Chromalloy. Borescope and Test Report. Prepared for. Triumph Air Repair A Triumph Group Company

Similar documents
APS 2000 Shop Findings Report

MINI PACK BUILD SPEC. 885 ESN: FA0278 TSN: 15, CSN: 15,815 TSO: N/A CSO: N/A TSHSI: 2, CSHSI: 2,373 RGB SN. FA0278

LM2500 BORESCOPE INSPECTION REPORT

MINI PACK N/A N/A N/A N/A FA0995 N/A

MINI PACK. ENGINE Model: PW127M BUILD SPEC ESN: TSN: 32, CSN: 33,815 TSO: 9, CSO: 8,813 TSHSI: 0.

MINI PACK ENGINE MODEL: PW123E BUILD SPEC: BS869 TM SN: TSN: 38, CSN: 36,637 TSO: 9, CSO: 9,231 TSHSI: - CSHSI: -

Chris Ruot. October 21, APU System Update

AIRCRAFT HOLDINGS AND LEASING LLC. 50 CENTRAL AVENUE SARASOTA FL LAST ACTUALS

Country Customer Name Site Name USA Specific Reports Task Risk Assessment CSA/Invoice/Work Order Numbers Borescope Inspection YES N/A.

Rolls -Royce M250--C47M OPERATION AND MAINTENANCE

Rolls -Royce M250--C47B OPERATION AND MAINTENANCE TABLE 603. Inspection Checksheet. A/C Make/Model S/N Reg. No. TSN

Rolls -Royce M250--C47M OPERATION AND MAINTENANCE

Rolls-Royce Corporation M250-B15G COMMERCIAL SERVICE LETTER (CSL) Technical Publications Index

MTU Maintenance Dallas, Inc. Integrated Management System. MM 03D-03 Capability List Manual

Rolls-Royce Corporation T56 SERVICE INFORMATION LETTER (SIL) Technical Publications Index

Rolls -Royce M250--C40B OPERATION AND MAINTENANCE. Table 603. Inspection Checksheet

AVIATION INVESTIGATION REPORT A02P0168 ENGINE POWER LOSS

Borescope Inspection Report MO-S-113 Taurus 70 CED Ie H

Rolls-Royce Corporation T56-A-14LFE COMMERCIAL ENGINE BULLETIN (CEB) Technical Publications Index

SA226 Series Engine AD and Time Compliance Sheet TPE U-521G TAT: TAC: Engine Last CURRENT ENGINE TIME AND CYCLES

THOMSON AIRWAYS LIMITED DISCREPANCY SHEET

Rolls-Royce Corporation 501-D22 COMMERCIAL SERVICE LETTER (CSL) Technical Publications Index

Rolls -Royce M250--C20R SERIES OPERATION AND MAINTENANCE

Engine/Module Repair Requirements /

CF34 TURBOFAN ENGINE MAINTENANCE MANUAL LIFE LIMITS OF ROTATING ENGINE PARTS

COMPONENT IDENTIFICATION

Preliminary Report. 19 October, For. Burak Marine. Aliağa İzmir TURKEY ESN Under. Mehmet AKIN (Granite)

Inspection and Repair of Compressor Wheels

V2527E-A5 ENGINE MINI-PACK

Rolls-Royce Corporation T56-A-15LFE COMMERCIAL SERVICE LETTER (CSL) Technical Publications Index

GUADALUPE POWER PARTNERS, LP Section MAINTENANCE GT1 CI WORK SCOPE

Salt River Aviation, LLC 175 S. Hamilton Place #112 Gilbert, AZ Phone: (480) Fax: (480) B APU MINI PACK

SGT-200 (Tornado) CAPABILITY OVERVIEW DMEnergy (Generation Service) Tel.: +7 (499) Web: dm.

Rolls -Royce M250--B17 SERIES OPERATION AND MAINTENANCE. Table 602 Inspection Checksheet Owner Date. A/C Make/Model S/N Reg No.

A1-F402B-MMI February 2003 Page A

Rolls-Royce Corporation 501-D22 COMMERCIAL ENGINE BULLETIN (CEB) Technical Publications Index

Fuse: On-wing engine inspection

Rolls-Royce Corporation M250-B17 COMMERCIAL SERVICE LETTER (CSL) Technical Publications Index

Preliminary Report. 17 October, For. Burak Marine. Aliağa İzmir TURKEY ESN Mehmet AKIN (Granite)

Rolls -Royce M250--C20R SERIES OPERATION AND MAINTENANCE. Table 602 Scheduled Inspections. Inspection Checksheet. A/C Make/Model S/N Reg. No.

Rolls-Royce Corporation 501-D13 COMMERCIAL SERVICE LETTER (CSL) Technical Publications Index

Rolls-Royce Corporation M250-C18 COMMERCIAL SERVICE LETTER (CSL) Technical Publications Index

AIRCRAFT INFORMATION MSN: 4066

2018 Capabilities International Blvd Cincinnati, OH Phone: (513) Fax: (513)

FINAL REPORT HCLJ

ENGINE, AIRCRAFT, GAS TURBINE MODEL T63-A-720 P/N NSN

Instructions for Continued Airworthiness Extex Replacement Parts for RR250

EQUIPMENT REPAIR REPORT

Current GE Frame Spare Parts Manufacture Capabilities

Additions, Revisions, or Updates

Additions, Revisions, or Updates

Rolls-Royce Corporation M250-C20R COMMERCIAL SERVICE LETTER (CSL) Technical Publications Index

1) Scheduled maintenance checks

Brief Introduction of The Selling Gen-set

REPORT IN-042/2006 DATA SUMMARY

FRCSE powers up some of Navy s mightiest engines

TSE (PPOH) AIRWORTHINESS MANAGEMENT DIVISION MINIPACK GE CF6-50E2 ESN P a g e ESN

BOILER PM & INSPECTION

Additions, Revisions, or Updates

CFM56-7B POWER PLANT REMOVAL & INSTALLATION

Toyota FJ40 Compressor/OEM Alternator Bracket Kit (158217)

TECHNICAL MANUAL AVIATION UNIT AND AVIATION INTERMEDIATE MAINTENANCE MANUAL ENGINE, GAS TURBINE MODEL T55-L-714 NSN

INSTALLATION - MAINTENANCE MANUAL Severe Service Series M4 Ball Valve

Additions, Revisions, or Updates

TECHNICAL MANUAL AVIATION UNIT AND AVIATION INTERMEDIATE MAINTENANCE MANUAL ENGINE, GAS TURBINE MODEL T55-L-714 NSN

Al -F402A-MMI-200 Change 2-10 April 1997 Page A

Unit s 1 & New Berlin Road No.109 Jacksonville, Florida Global Power Generation Services, All Rights Reserved.

PT6A & JT15D. turbine engines series FOR NEW ENGINES. Excluding hbc and cessna caravan installations

CENTRIFUGAL CHILLER. Lubrication System Pull oil sample for spectroscopic analysis.

Maintenance Manual. 3-Inch Internal Valve. F660 Series

Maintenance Manual 3-INCH INTERNAL VALVE F660 SERIES

Schuyler McElrath Gas Turbine Consultant JASC: Jansen s Aircraft Systems Controls, Inc

AEROSPACE AFTERMARKET SOLUTIONS RR250

Elements of Aircraft Maintenance Reserve Development

Maintenance Manual. 4-Inch Internal Valve. F614 Series

CHAPTER 63 MAIN ROTOR DRIVE SYSTEM

Vibration Diagnostic Software. Proven Automated Diagnostic Technology for Machinery Condition Assessment

Technology Application to MHPS Large Frame F series Gas Turbine

Abrupt Stoppage of Turbine Rotor, running on Barring after Major Overhauling

Coolant Purification Systems Ultra 90 INSTRUCTION MANUAL

11.Preparation for Overhaul

S. COMMERCIAL ENTERPRISE. Turbine Service & Supply of Spare Parts

17891 Chesterfield Airport Road Chesterfield, MO FAA APPROVED ROTORCRAFT FLIGHT MANUAL SUPPLEMENT TO THE

Table of Contents. 4. Before a New Turbocharger is Installed

SERVICE BULLETIN Engines, Systems & Services Phoenix, Arizona

Technician Turbocharger Guide for the L Power Stroke Engine

SEASONAL MAINTENANCE CHECKLISTS Johnson Controls

Coolant Purification Systems Ultra 360 INSTRUCTION MANUAL

403 Oldsmobile Compressor Bracket Kit (141026)

Power Flow System Extractor Exhaust System Installation Instructions Cessna 172, 175 TABLE OF CONTENTS

LMS100 Gas Turbine System

SERVICE INSTRUCTION SI Revision 1

RESEARCH ON INFLUENCE OF CONDITION ELEMENTS THE SUPERCHARGER SYSTEM ON THE PARAMETERS OF THE MARINE DIESEL ENGINE

EMEA Aftermarket Press Event. EMEA Aftermarket Press Event June 17, June 17, 2009

Maintenance Manual 6-INCH INTERNAL VALVE F620 SERIES

Frame 6 Users Conference Phoenix, AZ

Rolls-Royce Corporation M250-C28 COMMERCIAL SERVICE LETTER (CSL) Technical Publications Index

Supersedes CL2 (512) Form CL2 (615) STARTUP CHECKLIST PHONE: CUSTOMER ORDER NO: JCI TEL NO: JCI ORDER NO: JCI CONTRACT NO:

ENGINE, COMBUSTION ASSEMBLY - INSPECTION OF OUTER COMBUSTION CASE P/N M

(With the possibility of conversion to HFO firing)

Transcription:

A Triumph Group Company Borescope and Test Report Prepared for Chromalloy Customer P.O.#: S2669 A.P.U. Model #: GTCP331-200ER A.P.U. Serial #: P-2796 A.P.U. Part #: 3800298-1 Triumph SRO #: S000013678 Received Date: March 1, 2013 Shipment Date: 1

Receiving Inspection Findings: Incoming APU Times and Cycles: TSN: 19281 CSN: 8493 TSR: 231 CSR: 154 TSO: 6010 CSO: 2778 Log Book Received: NO YES Customer Supplied: NO YES Shipping Container is a: Wooden foam drop in box S/N: Shipping Container damage: NO YES A.P.U. external damage: NO YES A.P.U. Missing parts: NO YES Missing Q.E.C. Items: NO YES None recieved Engine Rotation: Smooth Rough Seized Oil Condition: Normal Burnt No-Oil Contaminated I.G.V. Pull Test: Smooth Rough Seized 2.0 Pounds of pull Fan Gears: Normal Worn Damaged Delta P Indicators Oil Pump Delta P extended: NO YES Fuel Control Delta P extended: NO YES Gen. Scavenge Filter Delta P extended: NO YES Filters Oil Pump Contamination: None Light Moderate Heavy Fuel Control Contamination: None Light Moderate Heavy Gen. Scavenge Contamination: None Light Moderate Heavy Magnetic Chip Detectors Gearbox Chip Detector: None Light Moderate Heavy Mid Frame Chip Detector: None Light Moderate Heavy -250H Aft Scav. Pump Chip Detector: None Light Moderate Heavy -250H Generator Chip Detector: None Light Moderate Heavy -250H 2

A.P.U. Borescoped NO YES Borescope Findings: 1 st Stage Turbine Stator: X Acceptable Damaged 1 st Stage Turbine Wheel Blades: X Acceptable Damaged -Minor Tip Erosion 1 st Stage Compressor Impeller: X Acceptable Damaged 2 nd Stage Compressor Impeller: X Acceptable Damaged Load Compressor Impeller: X Acceptable Damaged 3 rd Stage Turbine Wheel: X Acceptable Damaged Combustion Chamber: X Acceptable Damaged -Minor Loss of TBC Load Compressor & Power Section Ball Bearings: X Acceptable Damaged Wheel Times: 1 st Stage Turbine Wheel: CSN: 8709 Cycles Remaining 11291 2 nd Stage Turbine Wheel: CSN: 8493 Cycles Remaining 11507 3 rd Stage Turbine Wheel: CSN: 17810 Cycles Remaining 7190 Data Plate Information: Gearbox Assembly Data plate: P/N: 3862180-21 S/N: P-236 Load Compressor Data Plate: P/N: 3804002-11 S/N: P-2281 Power Section Data Plate: P/N: 3801003-8 S/N: P-2265 3

Incoming Functional Test Results Complete detailed functional test results are available upon request. A.P.U. was not pre-tested. See remarks below. A.P.U. was not pre-tested due to major internal damage. A.P.U. was not pre-tested due to major external damage. A.P.U. was not pre-tested due to metal contamination in oil. A.P.U. was pre-tested. Results are within acceptable manual specifications. A.P.U. was pre-tested. The following results exceed allowable specifications: Recertified APU Customer Reason for Removal: Removed in Serviceable Condition for End of Lease Term Confirmation of Cause for Removal No Yes Customer Requested Workscope: Repair As Necessary Recommended Workscope: LRU Workscope: Load Compressor: Power Section: Gearbox Workscope: QEC Workscope: Misc. Workscope: 4

EVALUATION AFTER WORKSCOPE Gearbox Condition Metal Contamination Bearing Failure Gear Failure Oil Leak Liners Worn/Scored High Hours/Cycles Requires Modification Customer Request Other Gearbox Recommended Workscope: Repair Overhaul Visually Accept Not Disassembled Load Compressor Condition Strike Damage Bearing Failure IGV Wear/Failure Rub Damage Low Performance Surge Margin Oil Leak Other Load Compressor Recommended Workscope: Repair Overhaul Visually Accept Not Disassembled Power Section Condition Strike Damage Bearing Failure Blade Shift Rub Damage High Hours/Cycles Hot Section Deteriorated High EGT Oil Leak Other Power Section Recommended Workscope: Repair Overhaul HSI Visually Accept Not Disassembled Line Replaceable Units Route for Test and Repair as Necessary Metal In Oil Check Sheet GTCP331-200/250 REV. A Auxiliary Power Unit Recommended Workscope: Repair No Fault Found Hot Section Inspection Overhaul Beyond Economical Repair / Part out Return As Is F/T Only 5

Analysis and Conclusion Chromalloy 331-200ER APU, P-2796 (S13678), was received at (TAR) April 19, 2013 with a reported time since overhaul of 6010 hours. The reason for removal was not given and the customer requested workscope was Repair as Necessary. Triumph relies on the results of the incoming inspection, as well as the return reason, to effectively disposition an APU. Results of the incoming inspection are critical in helping to verify the return reason or acceptability of the APU for a Pre Test. During incoming inspection the significant findings include: The engine rotation and IGV pull test was smooth with only 2.0 pounds of force needed. Oil Pump, Fuel Control, and Generator Scavenge Filter Delta P indicators were in the normal, un-extended position, the APU oil filter exhibited no contamination, the Generator and Fuel filters were free of debris, and the Magnetic Chip Detectors exhibited no contamination. The oil cooling fan is a sensitive reliability issue by design on the 331-200/-250 series APU s and Triumph inspects the cooling fan and mating idler gear closely. In this case the Cooling Fan Gear and Idler Gear were found acceptable for continued use. Borescope inspection revealed minor tip erosion to the 1st Stage Turbine Blades and some minor loss of thermal barrier coating in the Combustion Chamber. Both conditions are acceptable for continued use. The 1 st Stage Power Section Impeller blade leading edges were in servcieable condition. The trailing edges of the 1 st Stage Power Section Impeller can't be accessed during the borescope process. The 2 nd Stage Power Section Impeller trailing edges were viewed with the borescope and only showed minor flame spray build up on the blades, which was considered acceptable for a serviceable APU. The 2 nd Stage Power Section Impeller leading edges can't be accessed during the borescope process. The APU was found acceptable for a pre-test to determine the condition of the APU and LRU s. During test the APU met all OEM manual requirements. The Test sheet is attached below. 6

7

Post Test Borescope Pictures Photo 1. APU data plate. Photo 2. Acceptable 3 rd Stage Turbine Blades Photo 3. Acceptable 1 st Stage Turbine Nozzle Photo 4. Minor and acceptable 1 st Stage Turbine Blade tip erosion Photo 5. Acceptable Combustion Chamber thermal barrier TARF coating 4.1.4-17 delamination. (Rev. K, 11/10) Photo 6. Additional acceptable Combustion Chamber thermal barrier coating delamination. 8

Post Test Borescope Pictures Photo 7 2 nd Stage Power Section Impeller with minor rub and flame spray build up on the trailing edges Photo 8. 2 nd Stage Power Section Impeller and 2 nd Stage Diffuser-Minor rub and flame spray build up on impeller trailing edge. Photo 9. 1 st Stage Power Section Compressor Impeller leading edges-no defects noted Photo 10. Inlet Guide Vanes Photo 11. Load Compressor Impeller leading edges-no defects TARF noted 4.1.4-17 (Rev. K, 11/10) 9