Product Overview. Enclosure for batteries N PE/G. Battery (customer-provided - shown for reference only) Battery output terminals

Similar documents
Single and Parallel Installation

Single and Parallel Installation. MGE Galaxy kva 208/220 V

Single and Parallel Installation

AIS and 40 kva 400 V. Site Preparation and Installation Manual

Galaxy VM. Battery Breaker Box Installation 09/

Electrical Installation

INSTRUCTIONS. Power Panel. Installation Instructions

Symmetra PX kw 208 V. Installation 01/

Installation Guide Smart-UPS On-Line SRT1000/1500 UXI-NCLI, SRT1000/1500 UXI-LI, Tower/Rack-Mount

Smart-UPS VT kva 208/220 V Single and Parallel Installation. With Batteries 11/2016.

Galaxy 300 Battery Breaker Kit G3HTBKIT1

Symmetra PX with Maintenance Bypass

INSTRUCTIONS FOR THE RELIANCE CONTROLS ARM SERIES AUTOMATIC TRANSFER SWITCH

Galaxy VX Battery Breaker Trip Board (GVXBBTB) and Battery Breaker Capacitor Board (GVXBBCB)

Sheet No. Component /Detail

Smart-UPS VT kva 208/220 V. Site Preparation and Installation Manual

Symmetra PX. 250/500 kw 400/480 V Single and Parallel Installation 07/

Solar Hybrid Power Generating System CPS1200EOH12SC CPS2200EOH24SC CPS3000EOH24SC. User s Manual K01-C

SAVE THESE INSTRUCTIONS

Safety and General Information

Symmetra PX 20 kw. InfrastruXure 208 V. Installation 01/

LP Dimming Panels. GRAFIK Systems

AIS 5000 UPS kva 480 V. Installation Manual

INSTRUCTIONS FOR THE RELIANCE Fast/Tran TM ARL0909 & ARL0909R

PowerLogic High Density Metering System 4-Meter Enclosure Installation Guide

AE012 Enclosure for E5x Series Energy Meters With Swing Panel Kit Product Overview

TOPAZ 12 WALL PACK INSTALLATION & MAINTENANCE GUIDE (Part # LIT A)

Installation. InfraStruXure PDU 80kW PD80F6FK1-M-14 PD80F6FK1-M PD80G6FK1-M PD80G6FK1-M-14

Dry Contact Closure Interface

Galaxy Receiving and Unpacking 09/

Galaxy Installation 08/

Galaxy VM. Classic Battery Cabinet Installation GVMCBCWUE, GVMCBC2WUE, GVMCBC2WUF, GVMCBC3WUF 07/2017.

RT Series Battery Pack UL for RT 6 and 10 kva UPS UL. Extended Battery Pack. User Guide

RT Series Step Down Transformer for RT Series UPS 6-10kVA UL Input Vac Output Vac User Guide

TOPAZ 24 DIMMER RACK INSTALLATION & MAINTENANCE GUIDE (Part # LIT A)

Phoenix DX Sensorless AC Vector Drive. 3 HP to 3500 HP

dv Sentry TM 208V 600V INSTALLATION GUIDE Quick Reference ❶ How to Install Pages 6 14 ❷ Startup/Troubleshooting Pages WARNING

Altivar 58 TRX Adjustable Speed Drive Controllers in Motor Control Centers hp, 480 V or 1 50 hp, 208/240 V Class 8998

Nova UAC (NV-UAC-M) Modified Sine Wave 650W 800W 1000W

Technical Specifications

Enclosure for AMP1 Series Energy Meters with Swing Panel Kit

Installation Guide Smart-UPS On-Line SRT1000/SRT1500 XLA Tower/Rack-Mount

SineWave Guardian TM 380V 600V INSTALLATION GUIDE. Quick Reference. ❶ How to Install Pages 6 17 ❷ Startup/Troubleshooting Pages WARNING

INSTALLATION AND OPERATIONS MANUAL FUEL POLISHING MODULE (FPM)

INSTALLATION MANUAL MODEL #100947, AMP MODEL #100949, AMP RELIANCE CONTROLS ARL SERIES AUTOMATIC TRANSFER SWITCH

TOD-BCU-PNUS2. Installation Manual. Connection Box for EIBS16GU2 or EIBS16GU2+ (Storage Battery System) For Installation Company Use

INSTALLATION INSTRUCTIONS

ALL PURPOSE CNC/HEAVY DUTY

High Frequency SineWave Guardian TM

Electric Range installation manual

HP BladeSystem c7000 Carrier-Grade Options Installation Guide

Owner's/Installation Manual

Start UP Guide. Symmetra LX Tower Rack-Mount. UPS Models 200 V, 4-8 kva 208/240 V, 4-8 kva 220/230/240 V, 4-8 kva

www. ElectricalPartManuals. com Instruction Bulletin ALTIVAR FLEX58 TRX Adjustable Speed Chassis Drive Controllers Installation Guide

SAVE THESE INSTRUCTIONS

Galaxy VM. Modular Battery Cabinets Installation GVMMODBCW, GVMMODBCN 09/

AXA DALI P20. DALI Broadcast Controller. Installation Manual

CPS Energy Balancer. Version: 1.0

Control Van Electrical Power System 2A5A2

Installation Instructions CONSTANT WATT (CW) AND SELF-REGULATING (SR) PIPE TRACING CABLES

M Series External Battery Frame. User Guide

Commercial 1000VDC String Inverter XGI Installation and Operation Guide Models: XGI XGI

Operation and Maintenance

ANZI Transfer Switch and Generator Wiring Installation Addendum

SPECTRACOOL Slim Fit Air Conditioners (Surface-Mount Units Only) Quick Start Operation Guide

FIELD CONNECTIONS FOR YK CHILLER (STYLE G) OPTIVIEW CONTROL CENTER WITH REMOTE MEDIUM VOLTAGE SSS

Installation And Operation Instructions

Helena Snyman - Technical Manager and Sydney Bhengu - Customer Support Technologist Elster Kent Metering (Pty) Ltd. South Africa

Dual-Lite Trident TRF 40 Wide Battery Cabinet 20-40kVA Systems USER MANUAL

O & M Manual for the EATON Generator Ready Loadcenter

Programmer Disconnect Accessory Manual for Retrofil CB

INSTALLATION INSTRUCTIONS

Battery Cabinets for 400kW 1MW UPS Systems Assembly and Installation Manual

Hardware Installation. Tracer AH541 Version 2 Air-Handler Controller CNT-SVN02B-EN

Sheet No. Component /Detail

1329I Integrated Drive/Motor CE Filter Option Kit

Asymmetrical Installation Instructions. Components: i2cove Asymmetrical LED Light Fixtures. 12 [305mm] [918mm] 48.

UL/NEMA Type 1 & Type 12 FRENIC-HVAC Combination VFD

U N I T Y / Three-Phase Uninterruptible Power Systems UT310, UT315, UT320, UT Hz

Quick guide. Plug-in fans GPPM with FC101_106 August 2014

PLASTIC FOLDING ARM KIT This kit is designed for the 1600 model barrier gate operators only. Recommended for low headroom applications.

Differential Pressure Transmitter

Installation and Operating Instructions SWITCHED NEUTRAL KIT MODEL SNK

Minimum 18 in-lb Torque

Battery Racks for 400kW 1MW UPS Systems Assembly and Installation Manual

JBE LED2000 INDUSTRIAL SOLUTIONS FOR LED & INCANDESCENT MAINS LIGHTING FLICKER FREE TRAILING EDGE DIMMER

Introduction. Installation. A Series Lighting Control Panelboards. DEH41081 Installation Instructions

model ps600 Address all communications and shipments to: FEDERAL SIGNAL CORPORATION

SIGNAL WORDS QUALIFIED PERSON

Powerware 9390 Integrated Battery Cabinet (Models IBC-S and IBC-L) Installation Manual

Power Inverter. User s Manual. Diamond Series CPD1200EILCD

RP-4000 Reserve Power Control

Electric Vehicle Charging Solutions Powering the Future of Sustainable Mobility

Precision Power Center INSTALLATION, OPERATION, & MAINTENANCE MANUAL

Mini-Roto TM Paddle Wheel Installation & Operation Manual

LIEBERT APM 3-PHASE UPS: 15-90KVA/KW, 60HZ, VAC, SINGLE & DUAL INPUT - SITE PLANNING DATA

PF Guard Power Factor Capacitor Bank Installation, Operation, and Maintenance Manual

POWER kva

Galaxy VX. 480 V UPS System Technical Specifications 07/

magellan commercial UPS solutions Magellan Power Modular - Flexible UPS

Transcription:

Product Overview Enclosure for Transformer Installation MGE TM Galaxy TM 3500 and Smart-UPS VT Enclosure for Batteries and Enclosure for Transformer 400 V Enclosure for batteries PE/G ; PE/G Unistruts Input terminal block Battery (customer-provided - shown for reference only) Battery output terminals Battery tray Protective Earth/Ground eutral busbar Output terminal block PE/ground busbar Galaxy 3500 Enclosure for Batteries Enclosure for Transformer Smart-UPS VT Enclosure for Batteries Enclosure for Transformer DC disconnect Communication board eutral The enclosure can contain up to 3 batteries - 16 batteries on the positive (right) side and 16 batteries on the negative (left) side. The enclosure holds eight battery trays and four batteries each. The maximum battery size is 197 mm x 165 mm x 175 mm. Site Planning ote: Refer to the UPS Receiving and Unpacking sheet (990-940 for MGE Galaxy 3500 and 990-1747 for Smart- UPS VT) to determine the space requirements. Consult local codes for any additional requirements. Ideally, install the enclosure in a location close to the UPS. IMPORTAT SAFETY ISTRUCTIOS - SAVE THESE ISTRUCTIOS Warning: ALL safety instructions in the Safety Sheet (990-940) must be read, understood and followed when installing the UPS system. Failure to do so could result in equipment damage, serious injury, or death. Caution: All electrical power and power control wiring must be installed by a qualified electrician, and must comply with local and national regulations for maximum power rating. 990-360-001 7/009 *990-360-001*

Level the Enclosures Warning: The system must be installed on a level floor. The leveling feet will stabilize the enclosure, but will not account for a badly leveled floor. Use a screwdriver to lower the four leveling feet. Ensure that the enclosure is level. Do not move the enclosure after the leveling feet have been lowered. Bottom cable entry through the I/O box (optional) Remove the upper rear cover. Remove the top cover of the I/O box. Remove the bottom cover of the I/O box (this one will not be reinstalled). Route the cables through the I/O box to the cable connection area. Loosen the two screws from each battery tray and remove the battery trays. Install four batteries on each battery tray. + - + - Re-install the top cover of the I/O box. Prepare for Cables Top cable entry ote: Top cable entry is only applicable to Smart-UPS VT enclosure for batteries. Install and Connect Batteries Caution: Install the batteries from the bottom and work your way up. Connect wires between the four batteries on the tray (negative to positive). Re-install the trays with the batteries installed and secure with the two screws. Remove the upper rear cover. Remove the top cover. Make holes for cables/grommets. Remove the front door. Remove the inner front door by loosening the ten screws. Re-install the top cover.

Connect the Positive Bus See Battery Enclosure Wiring for more information. Connect wire from the battery breaker + and connect it to the right top tray. Connect wire from the top tray to the second tray. Connect wire from the second tray to the third tray. Connect wire from the third tray to the bottom tray. Connect wire from the back (-) of the bottom tray to the midpoint/neutral busbar in the top of the enclosure. Connect wire from the midpoint/ neutal busbar to the midpoint/ neutral of the battery breaker. Connect the egative Bus Left side of enclosure Right side of enclosure To midpoint/ neutral busbar To battery breaker + To midpoint/ neutral busbar Connect wire from the midpoint/neutral busbar to the + on the first battery from the front at the left top tray. Connect wire from the top tray to the second tray. Connect the EPO to the UPS and the Battery Enclosure Connect the EPO (Emergency Power Off) to J108 in the UPS and to J03 in the Battery Enclosure by guiding the cable through conduits as described on the previous page. Connect the EPO by using this configuration: UPS J108 1 3 4 5 6 EPO circuit Connect battery cables between the Enclosure for batteries and the UPS Connect battery cables from the battery terminal block (+,, -) to the (+,, -) battery cable landings in the UPS. XR Conn Board J03 1 EPO circuit EPO is activated when an external 4 VDC, 1500 ma is supplied on pin 1 with reference to pin +4 V ormally open of the Enclosure for Batteries Install and Connect Transformer Remove the front door. Remove the inner front door by loosening the ten screws. + - Connect wire from the second tray to the third tray. Connect wire from the third tray to the bottom tray. To battery breaker - Connect wire from the back of the bottom tray to the battery breaker -. 3

Install the transformer on the four unistruts (two unistruts are stationary and two are adjustible) and secure using the four M8 spring nuts. Connect cables from the transformer input to the top of the input terminal block and the ground and neutral busbars. Connect cables from the transformer output to the top of the output terminal block and the ground and neutral busbars. Connect cables (L1, L, L3,, G) from the mains supply to the bottom of the input terminal block and the ground and neutral busbars. Connect cables (L1, L, L3,, G) from the bottom of the output terminal block and the ground and neutral busbars to the UPS input terminals. From transformer Mains Output Input L1,L,L3 PE/G Output L1,L,L3 Specifications Physical Battery Transformer Dimensions (H W D) Shipping dimensions (H W D) Battery requirements 1487 53 837 mm 1487 53 837 mm 1664 74 1105 mm 1664 74 1105 mm Weight 59.5 kg 146.5 kg Shipping weight 94 kg 181 kg Environmental Operating environment Indoor use only, protect from water and conductive contaminates Operating temperature 0 to 40 C Recommendation for 15 to 5 C batteries Humidity 0 to 95%, non-condensing Electrical 10-40 kva om voltage (VDC) +/- 194 I om discharge 1 87.9 I Max discharge 110.1 End Voltage (VDC) +/- 154 1 ominal battery discharge current based on rated load and nominal battery voltage. Maximum battery discharge current based on rated load at the end of the discharge. Recommended batteries. Manufacturer Maximum total battery weight is 500 kg. M6 torque 1 m. Transformer requirements Maximum overall recommended dimensions for customer-provided transformer are (WxDxH) 400 x 500 x 600 mm. Maximum transformer mounting dimensions are (WxD) 305 x 410 mm and maximum transformer weight is 863 kg. Hardware provided is 4 x M8. M8 torque 4 m. Contact Information Model OTP 6FM4 OTP 6FM38 Yuasa P7-1 Yuasa P4-1 Yuasa P38-1 Panasonic LC-X14 Panasonic LC-X138 Electrical 40 kva/3 kw 380 V 400 V 415 V Max. input current (A) 57.4 54.6 5.6 Max. output current (A) 60.8 57.7 55.6 For local, country-specific centers: go to www.apc.com/support/ contact. 4

Appendix Battery Enclosure Wiring 5