Location Concept Plan Amendment Recommendation Approved 2011 Concept Plan

Similar documents
West LRT Lewis Estates to Downtown Concept Plan

1 Downtown LRT Connector: Draft Concept

THE WAY WE MOVE LRT FOR EVERYONE

West LRT. Alignment Update and Costing Report May Calgary Transit Transportation Planning Clifton ND Lea Consultants

Welcome The City has undertaken a naming exercise for the existing and future LRT lines. The SE to West LRT, as the project has been called to date,

TRANSPORTATION REVIEW

IMPROVEMENT CONCEPTS

2.0 Development Driveways. Movin Out June 2017

METRO Orange Line BRT American Boulevard Station Options

Attachment 5 Eglinton West LRT Planning and Technical Update

DOWNTOWN LRT FEASIBILITY STUDY

Station Evaluation. Durham-Orange Light Rail Transit Project Spring 2012

Bi-County Transitway/ Bethesda Station Access Demand Analysis

Environmental Assessment Derry Road and Argentia Road Intersection

Attachment 5. High Speed Transit Planning Study REPORT SUMMARY. Prepared by: City of Edmonton Transportation Planning Branch. Stantec Consulting Ltd.

Welcome. Green Line in Your Community

Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT

Business Advisory Committee. July 7, 2015

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project.

Sound Transit East Link: Bus/LRT System Integration Study

King Soopers #116 Thornton, Colorado

Construction Staging Area 4 Avenue Road

TRAFFIC IMPACT STUDY. USD #497 Warehouse and Bus Site

RE: A Traffic Impact Statement for a proposed development on Quinpool Road

4.0 TIER 2 ALTERNATIVES

5 VAUGHAN METROPOLITAN CENTRE AND SURROUNDING AREAS TRANSPORTATION STUDY PROGRESS

Midtown Corridor Alternatives Analysis Key Issues Memo

Station Evaluation Summary

Welcome. Public Open House Schedule. Super 8 West Kelowna 1655 Westgate Rd, West Kelowna. West Kelowna. Wednesday, March 2, :00 p.m. 8:00 p.m.

FREQUENTLY ASKED QUESTIONS

ANDERSON PROPERTY SITE ANALYSIS

King County Metro. Columbia Street Transit Priority Improvements Alternative Analysis. Downtown Southend Transit Study. May 2014.

Technical Memorandum. To: From: Date: October 14 th, 2018 Project #: 1302 Project Name: Subject: Distribution:

PROJECT: Wilkinson Road Corridor Improvement Traffic Management Planning Project SUBJECT: Traffic Analysis

RICHMOND OAKS HEALTH CENTRE 6265 PERTH STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Guycoki (Eastern) Limited.

Executive Summary. Draft Environmental Impact Statement/Environmental Impact Report ES-1

FREQUENTLY ASKED QUESTIONS

Calgary Transit and the Calgary Transportation Plan Chris Jordan, M.Sc., P.Eng. Coordinator, Strategic Transit Planning, Calgary Transit

Traffic Impact Study Proposed Residential Development (Watson Parkway North - Starwood Drive Node, City of Guelph)

West Hills Shopping Centre Lowe s Expansion Traffic Impact Study

Transit City Etobicoke - Finch West LRT

Challenges in a Post-Katrina Environment East-West Corridor Project Overview February, 2007

Pace Bus Depot Location Analysis

I-494/I-35 Interchange Vision Layout Development - BRT Station Concepts S.P B SEH No

November 1, Mr. Jafar Tabrizi President, Tabrizi Rugs 180 Bedford Highway. Traffic Impact Statement BH-1 and BH-2, Southgate Drive, Bedford, NS

To: File From: Adrian Soo, P. Eng. Markham, ON File: Date: August 18, 2015

2.4 TRANSIT VISION 2040 FROM VISION TO ACTION. Support the revitalization of urban cores STRATEGIC DIRECTION

RECOMMENDED ALTERNATIVE REPORT

Welcome. Metro Line Northwest LRT Expansion Project

Note: The October 2007 version of this report has been updated in this December 2008 report to present costs in year 2007 dollars.

RE: 67/71 Marquette Avenue Redevelopment Transportation Overview

Trans-Canada Highway and McCallum Road Interchange Upgrade

INDUSTRIAL DEVELOPMENT

TORONTO TRANSIT COMMISSION REPORT NO.

V03. APTA Multimodal Operations Planning Workshop August Green Line LRT

EGLINTON CROSSTOWN LIGHT RAIL TRANSIT (LRT) PLEASE SIGN IN

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS

TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY Prepared for:

STH 60 Northern Reliever Route Feasibility Study Report

Develop ground transportation improvements to make the Airport a multi-modal regional

Committee Report. Transportation Committee. Business Item No

Appendix G: Rapid Transit Technology Backgrounder July 2017

US 81 Bypass of Chickasha Environmental Assessment Public Meeting

Confederation Line West Alignment Improvement. September 21, 2016

Spadina Subway Extension Downsview Station to Steeles Avenue Environmental Assessment

The Eastern Connector Study November, 2007 planning for the future

Confederation Line West Queensway Terrace North. May 27, 2017

Traffic Impact Study for Proposed Olive Boulevard Development

Reston Transportation Strategy July 9, 2018

Letter of Transmittal

886 March Road McDonald's Transportation Study

Traffic Management Plan and Queuing Analysis Lakehill Preparatory School Z Hillside Drive, Dallas, TX October 27, 2015

Subarea Study. Manning Avenue (CSAH 15) Corridor Management and Safety Improvement Project. Final Version 1. Washington County.

Alternatives Analysis Findings Report

Midtown Corridor Alternatives Analysis Capital Cost Estimation Methodology and Assumptions

BUS RAPID TRANSIT (BRT) MISSISSAUGA SEGMENT IMPLEMENTATION PLAN

Appendix B. Tier 2 Final Environmental Assessment I-66 Transit/TDM Technical Report

BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

Table Existing Traffic Conditions for Arterial Segments along Construction Access Route. Daily

San Rafael Transit Center. Update. Golden Gate Bridge, Highway & Transportation District Transportation Committee of the Board of Directors

Denver Metro Association of Realtors

Harlem Avenue between 63 rd and 65 th

Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois

Chapter 7: Travel Demand Analysis. Chapter 8. Plan Scenarios. LaSalle Community Center. Image Credit: Town of LaSalle

Light rail, Is New Zealand Ready for Light Rail? What is Needed in Terms of Patronage, Density and Urban Form.

CTfastrak Expansion. Stakeholder Meeting #4 Manchester Town Hall June 3, 2016

We Want Your Input! Review the design alternatives and tell us what s important to you in the design of these areas of the approved BRT Network:

Lakeside Terrace Development

APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS

APPENDIX E. Traffic Analysis Report

2. Valley Circle Boulevard/Andora Avenue/Baden Avenue and Lassen Street

TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION

Eglinton East LRT Project Update and Next Steps

FINAL. Sound Transit Long-Range Plan Update. Issue Paper S.1: Tacoma Link Integration with Central Link. Prepared for: Sound Transit

SCARBOROUGH RAPID TRANSIT ENVIRONMENTAL PROJECT REPORT CHAPTER 2 PROJECT DESCRIPTION. Project Description

Energy Technical Memorandum

Downtown One Way Street Conversion Technical Feasibility Report

Interstate Operations Study: Fargo-Moorhead Metropolitan Area Simulation Results

BERKELEY DOWNTOWN AREA PLAN PROGRAM ENVIRONMENTAL IMPACT REPORT TRAFFIC IMPACT ANALYSIS

Oakbrook Village Plaza City of Laguna Hills

Transcription:

Valley Line West LRT Concept Plan Recommended Amendments Lewis Farms LRT Terminus Site Location Concept Plan Amendment Recommendation Approved 2011 Concept Plan Lewis Farms LRT terminus site, 87 Avenue/West of Anthony Henday Drive Adjust location of LRT Stop and LRV storage facility, increase size of Park and Ride facility to approximately 900 stalls LRV storage facility located adjacent to LRT Stop, Park and Ride facility with approximately 275 stalls Recommended Lewis Farms Terminus Site Layout Site Description: The Lewis Farms LRT terminus site is located adjacent to the existing Lewis Farms transit centre at 87 Avenue and west of Anthony Henday Drive. The site is constrained by the Transportation Utility Corridor to the east, the 87 Avenue arterial roadway to the north, a Natural Area to the west and a drainage pond to the south. The current site includes a transit centre and a 600 stalls park and ride facility. Page 1 of 16

General Considerations: Relocate Lewis Farms LRT Stop to improve passenger transfers to existing Lewis Farms transit centre and connection to adjacent park and ride facility Relocate Light Rail Vehicle storage facility to the southeast corner of site; adjacent to the TUC, existing storm pond and parking Increasing the size of park and ride to approximately 900 stalls to meet future demand, and relocate permanent infrastructure such as LRT platforms and paved parking stalls outside of the TUC. Opportunity to transition parking to Transit Oriented Development in the future Minimize impact to environment by not encroaching into adjacent Natural Area to the west With the confirmation of LRT terminus design at this site, the planning of the Potter Greens Special Study area and amendment of the Potter Greens Neighbourhood Structure Plan (NSP) can be completed Preliminary geotechnical testing indicates challenging soil conditions at Lewis Farms terminus site, requiring additional mitigations Overall, the project cost increase associated with this recommendation is approximately $24 million (+/-30%). Page 2 of 16

87 Avenue/178 Street Grade Separation Location Concept Plan Amendment Recommendation Approved 2011 Concept Plan 87 Avenue/178 Street Grade separation, elevated LRT guideway over 178 Street along the south side of 87 Avenue At-grade LRT crossing 178 Street along the south side of 87 Avenue Recommended 178 Street Elevated Guideway Site Description: The intersection of 87 Avenue and 178 Street is located at the intersection of Belmead, Summerlea, Thorncliff and Aldergrove communities and is directly adjacent to the southwest corner of West Edmonton Mall. Land use in the northwest, southeast and southwest corners of the intersection are mostly single family residential homes. The area experiences high pedestrian traffic due to local activity nodes such as the West Edmonton Mall and the adjacent transit center. Page 3 of 16

General Considerations: Extension of LRT guideway across 178 Street eliminates conflict points between LRT and existing intersection No additional land is required Increases total project cost by approximately $80 million (+/- 30%) Elevated guideway is 10 meter high and has an increased visual impact to adjacent properties Operation Considerations: Improves vehicle traffic operations on 178 Street. Grade separation would enable traffic signal green times to be redistributed to potentially reduce the level of traffic congestion, compared to the at-grade arrangement. Turning movements that would cross the tracks will benefit the most. On average, the travel time savings for cross-traffic through the intersection would be approximately 14 seconds compared to the at-grade arrangement. LRT will have unimpeded crossing of 178 Street. The grade separation would provide an average LRT travel time savings of approximately 25 seconds per trip through the intersection. Page 4 of 16

Jasper Place Transit Centre Location Location Concept Plan Amendment Recommendation Approved 2011 Concept Plan Jasper Place Transit Centre Maintain existing transit centre location west of 156 Street Relocate Jasper Place Transit Centre to the southeast corner of Stony Plain Road/156 Street Jasper Place Transit Centre Site Description: The Jasper Place transit centre is located in the northeast corner of the Glenwood community. The existing transit centre services the west and northwest regions of the City with 16 bus routes. General Considerations: The existing Jasper Place Transit Centre terminal and busway renewal work is underway, scheduled to be completed in 2018. The space and access restrictions associated with the original transit centre location proposed at the southeast corner of Stony Plain Road and 156 Street is not desirable from bus operation perspective. It is estimated that 12 bus routes will be serviced from this transit centre with the completion of the Valley Line West LRT. Cost savings of $20 million (+/-30%) with keeping transit centre at existing location Page 5 of 16

Stony Plain Road and 156 Street LRT Alignment Change and 156 Street LRT Stop Relocation Location Concept Plan Amendment Recommendation Approved 2011 Concept Plan Stony Plain Road, 155 Street to 156 Street; 156 Street, Stony Plain Road to 99 Avenue; and 156 LRT Stop At-grade track alignment with a 90 degree turn from the center of Stony Plain Road to the west side of 156 Street, transitioning back to the center of 156 Street at 99 Avenue. Relocate 156 Street LRT Stop to the west side of 156 Street, south of 100a Avenue At-grade track alignment from the center of Stony Plain Road, diagonal connection between 155 Street and 100a Avenue, to center alignment on 156 Street. 156 Street LRT Stop located in southeast corner of Stony Plain Road/156 Street, adjacent to relocated Jasper Place Transit Centre. Recommended Stony Plain Road and 156 Street LRT Alignment and LRT Stop Location Site Description: The intersection of Stony Plain Road and 156 Street is located between the Glenwood, Britannia Youngstown, Canora and the West Jasper Place communities. With the introduction of LRT on Stony Plain Road, the roadway configuration will be reduced to one lane in each direction along Stony Plain Road, east of 156 Street, and along 156 Street, south of Stony Plain Road. With the proposed concept plan amdendment, the LRT alignment travels down the center of Stony Plain Road and turns 90 degrees through the Stony Plain Road and 156 Street intersection and continue down the west side of 156 Street before transitioning back to the center of 156 Street at 99 Avenue. Page 6 of 16

General Considerations: Greater integration between transit centre and LRT stop. Improved passenger experience. With the relocation of LRT Stop closer to the existing Jasper Place Transit Centre, the walking distance for bus-lrt transfers is approximately 75 metres and eliminates the need to cross 156 Street roadway. Fewer properties required in comparison to the approved concept. Reduction in property acquisition cost by approximately 20%. More land available in the immediate area suitable for Transit Oriented Development. Access modification required for properties adjacent to the recommended track alignment along the west side of 156 Street, between Stony Plain Road and 99 Avenue. Closure of 100a Avenue road access onto 156 Street. Recommended LRT alignment and stop location eliminates conflicts with the Orange Hub parkade structure and building access. An amendment to the existing Jasper Place Area Redevelopment Plan may be required. The cost of the proposed change is in the same order of magnitude as the approved concept design. Operation Considerations: Due to geometric constraints the westbound left, northbound left, and southbound left turn movements will not be provided at the Stony Plain Road and 156 Street intersection. Southbound queue on 156 Street will likely reach 103 Avenue or beyond during afternoon peak period During the afternoon peak period in the 2027 year horizon, approximately 200-500 vehicles/hour in the southbound direction on 156 Street, between 107 Avenue and 95 Avenue, will likely divert to adjacent north-south corridors. During the afternoon peak period in the 2027 year horizon, approximately 100-250 vehicles/hour in the eastbound direction on Stony Plain Road, between 163 Street and 149 Street will likely divert to adjacent east-west corridors. The LRT trains will need to reduce speed to negotiate the bend through the intersection thus adding approximately one minute to the run time. The tighter curve radius may introduce wheel squeal and higher operation and maintenance costs. Page 7 of 16

Stony Plain Road/149 Street Grade Separation Location Concept Plan Amendment Recommendation Approved 2011 Concept Plan Stony Plain Road/149 Street Grade separation of vehicle traffic, urban interchange separating center running at-grade LRT on Stony Plain Road with 149 Street north-south traffic At-grade LRT crossing 149 Street along the center of Stony Plain Road Recommended 149 Street Urban Interchange Site Description: The intersection of Stony Plain Road and 149 Street is located at the intersection of the Canora, Grovenor, Crestwood and West Jasper Place communities. This intersection is also located adjacent to the Mackinnon Ravine Park which consists of a trail network that connects to the North Saskatchewan River Valley. With the introduction of LRT on Stony Plain Road, the roadway configuration will be reduced to 1 lane in each direction. With the proposed amendment, the LRT alignment travels down the center of Stony Plain Road, crossing over the depressed 149 Street roadway via a bridge structure, with the nearest at-grade LRT Stop located between 150 and 151 Street. Page 8 of 16

General Considerations: To balance property impact and access management, a single-point diamond interchange with limited ramp access is recommended. To accommodate the grade separation, additional property will be required along the west side of 149 Street from north of 102 Avenue to south of 100 Avenue. A storm water storage tank will need to be constructed beneath the underpass to accommodate major storm events. The facility will connect to the existing storm tunnel in MacKinnon Ravine. An environmental impact assessment will be undertaken for MacKinnon Ravine. An amendment to the existing Jasper Place Area Redevelopment Plan may be required. Landscaping can be provided on the bridge structure to enhance the area for pedestrians on Stony Plain Road. LRT alignment and the 149 Street stop location are the same as approved in the Concept Plan Increases cost by approximately $160 million (+/-30%), including construction and land acquisition cost. Operation Considerations: The underpass will provide enhanced capacity for northbound and southbound traffic on 149 Street between 100 Avenue and 107 Avenue. With the north-south traffic of 149 Street grade separated from LRT, and limiting left turning movements to northbound to westbound and westbound to southbound, the traffic signal green times can be redistributed to benefit LRT and traffic along Stony Plain Road. The major turning movements, northbound from 149 Street to eastbound on Stony Plain Road and westbound on Stony Plain Road to southbound on 149 Street would be maintained. The westbound right turn, eastbound left turn, southbound left and right turns would not be provided at this location. The proposed interchange configuation will help to minimize the infrastructure footprint while accommodating major traffic patterns in the area. It is anticipated that additional traffic in the range of 1000 vehicles per hour for the peak direction will be attracted to 149 Street from adjacent roadways. In the 2027 year horizon afternoon peak scenario of no LRT, the majority of movements through the intersection of Stony Plain Road and 149 Street are anticipated to perform at a Level of Service D or better. The northbound left turn movement is anticipated to perform at a Level of Service E, with a traffic delay in the range of 1 minute. Page 9 of 16

With the at-grade LRT on Stony Plain Road and a 149 Street underpass design in the 30 year horizon afternoon peak scenario, the eastbound and westbound through movements are anticipated to perform at a Level of Service B, with a traffic delay in the range of 0.5 minute. The westbound and northbound left turn movements are anticipated to perform at a Level of Service D and E respectively, with traffic delays in the range of 1 minute. Page 10 of 16

124 Street LRT Stop Relocation Location Concept Plan Amendment Recommendation Approved 2011 Concept Plan 124 Street LRT Stop Relocate 124 Street LRT Stop one block east, centered on 123 Street 124 Street LRT Stop on Stony Plain Road, centred on 124 Street Recommended 124 Street LRT Stop Location Site Description: The 124 Street LRT stop consists of a staggered side loading platforms centered around 124 Street. It is located in the Westmount community surround by a mix of residentials and commercial land use. General Considerations: The original LRT stop platform cannot be accommodated between 124 and 125 Street due to constraints associated with existing roadway grades and building elevations. Relocation of the LRT stop one block to the east will help achieve a level platform while providing opportunity to improve integration with adjacent roadway and properties. The LRT Stop will be one block further away from residences west of 124 Street and one block closer to the 120 Street stop. The 124 Street business area will continue to be well-served. No changes to the intersection configuration of Stony Plain Road at 124 Street. The cost of the proposed change is in the same order of magnitude as the approved concept design. Page 11 of 16

104 Avenue LRT Sidetrack Location Concept Plan Amendment Recommendation Approved 2011 Concept Plan 104 Avenue LRT sidetrack, 109 Street to 111 Street Relocate sidetrack to the median of 104 Avenue, between 109 and 111 Street Tail track located on 107 Street, south of 102 Avenue Recommended 104 Avenue Sidetrack Site Description: The recommended 104 Avenue sidetrack is located within Downtown, between 109 and 111 Street. MacEwan University is located on the north side of 104 Avenue. Land use along the south side of 104 Avenue is a mix of commercial, residential and institutional land uses. Page 12 of 16

General Considerations: The recommended sidetrack is approximately 185 metre in length, located between 109 and 111 Street. The availability of a sidetrack improves LRT system operation. The sidetrack will allow for staging of LRT trains to add capacity for special events being held Downtown. The ability to stage trains close to the special events allows a quick response to increase LRT service. Disabled LRT vehicles could also be held temporarily on the sidetrack until the end of the day when they could be taken to the maintenance facility without impacting LRT service. A disabled vehicle on the main LRT track can have LRT system delays due to trains having to operate on a single track around the disabled vehicle. The sidetrack would utilize available median space and thus not require any shift in road alignment or additional property. The original plan for LRT staging track on 107 Street, south of 102 Avenue, would have been temporary until the LRT expands south on 107 Street as envisioned by the LRT Network Plan and Downtown LRT Concept Plan. Page 13 of 16

Preliminary Land Requirements for Concept Plan Recommended Amendments Page 14 of 16

Page 15 of 16

Page 16 of 16