Work Zone Safety & New Interstate Resurfacing Provision

Similar documents
SN01 STANDARD NOTES CITY OF SAMMAMISH 2018 FLASHING YELLOW ARROW SIGNALS PROJECT NO. DATE BY APPR REVISION COSA0023 KING COUNTY WASHINGTON

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 808 DIGITAL SPEED LIMIT (DSL) SIGN ASSEMBLY.

SN01 STANDARD NOTES CITY OF SAMMAMISH 2018 INTERSECTION IMPROVEMENTS PROJECT NO. DATE BY APPR REVISION COSA0023 KING COUNTY WASHINGTON

Louisiana s s Work Zone Task Force Work Zone Improvements

Act 229 Evaluation Report

LaDOTD s s New Traffic Control Details

801-R-xxx LAW ENFORCEMENT OFFICER FOR WORK ZONE SAFETY. (Adopted xx-xx-17)

STATE ND PROJECT NO. CP 0883 (14) & CP 1152 (14) SHEET NO. TOTAL SHEETS 9 31 SIGN NUMBER SIGN SIZE DESCRIPTION AMOUNT REQUIRED UNITS PER AMOUNT UNITS

Diagram 1 - Shoulder Assistance

Created by: St. Louis County

Section 6H.01 Typical Applications

Work Zone Traffic Control

Work Zone Changes Since We Last Met 2016 Louisiana Transportation Conference. Barry L. Lacy, P.E. Work Zone/Claims/Audit Engineer

Work Zone Safety Best Practices Traffic Engineering & Safety Conference October 18, Dean Mentjes Federal Highway Administration

South Carolina. It s serious. Deadly serious.

2014 Fall Asphalt Conference October 7, 2014 Richmond, VA Review of Virginia s 2013 Work Zone Crash Statistics

Work Zone Safety. Mike Marr Industrial Safety Consultant Ohio Bureau of Workers Compensation Division of Safety & Hygiene

NCDOT Report on Improving Safety on Secondary Roads

TTI TRAFFIC SAFETY CONFERENCE. John A. Barton, P.E.

MISSOURI HIGHWAYS AND TRANSPORTATION PLANS FOR PROPOSED STATE HIGHWAY DESIGN DESIGNATION INDEX OF SHEETS LENGTH OF PROJECT SHEET NUMBER

Work Zone Safety Initiatives and Research Efforts. Irene Soria Safety Evaluation Engineer Illinois Department of Transportation Safety Engineering

Exhibit H: Typical Traffic Control Plans. North Metro Natural Gas Pipeline Project Routing Study

Work Zone Worker Protection

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, EDITION 2007

SCDOT TRAFFIC SIGNAL SPECIAL PROVISIONS TRAFFIC CONTROL FOR TRAFFIC SIGNAL PROJECTS MAINTENANCE OF TRAFFIC

Page 1 of KA

Moving Operations. Introduction by. National Traffic Management & Work Zone Safety Conference March 2009

2013 Changes to the 2011 MMUTCD, Part 6 September 2013

TRAFFIC ENGINEERING DIVISION INSTRUCTIONAL & INFORMATIONAL MEMORANDUM

60 70 Guidelines. Managing Speeds. Work Zones

1400 MISCELLANEOUS Traffic Engineering Manual

Anticipated Changes Based on 2009 Federal MUTCD

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 2 CONTRACT MAPLE STREET UNDERPASS BRIDGE (MM 106.0)

REVISION VIRGINIA WORK AREA PROTECTION MANUAL. Effective April 1, 2015 for State Forces & Effective starting on the July 2015 Advertisement

2016 Congestion Report

Handbook for Temporary Traffic Control - Construction, Maintenance, and Utility Operations

FREQUENTLY ASKED QUESTIONS

Night Work Specification

NOTIFICATION OF ADDENDUM ADDENDUM NO. 2 DATED 5/03/2013

Temporary Traffic Control Plans

Metropolitan Freeway System 2013 Congestion Report

Procedure Effective date Rescinds Vehicle Placement In or Near Moving Traffic 17 November January 2005

Fred H. Heery, Sr., P.E.

DELINEATOR REFERENCE POINT 200' TYPICAL SPACING (YELLOW DELINEATORS) END OF MERGE LANE TAPER DELINEATOR REFERENCE POINT

CLAY COUNTY MISSOURI HIGHWAYS AND TRANSPORTATION COMMISSION PLANS FOR PROPOSED STATE HIGHWAY NOT TO SCALE LENGTH OF PROJECT

FREQUENTLY ASKED QUESTIONS

Algo Traffic and the Tuscaloosa RTMC. Chris Sewell, P.E. ITS Operations Manager ALDOT West Central Region

s Contact the Area Construction Engineer at for RAP sample location. Page 2 of 10

Work Zone Safety. Guidelines for Temporary Traffic Control

D-25 Speed Advisory System

Design and Operation of Work Zone Strategies to Improve Large Truck Safety

Highway Construction Worker Dies When Struck By Semi-Tractor Trailer Incident Number: 03KY030

1200 ZONES AND STUDIES Traffic Engineering Manual

Road Safety. Top 10 misunderstood road rules in NSW

The following sign regulations shall apply to all uses as indicated. This Section (414-1) shall apply to all Residential Districts.

SECTION 12 - CONSTRUCTION AREA TRAFFIC CONTROL TABLE OF CONTENTS

Influence of Truck-Mounted Radar Speed Signs in Controlling Vehicle Speed for Mobile Maintenance Operations

Metropolitan Freeway System 2007 Congestion Report

PERFORMANCE ACTIVITY 603 SIGNS

2016 Traffic Signal System Performance Metrics Update Kumar Neppalli, Traffic Engineering, Public Works John Richardson, Planning and Sustainability

NCUTCD Proposal for Changes to the Manual on Uniform Traffic Control Devices

Illinois State Police Enforcement Initiatives. Commander Robert W. Haley Statewide Patrol Support Command

Median Barriers in North Carolina -- Long Term Evaluation. Safety Evaluation Group Traffic Safety Systems Management Section

Maintaining Pavement Marking Retroreflectivity

DESIGNATED CONSTRUCTION ZONE SPEED FINES DOUBLE. Manitoba Infrastructure and Transportation. Infrastructure and Transportation. Traffic Engineering

TRAFFIC CONTROL PLAN FOR SURVEYING OPERATIONS END ROAD WORK END ROAD WORK * ** END ROAD WORK END ROAD WORK. TCP (S-1a) TCP (S-1b)

NCDOT Rideability and IRI Special Provision. Nilesh Neel Surti, PE North Carolina DOT State Pavement Construction Engineer

800 Access Control, R/W Use Permits and Drive Design

- 1 - TRAFFIC CONTROL EQUIPMENT SPECIFICATIONS I. INTENT STATEMENT II. GENERAL EQUIPMENT CATEGORY SPECIFICATIONS

Plan Check Policies and Guidelines

Maine Turnpike Authority

Transportation Highway Engineering Conference February 24, 2015

Facility Conditions.

CITY OF BURLINGTON SHARON AVENUE SANITARY SEWER IMPROVEMENTS - PHASE 1 - REBID CITY OFFICIALS. STEVE SEXTON Mayor JAMES STAVIG.

All Electronic Tolling (AET): Frequently Asked Questions

REVIEW OF SIGNIFICANT CHANGES IN THE 2011 VIRGINIA WORK AREA PROTECTION MANUAL. VDOT Traffic Engineering Division Oc7, 2011 Presentation

2018 NDACE CONFERENCE

Safety Assessment. Intersection of Route 29 (Seminole Trail) and Ashwood Blvd (Route 1670). Albemarle County

THE CITY OF MARION HISTORIC DOWNTOWN STREETSCAPE PLAN DIRECTIONAL SIGNAGE

#6 IN A SERIES SHARING THE ROAD. How to stay safe.

Traffic Regulations Guidelines

LCDOT DETOUR PROCEDURES. and GUIDELINES

Plan Check Policies and Guidelines

The Highways Agency is working to improve the M3 between junctions 2 to 4a.

Chapter 17 TRAFFIC AND VEHICLES. Adoption of Uniform Rules of the Road. Temporary Traffic Regulations.

Report Title Report Date: Adaptir

All Electronic Tolling August 22, Media Overview

TRAFFIC DEPARTMENT 404 EAST WASHINGTON BROWNSVILLE, TEXAS City of Brownsville Speed Hump Installation Policy

traversing them. Speed dips may be installed in lieu of speed humps where the 85 th percentile speed on a street is at least 36 mph.

panelsizes:min.:30x30,std.:36x36,exp.:36x36,fwy.:48x48 levels:gscolorfill GSBWFILL GSOUTLINE chevronshoulderradius: constructpanels: pan

Alberta Transportation Rumble Strips - C-TEP Lunch and Learn

The final test of a person's defensive driving ability is whether or not he or she can avoid hazardous situations and prevent accident..

TRAFFIC CONTROL PLAN ONE-LANE TWO-WAY TRAFFIC CONTROL TCP(1-2)-12 ONE LANE TWO-WAY CONTROL WITH YIELD SIGNS ONE LANE TWO-WAY CONTROL WITH FLAGGERS

Maine Turnpike Authority

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 961 PORTABLE TRAFFIC SIGNALS OCTOBER 17, 2008

Brownwood Portable Traffic Signals and AFADs Evaluation. Carl Johnson, P.E., TxDOT Brownwood District Melisa Finley, P.E., TTI

Virginia Department of Transportation

Session 123 Rumble Stripes: Opportunity to Improve Safety and Retroreflectivity

Guelph Driving School. 246 WOOLWICH ST. Unit C Guelph, Ontario N1H 3V9. Office: Cell:

Open House. Highway212. Meetings. Corridor Access Management, Safety & Phasing Plan. 5:30 to 6:30 p.m. - Southwest Corridor Transportation Coalition

Transcription:

2017 CAPA Presentation Work Zone Safety & New Interstate Resurfacing Provision Steve Kite, PE State Work Zone Engineer

Work Zone Safety Data In 2016, Approximately 600 construction projects across NC (not including Maintenance and Utility work zones) 26 Fatalities in 2016 (5 Year Average = 20.4) We re projecting that 2016 WZ crashes will be 5,254 based on recent trends) 2015 Work Zone Crash Data 4,635 Work Zone Crashes Of those, 2,475 Involved Injuries (over 50%) 19 Work Zone Fatalities Over 80% of the Fatalities are Motorists Most crashes occur on clear, dry days Most crashes occur in Metropolitan areas (66%) Most crashes occur between Noon and 6 PM with the majority occurring between 3 and 4 PM 2

Safety Trends- Work Zone Crashes 6000 Work Zone Crash Chart 5000 4635 5254 4000 4120 3000 2858 3277 3479 2000 1000 0 2011 2012 2013 2014 2015 2016 WZ Crashes 3

Trends- Work Zone Fatalities Work Zone Fatalities 30 25 24 26 20 20 19 15 10 12 13 5 0 2011 2012 2013 2014 2015 2016 4

Why are crashes and fatalities trending upward NC s Average Price of Gasoline 4 3.5 3.38 3.47 3.31 3 2.5 2.67 2 2.05 2.01 1.5 1 0.5 0 2011 2012 2013 2014 2015 2016 5

Vehicle Miles Driven NC s Vehicle Miles Driven (Per 100 Million) 1160 1140 1151.38 1120 1118.72 1100 1080 1080.4 1060 1040 1037.37 1044.65 1051.44 1020 1000 980 2011 2012 2013 2014 2015 2016 6

North Carolina s Move Over Law NC s Move Over Law requires motorists to change lanes or slow down significantly if Law Enforcement and Highway Maintenance/Construction Vehicles are adjacent to traffic AND.have their lights flashing Hopefully, this law will also help in reducing speeds where equipment and workers are operating 7

Interstate Resurfacing Provision- WORK ZONE TRAFFIC CONTROL FOR INTERSTATE/FREEWAY RESURFACING PROJECTS Purpose Provision that specifically addresses the needs and requirements for resurfacing Interstates and Freeways Provide consistency for traffic control Requirements and Bidding Provide Pay Items and Quantities MAJOR TOPIC AREAS OF INTEREST 1. 5 Mile Lane Closure Length 2. Law Enforcement Pay Item 3. New Devices- Presence Lighting, Sequential Flashing Lights, and Digital Speed Limit Signs 4. Work Zone Speed Limit Reductions 5. Pay Items 8

Interstate Resurfacing- 5 Mile Lane Closure Length 5 Mile Lane Closure Length- Found under the Project Requirements 1B. The maximum Active Work Area is a distance of 5 miles. It s defined as the maximum allowable distance for Resurfacing Operations taking place in a single work period. Therefore, the maximum length of lane closure is 5 miles. However, approval by the Engineer is required before closing more than 2 miles of Interstate to ensure the Contractor has the equipment and labor force to actively pursue the work. 9

Interstate Resurfacing- Law Enforcement Pay Item Law Enforcement- Found in Traffic Operations Section 4. Law Enforcement Off Duty Law Enforcement officers will be required as part of the Traffic Control for Interstate resurfacing operations. There is a pay item for their use on it s based on using 2 officers per direction plus any officers needed at interchanges The hours of Law Enforcement are calculated as follows: Mainline = (Project Length / Production Rate of 2.5 miles/lane/night) x (Total # of Lanes) x (10 hours/night x 2 Officers/Night) Interchanges = 32 hours per interchange x Total Number of Interchanges 10

Interstate Resurfacing- Law Enforcement Location Where is the Proper Location for Law Enforcement during Lane Closures? On the Paved Shoulder Facing Traffic with Blue Lights Flashing and Headlights OFF Between the Middle (Lane Closed Symbol) and Last Sign (RT LANE CLOSED) before entering the lane closure 11

Interstate Resurfacing- Law Enforcement Facing Traffic Why Facing Traffic? Officer has a Larger Field of View of oncoming traffic A Frontal crash allows Engine and Airbags to protect the officer A Rear Impact could ignite gas tank 12

Work Zone Speed Limits Work Zone Speed Limits and Digital Speed Limit Signs -found in Traffic Operations Section 2. Work Zone Speed Limits and Digital Speed Limit Signs (DSLS) All Speed Limit reductions have to be ordinanced by the State Traffic Engineer (Send me and the Regional Traffic Engineer an email requesting this and we ll take care of the rest) NCDOT has sole authority of All Work Zone Speed Limits. The Work Zone Speed Limits will be displayed on Digital Speed Limit Signs. The Work Zone Speed Limits will change from 55 MPH during work activity involving lane closures to the existing speed limit (60/65/70 MPH) when the lane closures are removed. The Contractor, Traffic Control Sub and the Resident Engineer will coordinate and determine who is responsible for changing the Digital Speed Limit Signs. 13

Interstate/Freeway Resurfacing- New Devices Digital Speed Limit Signs Sequential Flashing Lights Work Zone Presence Lighting 14

Digital Speed Limit Sign- Special Provision and Drawing These will be covered in separate Special Provisions with pay items included in the Contract 15

Work Zone Presence Lighting Work Zone Presence Lighting -found in Traffic Operations Section 3. Work Zone Presence and Sequential Flashing Lighting Furnish and install WZ Presence Lighting to supplement the Contractor s portable construction and equipment lighting for the purpose of alerting the motorist of an active work zone and to encourage compliance with the reduced work zone speed limit Improve Worker Visibility 16

Sequential Flashing Lighting Sequential Flashing Lights -found in Traffic Operations Section 3. Furnish and install Sequential Flashing Lights on drums used for merging tapers to assist motorists in determining which direction to merge and to decrease late lane merging. 17

Interstate/Freeway Resurfacing- New Devices Main features of the Provision and Drawings Only install in areas of the lane closure where there is no lighting- (ie the dark areas Device spacing depends on Lumens and Surface Area of the balloon light No light meters required Sequential Flashing Lights are placed on drums used for merge tapers 18

3 Separate Pay Items for the Lights and the Digital Speed Limit Signs 1. Work Zone Presence Lighting- Quantity will normally be 15 units Based on using 6 units per mile over 2.5 miles 2. Sequential Flashing Lights- Quantity will normally be 16 units. Based on using 70 MPH taper length with drums spaced at 55 which is the Work Zone Speed Limit. 3. Digital Speed Limit Signs- Quantity will normally be 4 Units. Based on having 1 in advance of taper and one every 1.5 miles of the 5 mile lane closure 19

Interstate Resurfacing Provision- Pay Items 1. Work Zone Signs (Stationary) 2. Work Zone Signs (Portable) 3. Flashing Arrow Board 4. Portable Changeable Message Signs 5. Portable Changeable Message Signs (Short-term) 6. Drums 7. Paint Pavement Marking-4 8. Paint Pavement Marking-8 9. Paint Pavement Marking-24 10. Paint Pavement Marking Symbols 11. Removal of Pavement Marking Lines-4 12. Law Enforcement 20

This Slide Left Intentionally Blank 21

RWZ and Suggested Stationary Work Zone Sign Removal Changes This has been an on-going issue with Rural Resurfacing Projects not as much with Interstate Resurfacing Projects. We are recommending a revision in the RWZ language to assist in getting these signs removed as quickly as possible 1) The Rural Resurfacing Provision (RWZ) would allow for sign removal once Maps are substantially complete. 2) Substantially complete is when paving is completed and shoulders are brought up to proposed pavement elevation AND when temporary pavement markings are installed on both centerline and edgelines. Final Marking (Thermoplastic/Polyurea) can be later installed without Stationary Signs 22

Stationary Work Zone Signs-AST Treatments The drawing has been revised to allow for fewer Stationary Signs and the use of more portable signs since this work moves much quicker than standard resurfacing operations. The Begin Road Work Signs are Stationary and the Loose Gravel and Unmarked Pavement signs are portable. The Low/Soft Shoulder and Road Under Construction signs have been removed. 23

Questions/Comments? Contact Information Steve Kite, PE, State Work Zone Engineer Telephone: (919) 814-4937 Email: skite@ncdot.gov