INFRASTRUCTURE RENEWAL FOR THE NEXT GENERATION PATCO High Speed Line Power Infrastructure Renewal

Similar documents
Workplace Charging Challenge: part of the EV Everywhere Grand Challenge

Strategic Plan

FREQUENTLY ASKED QUESTIONS

Merger of the generator interconnection processes of Valley Electric and the ISO;

Summer Reliability Assessment Report Electric Distribution Companies Perspective

2015 Grid of the Future Symposium

Sales and Use Transportation Tax Implementation Plan

Purple Line Light Rail P3 Project

Microgrid solutions Delivering resilient power anywhere at any time

Smart Grid Progress and Plans

The Preferred Alternative: a Vision for Growth on the Northeast Corridor

Decision on Merced Irrigation District Transition Agreement

Program. presented by: September 22, 2010

Yukon Resource Gateway Project

UfM Ministerial Declaration on Energy

DRAFT Evaluation Scores. Transit

AMTRAK ENVISIONS WORLD CLASS HIGH-SPEED RAIL Washington to Boston in about three hours at up to 220 mph (354 kph)

BUS STOP ELITE. Innovative System for Bus, BRT & Tram. The world s most advanced, intelligent & attractive bus stop A POWERFUL MARKETING PLATFORM

MEDIA RELEASE. June 16, 2008 For Immediate Release

Planning for Sustainable Urban Transport Systems in India - Strengths and Weaknesses

Charlotte Area Transit System: Moving Forward John Lewis CATS Chief Executive Officer

CANADA LINE a Canadian P3 Success Story

Everything under control Thanks to reliable power grids

5. OPPORTUNITIES AND NEXT STEPS

How to make urban mobility clean and green

Tunney s Pasture Station Bus Loop and Lay-up Area Design

Green Line LRT: Beltline Segment Update April 19, 2017

COMMUNITY REPORT FISCAL YEAR We are making progress, are you on board? GOLD COAST TRANSIT DISTRICT

Herding Cats; Strategies used for KC Downtown Streetcar Utility Coordination ASCE Transportation Conference

Downtown Transit Connector. Making Transit Work for Rhode Island

Metropolitan Council Budget Overview SFY

GROWTH & DEVELOPMENT. Residents enjoying the newly opened Brickell City Centre on Nov. 3, 2016.

A Transit Plan for the Future. Draft Network Plan

AEP Ohio Distribution Reliability and Technology Programs

BIRMINGHAM CONNECTED Anne Shaw Tuesday 20 January 2015

US 29 Bus Rapid Transit Planning Board Briefing. February 16, 2017

ABB in primary aluminium From mine to market

Presentation to the Portfolio Committee on Transport Gautrain Update. Jack vd Merwe (Pr. Eng) CEO: Gautrain Management Agency 25 August 2009

Georgia Department of Transportation 2006 Fact Sheet Lovejoy to Atlanta Rail Line visit the website at

Late Starter. Tuesday, November 6, 2018

ADB Knowledge Partnership Week. Hirokazu Yamaguchi May, 2015

OPENING REMARKS BY SASOL S CHIEF EXECUTIVE OFFICER, DAVID E. CONSTABLE INAUGURATION OF THE THUBELISHA SHAFT, TWISTDRAAI COLLIERY

Share with the GHSEA. Smart Energy Initiatives. Collaboration and a partner eco-system to achieve results

Executive Summary October 2013

Sean P. McBride, Executive Director Kalamazoo Metro Transit. Presentation to Michigan Transportation Planning Association July 13, 2016

PLANNING TO START OR EXPAND A BUSINESS?

The Smart Grid Information Clearinghouse

CHEMICALS AND REFINING. ABB in chemicals and refining A proven approach for transforming your challenges into opportunities

Christopher Cannon, Chief Sustainability Officer Port of Los Angeles AAPA Environmental Committee Meeting November 14/15, 2017

Car Sharing at a. with great results.

Workplace Charging May 7, 2013 Jasna Tomic CALSTART

FOR IMMEDIATE RELEASE January 17, CONTACT: Mayor s Press Office

WESTERN INTERCONNECTION TRANSMISSION TECHNOLGOY FORUM

E-PAPER BUS STOPS. The ideal partner of Papercast E-Paper displays STRONG, LONG LASTING & LIGHTWEIGHT CONSTRUCTION

Improving Accessibility of Regional Bus Stops and Pathways

Power. Because Power is Needed Everywhere Off-grid solar power systems

The Jack A. Markell Trail Delaware s Bicycle Highway New England Bike- Walk Summit

CEDAR AVENUE TRANSITWAY Implementation Plan Update

Smart Cities Industry, Technology and Citizens. December 2017 Dr. Fritz Rettberg

NYSERDA Alternative Fuel Vehicle Programs. Patrick Bolton and Adam Ruder NYSERDA April 24, 2013

Valley Metro Overview. ITE/IMSA Spring Conference March 6, 2014

Overview of Transit Funding and Planning in the PACTS Region

building liveable cities

Vanpooling and Transit Agencies. Module 3: Benefits to Incorporating Vanpools. into a Transit Agency s Services

TORONTO TRANSIT COMMISSION REPORT NO.

Service Quality: Higher Ridership: Very Affordable: Image:

Mass Transit in Charlotte and San Antonio. Keith T. Parker, AICP

Goals, Objectives, Performance Measurements. Mayor s Transition Team Public Input Session: Finance & Budget/Pensacola Energy 1/22/2019

SMART DIGITAL GRIDS: AT THE HEART OF THE ENERGY TRANSITION

Mobile Source Committee Update

Fiji Bus Industry: improving through greening

Plug Power and Workhorse Provide FedEx Express With First ProGen Fuel Cell-Powered Electric Delivery Van

REPORT TO THE CHIEF ADMINISTRATIVE OFFICER FROM THE DEVELOPMENT AND ENGINEERING SERVICES DEPARTMENT COMPRESSED NATURAL GAS TRANSIT FLEET UPDATE

10-Year Vision Update. Vancouver City Council May 2, 2017

Atlantic County Utilities Authority CNG Fleet Project

The Case for. Business. investment. in Public Transportation

Aren t You Really a Mobility Agency? Why The Vanpool Works for Transit

RELEASED UNDER THE OFFICIAL INFORMATION ACT 1982

Compressed Natural Gas Snow Plows

O-Train Confederation Line Stage 1

Electric Vehicle Cost-Benefit Analyses

IEEE-PES Chicago Chapter Presentation November 11, Smart Grid. Mike Born. Principal Engineer, Capacity Planning

UPGRADING THE AMTRAK KEYSTONE CORRIDOR

State of the Energy Sector: National Perspective. David K. Owens E2Tech Expo November 17, 2016 Portland, ME

Annual General Meeting Infineon Technologies AG

Oakland County Board of Commissioners General Government Committee April 23, SMART Services in Oakland County

APTA Sustainability Conference August 8, 2017

Caltrain Modernization EMU Procurement

Metro Reimagined. Project Overview October 2017

TRANSIT FEASIBILITY STUDY Town of Bradford West Gwillimbury

Building Collaboration Between East African Nations via Transmission Interconnectors

EcoXpertTM Training & Certification Program

-Mobility Solutions. Electric Taxis

Please visit the stations to provide your input: EV Charging Location Map EV Adoption ZEV Drivers Other Ideas

Green Line LRT: Beltline Recommendation Frequently Asked Questions

Proposal for September 2006 Start of Commuter Rail from Lovejoy on the Macon Line to Atlanta

Effects of Smart Grid Technology on the Bulk Power System

Update on Bus Stop Enhancements

AT A GLANCE GRID /2014

PSTA as a Mobility Manager

Transcription:

PATCO High Speed Line Power Infrastructure Renewal Page 1 of 5 INFRASTRUCTURE RENEWAL FOR THE NEXT GENERATION PATCO High Speed Line Power Infrastructure Renewal This Engineering Excellence Award entry tells the story of how The Burns Group (Burns) helped the Delaware River Port Authority (DRPA) and the Port Authority Transit Corporation (PATCO) High Speed Line: Ensure continued, reliable service for PATCO s 50,000 daily passengers Preserve PATCO s outstanding record of on-time performance Promote clean transportation to support the region s green initiatives Utilize public funds for tangible, long-term regional benefits This award entry tells the story of how Burns creative and innovative engineering solutions: Renewed PATCO s electrical infrastructure, which had outlived its useful life, and was experiencing system failures and lapses in reliability Completed construction on a busy, 24-hour a day, 7-day a week (24/7) railroad without impacting operations Reimagined and repackaged the project to meet DRPA s funding limits, while saving them a total of $20 million Helped navigate existing conditions and scheduling intricacies while accounting for stakeholders fluid operating priorities, using collaboration and a detailed construction management framework ROLE OF ENTRANT Burns served as the Professional Engineer and Construction Monitor for the PATCO High Speed Line Power Infrastructure Renewal for the DRPA. Burns was responsible for the engineering and design for a state-of-the-art, low-maintenance fiberglass pole line, oversight of the installation of new traction power and signal power cables, and the complete replacement of PATCO s fiber-optic backbone, which allows for increased information capacity, future system expansion, and improvements in security, revenue collection and information dissemination throughout PATCO s system. Specifically, Burns was responsible for the following: Replacement of all traction power cable, signal power cable and telecommunications cable, replacing copper wire with fiber optic cabling, including: 113,000 feet of 26.4 kv cable; 113,000 feet of 2.4 kv cable; 36,000 feet of 27C signal cable, 12,000 feet of communications cable; 59,000 feet of fiber optic cable; 30 2.4 kv to 120 V 100 Hz transformers and 825 fiberglass poles Upgrade of telecommunications and signals backbone network using state-of-the-art ATM networking system Increasing capacity for DRPA/PATCO telecommunications needs for ongoing and planned projects Construction phasing to minimize impact on PATCO operations while providing contractors with adequate construction windows

PATCO High Speed Line Power Infrastructure Renewal Page 2 of 5 ROLE OF OTHER CONSULTANTS Construction Scheduling: Envision Consultants, Ltd. Construction Inspection: JCMS, Inc. Railroad Signal Construction Phase Services, Field Testing Oversight, and Support during Signal Cutovers: Hatch Mott Macdonald BURNS CONTRIBUTION TO THE PROJECT PATCO operates a 14.2-mile long, 2-track high-speed, heavy-rail transit system between Philadelphia, PA and Lindenwold, in southern New Jersey. The system is owned by the DRPA and has been in service since February 1969. In the early 2000s, the DRPA realized that PATCO s traction power distribution system infrastructure in the southern New Jersey part of the system was at the end of its useful life, had become unreliable and was subject to outages, and needed to be replaced. Much of the system infrastructure dated to the late 1960s when the PATCO system was built. The wood poles that served as support for the power lines were rotted at the base or were brittle, and were easily blown over in high winds. The insulation in the power cables had aged and weathered, leading to electrical shorts and system shutdowns. It became crucial for DRPA to update these systems, as reliable traction power and signal power are critical for the safe and efficient operation of the PATCO High-Speed Line. Included in Burns infrastructure renewal was the complete replacement of the aging electrification and power distribution system. The project would become one of the largest electrical public works projects ever built in southern New Jersey: construction costs topped $30 million, of which, $10 million came from American Recovery and Reinvestment Act of 2009 (ARRA) funds. 1. Uniqueness and/or innovative application of new or existing techniques This project represents an original application of an existing technology: fiberglass poles used on a railroad. The application of this technology is new due to the fact that it is the first application of fiberglass poles on a U.S. railroad. Utilization of fiberglass poles on this section of PATCO s High Speed Line adds a potential 100 years of life to the system, greatly increasing the system s reliability and durability, and protecting PATCO s investment. In the past, wood poles were used for pole lines because they were inexpensive. However they are also subject to decay and insect infestation. In order to ensure the infrastructure upgrade visually integrated with the natural surroundings, the new fiberglass poles were made brown. 2. Future value to the engineering profession and perception by the public Future value to the engineering profession The PATCO Power Infrastructure Renewal provides tremendous value to the engineering profession. It shows that existing technologies can be applied in untraditional ways to help clients meet their technical and operational needs. The use of fiberglass pole lines instead of traditional wood has greatly extended the life and reliability of PATCO s infrastructure, and serves as a model project for future traction power infrastructure upgrades across the country. This project also reinforces how important it is for engineers to support clean transportation initiatives, and is an example of how the engineering profession contributes to making a healthier, cleaner, greener environment for the traveling public.

PATCO High Speed Line Power Infrastructure Renewal Page 3 of 5 Perception by the public In a time of increased use of mass transit and regional rail due to high gas prices and increased population in major metropolitan areas, the growing number of riding public needs high reliability, predictability and on-time service. This project demonstrates to the public that mass transit can be upgraded to improve reliability while having minimal impact on daily ridership and schedules. This project was successfully completed with minimal impact on PATCO s 50,000 daily riders, emphasizing a positive image of engineering, and increasing the public s confidence in mass transit. This project also enabled Burns to utilize $10 million of ARRA funds, allowing DRPA significant savings and demonstrating the ability for public money to provide public good. 3. Complexity A summary of the engineering complexities associated with this project includes: Significant coordination between multiple stakeholder agencies including DRPA/PATCO, NJ TRANSIT and Conrail, was required to keep the project moving smoothly, and without significant impact to the riding public. For example, while working along the right-of-way that PATCO shares with NJ Transit s Atlantic City Line, buses were substituted for late-night NJ TRANSIT trains four nights a week. The project s construction phasing was carefully developed to minimize the impact on PATCO operations, while providing the contractor with adequate construction windows. A significant portion of the work area was only accessible from the track. Because PATCO does not have a parallel maintenance road along the tracks, and in many locations the track is inaccessible by conventional construction equipment, the installation of new poles and cable, including cable transfers and removal of old poles, was done using a train of hi-rail line equipment. 24/7 operations created a significant scheduling challenge for the construction team. Since most of the work was done using on-track construction equipment, the team used single-track outages at night between 9 p.m. and 5 a.m. in order to access the tracks. In a carefully orchestrated manner, the contractor was permitted to work from one track while revenue trains operated on the adjacent track. The team collaborated to carefully manage construction activity and shutdowns around peak travel times and special events. Significant safety measures were established and implemented in order to protect workers and equipment from closely passing trains. Look-ahead schedules were closely coordinated several times a week to make sure that all parties were synchronized. While working along the right-of-way that PATCO shares with NJ Transit s Atlantic City Line, buses were substituted for late-night NJ Transit trains four nights a week. 4. Successful fulfillment of client/owner needs Through the completion of this project, Burns helped DRPA improve the reliability and safety of the PATCO High Speed Line, enabling them to continue providing outstanding on-time service to their 50,000 daily riders. Burns exceeded expectations through: In order to capitalize on $10 million in ARRA funds, the project was quickly and creatively redesigned to become shovel-ready, ultimately saving DRPA nearly $20 million total. This project facilitated the successful use of ARRA funds to provide tremendous benefit to the region.

PATCO High Speed Line Power Infrastructure Renewal Page 4 of 5 Infrastructure upgrades, including the first fiberglass pole line on a U.S. railroad, extend service life and improve system reliability. The complete replacement of the system s fiber optic backbone allows for future increased information capacity, future system expansion, and improvements in security, revenue collection and information dissemination throughout PATCO s system All construction was completed on an active railroad without impacting PATCO operations, maintaining their outstanding on-time performance record Navigation of complex working conditions and scheduling intricacies and careful phasing minimized impact on daily operations and schedules Collaborative problem solving that enabled success even during the most extreme construction restrictions, and while accounting for PATCO s often fluid operating priorities Strong on-site resident engineering expertise resolved field issues correctly and in a timely fashion to allow safe, unimpeded construction progress 5. Social, economic and sustainable development considerations Social considerations The project reinforces to the general public and local community that PATCO is committed to promoting and providing clean transportation to support the region s green initiatives. The renewal of PATCO s infrastructure increases visibility of electric traction as a clean mode of transportation. Economic considerations While DRPA made a significant upfront investment in upgrading this section of PATCO track, the long term economic benefits to them are great. The low-maintenance fiberglass pole line has an anticipated 100 year service life, and requires much less periodic maintenance, providing tremendous long-term economic benefit to DRPA. Sustainable development considerations The renewal of PATCO s power infrastructure supports and promotes mass transit as a clean form of transportation, and supports the region s green initiatives. By providing a more reliable system, the PATCO High Speed Line will attract a greater number of riders, reducing the number of cars on the road and decreasing harmful emissions.

PATCO High Speed Line Power Infrastructure Renewal Page 5 of 5 SUMMARY The PATCO High Speed Line Power Infrastructure Renewal for the DRPA is unique and worthy of special recognition. Burns revitalization of an antiquated traction power distribution system helped DRPA and PATCO: Ensure continued, reliable service for PATCO s 50,000 daily passengers Preserve PATCO s outstanding record of on-time performance Promote clean transportation to support the region s green initiatives Utilize public funds for tangible, long-term regional benefits Burns creative and innovative engineering solutions: Renewed PATCO s electrical infrastructure, which had outlived its useful life, and was experiencing system failures and lapses in reliability Completed construction on a busy, 24-hour a day, 7-day a week (24/7) railroad without impacting operations Reimagined and repackaged the project to meet DRPA s funding limits, while saving them a total of $20 million Helped navigate existing conditions and scheduling intricacies while accounting for stakeholders fluid operating priorities, using collaboration and a detailed construction management framework Burns innovative solutions helped DRPA and PATCO achieve social, economic and sustainable design benefits, including: The project reinforces to the general public and local community that DRPA, PATCO, The Burns Group and the engineering community are committed to promoting and providing clean transportation to support the region s green initiatives The low-maintenance fiberglass pole line has an anticipated 100 year service life, and requires much less periodic maintenance, providing tremendous long-term economic benefit to DRPA