B21 Series BASOTROL Gas Valve

Similar documents
BGD258 Series BASOTROL CE Approved Class A Gas Valve

BGD278 Series BASOTROL CE Approved Gas Valve

G96 Series BASOTROL Dual Operator Valve

G196 Series BASOTROL Redundant Combination Gas Valve with Manual Shutoff Valve

Y75 and D Series Sensing Probes

H15 Series BASO Automatic Shutoff Pilot Gas Valve

G76x Direct Spark Ignition Controls

Y75 Series Sensing Probes

H15 Series BASO Automatic Shutoff Pilot Gas Valve

Electro- Hydraulic Actuator Gas Valves GH-5000

G861 Series Integrated Function. Direct Spark Ignition Control

G72x Series Direct Spark Ignition Controls

E Series CE Approved Intermittent Pilot Ignition Control

VQ400M SERIES CLASS A COMBINATION VALVES INSTRUCTION SHEET APPLICATION

Q35 Series Automatic Vent Damper System

BG1600M Intermittent Pilot Ignition Control

J Series Pilot Burners/Y90 Series Inlet Fittings

G600 Series Replacement Intermittent Pilot Ignition Controls

VQ400M SERIES CLASS A COMBINATION VALVES PRODUCT HANDBOOK APPLICATION

G821L/G822L Series Integrated Function Direct Spark Ignition Controls

VQ400M SERIES CLASS A COMBINATION VALVES PRODUCT HANDBOOK APPLICATION

BGH2UNCNTRLHT-01 Universal Hot Surface Ignition Control

Gas Conversion Kits and Instructions

VE Series. Class "A" Gas Valves. Product handbook APPLICATION CONTENTS. General. Technical. Installation and operation. Various

VA-8020 Floating Valve Actuator

V5197A Firing Rate Gas Valve

M x Series Valve Linkage Kits

Easytork Solenoid Valve IOM

f i r e - p a r t s. c o m

Ideal Installation. I & M Mark 67 (1/2 6 ) Control Line. Installation & Maintenance Instructions for Mark 67 Pressure Regulators

SERIES 2000 GAS SAFETY SHUT OFF VALVE

WARNING Warnings are indicated when mishandling this product might result in death or serious injury to the user.

VE4000 & VE5000 SERIES

Type N550 Emergency Shutoff Valves. Instruction Manual. Type N550 Emergency Shutoff Valves. Introduction. Specifications. Scope of Manual.

CIRCLE SEAL CONTROLS

Type N550 Snappy Joe Emergency Shutoff Valves

Old documentation - Only for your information! Product is not available any more!

Applies to: Models F, B, FE, and BE with spark pilot

M100F Incremental Motor Actuator R81F Interface Board

M9206-Bxx-2S Series On/Off Electric Spring Return Actuators

System 350 P352AB Electronic Pressure Control Series

LOW PRESSURE BALANCED VALVE DIAPHRAGM BALANCED

Type Operating Instructions. Bedienungsanleitung Manuel d utilisation. 2/2-way solenoid valve 2/2-Wege-Magnetventil Électrovanne 2/2 voies

SD Bendix E-10PR Retarder Control Brake Valve DESCRIPTION. OPERATION - Refer to Figure 2

HIGH PRESSURE CONTROL VALVE PISTON BALANCED

Kimray reserves the right to modify or improve the designs or specifications of such products at any time without prior notice Kimray Inc.

M x Cast Iron Flanged Valve Linkage Kit for Mounting a Single M9000 Series Electric Actuator

Installation Instructions

CIRCLE SEAL CONTROLS

X4 Installation and Operation Manual - POWER FLAME INCORPORATED

Model 6275RC 50% Duty Cycle Compressor

VA-4233-GGx Series Electric Valve Actuators

A25 Series Warm Air Control with Manual Reset

Refinery Supply Company, Inc.

Installation Instructions

V46 Series Pressure-Actuated Water-Regulating Valves

P70, P72 and P170 Series Controls for High Pressure Applications

DISCONTINUED. Installation. Aerada 900 Series Futura Faucet. With Accu-Zone (AZ) Infrared Control

Type Operating Instructions. Bedienungsanleitung Manuel d utilisation. 2/2-Way Solenoid Valve 2/2-Wege-Magnetventil Électrovanne à 2/2 voies

Type Operating Instructions. Bedienungsanleitung Manuel d utilisation. 2/2-Way Solenoid Valve 2/2-Wege-Magnetventil Électrovanne à 2/2 voies

INSTALLATION INSTRUCTIONS FOR PCDE-36VA CONVERSION KIT

MODEL G300 BRAKE BLEEDER

Type 6213 EV, 6281 EV

M x Series Cast Iron Flanged Valve Linkage Kit for Tandem Mounting of M9000 Series Electric Actuators

P70, P72, and P170 Series Controls for High Pressure Applications

VA-7150 Electric Valve Actuator. Features and Benefits. G 500N force output in a compact unit G Magnetic clutch. G Unique Yoke Design

45 VALVE SERIES. 2-Position 4-Way 5-Ports, Installation & Service Instructions. Valve with Stem Operator, Installation & Service Instructions

t EVAPORATOR PRESSURE REGULATING VALVES

P70, P72, and P170 Controls for Low Pressure Applications

SERVICE MANUAL RRG SERIES HEAVY DUTY GAS GRIDDLE - NOTICE - ML ML ML RRG Shown

Series 44 Installation Instructions

I-799/79V Coil Components

GasBloc Multifunctional gas control Combined regulator and safety shut-off valves Electrically modulating GB-M(P) 057 D01

Installation Manual. English. French

INSTALLATION INSTRUCTIONS NATURAL TO PROPANE CONVERSION KIT

P66 Series Electronic Fan Speed Controls

Type 5411, Operating Instructions. Bedienungsanleitung Manuel d utilisation

VG7000 Valve Linkage for M100 Series Motor Actuators

Introduction. System Components

Type Operating Instructions. Bedienungsanleitung Manuel d utilisation

PRESSURE REGULATOR BACK PRESSURE TO ATMOSPHERE WITH OUTSIDE SUPPLY

INSTALLATION INSTRUCTIONS FOR PCBM-36C CONVERSION KIT From Natural Gas to Propane/LP Gas

MODEL NUMBER: MEDIUM DUTY ONBOARD AIR SYSTEM

Installation For Service Only

Honeywell VV, VP, VB & MS SERIES FOR VQ400M CLASS A VALVES PRODUCT HANDBOOK APPLICATION

SECTION 4 - FUEL SYSTEMS AND CARBURETION

Q345A, Q3451, Q3481, Q348A, Q348B, Q362A, Q373A, Q381A and Q3452 Intermittent Pilot Burner/Igniter-Sensors

VA9104-xGA-1S Series Electric Non-Spring Return Valve Actuators

Model DV-5 Deluge Valve, Diaphragm Style, 1-1/2 thru 8 Inch (DN40 thru DN200), Deluge System Electric Actuation

Installation Instructions for. For Use When Converting Model (V)M42(B) Vented Decorative Fireplace. Fold Bi-Fold Door After Releasing

F61 Series Standard Flow Switches

VA9104-xGA-2S Series Electric Non-Spring Return Valve Actuators

VG7000 Series Bronze Control Valves

SERIES VAC Microprocessor Based Direct Spark Ignition Control FEATURES DESCRIPTION APPLICATIONS THE TOTAL SOLUTION FOR GAS IGNITION CONTROL

CHALLENGER Propane to Natural Gas Instructions

VA, VF, and VS Series Direct Mounted Globe Valve Assemblies. Application. Features

PH1 AIR INTAKE EMERGENCY SHUT-OFF VALVE PULL CABLE ACTUATION.

GAS CONVERSION KIT INSTALLATION INSTRUCTIONS

Type Operating Instructions. Bedienungsanleitung Manuel d utilisation. 2/2-way solenoid valve 2/2-Wege-Magnetventil Électrovanne 2/2 voies

Introduction. Installation. Maintenance. Bill of Materials

Transcription:

Installation Instructions B21 Issue Date September 19, 2017 Installation IMPORTANT: These instructions are intended as a guide for qualified personnel installing or servicing BASO Gas Products. Carefully follow all instructions in this bulletin and all instructions on the appliance. Limit repairs, adjustments, and servicing to the operations listed in this bulletin or on the appliance. WARNING: Risk of Fire or Explosion. The system must meet all applicable local, national, and regional regulations. Improper installation may cause gas leaks, explosions, property damage, and injuries. To install the B21 valve: 1. Shut off power to the appliance. 2. Shut off the gas at the main manual shutoff valve. 3. Label each wire with the correct terminal designation prior to disconnection. 4. Compare the voltage on the valve with the power source voltage to ensure the correct unit is being installed. 5. Mount the valve. The B21 valve may be mounted on a horizontal manifold with the solenoid coils pointed up (vertical) or in any position not exceeding 90 from the vertical (see Figure 1). The valve may also be mounted on a vertical manifold in any position around its axis. Do not install the solenoid coils upside down. WARNING: Risk of Fire or Explosion. To prevent leakage of upstream gas, shut off the gas supply at the main manual shutoff valve before installing or servicing the B21 valve. Failure to shut off the gas supply can result in the release of gas during installation or servicing, which can lead to an explosion or fire, and may result in severe personal injury or death. 90 Maximum from Vertical Limited Horizontal and Vertical 90 Maximum from Vertical Mounting CAUTION: Risk of Equipment Damage. To prevent damage to the valve when mounting to pipework, do not use a wrench on any surface other than the casting flats provided at the inlet and outlet ends of the valve body. Vertical mounting may be 360º around its axis with the gas flow either up or down, but always in the direction of the arrow. Figure 1: B21 Mounting Positions 2017 BASO Gas Products 1

6. Thread pipe (the amount shown in Table 1) for insertion into the control. Do not thread the pipe too far. Valve distortion or malfunction may result if the pipe is inserted too deeply. Table 1: NPT Pipe Thread Length Into Valve Pipe Size (NPT) Thread Pipe Amount (in.) Maximum Depth Pipe (in.) 3/4 13/16 3/4 1 13/16 5/8 7. For any threaded connections, threads of pipe and nipples must be smooth and free of tears and burrs. Steam clean all piping inside diameter to remove foreign substances such as cutting oil or thread chips before installing into the valve. Apply a moderate amount of good quality pipe compound (do not use Teflon tape) to pipe only, leaving two end threads bare (see Figure 2). On LP installations, use compound resistant to LP gas. CORRECT WRONG 8. Ensure the gas flows through the valve body in the direction indicated by the arrow on the body. If the valve is installed with the gas flow in the opposite direction of the arrow, leakage can occur. Connect pipe to gas control inlet and outlet. Use a wrench on the square ends of the valve body. If a flange is used, place the wrench on the flange rather than on the control valve body. This process should be used for both the install and removal of the valve in a gas system, (see Figure 5). 9. If you desire to measure the outlet pressure, use the Y99AX pressure test fitting (see Figure 3) and an approved pipe joint compound on the male threads and replace the marked pressure tap plug, which is optional on the inlet or outlet of the valve body. Screw the fitting into threaded port of the valve, which replaces the pressure tap plug. Figure 3: Y99AX-1 (1/8-27 NPT) Pressure Test Fitting Y99AX -2 (1/8-28 BSPT) Pressure Test Fitting APPLY A MODERATE AMOUNT OF PIPE COMPOUND TO PIPE ONLY (LEAVE TWO END THREADS BARE), CAUTION: EXCESSIVE COMPOUND MAY BLOCK DISC OFF VALVE SEAT CAUSING LEAKS. Figure 2: Use a Moderate Amount of Pipe Compound (Optional) Outlet Pressure Tap Connection Figure 4: Pressure Tap Location. 2017 BASO Gas Products 2

APPLY WRENCH TO THE FLATS FROM THE TOP OR BOTTOM OF THE GAS CONTROL VALVE APPLY WRENCH TO FLATS ONLY Figure 5: Proper Use of Wrench on Gas Control 10. Check for leakage before making any valve adjustments. a. Shut off the gas at the main manual shutoff valve and open the pressure connection between the manual shutoff valve and the B21 valve. b. Connect air tubing with a maximum pressure of 1-1/2 times the valve s maximum operating pressure (as indicated on the valve) to the opened pressure connection. c. Paint all valve body connections with a rich soap and water solution. If bubbles occur, this is an indication of a leak. To stop a leak, tighten joints and connections. Replace the part if the leak cannot be stopped. If bubbles do not occur, remove the air tubing and close the pressure connection. 11. Make wiring connections. See the Wiring section (Figure 6) for specific wiring instructions. 12. The inlet pressure tap is a bleed hole with a machined spigot, sealed with a threaded brass needle screw. To measure the inlet pressure, turn the screw in a counterclockwise direction one or two turns and fit a 9 mm diameter flexible tube over the machined spigot. Turn on the gas. After adjustments have been made and the desired inlet pressure has been obtained, turn off the gas and remove the flexible tube. Tighten the needle screw by turning it clockwise with a slotted screwdriver until hand tight, sealing the bleed hole. Turn the gas back on. 13. Check for leakage at the bleed hole. Paint the bleed hole with a rich soap and water solution (or use acceptable gas leak detection equipment). If bubbles occur, this is an indication of a gas leak. To stop a leak, tighten the needle screw. Replace the fitting if the leak cannot be stopped. 2017 BASO Gas Products 3

14. Observe at least three complete operating cycles to ensure that all components are functioning correctly before leaving the installation. Wiring CAUTION: Risk of Electric Shock. Disconnect power supply before making electrical connection to avoid electric shock or equipment damage. Ensure that the operating voltage is identical to the information on the product identification label. The B21 valve is supplied with 2-tab electrical connections. The solenoid coils are male tabs and electrical connections should be made using 1/4 in (6.35 x 0.8 mm) female, fully insulated push-on terminals. The electrical wiring to a twin solenoid valve from an electronic ignition system is comprised of a power line and power common. Wiring can be done using a single 4-wire cable. The wiring connections for a 4-wire cable are shown in Figure. Route the electrical cable for the valve solenoid actuators from the burner sequence control to the valve and make wiring connections in accordance with (see Figure ). Note: Electrical connections can also be made using electrical plugs (DIN 43650 Form B [ISO 4400]). Note: All wiring must be in accordance with national and local electrical codes and regulations. Setup and Adjustments Checkout WARNING: Risk of Explosion or Fire. Follow this or an equivalent checkout procedure after installation. Before leaving the installation, verify that the gas valve functions properly and that the system has no gas leaks. Gas leaks can lead to an explosion or fire, and may result in severe personal injury or death. Make sure all components are functioning properly by performing the following test: 1. Test all joints and connections for leaks with a soap solution. 2. Close the main upstream shutoff valve and wait at least 5 minutes for unburned gas to escape from the appliance, and then reopen the shutoff valve. 3. Turn on the main electrical power switch and close the thermostat contacts. The appliance should operate in accordance with the manufacturer s specified sequence of operation. 4. Turn the thermostat to a low dial setting to open the contacts. All burner flames should be extinguished. Repeat Steps 3 and 4 at least three times. 5. Return the thermostat to a normal setting before leaving the installation. Table 2: Replacement Solenoid Coil Part Number RSDA17A-12 RSDA17A-24 Description 12 VDC; 2-tab 17 VA Coil 24 VDC; 2-tab 17 VA Coil Do not make field repairs except for the replacement of the solenoid coil. Any attempt to repair this assembly voids the manufacturer s warranty. For a replacement coil or gas valve, contact the original equipment manufacturer or the nearest BASO Gas Products distributor. 2017 BASO Gas Products 4

Earth Ground Line 2 Neutral Line 1 L2 N2 N1 L1 Coil 2 Main Valve Coil 1 Pilot Valve Twin Solenoid Wiring Using 4-Wire Cable Non-Polarity Sensitive Line and Neutral Connections Ground Tab 25V, 120V and 240V Only Non-Polarity Sensitive Line and Neutral Connections Ground Tab 25V, 120V and 240V Only To Main Solenoid To Pilot Solenoid N L N L Figure 6: 2-Tab Electrical Connections 2017 BASO Gas Products 5

Technical Specifications Product Types of Gas Permissible Ambient (Surface) Temperature Electrical Ratings B21 Series Gas Valve 2nd (Natural Gas), and 3rd (LP Gas) Family Gases -40 to 175 F (-40 to 79 C) 12 VDC 24 VDC Rated Inlet Pressure North America: 1/2 psi Body Connections Pressure Connections Dirt Strainer Operating Time Rating Valve Timings Power Rating Electrical Connections Coil Insulation Class Packaging Bulk Pack Quantity Bulk Pack Weight Agency Listing Specification Standards 3/4 NPT; or 3/4 BSPT (Thread ISO 7-Rc) 1 NPT or 1 BSPT (Thread ISO 7-Rc) 1/8 BSPP (Thread ISO 7-Rp), 1/8 BSPT (Thread ISO 7-Rc), 1/8 NPT Left-hand and/or Right-hand 0.039 in. (0.99 mm) mesh 100% Continuous Closing Time: Opening Time: Dead Time: 17 VA < 1 Second < 1 Second < 1 Second 2-Tab Solenoid Coil: 2 x 1/4 in. (6.35 mm) Class F Bulk pack supplied to original equipment manufacturer (individual pack optional). 10 per carton 40 lb (18 kg) per carton UL Certification Number MH5939 UL429 Performance specifications are nominal and conform to acceptable industry standards. All agency certification of BASO products is performed under dry and controlled indoor environmental conditions. Use of BASO products beyond these conditions is not recommended and may void the warranty. Product must be protected if exposed to water (dripping, spraying, rain, etc.) or other harsh environments. The original equipment manufacturer or end user is responsible for the correct application of BASO products. Consult BASO Gas Products LLC for questionable applications. BASO Gas Products LLC shall not be liable for damages or product malfunctions resulting from misapplication or misuse of its products. Refer to the B21 Series BASOTROL Gas Valve Product Bulletin (BASO-PB-B21) for necessary information on operating and performance specifications for this product. 450 East Horseshoe Road PO Box 170 Watertown, WI 53094 1-877-227-6427 (1-877-BASOGAS) Published in U.S.A. 2017 BASO Gas Products 6