Cover Sheet Drainage District 7 DSR Butler County, Missouri

Similar documents
Appendix I. Canning River Fan Stream Data

PART A. INSTRUCTION SHEET FOR LOCK SERVICE PACK XW4Z CB, 5W4Z BB AND 4R3Z AA

Hydraulic Report. County Road 595 Bridge over Second River. Prepared By AECOM Brian A. Hintsala, P.E

Riverside County Flood Control & Water Conservation District 1995 Market St. Riverside, CA Phone: Fax:

A George & Associates

Wentzville Parkway South Phase 2 & 2A

Patton Hill Road (Four Inch Main), Project No

Project Book Worksheet for Cost Estimation

BID PROPOSAL. Item Description Unit Quantity Unit Price Total Price No. (Unit Price to be written in Words) (Figures) (Figures)

ATTACHMENT D (As referenced in Attachment B ) (Hydrology and Hydraulics Study)

DRAFT REPORT TXDOT SH 183 MASTER DRAINAGE STUDY HYDRAULIC ANALYSIS OF ELM FORK OF TRINITY RIVER CROSSING AT SH 183 WITHIN THE ELM FORK WATERSHED

CENTENNIAL PARK EXPANSION

PART A. INSTRUCTION SHEET FOR LOCK SERVICE PACK 5F1Z AA, XL2Z AC, XL1Z AB, F7SZ CB, F8OZ AB,

UBC Watermain as shown on Sheet 202 : Sub total 97,050

Supplemental Historical Background for Lake Sangraco and the Kershaw Ditch, Adams County, Colorado

Plainfield, Indiana Speed Limit Study

Summary of the Mineral Block

Town of Medley Office of Capital Projects & Development Services 7777 NW 72 Avenue, Medley, Florida 33166

INDIANA DEPARTMENT OF TRANSPORTATION PAGE 1 NOTICE TO HIGHWAY CONTRACTORS

Technical Inputs to Dredging Estimates. Robert Ramsdell Manager of Production Engineering Great Lakes Dredge & Dock

A REPORT TO. Electrical. Mechanical. Civil. Protection & Control. Transmission & Distribution. Telecontrol. System Planning

MILLIGAN SOLAR PROJECT

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/08/17 Comp. Dt:

$6, CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/08/17 -30, PROJECT: STP 2013(839) GRAYSON

Bid Summary Still Creek Wastewater Improvements Phase III City Job No. 411-D November 21, 2013

BUTTE COUNTY DEPARTMENT OF PUBLIC WORKS

Supporting Information

DELAWARE RIVER MAIN CHANNEL DEEPENING PROJECT

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 07/11/18 HIGHWAY: FM 3151 COUNTY: 12/02/2015 ESTIMATE PAID: AWARD DATE: 12/17/2015 ESTIMATE PERIOD:

Hydraulic power is the key to the utility of many excavators.

City of Houston Fondren Road Paving and Drainage

Tamil Nadu Public Service Commission

AMENDMENT OF SOLICITATION Old Hueco Tanks Rd. Improvements

ONONDAGA LAKE PRE-DESIGN INVESTIGATION: WASTEBED 13 SETTLEMENT PILOT STUDY MONITORING DATA YEAR 2 Onondaga County, New York

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 02/06/15 HIGHWAY: COUNTY: 09/07/2012 ESTIMATE PAID: AWARD DATE: 09/27/2012 ESTIMATE PERIOD:


Riverside County Transportation Department Summary of Bids

Engineering Data Book

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 05/10/13 HIGHWAY: FM 3301 COUNTY: 09/09/2011 ESTIMATE PAID: AWARD DATE: 09/29/2011 ESTIMATE PERIOD:

Ameren Missouri. AMENDED Renewable Energy Standard Compliance Report Prepared in Compliance with 4 CSR

LEGEND FULL DEPTH PAVEMENT 2" MILL AND OVERLAY CONCRETE PAVEMENT PAVERS EXIST. R/W ROW ROW EB/WB CONCRETE CURB -15.

STOREY C A RSON DOUGLAS NEVADA MILES 50 KILOMETERS NEVADA DEPARTMENT OF TRANSPORTATION LOCATION DIVISION CARTOGRAPHY (775)

HYDRAULIC EXCAVATOR. Super Long Front. Hydraulic Excavator Attachments PC200LC-8 PC220LC-8 PC270LC-8 PC350LC/HD-8 PC450LC-8

Super Long Front. PC210LC-10 PC240LC-10 PC290LC-10 PC360LC-10 PC390LC-10 PC490LC-10 Hydraulic Excavator Attachments. FRONT LENGTHS 50' 65'

SUMMARY 3-0 BRADFORD ALBANY TOWNSHIP. 1 OF 1 P:\8417\ Bridge A\AT\Albany A.MDB 7/21/2014 7:32:31 AM REVISION NO COUNTY

MoDOT 2016 UNIT BID PRICES Northwest District

Austin Constructors, LLC S FM N. Richey 9810 FM 969. Pasadena, TX Austin, TX 78724

Appendix 5 Sample Specifications. Specifications for Socioeconomic Survey in Rural Areas in Myanmar

City of Grand Island Tuesday, February 13, 2018 Council Session

Projected 2011 Missouri River Flood Elevations

SHEET # 48414AB1 CPR 2005 FORD MOTOR COMPANY DEARBORN, MICHIGAN

ROW CROP MANAGER CONTENTS

ADDENDUM #2 WATERSHED IMPROVEMENTS ON AN ANNUAL CONTRACT RP031-18

Tahoe-Reno Industrial Center Total Bonding Amounts Engineer's Opinion of Probable Construction Costs (30% Submittal) Project No. 783.

Notice of the Maritime Safety Administration of the People s. Republic of China on Strengthening the Supervision and

Transportation Analysis. Pedestrian Pathways. Sterling District. County Project Manager: Suheili Pérez-Jiménez. Prepared by: J2 Engineers, Inc.

I-405 Sepulveda Pass Improvements Project. Community Advisory Committee July 28, 2011

NOTIFICATION OF ADDENDUM ADDENDUM NO. 1 DATED 9/13/2006

September 09, ASU Meat Goat Performance Test Consignors. Dr. Mike Salisbury. Final Performance Data and Report

Riverside County Transportation Department Summary of Bids

Franklin County Engineer's Office - Highway Design ALKIRE RD & DEMOREST RD ROUNDABOUT CR NO. 11 & CR NO. 25 Bid Tabulation

Jasper County Right of Way Management Policy DRIVEWAY PERMITS Adopted May 5, 2005

DIXIE TIP CONCEPT REPORT APPLICATION FY 2015 (Due November 6, 2013) PROJECT INFORMATION

Excavation Equipment: Shovel

6/ Lorraine Cassista. Paradise Ln. Oxford

Report on Removing Marine Debris from Beaches near Teller, Alaska in Fred Jay Ivanoff and Wesley W. Jones 1. January, 2011.

Regular Data Structures. 1, 2, 3, 4, N-D Arrays

APPLICATION FOR PERMIT TO INSTALL A DRIVEWAY ON A COUNTY TRUNK HIGHWAY

B.6 Construction Equipment Utilization and Workforce

Safety Sense Ballast Under Cutter

www. ElectricalPartManuals. com GENERAL. ELECTRIC RENEWAL PARTS CR7006-C100, -C101 AND -C102 MAGNETIC STARTERS

National Association of Wastewater Transporters (NAWT) Onsite Treatment Tank Pumping & Cleaning Code of Practice

Excavation Report. Late Iron Age to Early Roman Settlement at Stratton Farm to Newspring Farm, Biggleswade. Excavation Report. Client: Anglian Water

Metrolinx Electrification Project

DESCRIPTION QUANTITY PRICE TOTAL

CUSTOMER/ TWIN ARROWS PROJECT

Engineering Data Book

INSTRUCTIONS 360 Y-DROP

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. District(s): 8 30=047 Start Dt: 05/01/17 Comp. Dt:

Steese Rd - Curb & Sidewalk Improvement

Design Concept and Financing of the Light Rail Zagreb Project

**Equipment production**

ROAD MASTER S REPORT

Plan Check Policies and Guidelines

I ADJUSTMENTS TO LEVIES I

2. Katikati. 2.1 Infrastructure Schedule. Katikati Utilities. Project Number. Project Construction Year. Funding Source (percentage) Costs 2015 ($)

I ADJUSTMENTS TO LEVIES I

BALLAST WATER RECORD BOOK

CITY OF ALAMO HEIGHTS WATER, STREET AND SIDEWALK CAPITAL IMPROVEMENT PROJECTS

Design Criteria Data

MO 370 Interchange Ramp at Salt River Road - Phase 1

F:\PROJ\ \dwg\Alt-bridge-alignments.dwg, 17-2, 11/12/ :22:17 PM, saamhu, Acrobat PDFWriter

Grays Ferry Cost Estimate Breakdown Budgetary Numbers for Machinery Drive Options 10 Nov 14

NEW CONSTRUCTION GROUND DISTURBANCE PACKAGE REQUEST & DOCUMENTATION PACKAGE CHECKLIST

TENDER FOR COUNTY ROAD 44 MULTI-USE PATHWAY PHASE 1A & 1B. Tender No.: NG16-19 ADDENDUM #1. October 31, 2016

Plan Check Policies and Guidelines

Turnpike Mitigation Program Application

VALUE ENGINEERING STUDIES FINAL REPORT. Portsmouth Bypass, Phase 1 SCI PID 19415

Non-Destructive Pavement Testing at IDOT. LaDonna R. Rowden, P.E. Pavement Technology Engineer

Section 5. Manhole Inspection Report

Transcription:

Neelyville, MO ESTIMATED QUANTITIES ITEM DESCRIPTION QUANTITY Excavation 58,186 Spoil Spreading 58,186 Mobilization 1 UNITS CY CY LS The project begins at Latitude 36.4868, Longitude -0.46721 in Section 3, Township 22 North, Range 6 East, in GENERAL PLANS SEET # 1 2-8 Digitally signed by JON ESTER : 2018.04.02 12:01:17-05'00' 1 EMERGENCY WATERSED PROGRAM INDEX OF DRAWING SEETS TITLE Cover Plan Views Cross Sections 3-18 3-18 3-18 WB J SJ JON ESTER Cover Drainage District 7 DSR-023-17-105 Department

31 30 AA 241 335 257 311 UU 611 307 605 607 251 245 243 333 205 327 20 621 628 623 305 33 315 314 OXIE SUB 322 158 332 312 FISERY RD 330 306 Sta. 644+73 316 320 344 342 617 Sta. 52+32 Sta. 480+57 Sta 368+18 608 613 53 32 328 615 Sta. 734+16 203 611 616 202 61 618 630 Sta. 426+74 2021 6471 650 647 658 Ackerman Ditch Width Depth 0+00 27 6+46 27 101+50 18 150+77 18 Co Road 244 212+74 13 +52 25 313+18 25 368+18 8 426+74 8 Co Road 480+57 21 543+27 18 5232 12 644+73 15 Co Road 316 65+6 16 734+16 16 Ending sj sj Plan View Ackerman WB 346 1 254 Sta. 150+77 Sta. 6+46 246 24 244 Sta. +52 214 Sta. 0+00 240 216 211 Sta. 101+50 232 236 N 20 220 237 Ackerman Ditch 80,817 CY Excavation/ Spoil Spreading 1. This project is for removal Department 2

33 335 257 333 24 251 247 N 245 Sta 1 254 344 346 Sta 7+30 Sta 0+00 246 342 Sta 43+77 576+8 Sta 542+15 244 214 240 203 216 202 2031 232 236 Sta 236+34 Sta 340+60 234 Black River Levee Ditch Width Depth 0+00 47 1+16 47 27+22 42 7+30 38 131+72 34 184+08 30 236+34 26 270+83 25 310+30 26 340+60 26 32+75 23 43+77 22 42+40 27 44+40 27 542+15 23 576+8 20 Ending Black River Levee Ditch,527 CY Excavation/ Spoil Spreading 1. This project is for removal sj sj Plan View Black River Levee Ditch WB Department 3

345 343 EE 341 BB 265 345 26 347 34 351 PRIVATE 263 261 33 PRIVATE RD ART ST 340 Sta. 45+7 Sta. +32 356 354 Sta. 38+72 WARNING GAS PIPELINE Sta. 232+80 Cane Creek Width Depth 0+00 40 0+30 55 26+42 55 78+75 50 12+17 47 181+3 43 232+80 38 Just north WY 285+10 38 +32 31 38+72 26 At CR 442+47 2 45+67 33 45+7 35 Ending At CR sj sj Plan View Cane Creek WB 268 267 353 CENTER ST 2671 OXIE SUB 272 276 Sta. 12+17 Sta. 26+42 Cane Creek 114,355 CY Excavation/ Spoil Spreading 1. This project is for removal Department 278 Sta 0+00 4

33 340 354 WARNING GAS PIPELINE Sta 7+1 Sta. 2+67 44,44 Craven Quantities CY Excavation/ Spoil Spreading 1. This project is for removal sj WB sj Sta 183+35 341 BB 332 330 158 Plan View Craven 2+67 26+75 7+1 131+26 183+35 235+36 287+86 35+30 Sta 287+86 Craven Width Depth 23 23 20 WARNING GAS PIPELINE 18 21 At CRD 18 20 At CRD 158 22 Ending Department 31 Sta 35+30 321 320 322 5

327 328 32 Sta 285+42 Sta 213+88 61 SETTLEMENT DR 53 Sta 162+14 658 Dan River Width Depth 0+00 25 2+23 25 58+36 26 At CRD 202 115+81 21 162+14 20 At wy 213+88 22 At CRD 328 266+64 16 285+42 12 Ending sj sj Plan View Dan River WB 203 2031 202 Sta 58+36 206 Dan River 37,672 CY Excavation/ Spoil Spreading 1. This project is for removal Department Sta 0+00 20 6

Sta346 421+2 356 335 351 Sta. 223+0 1. This project is for removal Sta. 6+48 1 24 247 263 EE 246 Sta. 120+8 254 Main Ditch Quantities 135,2 CY Excavation/ Spoil Spreading 244 251 257 261 265 267 2671 Sta. 172+14 214 sj sj WB 344 Plan View Main Ditch 341 34 354 342 276 617 268 UU 328 WARNING GAS PIPELINE 332 340 353 30 330 6+48 120+8 172+14 223+0 275+62 327+45 361+54 380+20 421+2 483+28 526+57 575+2 628+26 680+12 731+07 77+75 816+11 Main Ditch Width Depth 45 43 42 40 At CRD 341/ MO 42 38 3 23 21 21 21 23 24 GAS PIPELINE CROSSING 26 25 26 22 Ending at CRD 307 Department 336 316 320 Sta 628+26 BB IE S U B 323 315 322 33 C 321 31 FISERY RD Sta 816+11 318 158 OX 311 5 30 304 67 67 8 67 47 307 314 53 476 7

341 263 261 31 315 N 33 30 335 257 311 UU 251 247 245 354 318 158 FISERY RD 322 330 332 344 346 316 Sta 676+04 WARNING Width GAS PIPELINE 0+00 26 Sta 470+26 320 342 53 Sta 625+0 Sta 31+3 616 32 328 203 214 611 618 202 Bottom Stillcamp Sediment Depth 2+14 26 57+12 23 10+1 20 162+12 1 214+81 21 267+23 21 31+3 17 At CRD 372+15 1 418+25 21 470+26 20 521+83 20 574+60 21 625+0 22 At CRD 320 676+04 18 Ending SK SK Plan View Stillcamp WB 216 Sta 162+12 1 254 246 Sta 0+00 24 244 240 232 236 Stillcamp 85,437 CY Excavation/ Spoil Spreading 1. This project is for removal Department 8

Typical Cross Section DSR 023-17-105 Drainage District 7 SK SK SK 1. This project is for removal existing sediment only. ROW from the ditch bank. 4. Channel grade shall be uniform from beginning to end.