SA Power Networks Commissioning Witnessing Checklist

Similar documents
Technical Standard - TS 129. Small Inverter Energy Systems (IES) - Capacity not exceeding 30kW. SA Power Networks. Published: November 2017

Large Embedded Generation User Guide A

Date Issued: 10 August 2009 Status: ISSUED Review Date: 10 August 2011 Ref: NS5.3 DISTRIBUTED GENERATION TECHNICAL REQUIREMENTS TABLE OF CONTENTS

Enquiry Form (Non-Registered Generator With Capacity less than 5 MW)

Enquiry Form for Micro and Small Generators 5MW and Less

AS/NZS AS/NZS

Export limits for Embedded Generators up to 200 kva connected at Low Voltage

Technical Requirements for Renewable Energy Power System

DER Commissioning Guidelines Community Scale PV Generation Interconnected Using Xcel Energy s Minnesota Section 10 Tariff Version 1.

Connecting your business diesel generation

My Reserve 500 Install Guide

Draft Guideline for the connection of smallscale inverter based distributed generation. EEA Asset Management Forum 22 June 2016 Dr Richard Strahan

TECHNICAL BRIEF Americas

Appendix A2: Technical Requirements for Distributed Generators > 10 kw to be Connected to Kitchener-Wilmot Hydro Inc. s Distribution System

Micro Embedded Generating Units (0-30 kva)

AS/NZS :2016. Grid connection of energy systems via inverters AS/NZS :2016. Part 1: Installation requirements

Southern Company Interconnection Process. Dexter Lewis Research Engineer Research and Technology Management

Guideline for Parallel Grid Exit Point Connection 28/10/2010

Jemena Electricity Networks (Vic) Ltd

GRID CONNECTION ISSUES FOR DISTRIBUTED GENERATION REVIEW & STANDARDS

TECHNICAL SPECIFICATION FOR INDEPENDENT POWER PRODUCERS. NB Power Customer Service and Distribution. June 2008

DG Standard Updates. IEEE 1547, UL 1741 SA, and Rule 21 CHASE SUN GII/PG&E 3/28/18

Customer Guidelines for Low Voltage Connected. Embedded Generation

Form G5-1 PACIFIC GAS AND ELECTRIC COMPANY GENERATION PRE-PARALLEL INSPECTION

Implementing a Microgrid Using Standard Utility Control Equipment

Renewable Energy System - Electricity System Connection Application Form

ASC SWITCHBOARD DATA SHEET

Net +Plus Connection Code

INTERCONNECTION STANDARDS FOR PARALLEL OPERATION OF SMALL-SIZE GENERATING FACILITIES KILOWATTS IN THE STATE OF NEW JERSEY

Major Customer Connections. Preliminary Enquiry Form Embedded Generation > 30 kw

9.1.4 Troubleshooting of Faults in LCD Screen

Guidelines for connection of generators:

Minnesota Dept. of Commerce, Division of Energy Resources. Distributed Generation Workshop Interconnection Standards

National Distributed Energy Resources Grid Connection Guidelines. Technical Guidelines for Basic Micro EG Connections

Marina Bay Sands Guidelines for Electrical and Wiring Service

Appendix UA Ideal Power UL 1741 SA Advanced Inverter Features

Magellan Utility Scale Energy Storage

Substation LV AC Supplies. Document Number: 1-11-FR-04

INTERCONNECTION REQUIREMENTS INVERTER-BASED DISTRIBUTED GENERATION SOURCES FOR SINGLE-PHASE CUSTOMER SERVICES

Net Metering Interconnection Requirements

GUIDELINES FOR OPERATING, METERING AND PROTECTIVE RELAYING FOR. NET METERED SYSTEMS UP TO 50 kw AND BELOW 750 VOLTS

MX431 Generator Automatic Voltage Regulator Operation Manual

Solar Power Owner s Manual

SP PRO ABB Managed AC Coupling

Axpert-CSS AMTECH DRIVES Axpert-CSS Amtech

APPLICATION ELECTRICITY SERVICES. APPLICATION FOR THE CONNECTION OF SMALL SCALE EMBEDDED GENERATION Page 1

GUIDE FOR MICROGENERATION INTERCONNECTION TO CITY OF MEDICINE HAT ELECTRIC DISTRIBUTION SYSTEM

On and Off Grid Interactive Features AC Coupling

IES GRID FEED-IN LIMITER

SH5K+ Hybrid Inverter Overview & Installation.

Renewable Energy & Storage Best Practice at TPL and Issues Faced. Murray Sheerin Power Generation Manager, Tonga Power Limited.

Inverter-based DER Ride Through and IEEE Standard 1547

Document Requirements for Engineering Review- PV Systems v1.1 12/6/2018

Standards, Procedures and Policies for Grid Connection

Definitions. Scope. Customer Generation Interconnection Requirements

London Hydro Connection Checklist

The Participant will select one of the two Approval Categories (below) and submit the appropriate documentation.

Technical Requirements for Export Limiting Schemes

Modbus Communications

Net Metering Interconnection Requirements. Customer Generation Capacity Not Exceeding 100 kw. Date: Version: 1

Power Systems Trainer

Inverter Advancements in UL1741 and UL 62109

Solar Power Switchgear & Energy Storage Renewable Energy Systems

STOREDGE TM. SolarEdge Single Phase StorEdge TM Solutions for North America SolarEdge StorEdge Solutions Benefits:

List of exemptions from compliance with the Technical Rules granted by Western Power after 1 July 2007

3. Customer shall provide space for metering equipment and meter base as per Springville City Power requirements.

Quick guide. Plug-in fans GPPM with FC101_106 August 2014

National Grid UK Electricity Transmission plc. NATIONAL SAFETY INSTRUCTION and Guidance

Micro Embedded generation

Distinctive Features: Bidirectional solar PCU Hybrid inverter (Solar/ Grid/BATT) Vector Modulated Inverter Control Multiple DSP control operation

(High Pressure Boiler Plant) Tiruchirappalli , TAMIL NADU, INDIA MATERIALS MANAGEMENT / CAPITAL EQUIPMENT. Enquiry Date:

OFF-GRID Hybrid (BI-DIRECTIONAL) SOLAR INVERTER SOLAR INVERTER SOLAR UPS

TANZANIA BUREAU OF STANDARDS

Connecting to the network information pack Version 5

Regenerative Utility Simulator for Grid-Tied Inverters

Technical Guidance for Customer Export Limiting Schemes

COMPACT SUBSTATION GUIDE

Switchgear and Distribution Systems for Engineers and Technicians

SUPPLEMENTAL CORRECTION SHEET FOR SOLAR PHOTOVOLTAIC SYSTEMS - ELECTRICAL

G83/2 Engineering Recommendation

APPLICATION FOR INSTALLATION OF SMALL SCALE EMBEDDED ELECTRICITY GENERATION

Storage guidance & codes. Martin Cotterell

Operations Manual Pika Harbor Smart Battery

PQC - STATCON The ultra fast Power Quality Compensator

KD LV Motor Protection Relay

Emergency lighting units EM converterled. EM converterled ST 50 V SELFTEST series

RULES FOR CUSTOMER INTERCONNECTION OF ELECTRIC GENERATING FACILITIES

ENGINE GOVERNING SYSTEMS LSM672 LOAD SHARING MODULE. GOVERNORS AMERICA CORP. 720 Silver Street Agawam, MA , USA MEMBER

Solar PV General Introduction Guide for Electricians

Dycon D2430 EN54-4 Fire Alarm Power Supply Series

TD-2306B-001, Interconnecting Large 2-20MW Generation Systems. Employees involved with generation interconnection on electric distribution circuits.

Guideline for Using IEEE 1547 for Solar PV Interconnection Page 1

Residential Energy Storage System SH5K PV ESS

9200 Revenue Meter. Model Certification Current Inputs. Complies with the accuracy requirements of the ANSI C Revenue Metering Standard

This is intended to provide uniform application of the codes by the plan check staff and to help the public apply the codes correctly.

ABB central inverters PVS to 2091 kva

90.2 Scope. The installation of electrical conductors, equipment and raceways for:

IEEE Workshop Microgrids

Large Scale Solar Integration

STOREDGE TM. SolarEdge Single Phase StorEdge TM Solutions for North America SolarEdge StorEdge Solutions Benefits:

Transcription:

SA Power Networks Commissioning Witnessing Checklist CUSTOMER NAME: SOLAR PV APPROVED CAPACITY: BATTERY APPROVED CAPACITY: kw (AC) kw (AC) OPERATING PHILOSOPHY: MAXIMUM EXPORT: Non-Export/Export kw (AC) ADDRESS: TECHNICIAN: INSTALLER: INSTALLED DATE: WITNESSING DATE: CONTACT: Revision: Commissioning Officer: Engineering Report Issue and Date: Checklist Release Date: 18/10/2018 1 P a g e

PART A: Pre-Connection Off-Line Testing Table 1 details all required documentation that must be provided prior to SA Power Networks commissioning officer attending site for commissioning witnessing. Documentation Provided Customer/ SAPN Proponent Approved Electrical Certificate of Compliance for the Generating System(s) Date: Date: Protection test results for the protection relay(s) Date: Date: Written statement from protection technician Date: Date: Protection Settings Date: Date: Commissioning Plan Date: Date: Compliance Monitoring Plan Date: Date: Single Line Diagrams (as-built) Date: Date: (New HV sites) Incomer CB injection testing, earth grid testing results Date: Date: Table 1: Documentation Checklist Table 2 details the required pre-connection checks carried out by the SA Power Networks commissioning officer prior to proceeding to compliance testing in Part B. Pre-Connection Checks All inverters are isolated from network Bi-directional/import/export meter installed Protection relay installed and ready for testing Protection relay serial number Voltage, (Ø-N), before inverter system on Grid frequency before inverter system on National Meter Identifier (NMI) Power quality logger installed for 7-day measure (2 days prior to gen online) Go ahead has been received from all parties Table 2: Pre-Connection Checklist Customer/ Proponent SAPN V Hz Are there any interlock arrangements on site? E.g. incomer CB to solar distribution board locked open if site supplied by back-up feeder Summary of interlock/inhibit arrangement: Interlock arrangement demonstrated? 2 P a g e

For new or altered installations, the installation is subject to electrical checks as per table 3 below. The connection of generation (without altering the supply) is to be regarded as an alteration to the installation (but not the connection) and must not compromise any existing functionality or compliance. The marker (M) denotes mandatory compliance for witness procedure, while (D) denotes defect or concern to be noted with record of communication to REC to be kept (this paperwork). Note that these checks do not constitute approval of compliance to the Service & Installation Rules by the SA Power Networks commissioning officer and the onus remains on the Customer/Proponent to ensure the installation complies with the relevant rules. Item Rule Comment Checked Main Switchboard Confirm revenue meter aligns with NMI. (Available from PM) (M) Meter, CTs, voltage taps etc. physically and electrically located correctly. (M) Aligns with SEG/LEG approval S&IR 7.5.1, 8.5, 8.14 PV labels at MSB. (M) AS/NZS 4777.1 6.5 Main Switch label(s). (M) AS/NZS 4777.1-6 AS/NZS3000-2.3.3.5 Main Switch for inverter able to be secured in the open position. (M) Motorised CB or isolator used as isolator must be able to be secured in the open position and not able to be overridden. (M) AS/NZS 4777.1 3.4.3(b) AS/NZS3000-2.3.3.6 AS/NZS3000-2.3.3.6 No unmetered equipment or connections. (M) S&IR - 7.8.2.3 Drawing at MSB showing inverter location (difficult or large installations). (D) AS/NZS 4777.1 6.4 Any observed defects affecting safety (i.e. AS/NZS3000/S&IR non-compliance) communicated to owner/installer (D) Note: also apply DEI process if required Solar Distribution Board Main Isolator Label. (M) AS/NZS 4777.1-6 Main Isolator Isolates Entire Board. (D) AS/NZS 4777.1-3.4.3 Number of Main Isolators. (D) AS/NZS 4777.1-5.5.1 AS/NZS 3000-2.3.3.3 Protection Relay Label. (M) SAPN Requirement Shut Down Procedure Label. (M) AS/NZS 4777.1-6.7 Table 3: Electrical Checklist 3 P a g e

PART B: Compliance Testing Table 4 details the required anti-islanding protection setting check on the installed inverters to ensure compliance to AS4777.2 and the requirements in the Engineering Report. Inverter Anti-Islanding Protection Setting Trip Time Customer/Proponent SAPN Over Voltage Level (V) 260 V 1 Sec Over Voltage Level (V) 265 V 0.2 Sec Under Voltage Level (V) 180 V 1.0 Sec Over Frequency (f) 52 Hz 0.2 Sec Under Frequency (f) 47 Hz 1.0 Sec Active anti-islanding Soft Ramp Up after Reconnect Reconnect Time Table 4: Inverter Settings Checklist Enabled Enabled 60 Sec SA Power Networks commissioning officer to check multiple inverters. Ensure at least 1 is checked for every string of inverters. Total number of inverters: Inverters checked: Inverter 1 Inverter 2 Inverter 3 Inverter 4 Inverter 5 Inverter 6 Inverter 7 Inverter 8 Table 5 details the power quality response setting check on the installed inverters to ensure compliance to AS4777.2 and the requirements in the Engineering Report, if applicable. Inverter Power Quality Response Setting Customer/Proponent SAPN 10min Average Sustained Voltage, V nom-max 258 V (3 sec delay) Volt-VAr response mode As per Table 6 Volt-Watt response mode As per Table 7 Fixed Power Factor mode (as per Engineering Report if stated) Table 5: Power Quality Response Setting Checklist Reference Voltage in Volts VAr % rated VA V 1 207 (90% of nominal) 31% leading (sourcing vars, 2.4%/volt) V 2 220 (96%) 0 V 3 248 (108%) 0 V 4 253 (110%) 44% lagging (sinking vars, 8.8%/volt) Table 6: Volt-VAr response mode (Table 11 of AS 4777.2-2015) Reference Voltage in Volts Power % rated Power V 1 207 (90% of nominal) 100% (default) V 2 220 (96%) 100% (default) V 3 250 (109%) 100% (default) V 4 265 (115%) 20% (default, 5.3%/volt) Table 7: Volt-Watt response mode (Table 10 of AS 4777.2-2015) pf 4 P a g e

Table 8 details the required protection setting check on the installed protection relay to ensure compliance to AS4777.1 and the requirements in the Engineering Report. Protection Relay Make/Model: Relay Protection Setting Note 1 Trip Time Customer/Proponent SAPN Over Voltage 113% 260 V 2 Sec Under Voltage 80% 180 V 2 Sec Over Frequency 104% 52 Hz 2 Sec Under Frequency 94% 47 Hz 2 Sec Voltage Unbalance Note 2 Note 2 Note 2 ROCOF (Stage 1, preferred) or ROCOF (Stage 2) Vector Shift N/A ±4 Hz/Sec 0.25 Sec N/A ±3 Hz/Sec 1 Sec Disabled Sustained Overvoltage 111% 255V 15 Sec Zero Export / Minimum Import (if applicable) Auto Fault reset Enabled 60 Sec Table 8: Protection Relay Settings Checklist Note 1: The settings are for LV connected systems only and the V% is based on 230V nominal. Note 2: 2% for systems under 200kW. For systems above 200kW, voltage unbalance setting as per Engineering Report. Injection Testing If the protection elements in the relay are to be demonstrated via an injection test kit, SA Power Networks commissioning officer to witness the correct settings being applied and the appropriate breaker being operated. A copy of the log of events are to be provided to SA Power Networks at the end of the testing. Controlled Testing If the protection elements are to be demonstrated via set-point manipulation on the relay, the set-points will be adjusted to cause a trip under normal operational conditions. I.e. Under Voltage will be tested by setting the trip point to 245 V. Table 8 details the manipulated settings and whether the breaker has operated. Circuit breaker name: Relay Protection Manipulated Setting Trip Time Customer/Proponent SAPN Over Voltage % V 2 Sec Under Voltage % V 2 Sec Over Frequency % Hz 2 Sec Under Frequency % Hz 2 Sec Table 9: Controlled Testing Settings Manipulation Ensure that all set points are returned to correct settings as listed in table 8. Check fail-safe operation of relay: Inverters isolated on loss of supply to the relay. 5 P a g e

PART C: On-Line Commissioning Table 10 details tests (if applicable) that are to be demonstrated to SA Power Networks that the generating system meets the requirements of the Engineering Report after connection to the network. Time and date system online: Online Tests Setting Customer/Proponent SAPN Reactive Power Capability (manual adjustment) Permission Granted & Denied (for SCADA) Generator Dispatch Limiter (for SCADA) Power Factor Set Point (for SCADA) Table 10: Online Tests Table 11 details post-connection checks before SA Power Networks commissioning officer leaves site. Checks Customer/Proponent SAPN Tamper seal in place Tamper seal serial number Protection relay password protection Warning signages on switchboard(s) Table 11: Post-Connection Checks Outstanding issues: Customer/Proponent Representative Name: Signed: Date: SA Power Networks Representative Name: Signed: Date: 6 P a g e