The Avanti team works with Costain at PalaceXchange to deliver a better product with less waste in the design process

Similar documents
PortableLadders > Ladder standards are changing > What does this mean for you? > What action do you need to take?

Risk Based Maintenance

Microgeneration Installation Standard: MCS

Electric minibuses. Three new minibuses for Brive, France. Supply contract for 3 electric minibuses. Awarded: February 2016

ABB Services for Low Voltage equipment Your choice, your future

EVSE Permitting and Inspection Best Practices

BACS APPROVED BUREAU SCHEME SUPPORT GUIDELINES

Exceeding the standards with MNS

SPP TENDER MODEL. Electric buses. 20 Electric buses for Stolichen Avtotransport

ASEAN CAR ASSESSMENT PROGRAMME (ASEAN NCAP)

This Distribution Charter explains how PLS distributes collective licensing

Implementation procedure for certification and continued airworthiness of Beriev Be-200E and Be-200ES-E

1. Mobility Scooter storage policy

EUROPEAN NEW CAR ASSESSMENT PROGRAMME (Euro NCAP) CAR SPECIFICATION, SPONSORSHIP, TESTING AND RETESTING PROTOCOL

Understanding BS 1363 Amendment No.4

PROMOTING POSITIVE ENVIRONMENTAL BEHAVIOUR CHANGE AT CROSSRAIL THE GREEN LINE RECOGNITION SCHEME. Cathy Myatt, Lorna Mellings & Kenny Hills

All-Energy 2016, Glasgow. Contributing funding partners:

Tendering Public Charging Infrastructure for Electric Vehicles

ABB life cycle services Uninterruptible power supplies

PUBLIC Law, Chapter 539 LD 1535, item 1, 124th Maine State Legislature An Act To Create a Smart Grid Policy in the State

SUBSIDIARY BODY FOR SCIENTIFIC AND TECHNOLOGICAL ADVICE Fourteenth session Bonn, July 2001 Item 3 (b) of the provisional agenda

Lloyd s Register Type Approval System Test Specification Number GT04

CIF # City of Barrie. Large Curbside Containers. Final Report. Final Project Report, September City of Barrie. CIF Project # 801.

Solar Storage Solutions

To Our Business Partners

Procurement notes for councils (Scotland)

Connecting your home or small business generation

Issue 23 draft for Nuvve

Soft copies of working templates, procedures, compliance manuals and checklists.

Unilever Sustainable Palm Oil Sourcing Policy

Emergi-Lite Experts in central power supply systems

Respecting the Rules Better Road Safety Enforcement in the European Union. ACEA s Response

PUD ELECTRIC SYSTEM INTERCONNECTION

Comhairle Cathrach Chorcaí Cork City Council

INTERNATIONAL STANDARD

How To Start Your Own Trucking Company

petrol filling station consultants

Evaluating Stakeholder Engagement

ABB Drive Services Your choice, your future

Western Alberta Transmission Line (WATL) HVDC Project

Bulk Fuel and Lubricants Storage Total Fuel and Lubricants Management Solutions

Background. Whitepaper May Emerson Reliability Consulting. Michael Whittaker, Emerson Process Management

SENATE, No STATE OF NEW JERSEY. 218th LEGISLATURE INTRODUCED APRIL 5, 2018

National Grid UK Electricity Transmission plc. NATIONAL SAFETY INSTRUCTION and Guidance

Commitment to Innovation Leads Fairchild International to Launch New AC Scoop Powered by Baldor Products

Brochure. Synchronous generators for steam and gas turbines Proven generators reliable power

Mechanical Trainstop Systems

1. Thank you for the opportunity to comment on the Low Emissions Economy Issues Paper ( Issues Paper ).

CHAPTER 25. SUBSTANTIVE RULES APPLICABLE TO ELECTRIC SERVICE PROVIDERS.

Modernising the Great Western railway

Emergi-Lite EMEX central power supply solutions

A BRAND-NEW LIFT FOR YOUR BUILDING

Roundtable on Sustainable Palm Oil (Phase 2)

ANNEX MOTOR VEHICLES AND MOTOR VEHICLES' PARTS. Article 1. General Provisions

Final Report. LED Streetlights Market Assessment Study

GEAR 2030 Working Group 1 Project Team 2 'Zero emission vehicles' DRAFT RECOMMENDATIONS

Vehicle Online Services

Addressing ambiguity in how electricity industry legislation applies to secondary networks

ESS Lighting Instruction Pack Original Energy Saver

Moving Forward on Los Altos Parking Issues

Microgeneration Installation Standard: MCS 023

Grid connected rooftop solar and the end of the solar bonus feed-in tariff where to get advice.

MAR1011. West Birmingham Bus Network Review March 2010

Personalized Solutions. Personalized Service.

Information Packet Kissimmee Utility Authority Customer-Owned Renewable Generation Interconnection And Net Metering Program

The Vehicle Identity Check (VIC) Scheme

Sr Khairul Faizi B M Taib Robert Toba Siahaan

EUROPEAN COMMISSION ENTERPRISE AND INDUSTRY DIRECTORATE-GENERAL

ibusiness Banking Application Form Welcome to ibusiness Banking Need help completing this form? Adding an Additional Company to an existing Group

Bulky Waste Re-use Partners in Lancaster

Automated and Electric Vehicles Bill

Written questions to UTAC CERAM - EMIS hearing of 11/10/2016

Environment Agency Guidance

IALA Guideline No The Reporting of Results of e-navigation Testbeds. Edition 1. December 2013

NCC Leisure Battery Verification Scheme. Leisure Accommodation Vehicles

A MODEL SYLLABUS FOR THE TRAINING OF TECHNICIANS INVOLVED IN THE EXAMINATION, TESTING, MAINTENANCE AND REPAIR OF PETROLEUM ROAD TANKERS

Operating bus or coach services abroad if there s no Brexit deal

GRID CONSTRAINT: OPTIONS FOR PROJECT DEVELOPMENT

La Jolla Community Parking Management Plan A PLAN TO ADDRESS PARKING ISSUES AND TO UNIFY OUR COMMUNITY March 1, 2008

Net Metering Rate Option for Self-Generators

SUPPLEMENTARY EVIDENCE FROM SCOTTISH AND SOUTHERN ENERGY

Critical Chain Project Management (CCPM)

Lessons from a recent Judicial Review case on IT security and the LSC tendering process:

Conduct on-road training for motorcycle riders

Forest Hill Street Clutter study

Submission to the IESO re: RDGI Fund Virtual Net Metering Investigation Topic

Rhode Island Division of Public Utilities and Carriers & Office of Energy Resources. Power Sector Transformation

Household food waste collections guide

Electric Vehicle Charging Station Incentives PROGRAM HANDBOOK

Clean Energy Council submission to the Energy Networks Australia. Technical Guidelines for Basic Micro and Low Voltage Embedded Generation Connections

2 MEETING THE CHALLENGE OF A DIFFICULT JOB SPECIALTY CONTRACTOR

International Research Journal of Applied Finance ISSN Audit Practices for Automobile Dealerships

Reducing CO 2 emissions from vehicles by encouraging lower carbon car choices and fuel efficient driving techniques (eco-driving)

STATE LOAD DISPATCH CENTRES (SLDC)

Combining Optimisation with Dymola to Calibrate a 2-zone Predictive Combustion Model.

Official Journal of the European Union

The Gambia National Forum on

Spreading Innovation for the Power Sector Transformation Globally. Amsterdam, 3 October 2017

FUTURE BUMPS IN TRANSITIONING TO ELECTRIC POWERTRAINS

Norzilah Bt Jaffar. Head, Regulatory Compliance & Technical Assurance (RCTA) Technical Data (TD) Malaysia Petroleum Management (MPM) PETRONAS

Transcription:

The Avanti team works with Costain at PalaceXchange to deliver a better product with less waste in the design process Why Avanti? Costain wished to work in a better way to deliver a high quality end product with less waste in the design process, and their client, ING Real Estate, were keen to make good use of technologies and techniques to make the construction process more efficient and to reduce the cost of operating their development. However the PalaceXchange project brought a significant challenge when Costain first approached the team behind the Avanti approach for support, because a good deal of design had already been produced. First steps The goals associated with the introduction of the Avanti approach on the project were agreed with the principal team members at Costain. A decision was made early on in the involvement of the Avanti team that since a lot of design had already been undertaken design concepts had developed over a period of two years a wholesale conversion of existing processes to the Avanti approach was unachievable. However, to establish what was required Costain decided to review existing documentation to see to what extent a consistent approach had been taken, and standard format used, during the development of the design documentation to date. A third party consultancy, TruAxis, carried out this work, alongside 3-D modelling work which they were appointed to undertake, and an audit report was produced. Costain's main concern with the findings of the audit report was the lack of standards in use the drawings were to different scales and to different origins and, more importantly, the lack of spatial co-ordination which would be the obvious result. Project achievements Following the review, a series of simple common formats were defined, and fully agreed by representatives of all project partners, for the following: The origin for design information was to be based on a local project survey. Reference levels at the ground floor of the buildings were agreed. Orientation of the scheme, from the origin, was agreed. Specification for the use of building grids was agreed. PalaceXchange is a 30M prestige retail development located within the heart of Enfield in Middlesex. PalaceXchange is located directly between, and links together, the town s top stores (Mark s & Spencer, Pearsons Department Store and Woolworths). It will provide 14,000 sq m (150,696 sq ft) of new retail space in 22 shop units and 6,038 sq m (65,000 sq ft) of leisure and cultural venues. The scheme involves the erection of a civic building comprising three-storey civic/library accommodation. This is connected by a new footbridge to a 530-space multi storey car park with three leisure use compartments below. The client is ING Real Estate Architect: Reid Architecture Structural Engineer: Gifford Project Case Study No. 2 Avanti Page 1 of 5 April 2006

It was agreed that design data should be categorised in accordance with the CI/SfB system, however the architects were using aliases associated with that system and so conversions (using look-up tables layer conversion capability) were necessary when information was being exchanged between architect and engineers, who were using Microstation and AutoDesk2005 respectively. It was agreed that the data exchange format would be compliant with Autodesk2005 DWG file format. The originator had the responsibility to check the AutoCAD2005 conversion to ensure that it was fully representative of the original Microstation file before sharing on the project extranet. The DWF document exchange format was agreed. A drawing template supplied by Costain was agreed as the standard for use in all future drawing publication. It was agreed to use a CAD layer naming convention in accordance with the mandatory fields defined in BS1192 part 5 plus an alias exactly as the generic Avanti Standard Method and Protocol document see www.avanti-construction.org. The icosnet project extranet, as supplied by Costain, was to be used. The agreed methods were described to the project design managers, and subsequently to the CAD users. After some initial resistance the methods were accepted and subsequently published for use by the team. As described above, the early audits undertaken by TruAxis found some inconsistency in the spatial co-ordination of the design. The Avanti team was asked to investigate why this was the case and to confirm whether there were any reasons which may not be resolved through the agreed standards. A significant part of the issue resulted from inaccuracies, albeit minor ones, in dimensions being added to drawings during their development. The generic Avanti approach advocates the usage of associative dimensioning (where the CAD technology in use allows) whereby the dimensions are added to drawings automatically by the CAD system. This removes any risk of error in dimensions where they are added as text by the operator. Since the agreement of the project standards, meetings have been held where the methodology has been presented to sub-contractors with design and co-ordination responsibility as they are appointed and their buy-in has been achieved. Learning points The following observations and learning points have been made by the Avanti team, TruAxis, and/or by Costain themselves: Costain and their partners have a real culture of improvement and this has facilitated the introduction of the Avanti approach relatively easily. Successful implementation of the Avanti approach can be achieved where organisations have: o A management team with the willingness to promote and enable the change; o People with skills which are commensurate with the approach being adopted and the scale of the change required, or who are in a position to upgrade their skills as required; o Well-prepared and formalised processes and procedures so that consistency of approach is achieved without ambiguity; and o Technologies, where required, to enable the approach to be implemented. Costain is implementing the Avanti approach in a considered, phased manner. The experience to date suggests that this continuous improvement approach, on a project-by-project basis, allows resistance Project Case Study No. 2 Avanti Page 2 of 5 April 2006

to change to be managed more easily than where step changes in practice are adopted. The design team members develop design in 2-D as the norm, but this has not frustrated the adoption of collaborative methods a fact which backs up one of the principles of the Avanti approach, namely that, whilst 3-D modelling provides additional benefit, collaborative processes can have an impact where design is developed in 2-D. It is much easier to encourage sub-contractors to adopt processes and standards where these are agreed at the time of their appointment. In fact, evidence from this and other projects suggests that this is true of consultants and sub-contractors, not because of any terms in the appointment but because it means the collaborative approach is adopted from the outset and a transition from one approach to an alternative is not required. Costain recognise that by employing the external TruAxis team to undertake 3-D modelling they are paying for an external organisation to check one of the lead designers responsibilities, namely design coordination, but they have confirmed that this process was speeding up the overall design and co-ordination process. One of the benefits on this project, which was not expected and is related to the character of the project, is the opportunities the client sales / leasing team have: tenant requirements can be reflected in a coordinated design model quickly showing whether changes are achievable, and the impact of those changes. Bottom line (so far) The effect of adopting elements of the Avanti approach to collaborative working has been assessed in two ways. Firstly, since Costain has an external consultant engaged in a position to check co-ordination of 2-D design as it is issued, they are capable of spotting where clashes result from a failure to comply with the new processes and standards. These failures trigger RFIs, each of which can be analysed by the project Quantity Surveyors to establish the result of non-compliance with the new processes and standards. Secondly, the Avanti team have commissioned an independent consultant to investigate the investment made in adoption of the Avanti approach and the benefits accruing from it, when compared to the practices which are commonplace within the team members organisations. The findings established are described below. The Avanti team recognises that the adoption of a new method of working requires an investment in time to be made (and cost, where new technology is required). Feedback from this and other projects suggests that this investment is greater where the new approach is implemented once design has already been produced, since that design needs to be reformatted, which is the case on this project. Therefore, it is perhaps not surprising that a significant investment was required by the team: the architects were required to restructure drawings to comply with the Avanti Standard Method & Protocol (SMP) at a cost of approximately 60K (4 people, full-time for 6 weeks = 24 man-weeks). However, information management processes were seen to be greatly enhanced by the adoption of the Avanti approach. For example, in one area of the design a saving of 2 hours per drawing was seen in formatting and preparing the drawing for issue. Whilst this may not seem significant this area of the building was represented on 65 drawings each of which was expected to be issued 6 times for different purposes giving a total saving of nearly 800 man-hours (or 50K). It can be seen that just in the area of preparing documents for issue such a saving can be made that the total investment cost has nearly been paid back. Project Case Study No. 2 Avanti Page 3 of 5 April 2006

With regard to the actual exchange of information and documentation through the project extranet, savings of up to 50% in the effort required were observed compared to traditional methods. Subsequent re-use of information was analysed in focused aspects of the project. One of those aspects was in façade design where changes required to satisfy Planning Conditions meant that a set of 1:5 details had to be produced. The architect could re-use design produced by the façade contractor, Solaglas. The architect stated: the preparation of 1:5 drawings involved a lot less guesswork than usual as we could access [and re-use] the Solaglas model files. This meant we could issue fully co-ordinated information. A fundamental aspect of the formal activity of design co-ordination involves doing extensive dimensional checks to ensure that all information is dimensionally consistent and fits together without clashes something typically done by referring to multiple drawings once they have been printed. With the adoption of the Avanti approach it is evident that the formal coordination phase happens inherently when all parties are reusing each others CAD information all at the same origin, orientation scale. Similarly, the method of reviewing others information for approval is much simpler as a visual check will easily identify any significant error as it is fully spatially coordinated. As a result the overall approvals process involves significantly less effort to achieve a much higher quality and level of spatial co-ordination. The architect considered the effort required to reposition/make ready for review every other party s existing details so that they could perform a simple coordination check as described here: 45-50 details per area x 15-20 minutes per drawing x 4 areas for that building x between 3 and 6 levels on each building = approx 8 man-weeks per building This was felt to be so much work that it would not be feasible to undertake the work and achieve the desired time saving on this project. However it does show that where the Avanti approach is adopted, a huge quality improvement can be attained in return for little or no investment in cost or time. One of the interesting observations made concerned the impact consistent information has on cost certainty. It was noted that where information which was compliant with the Avanti SMP was issued for tender the spread in tender returns (variance in costs as % of total package value) was smaller than where returns had been received previously based on pre-avanti information. Costain has suggested that this is due to a consistency in the interpretation of information, which is enabled by the issue of better quality information. In a similar vein, where packages, such as steelwork, were being tendered whilst the Avanti approach was being adopted, new information was being generated and issued to sub-contractors which lead to requests for additional fees from the sub-contractors. Whilst this could be interpreted as addition of cost, Costain recognised that co-ordinated information generated using the Avanti approach was helping to flush out hidden design costs that otherwise may have developed into claims at a later stage where is would be more difficult to resolve. The experience of Avanti to date, and findings from impact analyses, has been sufficient for Costain and Reid Architecture to express commitment to the implementation of the Avanti approach on this and other projects. Costain is now considering the priorities among their other projects to adopt the approach. Likewise the team at Reid Architecture is committed to adoption of the Avanti approach and is also now prioritising its projects. Project Case Study No. 2 Avanti Page 4 of 5 April 2006

About Avanti Avanti is an approach to collaborative working on projects that enables construction partners to work together effectively. The principles of collaborative working the Avanti way are early access to all project information by all partners, early involvement of the supply chain, and sharing of project information, drawings and schedules, in an agreed and consistent manner. The Avanti approach is supported by handbooks, toolkits and on-site mentoring. Avanti focuses on people and processes, mobilising existing enabling technologies. Team working and access to a common information model are at the heart of the Avanti approach to a project's whole life cycle. Using the Avanti approach improves business performance by increasing quality of information and predictability of outcomes and by reducing risk and waste. The Avanti approach is led by a team of industry practitioners and managed by a construction industry consortium. It is supported by DTI, Constructing Excellence in the Built Environment, BuildingSmart and Teamwork. Acknowledgements Costain Reid Architects Gifford TruAxis Prepared by Mervyn Richards Tony Matthews Publishing and liability This document is published by Constructing Excellence in the Built Environment for the Avanti Partners as part of a contract placed by the Department of the Trade and Industry. The contract was let under the Partners in Innovation Programme, which provides part funding of collaborative research. Any views expressed in this document are not necessarily those of the Department. Constructing Excellence in the Built Environment publish this information as guidance of a general nature, and accept no liability for any use to which it may be put. Copyright All rights reserved. No part of this publication may be reproduced, stored in a retrieval system, or transmitted in any form or by any means, electronic, mechanical, photocopying, recording or otherwise, without prior written permission of the publishers. Project Case Study No. 2 Avanti Page 5 of 5 April 2006