Smart Switch Basic Kit - 24 volt ( ) Wiring Instructions

Similar documents
Deluxe High Amp Switch Kit - 12 Volt Wiring Instructions

Smart Switch with External Switch - 12 volt - ( )

Superwinch 12 Volt Smart Switch w/ Wireless Remote Kit Installation Instructions

Pulltarps Tower with Electric Drive

Steel Protector, 7 Aluminum Windguard, 9 Open & Steel Protector Plus w/electric Drive Conversion Kit Installation Instructions

Universal Super Shield & Ultimate Aluminum w/electric Drive Conversion Kits , , Installation Instructions

MIC210 Electric Farm Conversion Instructions

2000 lb WINCH. Instruction and Operation Manual

FARM MODEL INSTALLATION INSTRUCTIONS

Compact Triple Electric Step OWNERS MANUAL

FOR New Electric Kit and Remote Control Installation

The shifter can be mounted directly to the floor with the four sheet metal screws supplied.

National Marine Manufacturers Association Product Compliance Specialist Examination D.C. Electrical (2013 MY) ABYC E-11 (08 Amended 09)

Combine Cover Manual

Combine Cover Manual

AUXILIARY BATTERY BOX INSTALLATION INSTRUCTIONS

Designed for 2014 and newer 1500 Series and 2015 and newer Heavy Duty GM Silverado/Sierra Double Cab vehicles

650 Series Cargo Van Lift Mounting Instructions Fullsize Ford 1992-Present

Patriot. Aluminum and Steel 5spring. Step #1 Tarp Spool with Gear Motor (Includes Instructions for Optional Wind Deflector)

AUTO CHARGE 12HO-PIM AUTOMATIC BATTERY CHARGER

Slope Detector IV Installation Instructions

650 Series Cargo Van Lift Mounting Instructions Ford Transit (Standard Roof) 2015-Present

Cantilever Series Mounting Instructions Ram Promaster Extended Body (AH) Present

P Original Series Cargo Van Lift Mounting Instructions Fullsize Ford Van present. Preparing the Gate

Cantilever Series Mounting Instructions Fullsize Sprinter Van (US) WB (AB) present

and Original Series Pickup Lift Mounting Instructions Fullsize Nissan Titan Trucks present T-420 BOLT-ON GUSSET PART#5257

ONE TOUCH CONTROL BOX

HP10098 BASIC INDEPENDENT AIR SPRING ACTIVATION KIT

INSTRUCTION, GPT LOW VOLTAGE THERMAL SWITCH (LVTS) INSTALLATION KIT P/N

ONBOARD AIR HOOKUP KIT

INSTRUCTIONS. w w w. h d o n l i n e s h o p. d e SPRINGER AUXILIARY LAMP KIT 1WARNING -J03497 REV General.

Cantilever Series Mounting Instructions Chevy Express (AD) present

THE LIFTER OPERATION AND MAINTENANCE MANUAL Valley Drive, Rock Valley IA Ph: Fax:

Battery Products. Call or Fax:

Installation Instructions: Read these instructions in its entirety before performing any installation work.

AUTO CHARGE 11HO PIM AUTOMATIC BATTERY CHARGER

and Original Series Pickup Lift Mounting Instructions Fleetside Chevy & GMC Trucks Fleetside 4-door Chevy & GMC Trucks T-100

AEROMOTIVE Part # INSTALLATION INSTRUCTIONS

JODALE PERRY. Parts List & Mounting Instructions. Jacobsen HR9016 JDP BUILT FOR LIFE

240V UPS Typical Installation Guide

Technical Service Bulletin

Thunder Power Tarp Kit Operation. Dual Arm Curb Side Stowing Single Arm Curb Side Stowing Flex Arm Curb Side Stowing.

and Original Series Pickup Lift Mounting Instructions T-150-T T-150 PART#5177 T-150-T

and Original Series Pickup Lift Mounting Instructions Fullsize Chevy & GMC Trucks: 1500 & 2500 LD HD & 3500HD BOLT-ON GUSSET

! DANGER Lb. Winch Mounting Instructions. Tools required: Before You Start. Assembly Instructions. General Information. Manual No.

Cantilever Series Mounting Instructions Fullsize Sprinter Van (US) All except WB (AA) present

PARTS LIST WRANGLER 26-VS

ALTERNATOR PRECAUTIONS. Some precautions should be taken when working on this, or any other, AC charging system.

AGRI-COVERTM SWITCH CONTROL INSTRUCTIONS

INSTRUCTIONS. w w w. h d o n l i n e s h o p. d e ENGINE GUARD-MOUNTED FOG LAMP KIT 1WARNING -J02798 REV Installation.

Thank you for your interest in the Copper Battery Terminals through the farm magazine.

PARTS LIST CHAMP 2929

PARTS LIST STALLION 8 SC

Quick Install Lift AL065 Installation Guide & Owners Manual

AUTO CHARGE 12 DV AUTOMATIC BATTERY CHARGER

3094PM1ii (Model VS-24-11) & 3094PM4ii (Model VS-24-9)

LED Driving Light Set For 2014 & Newer Can-Am Spyder RT # CA006-RT

INSTRUCTION, LVTS KIT, GPTLR KIT P/N

Replacing a Gun RTD. Instruction Sheet P/N B. 1. Introduction. Using this Instruction Sheet

Gas Spreader PLUS Remote Kit With Built in Clutch Relay and On/Off Switch

RU SERIES UPGRADE TempAssure Compatible

INSTALLATION INSTRUCTIONS FORD POWERSTROKE PICKUPS MODEL YEAR

PARTS LIST WRANGLER 2625 DB

circuit protection & wiring accessories

Heavy Duty Copper Battery Terminals

MOTOALLIANCE WINCH MOUNT

INSTALLATION INSTRUCTIONS Auto Level Compressor Kit IMPORTANT NOTES


Electrical. Hardware & Fastening Solutions. Battery Supplies. J-Case Fuses - Regular... Page 162

HP10134 & HP10135 KITS BASIC SIMULTANEOUS AIR SPRING ACTIVATION KIT

6500DC Dual Motor Wireless Controller Kits

Inverting Fault Circuit Breaker Kit for FlexPak 3000 and WebPak 3000 Digital DC Drives VAC and VAC

circuit protection & wiring accessories

Grout Pump Automatic & Manual Troubleshooting Gas Wiring Diagram

Your Legal Fuel Tank Source.

JOHN DEERE GATOR SWITCH PANEL INSTRUCTIONS FITS 1GTRXUV2 AND 1GTRXUV4 CABS (p/n: 1XUVSP)

INSTALLATION INSTRUCTIONS

Kwikee Revolution Step Series

PRO RATCHET UNIVERSAL SHIFTER

A) 8 Pin Female. CUSTOMER WIRING INSTRUCTIONS TO SUIT : Ford EL Manual Universal Instructions

Installation Instructions

Technical Support (707)

Cantilever Series Mounting Instructions Ford Transit OTHER THAN Extended Body (AF) present

INTERLIFT. ILF INSTALLATION MANUAL & CHECK-OFF SHEET Rev. 1.2, Date

LGT-306L / LB Club Car Precedent LED Light Bar Bumper Kit Installation Instructions

Installation Manual. Model 300SS-M. Moisture Only Kit for Small Square Balers 300SS-16-INST-M 3/17 1

Accessory Harness & Bracket Kit

INSTRUCTIONS, NISSAN TITAN TRUCK INSTALLATION KIT (C2 PICKUP LIFTGATES)

INSTALLATION AND USER MANUAL

Ford C4 and C6 Floor Mount Automatic Transmission Shifter Installation Instructions

SELF DRILL SCREWS FILLER STRIP

PARTS LIST WRANGLER 2625 DB

Series 1000 and Figure NOTE: The top terminals are showing normally closed at rest and the middle terminals are normally

ELECTRIC BEDROOM SLIDEOUT SYSTEM OPERATION AND SERVICE MANUAL

TRAIL CHARGER with EXTENDER and COMBO NOSE BOX

WRANGLER 2016 WHEEL DRIVE, PAD ASSIST & ELECTRIC MODELS

This is to be wired to the start position on the ignition switch. If using an Automatic gearbox, wire this up through the inhibitor switch first.

BOLT-ON AND WELD-ON FLUSH FLOOR SLIDEOUT SYSTEMS OPERATION AND SERVICE MANUAL

Installation Instructions QUICKSILVER CONSOLE SHIFTER Fits: Chevelle / El Camino

Installation Instructions

Transcription:

Smart Switch Basic Kit - 4 volt (54-08) Wiring Instructions NB 8/0/ 6 ga. wire 6 ga. wire 6 ga. wire OUT IN 6 ga. wire Yellow Black Blue 50 AMP BREAKER MOTOR 6 ga. wire 6 ga. wire 6 ga. wire ROCKER SWITCH (IN CAB) 607-09 404 N. Marshall Ave, El Cajon, CA 900 For Technical Assistance Call Toll Free: (800) 368-3075 Section - Page

Step. Run the 6 ga. wire to both locations (motor & battery box) and attach to truck body as shown in Fig.. Note: The wire must go beyond the pivot point. Pivot Caution: Make sure wire does not get pinched at the pivot. Fig. Step. Attaching The Connectors (Motor) A. Split the molded 6 ga. wire approximately 4 and strip the ends about 5/8 down. 5/8 B. Attach connectors (part # 54-0308) and crimp (Fig. ). C. Attach black wire to Terminal # on motor (Fig. 3). D. Attach red striped wire to Terminal # on motor (Fig. 3). Fig. Fig. 3 Section - Page

Step 3. A. Locate the Solenoid in a ventilated area near the battery. Mount using the self drilling screws (part # 506-9904). Black Terminal Boot (part # 54-0337) 5/8 B. Split the 6 ga. wire at the solenoid about 4 back and slip on rubber boots - Red Boot (part # 54-0336) on red striped wire and Black Boot (part # 54-0337) on black wire (Fig. 4 & 5). C. Strip wire about 5/8 and attach connectors (part # 54-038) (Fig. 4). Crimp Connectors. D. Attach Red to IN and Black to OUT on Solenoid Fig. 4 (Fig. 5). Fig. 5 Do not over tighten nuts on Solenoid! Part # 506-9904 Black Wire Red Terminal Boot (part # 54-0336) Step 4. Run 6 ga. Wire to Cab from solenoid Green Wire A. Mount Switch Bracket (part # 54-9954) in a convenient place in cab using the two self drilling screws (part # 506-9904). B. Strip wire in cab about /4 and attach push on connectors (part # 54-03) and crimp (Fig. 6). C. Pull wire through Switch Bracket (part # 54-9954) (Fig. 6). D. Attach wire to Rocker Switch (part # 54-07) (Fig. 6). Green to Center Black to Top White to Bottom E. Snap Rocker Switch firmly in Switch Bracket. White Wire Part # 506-9904 Fig. 6 3 Strand Wire Section - Page 3

BATT+ Step 5. Attaching Switch Wires to Solenoid A. On the black and white wires only, strip ends about /4 and attach push on connectors (part # 54-03). B. On the green wire, strip end about /4 and attach connector with /4 eyelet (part # 54-030). C. Attach Black to YELLOW on Solenoid (Fig. 7). Attach White to BLUE on Solenoid (Fig. 7). Attach Green to BATT+ on Solenoid (Fig. 7). YELLOW BLUE Fig. 7 Step 6. Connecting the Solenoid to the Battery BATT+ A. Cut a length of wire to run between the battery and the solenoid. B. Split wire about 4 down and strip ends about 5/8. Slip on Red Boot (part # 54-0336) on Red Striped Wire and Black Boot (part # 54-0337) on Black Wire as done in Step 3. C. Attach Connectors (part # 54-038) and crimp to wires. D. Attach Red Striped wire to BATT+ on Solenoid, and tighten nut (Fig. 8). E. DO NOT attach Black wire to BATT- on Solenoid at this time. Fig. 8 Section - Page 4

Step 7. Hooking up the Breaker A. Mount the Breaker in the Battery Box away from moisture and so that it won t short out on the battery lid or terminals. B. Split a section of the 6 ga. wire that runs from BATT+ on the Solenoid to the Breaker as needed. C. Cut and then strip ends of the Red Striped Wire about 5/8 and attach the #0 terminal ends (Part # 54-0307) only to the Red Striped Wire. D. Attach to Breaker. The breaker is marked Load at the Solenoid end and Line at the Battery end. Warning: Failure to install properly will void warranty on motor and other parts. Fig. 9 6 ga. #0 terminal ends Part # 54-0307 Step 8. Attaching Jumper Jumper (part # 54-99) A. Attach the Jumper (part # 54-99) as shown (right). Push the female spade connector on to the BLACK terminal. Connect the /4 eyelet to the BAT - post on the solenoid. B. Attach the black 6 ga. wire (from battery) over the Jumper. Tighten the nut down and cover with the black terminal boot as done in previous steps. Fig. 0 Section - Page 5

Step 9. Hooking up the Battery A. Split the 6 ga. wire that runs from BATT+ and BATT- on the Solenoid about 4. B. Strip the ends about 5/8 and attach the 3/8 connectors (part # 54-0309), crimp to wires. C. Attach Red Striped wire to Positive Terminal on Battery (Fig. ). Attach Black wire to Negative Terminal on Battery (Fig. ). Note: If the system operates backwards, reverse the connections on the motor. Black wire to BATT- Solenoid Part # 54-0309 Part # 54-0309 Fig. Section - Page 6

Smart Switch Basic Kit (Part # 54-08) 3 Black 5 4 Red 6 7 8 9 0 3 Item 3 4 5 6 7 8 9 0 3 NB 8// Part # 54-9958 54-0408 54-9954 54-07 54-0337 54-0336 54-030 54-03 506-9904 54-99 54-0307 54-0308 54-0309 54-0 Description: Reversing Polarity 4v Solenoid 50 Amp Type II Breaker Rocker Switch Bracket Rocker Switch 3 Position Momentary Black Terminal Boot Red Terminal Boot Connector 4 ga. Lug with /4 Eyelet Push On Female Terminal 6 ga. #0 x 3/4 Self Drilling Screw 4 Black 0 ga. Jumper Wire Connector 6 ga. #0 Stud Connector 6 ga. Lug with /4 Eyelet Connector 6 ga. Lug with 3/8 Eyelet #6-3 Wire PVC 7# Copper QTY: 5 6 6 5 Ft. Section - Page 7

Motor check out procedure:. Remove leads from motor & attach volt meter to the leads.. With the switch in to on position, the volt meter should read volts minimum. If voltage is low recheck with engine running. Recheck wiring and connections (minimum 6 gauge wire must be used.) 3. Return switch to the neutral position & reattach leads to motor. 4. Attach volt meter to leads at the motor. 5. With the switch in the on position and the leads attached, the volt meter should read 8.5 volts minimum. If voltage is low recheck with engine running. Recheck wiring and connections (minimum 6 gauge wire must be used). 6. Return switch to the neutral position and attach amp meter to leads at the motor. 7. With the switch in the on position, amp meter should read approximately 30 amps. Constant amperage reading of over 50 amps indicated binding in the system and/or low voltage. 8. Disconnect 6 ga #0 terminal end from the solenoid side of the breaker. 9. Connect the 6 ga #0 terminal end to the battery side of the breaker. This will bypass the breaker. 0. Test the tarp system. If the motor operates properly then replace the breaker. Section - Page 8