Gauge Wiring Instructions

Similar documents
Oil Pressure Sender Installation Kit

M GT 2005 up Mustang ENGINE START Push-Button INSTRUCTION SHEET

Exhaust Heat Shield Instructions ND

06-15 ECU, Battery and Washer Bottle Relocation

Exhaust Heat Shield Instructions NC 06-15

Accessory Kit Estimated Fitting Time: 120 Minutes

SALEEN SPEEDLAB BOOST AND WATER TEMPERATURE GAUGE POD KIT

INSTALLATION INSTRUCTIONS

Application Note. Atlas RS-3 Tsunami Digital Sound Decoder Installation Notes

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS

Athearn SD40T-2 Tsunami Digital Sound Decoder Installation Notes

Installation Instructions - ECS Tuning Vent Pod Vacuum/Boost Gauge Kit

PRELIMINARY INSTALLATION INSTRUCTIONS. 8 Wire ties. PARTS LIST CD Changer Attachment Kit (sold separately): P/N 08B26-S9V-100A

INSTALLATION INSTRUCTIONS

Adjustable Light Kits E-Z-Go TXT All Models Installation Instructions

GOMINIGO Third Brake Light Pulsar Kit. Installation Instructions

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS

SPEED CONTROL 4 AND 6 CYL. JEEP WRANGLER. Read entire instructions thoroughly before starting. INSTALLATION INSTRUCTIONS TOOLS REQUIRED:

INSTALLATION INSTRUCTIONS

Atlas Silver Series HO RS-3 (2014 Release) Tsunami Digital Sound Decoder Installation Notes

INSTALLATION INSTRUCTIONS

Convenience Lighting

Installation Manual Lock-Switch KIA Sorento V3 Installation Manual Lock-Switch V3 for KIA Sorento (02-06) and KIA Sorento (07-09)

INSTALLATION INSTRUCTIONS

42 Draft Designs. Gauge Solution Installation Instruction Manual. * SW Gauges / Mitsubishi Lancer EVO 8 & 9 *

Installation of Auto Meter Cobalt Boost/Vacuum Gauge:

TOYOTA im INTERIOR LIGHT KIT Preparation

Athearn SD40 Tsunami Digital Sound Decoder Installation Notes

INSTALLATION INSTRUCTIONS

SPEED CONTROL 4 AND 6 CYL. JEEP WRANGLER. Read entire instructions thoroughly before starting. INSTALLATION INSTRUCTIONS TOOLS REQUIRED:

Designed for the Street Proven on the Track

Please read thoroughly before starting installation and check that kit contents are complete.

Kato P42 Tsunami Digital Sound Decoder Installation Notes

SUBARU/VOLVO VOLKSWAGEN INSTALLATION INSTRUCTIONS (pgs. 1-6) (pgs. 7-10)

INSTALLATION INSTRUCTIONS

Athearn RTR EMD CF7 Tsunami Digital Sound Decoder Installation Notes

GENUINE PARTS INSTALLATION INSTRUCTIONS

Athearn Genesis GP38-2 Tsunami Digital Sound Decoder Installation Notes

Athearn RTR EMD GP35 Tsunami Digital Sound Decoder Installation Notes

INSTALLATION INSTRUCTIONS DOCUMENT REVISION : /17/2014

SCION FR-S FOG LIGHTS

LiteDOT Installation Document

* * Inside Toyota Avalon. Tools Required IMPORTANT

Supply Valve Replacement

INSTALLATION INSTRUCTIONS

Application Note. Bachmann F40PH Tsunami Digital Sound Decoder Installation Notes

Fitting Instructions

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS

Part Number: T4R-2N1. Hardware Bag Contents. General Applicability Models with factory fog light

Part Number: TCA-712SE

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS

LGT-312L E-Z-Go TXT Light Bar Bumper Kit Installation Instructions

RoadComfort TM. Installation Manual Vibration Massage & Heat

INSTALLATION INSTRUCTIONS

PRELIMINARY INSTALLATION INSTRUCTIONS. PARTS LIST Security System Kit (sold separately) P/N 08E51-EP4-101

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS

Ford 6.7L Installation of the Guardian Safety System

INSTALLATION INSTRUCTIONS

PRELIMINARY INSTALLATION INSTRUCTIONS. PARTS LIST Attachment Kit(sold separately): P/N 08B23-S9V-100B. Display bracket.

Yamaha Apex Moto-R Kill w/jacobson Roll-over valve Installation Instructions

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS

Rear Vision System Tailgate Emblem Camera Aftermarket Display 2009-Current Ford F-150 and 2010-Current Super Duty (Kit part number )

Four Panel Amber LED Front Light Kit Installation Guide

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS


INSTALLATION INSTRUCTIONS

Part Number: TTA-712. Hardware Bag Contents. General Applicability All models

PRELIMINARY INSTALLATION INSTRUCTIONS PARTS LIST. Combination light switch Right fog light. 4 Self-tapping washer-screws.

INSTALLATION INSTRUCTIONS

How to Install and Remove a standard Teletrac Transceiver.

Tutorial:Head Unit Installation

Accessory Kit Estimated Fitting Time: 120 Minutes (Prado) Estimated Fitting Time: 140 Minutes (Kluger)

INSTALLATION INSTRUCTIONS TRAILER HITCH MAIN HARNESS KIT

How to: Install the HomeLink equipped Sun Visor into a 2005 Subaru Legacy (2.5i or 2.5GT) Revised 03/17/2005

CVO - with ipod Amp & Speaker Upgrade Install Instructions for Batwing Fairing

A. Preparing the charge harness. Start by removing the plastic covers by the battery terminal.

INSTALLATION INSTRUCTIONS

Part Number: STC-501. Hardware Bag Contents. General Applicability. Conflicts. Date: SCION tc LED DRL in FOG LIGHT HOUSING

Installation Instructions - ECS Tuning Vent Pod Vacuum/Boost Gauge Kit

TOYOTA PRIUS C FOG LIGHT (Halogen & LED)

2016 HONDA 1000 Pioneer PN 3102 Turn signal / horn kit rev nc

INSTALLATION INSTRUCTIONS

Ford Mustang V6 OEM-Style Fog Light Kit Parts List: Quantity: Tool List:

INSTALLATION INSTRUCTIONS

General Applicability Note: Recommended Tools. Personal & Vehicle Protection Safety Goggles Seat Covers Floor Covers Special Tools. Installation Tools

Turn Signal / Horn Kit PN 7101 by All years Polaris RZR 1000 and RZR 900, 900-4, 900 trail, 900S and 900XC STOP - THIS KIT IS DESIGNED

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS

Designed for the Street Proven on the Track

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS

Transcription:

Thank you for purchasing the Track Dog Racing Gauges. These instructions are for wiring the Westach brand gauges with the TDR gauge panel for all model years of the Miata. Refer to the installation instructions for wiring and installing the gauge kit into your car. There are many options as to which gauges you may want to install, but the wiring and the installation will be similar. We also offer a prewired kit to simplify your wiring. The photo below is the TDR angled gauge panel for the 99-05 Miata; the TDR gauge panel for the 90-97 Miata wiring is similar. Minor modifications such as clearances may be required to your dash area where the gauge panel will insert depending on the combination and placement of your gauges. Additional wiring and mounting for the sensors will also need to be considered. If you are going to move your radio down and install the gauge panel on top, which is the preferred method you will need to purchase a radio removal tool from Track Dog Racing or you may find one at your local automotive parts store. Here is a list of items and tools you may require for this installation depending on your gauge configuration. Radio removal tool Phillips screwdriver Wire cutters and strippers Soldering gun 3/16 shrink tubing Extra wire for sensors, 20-22 gauge Tee connection if using the water sensor Vacuum hose Electrical tape Tie-wraps Dremel tool or other cutting device if needed Vampire connections Ph: 214-340-9797 Fax: 214-349-9342 Page 1

The two generations of Miatas, 90-97 and 99-05 dashboard requires different methods to mount the gauge panel. For this reason there are two styles of TDR gauge panels. The angled metal version works with the 99-05 style and allows the prewired gauge to snap into place. The 90-97 version is a flat plastic model that uses the individual gauge mounting bracket to hold the gauge panel up against the bezel. Some modification will be required depending on the gauge selected and the placement of that gauge. MOUNTING GAUGES INTO 90-97 PANEL 1. Install radio into the bottom slot of the bezel until the clips are secure as shown in Photo 1-A. 2. Attach the new TDR panel into the bezel above the radio. Photo 1-A: Radio and gauge panel mounted into bezel Photo 1-B: Modified mounting bracket to secure gauge panel Photo 1-C: Modified mounting bracket installed pressing against bezel Photo 1-D: Modified mounting bracket installed pressing against bezel Ph: 214-340-9797 Fax: 214-349-9342 Page 2

3. Remove the gauge mounting brackets from each gauge and place the gauge, based on your preferences into the TDR gauge panel. 4. The gauge mounting brackets secure the gauge panel against the bezel. Modify the mounting bracket as required to press against the bezel as shown in Photo 1-B. Install remaining gauges as shown in Photos 1-C and 1-D. MOUNTING GAUGES INTO 99-05 PANEL 5. Remove the gauge mounting brackets from each gauge and place the gauge, based on your preferences into the TDR gauge panel. 6. The mounting bracket may require removal of some material for clearances as shown in Photo 2-B. Use a sander, file or cutters to remove material as necessary. Remove a small amount and recheck. Photo 2-A: Attach mounting bracket to the gauge Photo 2-B: Modify the mounting bracket as required for clearances Ph: 214-340-9797 Fax: 214-349-9342 Page 3

7. Before wiring, check to make sure the gauges will install without any clearance issues as shown in Photo 2-C. The gauge set shown in Photo 2-D required notching the dashboard area for clearances. This modification will be covered by the gauge panel and will not effect any reinstallations in the future. Photo 2-C: Modify dash as required for gauge clearances Photo 2-D: Disconnect hazard warning light connector INSTALLING THE LIGHT KIT 8. All year models lighting and wiring are the same. You will use only the longest light holder tube for the light kit as shown in Photo 3-A. Snap the long tube off the support and discard the remaining tubes. 9. Pull the two wires through the tube opposite of the flanged in as shown in Photo 3-B. Push the bulb into the tube. The bulb barely pushes in so don t push too hard. Installation in the gauge will support the bulb and holder. 10. The Miata uses green lighting so the green rubber cover will be used. To simplify putting the cover on, lick the bulb first to help lubricate. Put the green rubber cover over the bulb as shown in Photo 3-C. Do not pull to hard or you could damage it. The green cover may not cover 100% of the bulb; this is normal since only a small portion is exposed for lighting. Ph: 214-340-9797 Fax: 214-349-9342 Page 4

11. Remove the blank plug from the back of the gauges as shown in Photo 3-D. 12. Push the light tube into the back of the gauge as shown in Photo 3- E. It should be snug, but if it is not, use a small amount of silicon rubber or other product on the outside to hold it in place. Photo 3-A: Light kit components Photo 3-B: Insert the light wiring through the tube opposite of the flange end Photo 3-C: Gently install the green rubber cover over the light bulb Photo 3-D: Remove the blank plug from the back of the gauge Ph: 214-340-9797 Fax: 214-349-9342 Page 5

13. There is no voltage polarity with the light bulb wiring. Attach one wire from each light together with an extension wire about 18 long (not supplied). For best connections use a soldering iron followed by shrink tubing as shown in Photo 3-F. Attach the other light wire in the same manor with an extension wire about 18 long. See Gauge Installation for power source. Photo 3-E: Install light into the back of the gauge Photo 3-F: Attach the power leads together INSTALLING THE WIRING HARNESS 8. The factory harness consists of three or four lead wires depending on single or double input configurations. On the back of the gauge is a number designating the input function. Push on the appropriate colored lead on to the gauge pin; make sure it is secure. The No. 4 Pin is the RED wire, 12V Positive. The No. 5 Pin is the BLACK wire, 12V Negative. The Input wiring uses a GREEN wire attached to the No. 3 Pin and a WHITE wire to the No. 2 Pin as shown in Photo 4-A. Photo 4-A: Push on the wires to the gauge pins Photo 4-B: Bundle the wires using tie-wraps Ph: 214-340-9797 Fax: 214-349-9342 Page 6

14. The temperature sensor wires use a common ground. When you are setting up your wiring for the temperature sensor or sensors attach the ground wire with the gauge BLACK 12V Negative wire. This is required for proper reading of the sensor. Solder the wires together along with an extension wire about 18 long to be attached to a 12V Negative source. Bundle the RED wires together along with an extension wire about 18 long to be attached to a 12V Positive source. See Gauge Installation for power source. 15.Each of the Sensor wires will require extension wires long enough to reach their source of input. We usually install a 2-conductor 20 ft. lead wire that can be shortened after the sensing point is determined. Install one lead to the 12V Ground as stated above and to either the GREEN or WHITE wire. The O2 sensor wire does not require a ground wire. 16.Bundle the wires together using electrical tape and tie-wraps to secure as shown in Photo 4-B. In our TDR Wiring Kit we use plugs to simplify installation and removal. We sell the connector kits separately in 2-Pin, 6-Pin and 9-Pin configurations. Contact TDR for more information. 17.Refer to either the 90-97 or 99-05 Gauge Installation for more information such as the O2 oxygen sensor and temperature sensor connections, lighting and power sources. We hope you will be pleased with our products. If at any time you need assistance please feel free to contact us by phone or email us at support@trackdogracing.com. The Track Dog Racing Team Ph: 214-340-9797 Fax: 214-349-9342 Page 7

NOTES: Ph: 214-340-9797 Fax: 214-349-9342 Page 8