Mobile Barrier Trailer

Size: px
Start display at page:

Download "Mobile Barrier Trailer"

Transcription

1 Mobile Barrier Trailer Protecting our employees

2 History Born out of the need to protect employees working on highways (June 2004) 4 years of research and development Manufacture and deployment of the Mobile Barrier Trailer

3 What is the Mobile Barrier? It is a trailer barricade, towed behind a tractor, that can be deployed to almost any work zone. Towed length can vary, but is usually hauled in its shortest configuration (approximately 42 feet). Can have sections added to it to increase the protected work zone to 100 feet. Can be configured to perform positive protection on either side of the road. Can be outfitted with a variable message sign (VMS), radar, work zone lights, and crash attenuator cushion.

4 Mobile Barrier in use A CDOT Maintenance Crew using the Mobile Barrier Trailer at night on a project.

5

6 Mobile Barrier Trailer in stowed mode

7 Mobile Barrier Trailer in stowed mode The Mobile Barrier is set up for a right lane closure in this configuration.

8 Mobile Barrier Trailer in stowed mode The Mobile Barrier is set up for a right lane closure in this configuration. Additional sections can be added here to increase the work zone area.

9

10 Rear of the Mobile Barrier

11 Rear of the Mobile Barrier Crash attenuator cushion in travel mode

12 Rear of the Mobile Barrier Crash attenuator cushion in travel mode Variable Message Sign (VMS) in travel mode

13 Inside the work zone The trailer offers numerous electrical connections, lights, and a compressor to perform many maintenance activities.

14 Wall sections of the Mobile Barrier Trailer The wall sections can be hauled this way to the work zone.

15 MBT- Interesting 42 ft. to 102 ft. of positive protection Trailer and tractor- 65,000 lbs 0-3 wall sections lbs each 2 ballast boxes lbs each

16 Switching from right lane to left lane

17 Switching from right lane to left lane Removal of the crash attenuator cushion

18 Switching from right lane to left lane Removal of the crash attenuator cushion

19 Switching from right lane to left lane Removal of the crash attenuator cushion Removal of the VMS and wheels

20 Switching from right lane to left lane Removal of the crash attenuator cushion Removal of the VMS and wheels

21 Switching from right lane to left lane Removal of the crash attenuator cushion Removal of the VMS and wheels Re-assemble on the other end of the trailer. Approximately 30 minutes to turn around.

22 Adding a section to the Mobile Barrier Use of a front-end loader to accomplish the task. This can be done at a shop or in the field.

23

24

25

26 Deploying the crash attenuator cushion and V.M.S.

27

28 V.M.S.

29 V.M.S. Radar

30 V.M.S. Radar Deployed crash attenuator cushion

31 Mobile Barrier in action! The Maintenance Crew in total protection from traffic.

32 Other uses for the Mobile Barrier Mobile Barrier Trailer Patching & Repair Ramp Closure (accident & fire) Night Work (w/ passing traffic)

33 Typical Applications: Freeway TA-5 Shoulder Closure on

34 Typical Applications: Freeway TA-5 Shoulder Closure on

35 TA-30 Interior Lane Closure on Multi-Lane Street

36 TA-30 Interior Lane Closure on Multi-Lane Street

37 TA-33 Stationary Lane Closure on Divided Highway

38 TA-33 Stationary Lane Closure on Divided Highway

39 TA-35 Mobile Operation on Multi-Lane Road

40 TA-35 Mobile Operation on Multi-Lane Road

41 TA-37 Double Lane Closure on Freeway

42 TA-37 Double Lane Closure on Freeway

43 TA-38 Interior Lane Closure on Freeway

44 TA-38 Interior Lane Closure on Freeway

45 Mobile Barrier

46 Mobile Barrier Questions?

47 Mobile Barrier Questions? Comments?

48 Mobile Barrier Questions? Comments? Concerns?

49 Mobile Barrier Questions? Comments? Concerns? Jokes? Good? Bad?

50 Mobile Barrier Questions? Comments? Concerns? Jokes? Good? Bad? Thank you!

AGC/MoDOT Annual COOP Meeting. Safety/Traffic Division & Specialty Contractors/Suppliers Breakout Session. December 5, 2018

AGC/MoDOT Annual COOP Meeting. Safety/Traffic Division & Specialty Contractors/Suppliers Breakout Session. December 5, 2018 AGC/MoDOT Annual COOP Meeting Safety/Traffic Division & Specialty Contractors/Suppliers Breakout Session December 5, 2018 District Work Zone Review St. Louis June 11-14, 2018 Central July 16-18, 2018 Northeast

More information

SN01 STANDARD NOTES CITY OF SAMMAMISH 2018 INTERSECTION IMPROVEMENTS PROJECT NO. DATE BY APPR REVISION COSA0023 KING COUNTY WASHINGTON

SN01 STANDARD NOTES CITY OF SAMMAMISH 2018 INTERSECTION IMPROVEMENTS PROJECT NO. DATE BY APPR REVISION COSA0023 KING COUNTY WASHINGTON STANDARD NOTES SN01 2 OF 17 STANDARD NOTES SN02 3 OF 17 SITE PREP & T.E.S.C. NOTES GENERAL NOTES SITE PREP & T.E.S.C. PLAN SP01 4 OF 17 SITE PREP & T.E.S.C. NOTES GENERAL NOTES SITE PREP & T.E.S.C. PLAN

More information

SN01 STANDARD NOTES CITY OF SAMMAMISH 2018 FLASHING YELLOW ARROW SIGNALS PROJECT NO. DATE BY APPR REVISION COSA0023 KING COUNTY WASHINGTON

SN01 STANDARD NOTES CITY OF SAMMAMISH 2018 FLASHING YELLOW ARROW SIGNALS PROJECT NO. DATE BY APPR REVISION COSA0023 KING COUNTY WASHINGTON STANDARD NOTES SN01 2 OF 8 ROADWAY PLAN PL01 3 OF 8 ROADWAY PLAN PL02 4 OF 8 LANE 10 105 150 205 270 450 500 550 11 12 SHOULDER 115 125 MINIMUM LANE CLOSURE TAPER LENGTH = L 165 225 295 180 245 320 5 25

More information

TTMA-100 Trailer TMA. User s Manual. NCHRP 350 TL-3 Trailer Truck Mounted Attenuator

TTMA-100 Trailer TMA. User s Manual. NCHRP 350 TL-3 Trailer Truck Mounted Attenuator User s Manual TTMA-100 Trailer TMA NCHRP 350 TL-3 Trailer Truck Mounted Attenuator A LINDSAY TRANSPORTATION SOLUTIONS COMPANY PT-TTMA01 Revised 05/01/2010 BSI Customer Service Department +1 (707) 374-6800

More information

Work Zone Safety. Mike Marr Industrial Safety Consultant Ohio Bureau of Workers Compensation Division of Safety & Hygiene

Work Zone Safety. Mike Marr Industrial Safety Consultant Ohio Bureau of Workers Compensation Division of Safety & Hygiene Work Zone Safety Mike Marr Industrial Safety Consultant Ohio Bureau of Workers Compensation Division of Safety & Hygiene 1 Agenda Manuals/Codes/Statistics Setup & Removal of Work Zones Devices and Locations

More information

STATE ND PROJECT NO. CP 0883 (14) & CP 1152 (14) SHEET NO. TOTAL SHEETS 9 31 SIGN NUMBER SIGN SIZE DESCRIPTION AMOUNT REQUIRED UNITS PER AMOUNT UNITS

STATE ND PROJECT NO. CP 0883 (14) & CP 1152 (14) SHEET NO. TOTAL SHEETS 9 31 SIGN NUMBER SIGN SIZE DESCRIPTION AMOUNT REQUIRED UNITS PER AMOUNT UNITS STATE ND PROJECT NO. CP 0883 (14) & CP 1152 (14) SHEET NO. TOTAL SHEETS 9 31 SIGN NUMBER SIGN SIZE DESCRIPTION AMOUNT REQUIRED UNITS PER AMOUNT UNITS SUB TOTAL SIGN NUMBER SIGN SIZE DESCRIPTION AMOUNT

More information

D-25 Speed Advisory System

D-25 Speed Advisory System Report Title Report Date: 2002 D-25 Speed Advisory System Principle Investigator Name Pesti, Geza Affiliation Texas Transportation Institute Address CE/TTI, Room 405-H 3135 TAMU College Station, TX 77843-3135

More information

Work Zone Worker Protection

Work Zone Worker Protection Work Zone Worker Protection Field Guide Developed by American Traffic Safety Services Association 15 Riverside Parkway, Suite 100 Fredericksburg, VA 22406 (800) 272-8772 Web Address: www.atssa.com E-mail:

More information

[Insert name] newsletter CALCULATING SAFETY OUTCOMES FOR ROAD PROJECTS. User Manual MONTH YEAR

[Insert name] newsletter CALCULATING SAFETY OUTCOMES FOR ROAD PROJECTS. User Manual MONTH YEAR [Insert name] newsletter MONTH YEAR CALCULATING SAFETY OUTCOMES FOR ROAD PROJECTS User Manual MAY 2012 Page 2 of 20 Contents 1 Introduction... 4 1.1 Background... 4 1.2 Overview... 4 1.3 When is the Worksheet

More information

Act 229 Evaluation Report

Act 229 Evaluation Report R22-1 W21-19 W21-20 Act 229 Evaluation Report Prepared for Prepared by Table of Contents 1. Documentation Page 3 2. Executive Summary 4 2.1. Purpose 4 2.2. Evaluation Results 4 3. Background 4 4. Approach

More information

Maine Turnpike Authority

Maine Turnpike Authority Company Name Total Bid Amount R J Grondin & Sons - Gorham, ME $1,436,720.00 Shaw Brothers Construction, Inc. - Gorham, ME $1,476,398.83 Pratt & Sons, Inc. - Minot, ME $1,733,615.00 Page 1 of 13 R J Grondin

More information

Wichita TMC Support- Monthly Incident Report for July 2018

Wichita TMC Support- Monthly Incident Report for July 2018 Highway Wichita TMC Support- Monthly Incident Report for July 8 There were a total of actively logged incidents during the month. The Traffic Management Center (TMC) is actively staffed 6am to pm, Monday-Friday,

More information

Wichita TMC Support- Monthly Incident Report for June 2018

Wichita TMC Support- Monthly Incident Report for June 2018 Highway Wichita TMC Support- Monthly Incident Report for June 208 There were a total of 256 actively logged incidents during the month. The Traffic Management Center (TMC) is actively staffed 6am to 7pm,

More information

Notes from a Demonstration of the Balsi Beam and ArmorGuard Positive Protection Systems

Notes from a Demonstration of the Balsi Beam and ArmorGuard Positive Protection Systems Notes from a Demonstration of the Balsi Beam and ArmorGuard Positive Protection Systems The demonstration described here occurred on Tuesday, December 11, 2007, on Interstate 80 at post mile 33, in Colfax,

More information

Work Zone Safety Intrusion Mitigation

Work Zone Safety Intrusion Mitigation Work Zone Safety Intrusion Mitigation Advanced Warning and Risk Evasion Lee Cole VP EHS CRH Americas Materials Lee.Cole@na.crh.com Curt Davison Director of AWARE (407) 353-1140 cbdavison@oldcastlematerials.com

More information

Purdue Road School West Lafayette IN

Purdue Road School West Lafayette IN Purdue Road School West Lafayette IN Plastic Safety Systems, Inc. Tim Cox National Sales Manager Kenny Kolberg Roadway Safety Consultant Indiana Work Zone Facts Source: IN DOT In 2013, 13 fatalities in

More information

Exhibit H: Typical Traffic Control Plans. North Metro Natural Gas Pipeline Project Routing Study

Exhibit H: Typical Traffic Control Plans. North Metro Natural Gas Pipeline Project Routing Study Exhibit H: Typical Traffic Control Plans North Metro Natural Gas Pipeline Project Routing Study North Metro Natural Gas Pipeline Project Routing Study This page intentionally left blank. Contractor: CAMPOS

More information

State PA* Base Fine. County PA*/10 DNA PA* Offense 10/10 7 5/ % (b,c) I Failure to Obey Traffic Control/Devices at

State PA* Base Fine. County PA*/10 DNA PA* Offense 10/10 7 5/ % (b,c) I Failure to Obey Traffic Control/Devices at EMAT Ṅight (*See Preface, s III and IV.C.2) (**See Preface, IV) 0 7 5 5 20% 2 4 40 0 2367 (b,c) I Failure to Obey Traffic Control/Devices at Construction Site 245 (a,b) I "Green" Signal Vehicular Responsibilities

More information

2013 Changes to the 2011 MMUTCD, Part 6 September 2013

2013 Changes to the 2011 MMUTCD, Part 6 September 2013 2013 Changes to the 2011 MMUTCD, Part 6 September 2013 The requirements for drum spacing in Sections 6C.07 (Page 557 (MI)) and 6F.63 (Page 604 (MI)) have been revised to more closely match the pavement

More information

Motorways Route in Thailand. Sustainable Highway Design

Motorways Route in Thailand. Sustainable Highway Design Motorways Route in Thailand 2 2 Development of Highway Community Speed decreased Open Highway At Grade Median Opening Settlements along the highway (Ribbon Development) Non Control Access or Partial Control

More information

PERFORMANCE ACTIVITY 603 SIGNS

PERFORMANCE ACTIVITY 603 SIGNS PERFORMANCE ACTIVITY 603 SIGNS WORK DESCRIPTION 3 WORK DESCRIPTION 4 WORK DESCRIPTION 6 New Install Maintenance / Replace Temporary 603 SIGNS ACTIVITY DESCRIPTION Install new signs and maintain and replace

More information

Work Zone Safety Initiatives and Research Efforts. Irene Soria Safety Evaluation Engineer Illinois Department of Transportation Safety Engineering

Work Zone Safety Initiatives and Research Efforts. Irene Soria Safety Evaluation Engineer Illinois Department of Transportation Safety Engineering Work Zone Safety Initiatives and Research Efforts Irene Soria Safety Evaluation Engineer Illinois Department of Transportation Safety Engineering TES Conference - October 17 th, 2012 Outline Work Zone

More information

Section 6H.01 Typical Applications

Section 6H.01 Typical Applications December 27, 2010 Draft Page 6H-1 Section 6H.01 Typical Applications Support: 01 Whenever the acronym TTC is used in this Chapter, it refers to temporary traffic control. 02 The needs and control of all

More information

TRAFFIC ENGINEERING DIVISION INSTRUCTIONAL & INFORMATIONAL MEMORANDUM

TRAFFIC ENGINEERING DIVISION INSTRUCTIONAL & INFORMATIONAL MEMORANDUM VIRGINIA DEPARTMENT OF TRANSPORTATION TRAFFIC ENGINEERING DIVISION INSTRUCTIONAL & INFORMATIONAL MEMORANDUM GENERAL SUBJECT: Portable Temporary Rumble Strips (PTRS) SPECIFIC SUBJECT: Guidelines for the

More information

Moving Operations. Introduction by. National Traffic Management & Work Zone Safety Conference March 2009

Moving Operations. Introduction by. National Traffic Management & Work Zone Safety Conference March 2009 Driver Behavior Around Moving Operations Introduction by Mli Melisa D. Fil Finley, PE P.E. National Traffic Management & Work Zone Safety Conference March 2009 Mobile Operation Intrusions New York State

More information

Procedure Effective date Rescinds Vehicle Placement In or Near Moving Traffic 17 November January 2005

Procedure Effective date Rescinds Vehicle Placement In or Near Moving Traffic 17 November January 2005 Procedure Effective date Rescinds Vehicle Placement In or Near Moving Traffic 17 November 2008 1 January 2005 Reference Norwich Township Fire Department SOG #30 Page 1 of 6 Purpose: The purpose of this

More information

Section 2B.59 Weight Limit Signs - Interim Revisions

Section 2B.59 Weight Limit Signs - Interim Revisions Note: this document is an interim modification to Section 2B.59 of the Virginia Supplement to the MUTCD, Revision #1. Once the VDOT District Structure & Bridge section has made the determination that a

More information

PAGE 2 PAGE 3 PAGE 1 PAGE 8 PAGE 9 PAGE 7. Low Headroom Drill. Turchi. Hydrovac. IMT -Af 80, AF 100. Sterling Auger. Backhoe -w/dangle Auger

PAGE 2 PAGE 3 PAGE 1 PAGE 8 PAGE 9 PAGE 7. Low Headroom Drill. Turchi. Hydrovac. IMT -Af 80, AF 100. Sterling Auger. Backhoe -w/dangle Auger POWELL Rental Equipment www.powellcontracting.com ENTAL EQ Hydrovac Low Headroom Drill -315 Cat., 320 Cat. Turchi PAGE 1 PAGE 2 PAGE 3 IMT -Af 80, AF 100 Sterling Auger Backhoe -w/dangle Auger 40/50 Ton

More information

SUMMARY CHANGES FOR NCHRP REPORT 350 GUIDELINES [NCHRP (02)] Keith A. Cota, Chairman Technical Committee on Roadside Safety June 14, 2007

SUMMARY CHANGES FOR NCHRP REPORT 350 GUIDELINES [NCHRP (02)] Keith A. Cota, Chairman Technical Committee on Roadside Safety June 14, 2007 SUMMARY CHANGES FOR NCHRP REPORT 350 GUIDELINES [NCHRP 22-14 (02)] Keith A. Cota, Chairman Technical Committee on Roadside Safety June 14, 2007 BACKGROUND Circular 482 (1962) First full scale crash test

More information

Diagram 1 - Shoulder Assistance

Diagram 1 - Shoulder Assistance Diagram - Shoulder Assistance Approx. skip (40 ). Notify K. C. Scout. Turn on the emergency directional flashers and top rear facing strobe lights. 3. Pull to the shoulder and stop approximately 40 feet

More information

Development of a Moving Automatic Flagger Assistance Device (AFAD) for Moving Work Zone Operations

Development of a Moving Automatic Flagger Assistance Device (AFAD) for Moving Work Zone Operations Development of a Moving Automatic Flagger Assistance Device (AFAD) for Moving Work Zone Operations Edward F. Terhaar, Principal Investigator Wenck Associates, Inc. March 2017 Research Project Final Report

More information

Work Zone Traffic Control

Work Zone Traffic Control Work Zone Traffic Control AGC/ Annual Meeting Bob Pappe, PE, PLS Traffic-Roadway Engineer Oregon Department of Transportation Chapter 1: TCP Design Introduction 1 Work Zone Traffic Control Update from

More information

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, EDITION 2007

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, EDITION 2007 07-08001 Sheet 1 of 2 KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, EDITION 2007 SECTION 805 WORK ZONE TRAFFIC CONTROL AND SAFETY TYPICAL TRAFFIC CONTROL, 2-LANE

More information

Lee County DOT Traffic Section Design Standard for Sign Installation

Lee County DOT Traffic Section Design Standard for Sign Installation Lee County DOT Traffic Section Design Standard for Sign Installation Traffic Section Table Of Contents Section Title 1. Sign Panel Material 2. Sign Shape 3. Posts 4. Fasteners 5. Retro reflectivity and

More information

Collision Analysis Safety Tables

Collision Analysis Safety Tables Crash Severity Geography of Geography of Time and Date of Crash Conditions Features Features.. Queries Selected: Town(Hartford), Date(Year:All or //05 to 9/7/06), Severity(All), Route Class(Interstate),

More information

The challenges of driving

The challenges of driving Driving is not that easy 32 Some facts about new solo drivers 34 The challenges of driving The challenges of driving 29 The challenges of driving month in Victoria in casualty crashes per (over a 6 year

More information

WATER DISTRIBUTION OPERATOR (WDO I, II, III, IV, V) EQUIPMENT OPERATOR

WATER DISTRIBUTION OPERATOR (WDO I, II, III, IV, V) EQUIPMENT OPERATOR CITY OF REDLANDS WATER DISTRIBUTION OPERATOR (WDO I, II, III, IV, V) EQUIPMENT OPERATOR DEFINITION Under direction, to operate construction, maintenance, and transportation equipment in a variety of maintenance

More information

Heavy Truck Conflicts at Expressway On-Ramps Part 1

Heavy Truck Conflicts at Expressway On-Ramps Part 1 Heavy Truck Conflicts at Expressway On-Ramps Part 1 Posting Date: 7-Dec-2016; Revised 14-Dec-2016 Figure 1: Every day vast numbers of large and long trucks must enter smoothly into high speed truck traffic

More information

Collision Warning Systems

Collision Warning Systems Collision Warning Systems Amy Houser Engineer, Technology Division Wednesday, July 25, 2007 12:00 1:30 P.M. EDT Office of Research and Analysis Rear End Crashes In 18 percent of all rear-end crashes where

More information

MDOT Tow Plow USAGES AND EFFECTIVENESS FOR RIGHT OF WAY SNOW CLEARING

MDOT Tow Plow USAGES AND EFFECTIVENESS FOR RIGHT OF WAY SNOW CLEARING MDOT Tow Plow USAGES AND EFFECTIVENESS FOR RIGHT OF WAY SNOW CLEARING Goal Achieve a greater customer service level with less overhead. Quicker return to posted Travel Speeds Minimize user delay costs

More information

Highway Construction Worker Dies When Struck By Semi-Tractor Trailer Incident Number: 03KY030

Highway Construction Worker Dies When Struck By Semi-Tractor Trailer Incident Number: 03KY030 Highway Construction Worker Dies When Struck By Semi-Tractor Trailer Incident Number: 03KY030 Kentucky Fatality Assessment and Control Evaluation Program Kentucky Injury Prevention and Research Center

More information

South Carolina. It s serious. Deadly serious.

South Carolina. It s serious. Deadly serious. South Carolina It s serious. Deadly serious. Work Zone Safety Guidelines for the South Carolina Department of Transportation, Municipalities, Counties, Utilities, and Contractors 2013 1 Table of Contents

More information

I-405 Sepulveda Pass Improvements Project

I-405 Sepulveda Pass Improvements Project I-405 Sepulveda Pass Improvements Project Community Meeting November 15, 2012 1 Wilshire Segment Overview of Wilshire Segment There are a total of 23 bridges being constructed on this project; almost half

More information

Work Zone Safety Best Practices Traffic Engineering & Safety Conference October 18, Dean Mentjes Federal Highway Administration

Work Zone Safety Best Practices Traffic Engineering & Safety Conference October 18, Dean Mentjes Federal Highway Administration Work Zone Safety Best Practices Traffic Engineering & Safety Conference October 18, 2017 Dean Mentjes Federal Highway Administration Juan Pava Illinois Department of Transportation 1 Setting the Stage:

More information

TRAFFIC CONTROL PLAN FOR SURVEYING OPERATIONS END ROAD WORK END ROAD WORK * ** END ROAD WORK END ROAD WORK. TCP (S-1a) TCP (S-1b)

TRAFFIC CONTROL PLAN FOR SURVEYING OPERATIONS END ROAD WORK END ROAD WORK * ** END ROAD WORK END ROAD WORK. TCP (S-1a) TCP (S-1b) kind is made by TxDOT for any purpose whatsoever. TxDOT assumes no responsibility for the conversion of this standard to other formats or for incorrect results or damages resulting from its use. 3 for

More information

Safer travel - faster arrival

Safer travel - faster arrival Safer travel - faster arrival Karolina Joanna Korth Page 1 Siemens AG 2013. All rights reserved Siemens Centrals to manage traffic on the highway and tunnel Highway Control Center - CONDUCT+ International

More information

HAULING EQUIPMENT with TRUCK and TRAILER COMBINATION

HAULING EQUIPMENT with TRUCK and TRAILER COMBINATION SAFE OPERATING GUIDELINES JOB TITLE HAULING EQUIPMENT with TRUCK and TRAILER COMBINATION JOB DESCRIPTION This guideline describes loading, unloading and hauling equipment with a truck and trailer. JOB

More information

panelsizes:min.:30x30,std.:36x36,exp.:36x36,fwy.:48x48 levels:gscolorfill GSBWFILL GSOUTLINE chevronshoulderradius: constructpanels: pan

panelsizes:min.:30x30,std.:36x36,exp.:36x36,fwy.:48x48 levels:gscolorfill GSBWFILL GSOUTLINE chevronshoulderradius: constructpanels: pan panelsizes:min.:30x30,std.:36x36,exp.:36x36,fwy.:48x48 levels:gscolorfill GSBWFILL GSOUTLINE chevronshoulderradius:12.000 constructpanels:36 24 18 panelborderradius:12.000 chevrontipradius:12.000 panelstyle:warning.ssi

More information

General Knowledge Test D. 1. Which of these statements about driving in areas with strong winds are true?

General Knowledge Test D. 1. Which of these statements about driving in areas with strong winds are true? General Knowledge Test D 1. Which of these statements about driving in areas with strong winds are true? a. Winds are especially a problem when coming out of tunnels. b. You should drive alongside other

More information

ROAD SAFETY PRODUCTS. Randgate Consultants Pty Ltd College House, 26 Peter Place Road, Bryanston 2021 T:

ROAD SAFETY PRODUCTS. Randgate Consultants Pty Ltd College House, 26 Peter Place Road, Bryanston 2021 T: ROAD SAFETY PRODUCTS Randgate Consultants Pty Ltd College House, 26 Peter Place Road, Bryanston 2021 T: 011 540 0332 www.randgate.co.za WATER FILLED BARRIERS 2m long x 1m high interlocking road water barriers

More information

Preliminary Analysis of LED Enhanced Signs at a Passive Rural Level Crossing

Preliminary Analysis of LED Enhanced Signs at a Passive Rural Level Crossing Preliminary Analysis of LED Enhanced Signs at a Passive Rural Level Crossing Adrian Hellman Systems Safety and Engineering Division August 6, 2014 Volpe The National Transportation Systems Center Advancing

More information

Worksite Safety Update Promoting safety in road construction

Worksite Safety Update Promoting safety in road construction Worksite Safety Update Promoting safety in road construction No 115 January 2012 In this Edition: Safety Excellence Award for West Gate Bridge Project Page 1 VicRoads Guidelines for Truck Mounted Attenuators

More information

.MAINTENANCE. Strategic Initiative Four:

.MAINTENANCE. Strategic Initiative Four: The accompanying fact sheets explain specific components of the department s effort to prioritize maintenance activities. This information provides the basis of ODOT s 2001 Strategic Initiative Four: Re-Defining

More information

Maine Turnpike Authority

Maine Turnpike Authority Company Name Total Bid Amount CPM Constructors - Freeport, ME $1,309,765.25 Scott Construction Corporation - Portland, ME $1,528,840.00 Wyman & Simpson Inc. - Richmond, ME $1,674,845.00 Page 1 of 10 CPM

More information

60 70 Guidelines. Managing Speeds. Work Zones

60 70 Guidelines. Managing Speeds. Work Zones 50 40 30 60 70 Guidelines on Managing Speeds in Work Zones 50 40 30 60 70 This document summarizes available guidance on setting speed limits and managing speeds in work zones. The Manual on Uniform Traffic

More information

DISTRIBUTION: Electronic Recipients List TRANSMITTAL LETTER NO. (15-01) MINNESOTA DEPARTMENT OF TRANSPORTATION. MANUAL: Road Design English Manual

DISTRIBUTION: Electronic Recipients List TRANSMITTAL LETTER NO. (15-01) MINNESOTA DEPARTMENT OF TRANSPORTATION. MANUAL: Road Design English Manual DISTRIBUTION: Electronic Recipients List MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards Unit ISSUED BY: Office of Project Management and Technical Support TRANSMITTAL LETTER NO.

More information

Louisiana s s Work Zone Task Force Work Zone Improvements

Louisiana s s Work Zone Task Force Work Zone Improvements Louisiana s s Work Zone Task Force Work Zone Improvements Louisiana Asphalt Technology Conference Shreveport, Louisiana February 24, 2005 Charles Adams, P.E., PTOE Why Improve Work Zones? Number of Work

More information

VULCAN BARRIER TL-3 GENERAL SPECIFICATIONS

VULCAN BARRIER TL-3 GENERAL SPECIFICATIONS VULCAN BARRIER TL-3 GENERAL SPECIFICATIONS I. GENERAL A. The VULCAN BARRIER TL-3 (VULCAN TL-3) shall be a highly portable and crashworthy longitudinal barrier especially suited for use as a temporary barrier

More information

Implementation of Automatic Flagger Assistance Devices (AFADs) for Minnesota Department of Transportation Flagger Operations

Implementation of Automatic Flagger Assistance Devices (AFADs) for Minnesota Department of Transportation Flagger Operations Implementation of Automatic Flagger Assistance Devices (AFADs) for Minnesota Department of Transportation Flagger Operations Edward F. Terhaar, Principal Investigator Wenck Associates, Inc. December 2014

More information

A LEADER... NOT A FOLLOWER! MANUFACTURER OF TRAFFIC SAFETY SYSTEMS & LED LIGHTING TOWERS

A LEADER... NOT A FOLLOWER! MANUFACTURER OF TRAFFIC SAFETY SYSTEMS & LED LIGHTING TOWERS A LEADER... NOT A FOLLOWER! MANUFACTURER OF TRAFFIC SAFETY SYSTEMS & LED LIGHTING TOWERS CONTENT LIGHTING INTRO 6 OVERVIEW 8 HYBRID LED LIGHT TOWER 10 HYBRID LED LIGHT TOWER CUBE 12 LED LIGHT TOWER TRAILER

More information

Attachment B - Fleet Data and Vehicle Use Case Information

Attachment B - Fleet Data and Vehicle Use Case Information Attachment B - Fleet Data and Vehicle Use Case Information The combined fleets of Los Angeles, San Francisco, Portland and Seattle contain nearly 25,000 pieces of equipment. Of these, almost 8,000 are

More information

Equipped for Versatility

Equipped for Versatility a privately held American corporation, has been providing rugged, efficient, dependable, mobile material-handling equipment to agricultural and commercial operators since 1983. Our customers have proven

More information

REVIEW OF THE DRAFT 2011 VA WORK AREA PROTECTION MANUAL. December 14, 2010 David Rush VDOT WZS Program Manager

REVIEW OF THE DRAFT 2011 VA WORK AREA PROTECTION MANUAL. December 14, 2010 David Rush VDOT WZS Program Manager REVIEW OF THE DRAFT 2011 VA WORK AREA PROTECTION MANUAL December 14, 2010 David Rush VDOT WZS Program Manager Manual on Uniform Traffic Control Devices (MUTCD) Released in December 2009 States have until

More information

THINK YOU KNOW PORTABLE TRAFFIC SIGNALS? THINK AGAIN.

THINK YOU KNOW PORTABLE TRAFFIC SIGNALS? THINK AGAIN. Versatility Safety Cost Options Request a Call Request a Quote THINK YOU KNOW PORTABLE TRAFFIC SIGNALS? THINK AGAIN. Portable traffic signals aren t just for bridgework. Our Pop-Up line of portable traffic

More information

ArmorGuard Barrier Portable Longitudinal Barrier

ArmorGuard Barrier Portable Longitudinal Barrier ArmorGuard Barrier Portable Longitudinal Barrier Installation & Maintenance Manual AGB I&M 082409 Page 1 of 12 ArmorGuard Barrier Table of contents Preface... 2 Applications and System Characteristics

More information

3/27/2016. Crack filling/sealing PLANNING & SCHEDULING. Two types of crack treatment

3/27/2016. Crack filling/sealing PLANNING & SCHEDULING. Two types of crack treatment Crack filling/sealing Two types of crack treatment Crack Filling: Pavements that are in good condition Working cracks Crack Sealing: Filling non working cracks closely spaced Most cost effective treatment

More information

REVISION VIRGINIA WORK AREA PROTECTION MANUAL. Effective April 1, 2015 for State Forces & Effective starting on the July 2015 Advertisement

REVISION VIRGINIA WORK AREA PROTECTION MANUAL. Effective April 1, 2015 for State Forces & Effective starting on the July 2015 Advertisement REVISION 1 2011 VIRGINIA WORK AREA PROTECTION MANUAL Effective April 1, 2015 for State Forces & Effective starting on the July 2015 Advertisement VA Supplements to the MUTCD Revisions to VDOT developed

More information

TRAFFIC CONTROL PLAN ONE-LANE TWO-WAY TRAFFIC CONTROL TCP(1-2)-12 ONE LANE TWO-WAY CONTROL WITH YIELD SIGNS ONE LANE TWO-WAY CONTROL WITH FLAGGERS

TRAFFIC CONTROL PLAN ONE-LANE TWO-WAY TRAFFIC CONTROL TCP(1-2)-12 ONE LANE TWO-WAY CONTROL WITH YIELD SIGNS ONE LANE TWO-WAY CONTROL WITH FLAGGERS DISCLAIMER: The use of this standard is governed by the "Texas Engineering Practice Act". No warranty of any kind is made by TxDOT for any purpose whatsoever. TxDOT assumes no responsibility for the conver-

More information

CITY OF REDLANDS EQUIPMENT OPERATOR IN TRAINING (OIT) EQUIPMENT OPERATOR I/II

CITY OF REDLANDS EQUIPMENT OPERATOR IN TRAINING (OIT) EQUIPMENT OPERATOR I/II CITY OF REDLANDS EQUIPMENT OPERATOR IN TRAINING (OIT) EQUIPMENT OPERATOR I/II DEFINITION Under immediate supervision (Equipment Operator in Training) or general supervision (Equipment Operator I) or direction,

More information

Appendix Baseline seats High Retention seats MAIS

Appendix Baseline seats High Retention seats MAIS Appendix Table A1: 2001-2008 NASS-CDS crashes with GAD = B and 1992-2008 model year GM vehicles with baseline or high retention seats (n: sample size, se: standard error. Baseline seats High Retention

More information

Work Zone Safety. Guidelines for Temporary Traffic Control

Work Zone Safety. Guidelines for Temporary Traffic Control Work Zone Safety Guidelines for Temporary Traffic Control Revised April 2015 1 Table of Contents Introduction 3 Traffic Control Devices 4 Signs 4 Channelizing Devices 7 Lighting Devices 11 Component Parts

More information

Questions and Answers from March 1 st, 2016 Roadbuilders Introduction Webinar

Questions and Answers from March 1 st, 2016 Roadbuilders Introduction Webinar Questions and Answers from March 1 st, 2016 Roadbuilders Introduction Webinar No. Question Answer 1 Is it mandatory to have an Engineer sign off on all TMP's containing a lane closure even in a 50 or 60

More information

DESIGNATED CONSTRUCTION ZONE SPEED FINES DOUBLE. Manitoba Infrastructure and Transportation. Infrastructure and Transportation. Traffic Engineering

DESIGNATED CONSTRUCTION ZONE SPEED FINES DOUBLE. Manitoba Infrastructure and Transportation. Infrastructure and Transportation. Traffic Engineering CONSTRUCTION DESIGNATED ZONE SPEED FINES DOUBLE Manitoba Infrastructure and Transportation Work Zone Traffic Control Manual Provincial Roads and Provincial Trunk Highways Infrastructure and Transportation

More information

Roadside Safety MASH

Roadside Safety MASH Ministry of Transportation MEA 2016 ANNUAL WORKSHOP AND GENERAL MEETING Roadside Safety MASH MTO Design & Contract Standards Office Highway Standards Branch November 24, 2016 Roadside Safety - MASH Highway

More information

Wichita TMC Support- Monthly Incident Report for December 2017

Wichita TMC Support- Monthly Incident Report for December 2017 Highway Wichita TMC Support- Monthly Incident Report for December 7 There were a total of 6 actively logged incidents during the month. The Traffic Management Center (TMC) is actively staffed 6am to 7pm,

More information

CTOC Best practice for speed management at roadwork sites

CTOC Best practice for speed management at roadwork sites CTOC Best practice for speed management at roadwork sites CTOC Version 2 July 2014 Contents Background... 4 Purpose... 4 Speed treatment options (positive traffic management)... 6 Speed treatments explained...

More information

O5 GENERAL VEHICLE ISSUES

O5 GENERAL VEHICLE ISSUES O5 GENERAL VEHICLE ISSUES O5.1 GENERAL O5.1.1 Production vehicles are rarely suited to site work in their standard form, so before purchasing a vehicle, consideration should be given to the model s suitability

More information

Case Study STREAMS SMART MOTORWAYS

Case Study STREAMS SMART MOTORWAYS Case Study STREAMS SMART MOTORWAYS One of the key challenges facing road agencies today is maximising road network efficiency while reducing impacts on the community. Increasingly, road agencies are turning

More information

OR 217 Active Traffic Management

OR 217 Active Traffic Management OR 217 Active Traffic Management Category: Best New Innovative Product, Service, or Application Oregon Department of Transportation (ODOT) 123 NW Flanders Street, Portland, Oregon 97209 Dennis Mitchell,

More information

SCDOT TRAFFIC SIGNAL SPECIAL PROVISIONS TRAFFIC CONTROL FOR TRAFFIC SIGNAL PROJECTS MAINTENANCE OF TRAFFIC

SCDOT TRAFFIC SIGNAL SPECIAL PROVISIONS TRAFFIC CONTROL FOR TRAFFIC SIGNAL PROJECTS MAINTENANCE OF TRAFFIC SCDOT TRAFFIC SIGNAL SPECIAL PROVISIONS TRAFFIC CONTROL FOR TRAFFIC SIGNAL PROJECTS MAINTENANCE OF TRAFFIC TRAFFIC CONTROL: The Contractor shall execute the item of Traffic Control as required by the Standard

More information

#6 IN A SERIES SHARING THE ROAD. How to stay safe.

#6 IN A SERIES SHARING THE ROAD. How to stay safe. #6 IN A SERIES SHARING THE ROAD How to stay safe. SM Today, there are more vehicles on the road than ever. That s why it s important to be aware of vehicles around you as well as where you re driving.

More information

Pennsylvania Farm Bureau 510 South 31 st Street P O Box 8736 Camp Hill, PA

Pennsylvania Farm Bureau 510 South 31 st Street P O Box 8736 Camp Hill, PA Pennsylvania Farm Bureau 510 South 31 st Street P O Box 8736 Camp Hill, PA 17001-8736 Phone: (717) 761-2740 Fax: (717) 731-3575 www.pfb.com INFORMATION TO HELP YOU UNDERSTAND CHANGES IN FARM TRANSPORTATION

More information

In Recognition of National Work Zone Safety Awareness Week April 11-15, 2016 Presentation Provided by Alabama Struck By Alliance

In Recognition of National Work Zone Safety Awareness Week April 11-15, 2016 Presentation Provided by Alabama Struck By Alliance TOOL BOX SAFETY TALK In Recognition of National Work Zone Safety Awareness Week April 11-15, 2016 Presentation Provided by Alabama Struck By Alliance 1 GOALS To prevent highway construction and utility

More information

CLEARWATER FIRE & RESCUE TRAINING BUREAU

CLEARWATER FIRE & RESCUE TRAINING BUREAU CLEARWATER FIRE & RESCUE TRAINING BUREAU TILLER OPERATOR TASK BOOK #4 Candidate Name (printed) Signature Beginning Date Candidate Station/Shift 08# Hire Date Lieutenant (print) Signature Completion date

More information

Introduction and Background Study Purpose

Introduction and Background Study Purpose Introduction and Background The Brent Spence Bridge on I-71/75 across the Ohio River is arguably the single most important piece of transportation infrastructure the Ohio-Kentucky-Indiana (OKI) region.

More information

This sign pictured below means: This sign pictured below means: a. gradual curve to the right then curve to the

This sign pictured below means: This sign pictured below means: a. gradual curve to the right then curve to the a. Yield right of way b. Railroad crossing c. Stop a. gradual curve to the right then curve to the left b. winding road c. sharp turn to the right a. Merging traffic b. Four lane ahead c. Two-way travel

More information

LaDOTD s s New Traffic Control Details

LaDOTD s s New Traffic Control Details LaDOTD s s New Traffic Control Details Louisiana Pavement Conference Baton Rouge, Louisiana October 7, 2004 Charles Adams, P.E., PTOE Objectives Traffic Background Information What Drove the Department

More information

PROCUREMENT SPECIFICATIONS DELTA MODEL DSC 1500 PORTABLE BEAM - CRASH CERTIFIED BARRIER SYSTEM

PROCUREMENT SPECIFICATIONS DELTA MODEL DSC 1500 PORTABLE BEAM - CRASH CERTIFIED BARRIER SYSTEM PROCUREMENT SPECIFICATIONS DELTA MODEL DSC 1500 PORTABLE BEAM - CRASH CERTIFIED BARRIER SYSTEM Copyright 2019 Delta Scientific Corporation Page 1 of 8 SYNOPSIS This Procurement Specification defines a

More information

WORK ZONE SAFETY TOOLBOX

WORK ZONE SAFETY TOOLBOX Maryland State Highway Administration Page 1 of 9 USE OF PORTABLE CHANGEABLE MESSAGE SIGNS WITH SPEED DISPLAY IN WORK ZONES A. INTRODUCTION Portable Changeable Message Signs (PCMS) with speed display can

More information

CDOT SPF Development and 10 Years of Application. A Practical Approach...

CDOT SPF Development and 10 Years of Application. A Practical Approach... CDOT SPF Development and 10 Years of Application A Practical Approach...... Jake Kononov, P.E. Ph.D. Bryan K. Allery, P.E. National SPF Summit Chicago 2009 In Order to Manage Safety Effectively, We Need

More information

An Introduction to Automated Vehicles

An Introduction to Automated Vehicles An Introduction to Automated Vehicles Grant Zammit Operations Team Manager Office of Technical Services - Resource Center Federal Highway Administration at the Purdue Road School - Purdue University West

More information

SECTION 12 - CONSTRUCTION AREA TRAFFIC CONTROL TABLE OF CONTENTS

SECTION 12 - CONSTRUCTION AREA TRAFFIC CONTROL TABLE OF CONTENTS SECTION 12 - CONSTRUCTION AREA TRAFFIC CONTROL TABLE OF CONTENTS Section Page 12-1 GENERAL...12.1 12-2 FLAGGING...12.1 12-2.01 Flaggers...12.1 12-2.02 Flagging Costs...12.1 12-3 TRAFFIC-HANDLING EQUIPMENT

More information

Work Zone Safety & New Interstate Resurfacing Provision

Work Zone Safety & New Interstate Resurfacing Provision 2017 CAPA Presentation Work Zone Safety & New Interstate Resurfacing Provision Steve Kite, PE State Work Zone Engineer Work Zone Safety Data In 2016, Approximately 600 construction projects across NC (not

More information

USE RESTRICTED 23 USC 409

USE RESTRICTED 23 USC 409 Study Map & Totals Legend Fatality Injury Property Damage Remarks: NONE Date Range: 01-01-2010 thru 12-31-2014 2010 2011 2012 Fat Incap Inj Non-Incap Inj Poss Inj PD Tot Fat Incap Inj Non-Incap Inj Poss

More information

TRAFFIC OPERATIONS AND ITS. Built It, Renew It and Operate It

TRAFFIC OPERATIONS AND ITS. Built It, Renew It and Operate It TRAFFIC OPERATIONS AND ITS Built It, Renew It and Operate It Delivering the system s benefits to our customers Traffic Operations Sections Manny Anastasiadis Traffic Operations Manager Janet Vogel Arterial

More information

Maine Turnpike Authority

Maine Turnpike Authority Company Name Total Bid Amount Liddell Brothers, Inc. - Halifax, MA $1,590,213.00 Northeast Traffic Control Services, Inc. - Plymouth, MA $1,932,117.00 Page 1 of 5 Liddell Brothers, Inc. Halifax, MA 202.2061

More information

Southern Oregon University Van Safety Training for Students and Employees of the University

Southern Oregon University Van Safety Training for Students and Employees of the University Southern Oregon University Van Safety Training for Students and Employees of the University Template courtesy of George Fox University PASSENGER VAN USE POLICY All drivers must be 18, have a valid drivers

More information

PURPOSE POLICY. Page 1 of 6 / S.O.G Highway Operations Pascal Arnes Chief of Fire

PURPOSE POLICY. Page 1 of 6 / S.O.G Highway Operations Pascal Arnes Chief of Fire DECATUR TOWNSHIP FIRE DEPARTMENT STANDARD OPERATING GUIDELINE TITLE: HIGHWAY OPERATIONS SECTION: SAFETY NUMBER: 6.01 EFFECTIVE: JULY 1, 2014 THIS GUIDELINE SUPERSEDES ALL PREVIOUS GENERAL ORDERS, POLICIES,

More information

A Literature Review of Roadway Safety for Firefighters

A Literature Review of Roadway Safety for Firefighters A Literature Review of Roadway Safety for Firefighters Mark J. Correira Mukilteo, Washington An applied research project submitted to the University of Cincinnati as part of the Firefighter Safety and

More information

TRIP Equipment Requirements

TRIP Equipment Requirements TRIP Requirements Recovery Wrecker Specifications All eligible COMPANIES must have either one 50-Ton Recovery Truck OR one 40-Ton Rotator AND One 30-Ton Heavy Duty Wrecker. The qualifications listed below

More information