PowderPro Spray System

Similar documents
Crestline Dampening System Installation Instructions

Crestline Dampening System. Installation Instructions. Ryobi 500N X /98

Crestline Dampening System. Installation Instructions. Hamada RS34 & VS34 Satellite Unit. For Presses Originally Equipped With. Integrated Dampeners

Crestline Altra Series TM Dampener. Installation Instructions. Heidelberg GTO. X /98 Rev-A

CRESTLINE DAMPENING SYSTEM INSTALLATION INSTRUCTIONS. Ryobi 3302M Itek 3985 A.B. Dick 9985 X /99

Crestline Dampening System

Altra Series Dampener

Crestline Dampening System. Installation Instructions. A.B. Dick 350, 360, 375 Single & Dual Lever Machines. X /01 Rev-A

Crestline Altra TM Series Dampener. Installation Instructions. Didde MCP/Conserver. X /2001 Rev-A

Hose Reel Kit for Multi-Pro 1200 and 1250 Sprayers. Installation Instructions. Form No Model No Serial No.

Hose Reel Kit for Workman 200 Spray Systems. Installation Instructions. Form No Rev A. Model No Serial No.

ATS-9600/9700 TABBER/LABELER

ATS-9600/9700 TABBER/LABELER

XPS-ProFeed Shuttle SERVICE MANUAL. Revised:

Arch HTH Water Chemicals Commercial Equipment Trouble Shooting Guide

XPS-ProFeed Shuttle SERVICE MANUAL. Revised:

Supply Valve Replacement

Heavy Duty Sprayer Owners Manual Model MS-O

OPERATING & SERVICE PARTS MANUAL SM20ES ENERGY SMART WRAPPER

The steering column is of a modular construction and features easy to service electrical switches.

MKVI Jetta Fog Light Kit

LANCER FOG LAMP KIT MZ380479EX (for RHD) INSTALLATION AND HANDLING INSTRUCTIONS

Combine Cover Manual

TB-690 Conveyor/Stacker

WEBER CARBURETOR TROUBLESHOOTING GUIDE

Repair. Clutch Replacement Kit C. GMax and LineLazer Airless Paint Sprayers WARNING. Pressure Relief Procedure

MKVI Jetta Fog Light Kit

DriMaster II HiFlo Stainless Steel Upholstery Tool Owner s Manual

Perfmaster Air V3. Serial Number. Date

Four Wheel Drive Kit Groundsmaster 580D

INSTRUCTIONS. US Patent Pending HVLP Turbine Guns

BASIC TROUBLE SHOOTING (PERFECTPASS FOR MECHANICAL ENGINES) How PerfectPass Works

ATS-8000 TABBER QUICK START INSTRUCTIONS / PARTS CATALOG

ENGLISH MF-7500(D)/UT37

Installing the PAMCO CB750, CB550, CB500 Four, CB400F and CB350F Ignitions

M GT 2005 up Mustang ENGINE START Push-Button INSTRUCTION SHEET

Dealer4 Maintenance, Adjusting and Cleaning Manual ver: 1.0

IMPORTANT! READ BEFORE INSTALLING!

THE safety accessory of the 21 st Century.

Model 1100B CHG Terminator. Installation Instructions

RENA AF371Feeder Operating Manual. Feeder. Operating Manual. Manual Part #: M AF371 Operations Rev

#TL T EA888 GEN 3 FUELING SYSTEM/ INSTALLATION INSTRUCTIONS

INSTALLATION AND OPERATING INSTRUCTIONS

OPERATING INSTRUCTIONS FINISHER 4300

Installation MKIV Headlight Housings with Fog Lamps (Procedures apply to both MKIV Jetta and Golf)

PARTS LIST: 8581 DODGE LONG ARM BRACKETS 03-13

Stand-On Spreader Sprayer

Roller Removal Instructions

AQT-56 POWERFLO SERIES SERVICE MANUAL CONTROL VALVES

INSTALLATION GUIDE. AMP RESEARCH TECH SUPPORT (Press 2) Monday - Friday, 6:00 AM - 5:00 PM PST

DARMAN. ENDURA II Cloth Towel Cabinet Product Guide. Manufacturing Company, Inc Lincoln Ave., Utica, NY 13502

TAKE-A-LABEL Power Dr. Nunica, MI Phone: (616) Fax: (616)

PORSCHE V TO 32V CAM GEAR CONVERSION INSTRUCTIONS. For all 16V engines: USA 78-84, Euro

SE-1200-MP ECO - SERIES

Go-ped ESR750 / ESR750EX Rear Brake Installation Instructions

Lacquer Conversion Kit

Hand Held Pull Tester Instruction Manual Order No

Page 1. File: Motolight caliper one-piece Date: 8/14/2006

INSTALLATION INSTRUCTIONS FOR COZY CAB A-1 AIR CONDITIONING KIT

CABINET REEL OPERATING INSTRUCTIONS

SERVICE PARTS LIST. SPECIFY CATALOG NO. AND SERIAL NO. WHEN ORDERING PARTS M18 Sawzall STARTING SERIAL NO.

This LED flashtube kit covers models 400, 404, 500, 504, 600, 680 & 506.

Hydro-Sync Slide-Out System

4500 Series Electric Exit Devices Request to Exit (RX) Installation Instruction Grade 1 I-ED00368

OPERATING & SERVICE PARTS MANUAL 700ES ENERGY SMART WRAPPER SERIES B

USER INSTRUCTIONS. General Description. Upgrade EEPROM. Keypanel EEPROM Version Identification

EasySelect-Cup Manual Powder Gun

Banks Brake. with installation instructions EXHAUST BRAKE SYSTEM Dodge 5.9L Cummins (12-valve) Turbo-Diesel Pickups with Manual Transmissions

TCI FastGate Shifter Installation Instructions

Sure-Feed Engineering Inc. PLACER STANDARD HOPPER. Operation & Parts Manual PLACER-STD_1

INSTALLATION PROCEDURE Step 1. Unpack and verify shipment. Double-check site specifics. Step 2. - Page 3 -

SERVICE PARTS LIST SPECIFY CATALOG NO. AND SERIAL NO. WHEN ORDERING PARTS. M18 Sawzall

BOVIBOOSTER WDone & WDtwo

INSTALLATION INSTRUCTIONS

Installation Instructions

MPT-250B SPECIFICATIONS AND OPERATING INSTRUCTIONS

Stay-IN-Play with Panic Stop Braking

INSTALLATION GUIDE. AMP RESEARCH TECH SUPPORT (Press 2) Monday - Friday, 6:00 AM - 5:00 PM PST

200 Shadylane Drive Philipsburg, PA Phone: (814) Fax: (814) Service Manual

LS10.0T Service Manual

INSTALLATION INSTRUCTIONS

Owner s Manual This Manual Must Be Read Before Operating The Equipment

* * APPLICABLE MODELS: 2014 > Mazda 3

Prodigy HDLV System Troubleshooting - Generation III

A. Preparing the charge harness. Start by removing the plastic covers by the battery terminal.

This chapter contains operational verification, adjustment, and repair/replacement procedures for major

INSTALLATION INSTRUCTIONS

Installation Instructions PowerBoard Automatic Retracting Running Board

INSTALLATION, OPERATING AND SERVICE MANUAL

* * APPLICABLE MODELS: 2014 > Mazda 6

INSTALLATION AND OPERATING INSTRUCTIONS

Techcon Systems TS6500 CIM Automatic Techkit Mixer

INTEGRATED1500LB WINCH KIT

INSTRUCTIONS FOR A

Service Bulletin #117 SJ7127 RT, SJ7135 RT, SJ8841 RT, SJ9250 RT Brake Manifold Assembly Replacement

THANK YOU FOR CHOOSING BATHERBOX GETTING STARTED WHAT S IN THE BOX? N. Northview Ave Sioux Falls, SD 57107

Firehawk Second Stage Regulator Fire Service

PARTS. 190ES , A, B, C (Stand) , A, B (Stand) , A, B (Hi-boy) , A, B (Hi-boy) Airless Paint Sprayers. Rev.

SERVICE PARTS LIST. M18 FUEL ONE KEY SAWZALL Reciprocating Saw H31A BULLETIN NO

Installation Instructions PowerBoard Automatic Retracting Running Board

Transcription:

PowderPro Spray System Installation Instructions Hamada C248 X88-72 10/98 REV-C 2657

GENERAL INFORMATION ATTENTION POWDERPRO OWNER! Accel Graphic Systems provides parts and service through its authorized distributors and dealers. Therefore, all requests for parts and service should be directed to your local dealer. The philosophy of Accel Graphic Systems is to continually improve all of its products. Written notices of changes and improvements are sent to Accel Graphic Systems' Dealers. If the operating characteristics or the appearance of your product differs from those described in this manual, please contact your local Accel Graphic Systems Dealer for updated information and assistance. Always update your equipment when improvements are made available, especially those related to safety. YOUR AUTHORIZED POWDERPRO DEALER IS: THE SERIAL NUMBER OF YOUR POWDERPRO IS: For technical assistance, please contact: ACCEL GRAPHIC SYSTEMS 11103 Indian Trail Dallas, TX 75229 (972) 484-6808 FAX (800) 365-6510 E-MAIL accel@dallas.net WEB SITE www.accelgraphicsystems.com PowderPro is covered by U.S. Patents Pending 3

4

INSTALLATION 1 Attention: If this PowderPro is being installed inconjunction with a Tempest dryer you must first install the Tempest. Disconnect the electrical power to the press. 2 Remove the NOPS delivery side cover and upper & lower NOPS press covers. 3 Remove original spray system from the press including the spray heads, hoses, distribution block, hopper and solenoid. Save the bolts used to secure the spray heads to the tie bar and the bolts that attach the hopper mounting bracket to the press frame. Connect the hose from the pump directly to the blow down adjustment valve. Use the provided closed end splice connectors to terminate the original solenoid wires. NOTE: If this PowderPro is being installed inconjunction with a Tempest then some of the original parts have already been removed. 5

Diagram A Diagram B Diagram C 6

INSTALLATION 4 5 Install the new PowderPro spray bar to the feeder side of the tie bar using the original bolts and supplied flat washers as shown in Diagram A. Route the hoses under the tie bar and through the same hole in the NOPS press that the original hoses went through as shown in Diagram A. It is easier to insert the hoses through the hole before securing the spray bar to the tie bar. Be careful not to pinch the hoses between the spray block and the tie bar. Use the provided tie wraps to secure the hoses away from beneath the static eliminator and any moving parts in the delivery. NOTE: If the press is also equipped with a Tempest dryer then the spray head assembly mounts on the dryer unit. Install the PowderPro control box using the same bolts and tapped holes that secured the original powder hopper as shown in Diagram B. 6 Attach the hoses from the spray heads installed in step 3 to the tubes coming out of the side of the PowderPro control box as shown in Diagram C. Make sure that the hoses with black tape on the ends are attached to the lower two tubes coming out of the control box. When the side covers to the press are reinstalled the tubes go through the same slot in the end of the lower cover, that the hard pipe went through, on the factory sprayer. Keep this in mind if you trim the hose length. 7

Diagram D Diagram E Diagram F 8

INSTALLATION 7 Locate the timing wheel on the NOPS. Briefly restore the power to the press. Rotate the press until the hole in the wheel is at the six o'clock position (straight down). Disconnect the power to the press. With the hole in this position it will be easier to reinstall the wheel in the correct position. Remove the bolt that secures the timing wheel to the delivery cylinder shaft. Using the provided longer bolt attach the provided cam and spacer to the press as shown in diagram D. 8 Remove the two bolts that secure the upper sensor mounting bracket to the press frame. Using the supplied longer bolts attach the provided switch mounting bracket (with the switch already attached) to the press as shown in diagram E. 9 Briefly restore the power to the press. Rotate the press forward until one of the grippers is about 1" (30 o as indicated on degree wheel) away from going under the new spray nozzle in the delivery as shown in diagram F. Loosen the bolt securing the new cam and rotate it counterclockwise until it just engages the switch, listening for the "click" noise indicating that the switch is closed. Be very careful not to disturb the position of the factory timing wheel when rotating the cam. Tighten the bolt to lock the cam in position. Disconnect the power to the press. NOTE: Check the position of the press timing wheel as follows. 1. Rotate the press forward until the degree wheel on the OPS indicates 0 o. 2. The light on the sensor should just turn off as the degree wheel comes up on 0 o. 3. If the light on the sensor is still on, or if it turned off way before 0 o, then loosen the bolt securing the timing wheel and rotate it counterclockwise until the hole in the wheel passes the sensor (light on) and the light just turns off. Lock the wheel in place. 9

Diagram G 10

INSTALLATION 10 Note: If the press is already equipped with a Tempest dryer and the impression board is already present, skip to step 11. Remove the cover from the electrical cabinet. Locate the CN11 connector on the upper left side of the printed circuit board. Attach the provided t-tap connectors to wire no.'s Y31 and T (no. 1 impression solenoid) and wires Y33 and T (no. 2 impression solenoid). The T wires are all common so it does not matter which T wires that the t- tap connectors are attached. Insert the ends of the two cable assemblies attached to the provided impression relay circuit board into the t-tap connectors, one cable to Y31 and T and the other cable to Y33 and T. Remove the backing from the two-sided tape on the bottom of the board and secure it to the inside of the cabinet. See diagram G. 11 Plug the provided cable assembly into the four pin connector coming out of the PowderPro control box. Route the shorter of the two cables in this assembly to the switch installed in step 9. Route the other cable into the electrical cabinet and to the impression board installed in the previous step. Insert the wires into the J6 connector (also labeled "PowderPro ") on the board. 12 Set the provided pump on the floor of the NOPS. Connect the cable coming out of the pump to the three pin connector coming out of the PowderPro control box. Connect the air supply hose to the barbed reducer fitting on the hose coming out of the control box. 11

12

INSTALLATION 13 Plug the PowderPro power cord into a standard 115 VAC wall recepticle. This completes the installation of the PowderPro spray system. Continue on to the next section for proper set-up, operation and maintenance procedures. 13

OPERATION AND MAINTENANCE INDICATOR LIGHT ON/OFF SWITCH POWDER VOLUME ADJUSTMENT KNOB MANUAL PUMP ON TEST 2 3 SPRAY NOZZLE SELECTOR KNOB NORMAL OPERATION 1 2 3 4 TEST SWITCH POWDER PRO CONTROLS VOLUME ADJUSTMENT KNOB Adjusts the amount of spray powder with 0 the minimum and 10 the maximum. ON/OFF SWITCH When switched to "Manual Pump On the pump comes on for setting spray powder volume. When switched to the "Normal Operation" position, the system is armed and sprays only when the press goes on impression. Center position is off INDICATOR LIGHT This light is illuminated only when the unit is actually spraying. The light goes on and off as sheets pass under the spray nozzles. TEST SWITCH Use this switch for setting powder volume when not printing. With the "On/Off" switch set at "Manual Pump On", push the test switch to visually see the amount of powder being sprayed, adjust as desired with volume adjustment knob. NOZZLE SELECTOR KNOB This knob lets you control which spray nozzles are being used. For maximum width sheets set the selector to the lower position. This setting sprays all four nozzles. For narrow sheets (generally 11" wide or less) set the selector to the upper position. This setting sprays only the center two nozzles. 14

OPERATION AND MAINTENANCE PUMP ADJUSTMENT Powder volume range is adjusted by the outlet pressure of the pump. Locate the adjustment knob on the pump near the outlet hose. Loosen the locking knob and turn the adjustment knob clockwise to increase the pressure for more powder. Turn the knob counter clockwise to decrease pressure for less powder. Set the correct pump pressure as follows: 1. Turn the pump on by switching the large switch on the PowderPro control box to the "Manual Pump On" position. 2. Set the nozzle selector knob on the PowderPro control box to "4". 3. Set the powder volume adjustment knob to "10". 4. Hold the "Test" switch "On" while looking at the spray nozzles in the delivery. 5. Have someone slowly adjust the pressure on the pump until the powder is barely visible. A powder setting of "10" with visible powder in the delivery is more than enough powder. Consequently, a setting of "5" results in no visible powder but sufficient powder for most jobs. If powder is visible at the "5" setting than too much powder is being sprayed. Return to step 3 and reset the pump. 6. Tighten the locking knob on the pump adjustment. INITIAL SETTINGS The initial setting for the powder volume adjustment on an average job is 5. If more powder is required than is available at a setting of 10 you need to adjust the pump. If less powder is required than is available at a setting of 0 you also have to adjust the pump. So that you have a wide range of powder volume adjustment available for different jobs you want your normal setting for average jobs to be somewhere in the range from 4 to 6, otherwise you need to adjust the pump. 15

OPERATION AND MAINTENANCE MAINTENANCE 1. Clean the filter on the pump once a week, blowing it clean with compressed air. 2. Remove powder that may accumulate on the bottom of the spray nozzles daily. 3. Never use solvents containing oil when cleaning any part of the sprayer. 4. Use compressed air only if your compressor is equipped with a proper in-line dryer. Otherwise, use canned air. Moisture in the sprayer affects its performance. OPERATION 1. Fill the powder hopper with an intermediate grain (20-25) powder (available from Accel) up to the MAX line on the hopper. 2. Place the original On\Off switch to the On" position. 3. Consider the sheet width and if necessary change the spray nozzle selector knob. When switching from four to two nozzles reduce the total amount of powder being sprayed by turning the powder volume adjustment knob to a lower number. 4. The spray length is automatically controlled by the press. 5. Adjust the powder volume adjustment knob if necessary. 6. The sprayer operates automatically when the press goes on impression and a sheet is present under the spray nozzles 16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45

11103 Indian Trail, Dallas, TX 75229 Phone 972-484-6808, Fax 800-365-6510 E-mail accel@dallas.net, Web Site www.accelgraphicsystems.com