemble and clean the valve. Check that the holes in the center of the Valve Diaphragm and Housiing are not plugged with debris. 0

" Recirculating Evaporative Cooling Parts Lists and Kits Parts Lists and Kits Turbo-Cool Pad Frame with Stand-Off Kit P/N -XX 7 9 8 0 8 9 0 7 MV-00 08/00 Item Part No. Description 79 Connecting Bracket 98 /-0 Hex Nut /--/ Lag Screw 8 8" Stand-Off Bottom Bracket 8 Notched Stand-Off Top Cover 8 Right End Stand-Off Top Cover 7 80 Turbo Cool Trough Hanger 8 87 8" Sump Back Stand-Off Brace 9 97 Wire Pipe Hanger 0 8 Cover Lock Turbo Cool Pad Support 8 " Evap. Pad Cover 8 #0 x / Hex Hd Screw 8- Lower Right End Stand-Off EndPanel 8- Lower Left End Stand-Off EndPanel Item Part No. Description 8- Upper Right Stand-Off End Panel 7 8- Upper Left Stand-Off End Panel 8 Jet Deflector 9 " x PVC Distribution Pipe 0 877 -/ x ' PVC Pipe 8 Stand-Off Top Support 9 / x / SHML Screw

Parts Lists and Kits " Recirculating Evaporative Cooling Sump Kit Part No. 0 7 7 7 7 7 9 8 0 8 9 9 8 0 7 0 7 8-00 7/00 Part No. Qty Part No. Qty /'' Black Bleed Off Hose - 9 Trim, /8" Rubber Edge 0- Hose Barb Cap 0 -/'' Union 00 /'' Bleed-off Valve 9 Insert,Sump End 00 -/" x /'' Reducer Bushing 87 Insert, Trough End 09 -/ x " x " PVC Tee 7 Strap, Insert Clamp 00 -/" PVC Tee 88 Sump Support 7 Hose Plug " PVC MPT 79 8 Garden Hose to /" Pipe Adp. 0 Adapter " PVC Spig x FIPT 78 9 -/" Drain Plug 87 7 Bolt, /-0 x -/ 0-0 Turbo Cool Sump 9 8 -/" Clamp Nut 9 -/" SS Hose Clamp 9 Screw, / x -/ Lag Ball, Float 98 0 Washer, / x 9- -/ x " Foam Tape 708- Valve,PVC Float 989 Cable, loop 9" 0 Nut, /-0 S.S. 7 -/" PVC Adapter 87 Rod, Float " 0 -/" PVC Valve 09 Adapter, /" PVC Female 80 7* -/ x ' PVC Pipe 877 Adapter, /" FS x FGHT 0 8 Strainer 87 Pipe, /" x 9-/" PVC 7- * The ' PVC Pipe is not supplied with the Sump Kit (Part No. 0). It is included with the End Panel Kit (Part No. 8).

" Recirculating Evaporative Cooling Parts Lists and Kits Distribution Kit Part No s. 8- and 8-0 7 8 MV98-0/99 Part No. Qty ' Qty 0' x ' Distribution Pipe Cover Lock 8 8 Pipe Hanger 8 8 Trough Support Splash Plate 87 Pad Support 7 Evaporative Pad Cover 8 8 Jet Deflector -- / x -/'' SS Lag Screw -- 0 x -/'' SS Screw 70 -- 0 x /'' SS Screw 8 -- /" Drive Rivet 97 *The 8- Distribution Kit includes appropriate components for a ' evaporative cooling line. The 8-0 Distribution Kit includes components for a 0' evaporative cooling line.

Parts Lists and Kits " Recirculating Evaporative Cooling End Panel Kit Part No. 8 and Center Panel Kit Part No. 7 9 8 0 MV-00 07/00 Quantity Part No. End Panel Kit Center Panel Kit Evap. End Lower Panel (L.H.) 87- Evap. End Upper Panel (L.H.) 8- Evap. End Upper Panel (R.H.) 8- Evap. End Lower Panel (R.H.) 87- x ' Distribution Pipe ---- -/ x ' PVC Pipe 877 ---- 7 End Panel Support 9 8 " x " x -/" PVC Tee 7 ---- 9 -/" Drain Plug 87 ---- 0 x " Foam Tape 708- ---- Insert, Trough End 09 ---- Insert, Sump End 0 ---- Strap, Insert Clamp 00 ---- Nut, /-0 Special 9 Bolt, /-0 x -/ 0- ---- Trim, /8" Rubber Edge 0- ---- -- 0 x /'' SS Screw 8 * ---- -- 0 x -/'' SS Screw 70 * 8 -- / x -/'' SS Lag Screw 7* ---- -- /" Drive Rivet 97 ---- -- / x /" Screw 9 * ---- *Includes at least extra pieces to cover any lost hardware.

" Recirculating Evaporative Cooling Parts Lists and Kits Miscellaneous Components MV-0 07/00 Part No. Pump (see chart on page ) ----------- * PP Black Trough " inside with holes 0-X Cooling Pads: Munters Celdek / " x " x foot " x " x foot " x " x foot " x " x foot ** Cooling Pads: Glacier Core / " x " x foot " x " x foot " x " x foot " x " x foot Cooling Pads: General Shelters / " x " x foot " x " x foot " x " x foot " x " x foot Cooling Pads: Munters Mi-T Cool / " x " x foot " x " x foot " x " x foot " x " x foot 8-8- 8-8- 87-87- 87-87- 89-89- 89-89- 87-87- 87-87- Part Numbers listed are for pads with coating on inlet side, shipped from Milford *Round up to the nearest ' Trough lengths are available from ' to 0' Example: 0-00 is a 0' roll of Trough, 0-0 is a ' roll of trough. **Add a "D" to the part number (xxxxx-d) for drop shipped pads Add a "N" to the part number (xxxxx-n) for pads without coating on the inlet side Add a "B" to the part number (xxxxx-b) for pads with coating on the inlet and bottom side of the pad

Parts Lists and Kits " Recirculating Evaporative Cooling Made to work. Built to last. Revisions to this Manual Page No. Description of Change Contact your nearby Chore-Time distributor or representative for additional parts and information. CTB Inc. P.O. Box 000 Milford, Indiana -000 U.S.A. Phone (9) 8-0 Fax (877) 70-88 E-Mail: ctb@ctbinc.com Internet: http//www.ctbinc.com Printed in the U.S.A.