APPROACH SLAB (HPC) CY RETAINING WALL (MSE) SF 52, RETAINING WALL (CONC BLOCK) SF 493.
|
|
- Letitia Griffith
- 5 years ago
- Views:
Transcription
1 COUNTY: COLLIN HIGHWAY: US 75 LENGTH: MI CONTROL NUMBER: DBE GOAL: 11.0 % PROJECT NUMBER: STP 1502(083)MM TYPE: STR, PVMT, SIGNS, PVMT MKGS TIME FOR COMPLETION: 750 WORKING DAYS GUARANTY: 0.00 BIDS RECEIVED UNTIL: 1:00 PM MAY 05, 2015 * EST.COST: 42,886, BIDS WILL BE OPENED: 1:00 PM MAY 05, 2015 MAIL OR DELIVER BIDS TO: FOR PS&E PACKAGE QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATION BARRY HEARD, P.E. ATTN: CONSTRUCTION DIVISION - ROOM 1B S. HWY E RIVERSIDE MCKINNEY, TX AUSTIN TX / FOR PROPOSAL QUESTIONS CALL 512/ FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: LIMITS FROM: PGBT LIMITS TO: PARK BLVD ITEM DES APPROXIMATE ALT NO. CD. ITEM DESCRIPTION UNIT QUANTITIES BID PRICE AMOUNT SEQ PREPARING ROW STA REMOVING CONC (PAV) SY 45, REMOVING CONC (RIPRAP) SY 1, REMOVING CONC (MEDIANS) SY REMOVING CONC (DRIVEWAYS) SY REMOVING CONC (RETAINING WALLS) SY 9, REMOVING CONC (COPING) LF REMOVING CONC (SIDEWALK OR RAMP) SY REMOVE CONC (RAIL) LF REMOVING CONC (PAVERS) SY EXCAVATION (ROADWAY) CY 98, EXCAVATION (CHANNEL) CY EMBANKMENT (FINAL)(DENS CONT)(TY C) CY 29, FURNISHING AND PLACING TOPSOIL (6") SY 20, BLOCK SODDING SY 3, DRILL SEEDING (TEMP) (WARM) SY 5, DRILL SEEDING (TEMP) (COOL) SY 5, DRILL SEEDING (PERM)(WARM OR COOL) SY 16, VEGETATIVE WATERING MG 12, SOIL RETENTION BLANKETS (CL 1) (TY A) SY LIME (HYD, COM, OR QK(SLURRY)) TON 1, LIME TRT (EXIST MATL)(9") SY 64, SALV, HAUL & STKPL RCL APH PV (2"-6") SY 45, D-GR HMA TY-B PG64-22 TON 14, CONC PVMT (CONT REINF - CRCP) (9") SY 15, CONC PVMT (CONT REINF - CRCP) (13") SY 40, CONC PVMT (CONT REINF)(FAST TRK)(13") SY 7, CONC PVMT (CONT REINF) (FAST TRK) (9") SY CEM STABIL BKFL CY 1, CUT & RESTORING PAV SY TRENCH EXCAVATION PROTECTION LF 8, TEMPORARY SPL SHORING SF 10, STL H - PILING (HP 14 X 117) LF DRILL SHAFT (24 IN) LF 1, DRILL SHAFT (30 IN) LF DRILL SHAFT (36 IN) LF 5, DRILL SHAFT (48 IN) LF 5, DRILL SHAFT (54 IN) LF 3, DRILL SHAFT (60 IN) LF 4, DRILL SHAFT (72 IN) LF DRILL SHAFT (SIGN MTS) (42 IN) LF DRILL SHAFT (SIGN MTS) (48 IN) LF DRILL SHAFT (SIGN MTS) (54 IN) LF DRILL SHAFT (RDWY ILL POLE) (30 IN) LF DRILL SHAFT (TRF SIG POLE) (30 IN) LF DRILL SHAFT (TRF SIG POLE) (36 IN) LF DRILL SHAFT (96 IN) LF CL B CONC (FLUME) CY CL C CONC (ABUT)(HPC) CY CL C CONC (BENT)(HPC) CY 1, CL C CONC (CAP)(MASS) CY CL C CONC (COLUMN)(MASS) CY CL C CONC (COPING) CY CL C CONC (RAIL FOUNDATION) CY REINF CONC SLAB (HPC) SF 69, BRIDGE MEDIAN (HPC) SF 11,
2 APPROACH SLAB (HPC) CY RETAINING WALL (MSE) SF 52, RETAINING WALL (CONC BLOCK) SF RETAINING WALL (DRILL SHAFT) (FACIA) SF 51, PRESTR CONC GIRDER (TX34) LF 10, PRESTR CONC GIRDER (TX46) LF RIPRAP (CONC)(4 IN) CY RIPRAP (CONC)(CL B) CY RIPRAP (MOW STRIP)(4 IN) CY ELASTOMERIC BEARING (PLAIN) EA ELASTOMERIC BEARING (LAMINATED) EA STR STEEL (RAILROAD DECK - GIRDER) LB 430, STR STEEL (MISC NON - BRIDGE) LB 1, STR STEEL (MISCELLANEOUS BRIDGE) LB 503, RAIL (TY T551) LF 15, RAIL (TY T551)(HPC) LF 2, RAIL (TY T552) LF 3, RAIL (HANDRAIL)(TY E) LF RAIL (TY T551RW) LF 3, RAIL (RR-PIPE) LF SEALED EXPANSION JOINT (4 IN) (SEJ - A) LF ARMOR JOINT LF WATERPROOFING (TY RR - 1) SY 2, CONC BOX CULV (4 FT X 4 FT) LF CONC BOX CULV (6 FT X 4 FT) LF RC PIPE (CL III)(12 IN) LF RC PIPE (CL III)(18 IN) LF 3, RC PIPE (CL III)(21 IN) LF RC PIPE (CL III)(24 IN) LF 1, RC PIPE (CL III)(30 IN) LF RC PIPE (CL III)(36 IN) LF RC PIPE (CL V)(18 IN) LF 2, RC PIPE (CL V)(24 IN) LF RC PIPE (CL V)(36 IN) LF RC PIPE (CL V)(21 IN) LF RC PIPE (CL V)(30 IN) LF MANH (COMPL)(PRM)(48IN) EA INLET (COMPL)(PCO)(3FT)(BOTH) EA INLET (COMPL)(PCU)(3FT)(NONE) EA INLET (COMPL)(PCU)(3FT)(LEFT) EA INLET (COMPL)(PCU)(3FT)(RIGHT) EA INLET (COMPL)(PCU)(3FT)(BOTH) EA INLET (COMPL)(PSL)(FG)(3FTX3FT-3FTX3FT) EA INLET (COMPL)(RWI)(TY I) EA INLET (COMPL)(RWI)(TY II) EA INLET (RAIL & GRATE) (TY II) EA SET (TY II) (30 IN) (RCP) (6: 1) (C) EA SET (TY II) (36 IN) (RCP) (4: 1) (C) EA PRE-CAST TRENCH DRAIN (IN CONC PAVEMNT) LF ADJUSTING MANHOLES EA ADJUSTING INLETS EA ADJUSTING MANHOLES (WATER VALVE BOX) EA ADJUSTING INLET (CAP) EA ADJUSTING MANHOLES (WATER METER) EA TREAT TIMBER MBF REMOV STR (INLET) EA REMOV STR (MANHOLE) EA REMOV STR (HEADWALL) EA REMOV STR (PIPE) LF 5, REMOV STR (BOX CULVERT) LF REMOV STR (BRIDGE FT LENGTH) EA REMOV STR (BRIDGE SLAB) EA REMOV STR (ABUTMENT) EA MOBILIZATION LS BARRICADES, SIGNS AND TRAFFIC HANDLING MO ROCK FILTER DAMS (INSTALL) (TY 1) LF ROCK FILTER DAMS (REMOVE) LF CONSTRUCTION EXITS (INSTALL) (TY 1) SY CONSTRUCTION EXITS (INSTALL) (TY 2) SY CONSTRUCTION EXITS (REMOVE) SY 1, TEMP SEDMT CONT FENCE (INSTALL) LF 2, TEMP SEDMT CONT FENCE (REMOVE) LF 2, BIODEG EROSN CONT LOGS (INSTL) (12") LF 7, BIODEG EROSN CONT LOGS (INSTL) (18") LF 4, BIODEG EROSN CONT LOGS (REMOVE) LF 11, CONSTRUCTING DETOURS SY 4, PORT CTB (FUR & INST)(F-SHAPE)(TY 1) LF 22, PORT CTB (FUR & INST)(LOW PROF)(TY 1) LF 12, PORT CTB (FUR & INST)(LOW PROF)(TY 2) LF
3 PORT CTB (MOVE)(F-SHAPE)(TY 1) LF 13, PORT CTB (MOVE)(LOW PROF)(TY 1) LF 4, PORT CTB (MOVE)(LOW PROF)(TY 2) LF PORT CTB (REMOVE)(F-SHAPE)(TY 1) LF 22, PORT CTB (REMOVE)(LOW PROF)(TY 1) LF 12, PORT CTB (REMOVE)(LOW PROF)(TY 2) LF LANDSCAPE PAVERS SY CONC CURB (MONO) (TY I) LF 6, CONC CURB (MONO) (TY II) LF 2, CONC CURB & GUTTER (TY II) LF 2, CONC CURB (DOWEL) (TY II) LF 2, DRIVEWAYS (CONC) SY CONC SIDEWALKS (4") SY CURB RAMPS (TY 1) EA CURB RAMPS (TY 2) EA CURB RAMPS (TY 7) EA CURB RAMPS (TY 10) EA CURB RAMPS (TY 21) EA CONC DIRECTIONAL ISLAND SY MTL W-BEAM GD FEN (TIM POST) LF 1, MTL BEAM GD FEN TRANS (THRIE-BEAM) EA DOWNSTREAM ANCHOR TERMINAL SECTION EA REMOVE METAL BEAM GUARD FENCE LF 3, REMOVE TERMINAL ANCHOR SECTION EA RM MTL BM GD FENCE TRANS (THRIE-BEAM) EA GUARDRAIL END TREATMENT (INSTALL) EA GUARDRAIL END TREATMENT (REMOVE) EA CRASH CUSH ATTEN (INSTL) EA CRASH CUSH ATTEN (MOVE & RESET) EA CRASH CUSH ATTEN (REMOVE) EA CRASH CUSH ATTEN (INSTL)(L)(N)(TL2) EA CRASH CUSH ATTEN (INSTL)(L)(N)(TL3) EA CRASH CUSH ATTEN (INSTL)(L)(W)(TL2) EA CRASH CUSH ATTEN (INSTL)(L)(W)(TL3) EA RELOCATE RD IL ASM (TRANS-BASE) EA REMOVE RD IL ASM (BRIDGE MOUNT) EA REMOVE RD IL ASM (SHOE-BASE) EA REMOVE RD IL ASM (TRANS-BASE) EA REMOVE RD IL ASM (U/P) EA IN RD IL AM (U/P) (TY 1) (150W) S EA IN RD IL AM (TY SP) 48S-8 (400W) S EA IN RD IL AM (TY SP) 48S-8-8 (400W) S EA IN RD IL AM (TY SA) 50B-8 (400W) S EA IN RD IL AM (TY SA) 50T-8 (400W) S EA IN RD IL AM (TY SA) 50T-8-8 (400W) S EA CONDT (PVC) (SCH 40) (2") LF 10, CONDT (PVC) (SCH 40) (3") LF CONDT (PVC) (SCH 40) (3") (BORE) LF 5, CONDT (PVC) (SCH 40) (3") (CONC ENCSE) LF 6, CONDT (PVC) (SCH 40) (4") LF CONDT (PVC) (SCH 40) (4") (BORE) LF CONDT (PVC) (SCH 80) (2") LF CONDT (PVC) (SCH 80) (2") (BORE) LF CONDT (RM) (2") LF CONDT (RM) (3") LF 1, CONDT (RM) (3") (BORE) LF ELEC CONDR (NO.12) INSULATED LF 2, ELEC CONDR (NO.8) BARE LF 7, ELEC CONDR (NO.8) INSULATED LF 25, ELEC CONDR (NO.6) BARE LF 5, ELEC CONDR (NO.6) INSULATED LF 10, ELEC CONDR (NO.4) BARE LF ELEC CONDR (NO.4) INSULATED LF GROUND BOX TY A (122311) EA GROUND BOX TY A (122311)W/APRON EA GROUND BOX TY D (162922) EA GROUND BOX TY D (162922)W/APRON EA GROUND BOX TY 1 (364860)W/APRON EA GROUND BOX TY 2 (484860)W/APRON EA REMOVE GROUND BOX EA REMOVE ELECTRICAL SERVICES EA ELC SRV TY A 240/ (NS)SS(E)GC(O) EA ELC SRV TY A 240/ (NS)SS(E)GC(O) EA ELC SRV TY D 120/ (NS)AL(E)PS(U) EA ALUMINUM SIGNS (TY A) SF 1, ALUMINUM SIGNS (TY O) SF 2, IN SM RD SN SUP&AM TY10BWG(1)SA(P) EA IN SM RD SN SUP&AM TY10BWG(1)SA(T) EA IN SM RD SN SUP&AM TYS80(1)SA(P) EA
4 IN SM RD SN SUP&AM TYS80(1)SA(T) EA IN SM RD SN SUP&AM TYS80(1)SA(U) EA IN SM RD SN SUP&AM (RAIL MOUNT) EA RELOCATE SM RD SN SUP&AM TY 10BWG EA REMOVE SM RD SN SUP&AM EA INS OH SN SUP(30 FT CANT) EA INS OH SN SUP(35 FT CANT) EA INS OH SN SUP(40 FT CANT) EA REMOVE OVERHD SIGN SUP EA WK ZN PAV MRK REMOV (REFL) TY II-A-A EA WK ZN PAV MRK REMOV (REFL) TY II-C-R LF WK ZN PAV MRK REMOV (W)4"(BRK) LF 5, WK ZN PAV MRK REMOV (W)4"(DOT) LF 2, WK ZN PAV MRK REMOV (W)4"(SLD) LF 43, WK ZN PAV MRK REMOV (W)8"(SLD) LF 4, WK ZN PAV MRK REMOV (W)12"(SLD) LF 1, WK ZN PAV MRK REMOV (W)24"(SLD) LF WK ZN PAV MRK REMOV (W)(ARROW) EA WK ZN PAV MRK REMOV (W)(ENTR GORE) EA WK ZN PAV MRK REMOV (W)(EXIT GORE) EA WK ZN PAV MRK REMOV (W)(RR XING) EA WK ZN PAV MRK REMOV (Y)4"(SLD) LF 25, REFL PAV MRK TY I (W)4"(BRK)(100MIL) LF 4, REFL PAV MRK TY I (W)4"(DOT)(100MIL) LF REFL PAV MRK TY I (W)4"(SLD)(100MIL) LF 34, REFL PAV MRK TY I (W)8"(SLD)(100MIL) LF 3, REFL PAV MRK TY I (W)12"(LNDP)(100MIL) LF 2, REFL PAV MRK TY I (W)12"(SLD)(100MIL) LF 3, REFL PAV MRK TY I (W)24"(SLD)(100MIL) LF REFL PAV MRK TY I (W)(ARROW)(100MIL) EA REFL PAV MRK TY I (W)(WORD)(100MIL) EA REFL PAV MRK TY I(W)(ENTR GORE)(100MIL) EA REFL PAV MRK TY I(W)(EXIT GORE)(100MIL) EA REFL PAV MRK TY I (W)(RR XING)(100MIL) EA REF PAV MRK TY I(W)18"(YLD TRI)(100MIL) EA REFL PAV MRK TY I (Y)4"(SLD)(100MIL) LF 14, REFL PAV MRK TY I (Y)24"(SLD)(100MIL) LF RE PV MRK TY I(BLACK)4"(SHADOW)(100MIL) LF 7, REFL PAV MRKR TY II-A-A EA REFL PAV MRKR TY II-C-R EA 1, ELIM EXT PAV MRK & MRKS (4") LF 31, ELIM EXT PAV MRK & MRKS (8") LF ELIM EXT PAV MRK & MRKS (12") LF ELIM EXT PAV MRK & MRKS (24") LF ELIM EXT PAV MRK & MRKS (ARROW) EA ELIM EXT PAV MRK & MRKS (ENTR GORE) EA ELIM EXT PAV MRK & MRKS (EXIT GORE) EA ELIM EXT PAV MRK & MRKS (RR XING) EA PAV SURF PREP FOR MRK (4") LF 152, PAV SURF PREP FOR MRK (8") LF 7, PAV SURF PREP FOR MRK (12") LF 4, PAV SURF PREP FOR MRK (24") LF 1, PAV SURF PREP FOR MRK (ARROW) EA PAV SURF PREP FOR MRK (WORD) EA PAV SURF PREP FOR MRK (ENTR GORE) EA PAV SURF PREP FOR MRK (EXIT GORE) EA PAV SURF PREP FOR MRK (RR XING) EA INSTALL HWY TRF SIG (ISOLATED) EA REMOVING TRAFFIC SIGNALS EA TEMP TRAF SIGNALS EA VEH SIG SEC (12")LED(GRN) EA VEH SIG SEC (12")LED(GRN ARW) EA VEH SIG SEC (12")LED(YEL) EA VEH SIG SEC (12")LED(YEL ARW) EA VEH SIG SEC (12")LED(RED) EA VEH SIG SEC (12")LED(RED ARW) EA PED SIG SEC (LED)(COUNTDOWN) EA BACK PLATE (12")(3 SEC) EA BACK PLATE (12")(4 SEC) EA TRF SIG CBL (TY A)(14 AWG)(5 CONDR) LF TRF SIG CBL (TY A)(14 AWG)(7 CONDR) LF TRF SIG CBL (TY A)(14 AWG)(9 CONDR) LF TRF SIG CBL (TY A)(14 AWG)(10 CONDR) LF 2, TRF SIG CBL (TY A)(14 AWG)(20 CONDR) LF 1, TRF SIG CBL (TY C)(12 AWG)(2 CONDR) LF 4, INS TRF SIG PL AM (S)STR(TY B) EA INS TRF SIG PL AM (S)STR(TY B)LUM EA INS TRF SIG PL AM(S)1 ARM(32')LUM EA INS TRF SIG PL AM(S)1 ARM(40')LUM EA
5 INS TRF SIG PL AM(S)1 ARM(48')LUM EA PED POLE ASSEMBLY EA PED DETECT PUSH BUTTON (APS) EA PED DETECTOR CONTROLLER UNIT EA FIBER OPTIC CBL (SNGLE-MODE)(6 FIBER) LF 1, FIBER OPTIC CBL (SNGLE-MODE)(36 FIBER) LF 8, FIBER OPTIC CBL (SNGLE-MODE)(48 FIBER) LF 8, MULTIDUCT COND SYS (PVC)(SCHD 40) LF 3, MULTIDCT COND SYS(PVC)(SCHD 40)4"(BORE) LF 2, MULTIDUCT CONDUIT SYS (RM)(4")(BORE) LF SYSTEM INTEGRATION LS LONG CHANNEL MOUNT CURB SYS (INSTALL) LF 14, LONG CHANNEL MOUNT CURB SYS (REMOVE) LF 4, REMOVE AND RELOCATE CAMERA POLE STRCTRE EA RELOCATE EXISTING COMMUNICATION CABINET EA COMMUNICATION CABINET FOUNDATION EA GHZ ETHERNET RADIO EA CURB INLET SEDIMENT PROTECTION LF * INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS: CONTRACTOR FORCE ACCOUNT WORK (PART) $840, MATERIAL FURNISHED BY THE STATE (PART) $2, RAILROAD FORCE ACCOUNT WORK (PART) $2,500,000.00
AMENDMENT OF SOLICITATION Old Hueco Tanks Rd. Improvements
AMENDMENT OF SOLICITATION Old Hueco Tanks Rd. Improvements The above titled solicitation is amended. All amendments must be acknowledged on the PROPOSAL ; failure to do so may be cause for rejection of
More informationNOTIFICATION OF ADDENDUM ADDENDUM NO. 1 DATED 4/28/2015
TIFICATION OF ADDENDUM ADDENDUM 1 DATED 4/28/2015 Control 0535-01-072 Project C 535-1-72 Highway IH 10 County GUADALUPE Ladies/Gentlemen: Attached please find an addendum on the above captioned project.
More informationCONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/17 HIGHWAY: US 287 COUNTY: 11/04/2015 ESTIMATE PAID: AWARD DATE: 11/19/2015 ESTIMATE PERIOD:
287,585.47 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/17 184 38.00 CONTRACT ID: 004301079 PROJECT: NH 2016(310) CONTRACT: 11153208 AWARD : $1,893,993.41 PROJECTED : $1,893,993.41 ADJ. PROJECTED :
More informationNOTIFICATION OF ADDENDUM ADDENDUM NO. 1 DATED 1/02/2018
TIFICATION OF ADDENDUM ADDENDUM. 1 DATED 1/02/2018 Control 0483-02-021 Project STP 2018(077) Highway SH 72 County MCMULLEN Ladies/Gentlemen: Attached please find an addendum on the above captioned project.
More informationNOTIFICATION OF ADDENDUM ADDENDUM NO. 1 DATED 6/04/2014
TIFICATION OF ADDENDUM ADDENDUM 1 DATED 6/04/2014 Control 1378-02-040 Project STP 2013(297) Highway RM 1431 County WILLIAMSON Ladies/Gentlemen: Attached please find an addendum on the above captioned project.
More informationCONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: 02/10/2016 ESTIMATE PAID: AWARD DATE: 02/25/2016 ESTIMATE PERIOD:
47,635.79 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 161 3 CONTRACT ID: 092106270 PROJECT: STP 2014(101)TE CONTRACT: 02163244 AWARD : $899,908.10 PROJECTED : $905,908.10 ADJ. PROJECTED : $953,543.89
More informationNOTIFICATION OF ADDENDUM ADDENDUM NO. 2 DATED 7/09/2013
TIFICATION OF ADDENDUM ADDENDUM. 2 DATED 7/09/2013 Control 0200-11-100, ETC. Project NH 2013(224) Highway US 69 County JEFFERSON Ladies/Gentlemen: Attached please find an addendum on the above captioned
More informationCONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 04/08/15 HIGHWAY: LP 289 COUNTY: 06/09/2009 ESTIMATE PAID: AWARD DATE: 06/25/2009 ESTIMATE PERIOD:
1,297,105.73 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 04/08/15 466 186.00 CONTRACT ID: 078302064 PROJECT: STP 2009(104)ES CONTRACT: 06093001 AWARD : 25,867,573.35 PROJECTED : 25,867,573.35 ADJ. PROJECTED
More informationNOTIFICATION OF ADDENDUM ADDENDUM NO. 2 DATED 3/28/2003
TIFICATION OF ADDENDUM ADDENDUM. 2 DATED 3/28/2003 Control 0027-12-119 Project NH 2003(385) Highway US 59 County FORT BEND Ladies/Gentlemen: Attached please find an addendum on the above captioned project.
More informationCONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 09/08/16
17,810.73 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 09/08/16-65.00 125 CONTRACT ID: 118802088 PROJECT: STP 2014(614)G CONTRACT: 05143227 AWARD AMOUNT: $600,782.63 PROJECTED AMOUNT: $632,782.63 ADJ. PROJECTED
More information$6, CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/08/17 -30, PROJECT: STP 2013(839) GRAYSON
-30,219.83 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/08/17 291 CONTRACT ID: 051002028 PROJECT: STP 2013(839) CONTRACT: 07133220 AWARD : $4,317,753.44 PROJECTED : $4,394,254.44 ADJ. PROJECTED : $4,364,034.61
More informationCONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 07/11/18 HIGHWAY: FM 3151 COUNTY: 12/02/2015 ESTIMATE PAID: AWARD DATE: 12/17/2015 ESTIMATE PERIOD:
CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 07/11/18 131 CONTRACT ID: 187503022 PROJECT: C 1875-3-22 CONTRACT: 12153043 AWARD : $3,146,993.47 PROJECTED : $3,149,993.47 ADJ. PROJECTED : $3,149,993.47 CONTRACT:
More informationNOTIFICATION OF ADDENDUM ADDENDUM NO. 1 DATED 7/02/2004
TIFICATION OF ADDENDUM ADDENDUM. 1 DATED 7/02/2004 Control 0009-02-049, ETC. Project CM 97(89) Highway SH 78, ETC. County DALLAS Ladies/Gentlemen: Attached please find an addendum on the above captioned
More informationCONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 02/09/18 HIGHWAY: FM 423 COUNTY: 05/06/2014 ESTIMATE PAID: AWARD DATE: 05/29/2014 ESTIMATE PERIOD:
4,177,077.12 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 02/09/18 810 54.00 CONTRACT ID: 156702032 PROJECT: C 1567-2-32 CONTRACT: 05143001 AWARD : 57,943,494.30 PROJECTED : 59,102,084.30 ADJ. PROJECTED
More informationCONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 05/10/13 HIGHWAY: FM 3301 COUNTY: 09/09/2011 ESTIMATE PAID: AWARD DATE: 09/29/2011 ESTIMATE PERIOD:
CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 05/10/13 75 CONTRACT ID: 349701008 PROJECT: STP 2012(033)HES CONTRACT: 09113205 AWARD : $1,297,485.60 PROJECTED : $1,307,485.60 ADJ. PROJECTED : $1,307,485.60
More informationNOTIFICATION OF ADDENDUM ADDENDUM NO. 1 DATED 9/13/2006
TIFICATION OF ADDENDUM ADDENDUM. 1 DATED 9/13/2006 Control 0196-07-026 Project STP 2006(438)MM Highway SP 366 County DALLAS Ladies/Gentlemen: Attached please find an addendum on the above captioned project.
More informationADDENDUM 3 - JULY 24, 2015
FORM G PRICE PROPOSAL CAMINO REAL REGIONAL MOBILITY AUTHORITY ("CRRMA") The undersigned having familiarized themselves with the local conditions affecting the cost of work and with the Request for Proposals
More informationCONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/08/16 07/07/2011 ESTIMATE PAID: AWARD DATE: 07/28/2011 ESTIMATE PERIOD: 00/00/0000 % TIME USED:
1,322,035.19 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/08/16 1,103 CONTRACT ID: 001507065 PROJECT: C 15-7-65 CONTRACT: 07113001 AWARD : $70,449,357.13 PROJECTED : $72,387,266.12 ADJ. PROJECTED : $73,709,301.31
More informationCIS 26.txt MIS.CIS.26 MATL VERIF & MISSING SOURCES CONTRACT MGR.NO. 055 PAGE 001
MIS.CIS.26 MATL VERIF & MISSING SOURCES CONTRACT 323216 MGR.NO. 55 PAGE 1 CONT 1 SEC 13 JOB 76 RES ENGR ICENHOWER, KENNETH PROJ MG 22(313) HWY US 67 BOX 538 TEXARKANA CNTY BOWIE DIST 19 CONTRACT PRICE
More informationCITY OF ALAMO HEIGHTS WATER, STREET AND SIDEWALK CAPITAL IMPROVEMENT PROJECTS
CITY OF ALAMO HEIGHTS WATER, STREET AND SIDEWALK CAPITAL IMPROVEMENT PROJECTS CITY OF SAN ANTONIO DEPT. OF CAPITAL IMPROVEMENTS MANAGEMENT SERVICES N. NEW BRAUNFELS AVE. SIDEWALK PROJECT FROM RITTIMAN
More informationSteese Rd - Curb & Sidewalk Improvement
REF. NO. ITEM NO. Steese Rd - Curb & Sidewalk Improvement DESCRIPTION QTY UNITS UNIT COST SUB-TOTAL 1 103.05 Requirement of Contract Bid 1 LS 24,048.00 24,048.00 2 201 Clearing and Grubbing 1 LS 11,077.00
More informationFederal Project No.: NHFP-081-1(346)
Order : N27 Schedule of Items Page: 2 Oversight/State Project : (NFO)0081-098-778,B650-51,C501 Federal Project : NHFP-081-1(346) 0010 513 00100 0020 517 00101 MOBILIZATION CONSTRUCTION SURVEYING (CONSTRUCTION)
More informationFertilizer Type B 2 CWT $ $ $60.00 $ $60.00 $ Sod Water 60 MGAL $60.60 $3, $30.00 $1, $30.00 $1,
BID TABS PROJECT 18-1029 22 nd AVENUE RECONSTRUCTION BID DATE: MAY 9, 2018 Stark Pavement Corp. Lalonde Contractors Cornerstone Pavers LLC Brookfield, WI Waukesha, WI Racine, WI Item Number Roadway Quantity
More informationWhitley & Siddons Bid Tabulations
Whitley & Siddons Bid Tabulations LOCAL LET TABULATIONS FOR OCTOBER, 2011 1402 BASTROP SH0021 6231-41-001 $235,694.01 1901 BOWIE US0059 6230-06-001 $251,000.00 1905 BOWIE US0059 6232-99-001 $31,000.00
More informationFederal Project No.: STP-5128(388)
Order : M48 Schedule of Items Page: 2 Oversight/State Project : (NFO) 0460-129-105, C501 Federal Project : STP-5128(388) 0010 513 00100 0020 517 00101 MOBILIZATION CONSTRUCTION SURVEYING (CONSTRUCTION)
More informationDESCRIPTION QUANTITY PRICE TOTAL
GENERAL 1 TRAFFIC CONTROL LS 1 $40,000 $40,000 $8,500.00 $8,500.00 $5,000.00 $5,000.00 $5,000.00 $5,000.00 $15,000.00 $15,000.00 2 MOBILIZATION LS 1 $557,000 $557,000 $629,500.00 $629,500.00 $350,000.00
More informationAVERAGE LOW BID UNIT PRICE - CONSTRUCTION - STATEWIDE 3 MONTH MOVING AVERAGE
AVERAGE LOW BID UNIT PRICE - CONSTRUCTION - STATEWIDE 3 MONTH MOVING AVERAGE Item 01002001 PREPARING ROW AC 12.91 $4,956.38000 22.28 $10,327.06000 7 01002002 PREPARING ROW STA 2,415.92 $3,604.56000 8,220.73
More informationCONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/08/18 HIGHWAY: COUNTY: 08/12/2015 ESTIMATE PAID: AWARD DATE: 08/14/2015 ESTIMATE PERIOD:
209,750.00 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/08/18 650 365.00 CONTRACT ID: 628798001 PROJECT: RMC - 628798001 CONTRACT: 08151502 AWARD : $276,487.00 PROJECTED : $276,487.00 ADJ. PROJECTED :
More informationProject Book Worksheet for Cost Estimation
001.01 MOBILIZATION LS $34,716.18 007 3/17/2039 001.02 INCIDENTAL LS $23,929.43 019 3/17/2039 001.03 CONSTRUCTION STAKING LS $10,504.39 201 5/9/2013 001.04 REESTABLISH PROPERTY CORNERS EA $496.08 201 5/9/2013
More informationBIDDER'S PROPOSAL (continued) CITY OF BERKELEY BID PROPOSAL ITEM NO. A: BASE BID
SPECIFICATION 16-11031-C CITY OF BERKELEY BID PROPOSAL A: BASE BID 1 MOBILIZATION 1 LS 2 TRAFFIC CONTROL 1 LS 3 CONTRACTOR INFORMATION SIGN 2 EA 4 CONSTRUCTION AREA SIGN 18 EA 5 PROJECT IDENTIFICATION
More informationSPECIAL GRADING INTERSECTION IMPROVEMENT JOHN WARD RD AT IRWIN RD REVISION DATES
9/20/2017 2:39:11 PM GPLOT-V8 2016104_18-001.dgn Project Number Sheet Total Sheets djackson gplotborder-v8i-po.tbl X2802 30 118 966.5 21+00 L.P. EL. 966.34 L.P. EL. 966.58 0.29% 0.11% 965 H.P. EL. 966.54
More informationHILLS MATERIALS COMPANY UNIT COST TOTAL COST UNIT COST TOTAL COST UNIT COST $294, $294, $74, $74, $35, $35,000.
PROJECT NAME: Anamosa Street Reconstruction - Midway Street to Miiwuakee Street PROJECT NUMBER: PROJECT NO. 07-1473 / CIP NO. 50559 LET DATE: April 11, 2017 LOW BID AMOUNT: $3,941,397.20 ENGINEER'S ESTIMATE
More informationBID TABULATION PAGE 1 OF 4. BL S.R. Harbins Road/Alcovy Road - Intersection Improvements Department of Transporation. CMES, Inc.
BID TABULATION PAGE 1 OF 4 E.R. Snell Contractor, Inc. G.P.'s Enterprises, Inc. Est. 1 005 Traffic Control Project No M-0679 1 LS $27,811.00 $27,811.00 $48,800.00 $48,800.00 $22,021.80 $22,021.80 2 010
More informationFederal Project No.: HSIP-5A27(567)
Order : A11 Schedule of Items Page: 2 Oversight/State Project : (NFO)0001-020-S82,C501 Federal Project : HSIP-5A27(567) 0010 513 00100 0020 517 00101 MOBILIZATION LUMP SUM LUMP SUM CONSTRUCTION SURVEYING
More informationKansas Department of Transportation DISTRICT 2. Project(s): Min: Max:
Page 1 of 23 518122 SECTION: 01 COMMON ITEMS 1 020100 CONTRACTOR CONSTRUCTION STAKING 2 025602 FIELD OFFICE AND LABORATORY (TYPE C) 3 025323 MOBILIZATION 4 070626 MOBILIZATION (DBE) 5 020001 MAINTENANCE
More informationFederal Project No.: OC-095-1(348)
Order : N83 Schedule of Items Page: 2 Oversight/State Project : (NFO)0095-127-857, C501 Federal Project : OC-095-1(348) 0010 513 00100 MOBILIZATION LUMP SUM LUMP SUM 0020 517 00101 CONSTRUCTION SURVEYING
More informationMoDOT 2016 UNIT BID PRICES Northwest District
MoDOT 2016 UNIT BID PRICES Northwest District 2013000 CLEARING AND GRUBBING ACRE 7.95 20 1926.49132 20000 1 159 2022010 REMOVAL OF IMPROVEMENTS L.S. 1.00 56 24479.13304 201719 750 56 2024043 REMOVAL OF
More informationLicensed Class C Virginia Contractor No.
month period is seven hundred and fifty thousand dollars (750,000) or more, the Bidder is required under Title 54.11100, Code of Virginia (1950), as amended, to be licensed by the State Board of Contractors
More informationCITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS STATEMENT OF QUANTITIES. Item No. Description Estimated Quantity
202-00019 Removal of Inlet 15 EA 202-00035 Removal of Pipe 121 LF 202-00200 Removal of Sidewalk 1,057 SY 202-00203 Removal of Curb and Gutter 2,142 LF 202-00206 Removal of Concrete Curb Ramp 320 SY 202-00207
More informationMacomb County Department of Roads Bid Comparison
Macomb County Department of Roads Bid Comparison Contract ID: 1643 Description: M-53 Freeway to 33 Mile Road Connector to the proposed 33 Mile Road & McKay Road Roundabout Location: Projects(s): M-53 &
More information2015 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR 2015 ENGLISH
Page 1 2015 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR 2015 ENGLISH ITEM ITEM DESCRIPTION UNITS N TOTAL QUANTITY AVERAGE PRICE 106.05100 FIELD LABORATORY
More informationFederal Project No.: NHPP-967-7(083)
Order : N20 Schedule of Items Page: 2 Oversight/State Project : (NFO)9999-967-430,N501 Federal Project : NHPP-967-7(083) 0010 ATTD 00124 ROCK EXCAVATION CY 0020 302 504 00525 CONCRETE CLASS A3 MISC. CY
More informationCONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 02/06/15 HIGHWAY: COUNTY: 09/07/2012 ESTIMATE PAID: AWARD DATE: 09/27/2012 ESTIMATE PERIOD:
60,795.01 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 02/06/15 58 CONTRACT ID: 092406377 PROJECT: NH 2013(045) CONTRACT: 09123218 AWARD : $340,789.00 PROJECTED : $362,789.00 ADJ. PROJECTED : $423,584.01
More informationTown of Medley Office of Capital Projects & Development Services 7777 NW 72 Avenue, Medley, Florida 33166
Town of Medley Office of Capital Projects & Development Services 7777 NW 72 Avenue, Medley, Florida 33166 Date: August 10, 2016 Subject: Bid for Construction of NW 89 th Avenue, NW 93 rd Street and NW
More informationMETRO Magnolia Transit Center - Bid Tab
Section A - GENERAL ITEMS A-1 01505 Mobilization LS 1 $ 100,000.00 $ 100,000.00 A-2 -- Payment and Performance Bonds LS 1 A-3 01310 Document Control LS 1 A-4 01311 CPM Schedule LS 1 A-5 01590 Engineer's
More informationCT Consultants, Inc.
Cost 1 202 AHRESTY DRIVE REMOVAL 1 LS 2 202 EXISTING SILO DEMOLISHED AND REMOVED, AS PER PLAN 1 LS 3 203 EXCAVATION (NOT INCLUDING UNDERCUT) 2,372 CY 4 203 EMBANKMENT 3,306 CY 5 204 PROOF ROLLING 10 HRS
More information2016 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR 2016 ENGLISH
Page 1 2016 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR 2016 ENGLISH ITEM ITEM DESCRIPTION UNITS N TOTAL QUANTITY AVERAGE PRICE 106.05100 FIELD LABORATORY
More informationOhio Department of Transportation Official Bid Tabulation Jolene M. Molitoris, Director
Ohio Department of Transportation Official Bid Tabulation Jolene M. Molitoris, Director Project No. 100281 PID 77255 LUC-IR-475-14.18 Federal Type: MAJOR RECONSTRUCTION Letting Date: 6/3/2010 Completion
More informationProject # & Name: # CDBG - Pugh Street Streetscape - East College Ave to East Beaver Ave & East Beaver Ave/Locust Lane Improvements
Bid Opening Date: May 6, 2014 Time: 11:00 a.m. Surety NCA Surety NCA Yes Yes Yes Yes Total Amount Bid: $1,358,851.00 Total Amount Bid: $1,386,098.72 Item Nos. Approx. Quantities Unit Item & Unit Prices
More information2017 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR ENGLISH (10)
106.05100 FIELD LABORATORY EA 33 33.00 $12,605.17 201.03201 CLEARING AND GRUBBING ACRE 2 76.00 $1,269.74 201.03206 CLEARING TREES 6 in EA 1 53.00 $122.27 201.03210 CLEARING TREES 10 in EA 3 66.00 $227.33
More informationMaine Turnpike Authority
Company Name Total Bid Amount R J Grondin & Sons - Gorham, ME $1,436,720.00 Shaw Brothers Construction, Inc. - Gorham, ME $1,476,398.83 Pratt & Sons, Inc. - Minot, ME $1,733,615.00 Page 1 of 13 R J Grondin
More informationAustin Constructors, LLC S FM N. Richey 9810 FM 969. Pasadena, TX Austin, TX 78724
National Power Rodding Corp. 9810 FM 969 Austin, TX 78724 Austin Constructors, LLC. 7907 S FM 973 Item No. Estimate Qty Unit of Issue Description Unit Price Total Unit Price Total Unit Price 103.1 125.00
More informationADDENDUM No. 1 Prospective Bidders
Page 1 of 1 Attachment to Addendum # 1 Revised Itemized Bid ADDENDUM No. 1 TO: Prospective Bidders FROM: Gregory Tate, Construction Contracts Administrator DATE: January 24, 2019 PROJECT: Traffic Signal
More informationPAGE 1 of 18 WEIGHTED AVERAGE
UNIT PRICES PAGE 1 of 18 201 BRIDGE SITE PREPARATION L.S. 1.00 15,000.00 15,000.00 15,000.00 * 201 CLEARING ACRE 4.10 40,470.00 4,500.00 13,010.78 201 CLEARING STA 6,089.00 11,000.00 1.00 1,162.09 201
More informationBID TABULATION REPORT McKINNEY STREET DRAINAGE IMPROVEMENTS PROJECT No. PWDR10012 BID OPENED : TUESDAY, AUGUST 13, :00 P.M.
PAVING IMPROVEMENTS McKINNEY 101 Rightofway Preparation LS 1 75,000.00 75,000.00 200,000.00 200,000.00 67,000.00 67,000.00 110,000.00 110,000.00 102 12inch HMAC Street Pulvermix SY 11,650 3.00 34,950.00
More informationCITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS STATEMENT OF QUANTITIES. Item No. Description Estimated Quantity
202-00001 Removal of Structure 24 EA 202-00019 Removal of Inlet 24 EA 202-00195 Removal of Median cover 930 SY 202-00200 Removal of Sidewalk 1,188 SY 202-00201 Removal of Curb Head 273 LF 202-00203 Removal
More informationMcCRORY & WILLIAMS, INC. HILLCREST ROAD CONNECTOR MCR ROADWAY ITEMS
BID TABULATION Hillcrest Road Connector John G. Walton Construction M. C. Williams Contracting Hosea. Weaver & Sons, Inc. BID OPENING: March 25, 29 Company, Inc. Company, Inc. QTY DESCRIPTION DOLLARSjCTS
More informationAPPENDIX H COST ESTIMATES
APPENDIX H COST ESTIMATES H-1 HDR ENGINEERING, INC. TBPE FIRM NO. F-754 COST ESTIMATING TEMPLATE PRELIMINARY NOT TO BE USED FOR PERMITTING, BIDDING, OR CONSTRUCTION PREPARED BY: PHILIP A. FULTON, PE PE
More informationADDENDUM #2 WATERSHED IMPROVEMENTS ON AN ANNUAL CONTRACT RP031-18
November 29, 2018 ADDENDUM 2 WATERSHED IMPROVEMENTS ON AN ANNUAL CONTRACT RP031-18 Q1. Do contractors not need to be on the Watershed Improvements Pre-Qualifications List to submit on the RP031-18 Watershed
More informationMaine Turnpike Authority
Company Name Total Bid Amount Shaw Brothers Construction, Inc. - Gorham, ME $659,771.50 R J Grondin & Sons - Gorham, ME $690,828.50 Gendron & Gendron - Lewiston, ME $753,187.00 Gordon Contracting - Sangerville,
More informationMaine Turnpike Authority
Interchange 44 Barrier Toll Plaza Open Road Tolling Conversion Mile 44.3 201.11 CLEARING 3.50 AC 202.071 REMOVING ASBESTOS CONTAINING MATERIALS, TOLL BOOTH LAB TOPS 1.00 LS 202.081 REMOVING EXISTING BUILDING
More informationSOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE TO CONTRACTORS FOR REGULAR HIGHWAY LETTING April 10, 2018 REVISED
SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE TO CONTRACTORS FOR REGULAR HIGHWAY LETTING April 10, 2018 REVISED Rev 2: Call No. 320, File No. 0247541 - Added Rev 1: Call No. 010, File No. 0425551
More informationIngham County Request for Proposals Okemos Road and Sandhill Road Widening, Packet #15-15
COST FORM (1 of 5) Packet #15-15, Okemos Road & Sandhill Road Widening Project (Please Type or Print Clearly in Ink) Pay Description Unit Quantity Unit Price Total 1500001 Mobilization, Max. LS 1 2020002
More informationOhio Department of Transportation Official Bid Tabulation Jerry Wray, Director
Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 110146 PID 82278 HAM-IR-75-5.58 Federal Type: INTERCHANGE Letting Date: 5/5/2011 Completion Date: 7/31/2014 Contract
More informationOhio Department of Transportation Official Bid Tabulation Jerry Wray, Director
Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 140123 PID 82645 LOR- SR 0057 19.42 Federal Type: INTERCHANGE Letting Date: 4/17/2014 Completion Date: 7/15/2016
More informationFranklin County Engineer's Office - Highway Design ALKIRE RD & DEMOREST RD ROUNDABOUT CR NO. 11 & CR NO. 25 Bid Tabulation
7/07/2015 Page 1 of 20 Strawser Paving Co., Inc. Shelly & Sands, Inc. Double Z Construction Co Columbus Asphalt Paving, Inc. 1595 Frank Road P.O.Box 2469 2550 Harrison Road 1196 Technology Dr Columbus,
More informationCONTRACTOR'S REQUEST FOR PAYMENT CHASKA VETERANS PARK IMPROVEMENTS STANTEC PROJECT NO
Owner: City of Chaska, 1 City Hall Plz., Chaska, mn 55318 Date: December 12, 2017 For Period: 12/1/2017 to 1/31/2018 Request No: 1 Contractor: Blackstone Contractors, LLC, 9520 County Rd. 19, Ste. D, Loretto,
More informationCITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS Engineering Division PROJECT NO INCA STREET MULTI-USE PATH 38 TH AVE. TO 43 RD AVE.
201-00000 Clearing and Grubbing 1 LS 202-00010 Removal of Tree 9 EA 202-00019 Removal of Inlet 8 EA 202-00034 Removal of Pipe (6 Inch) 196 LF 202-00035 Removal of Pipe (18 Inch) 10 LF 202-00036 Removal
More informationARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS
ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS CONTRACT # 2016153 TRACS No. Project No. County District Gross
More informationTHORNTON ROAD WIDENING PROJECT NO. PW1428 B I D D I N G S C H E D U L E
THORNTON ROAD WIDENING PROJECT NO. PW1428 B I D D I N G S C H E D U L E Each bidder shall bid each item of the Base Bid Schedule and Alternate A Bid Schedule. Failure to bid an item shall be just cause
More informationUnits Est. Qty. Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price
1 1500001 Mobilization, Max. $25,000.00 LSUM 1.00 25,000.00 25,000.00 25,000.00 25,000.00 25,000.00 25,000.00 25,000.00 25,000.00 4,400.00 4,400.00 2 2020040 Tree, Rem, 6 inch to 18 inch Ea 2.00 600.00
More informationOhio Department of Transportation Official Bid Tabulation Jerry Wray, Director
Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 180573 PID 93496 FRA-IR 71-01.53 Federal Type: BRIDGE REPLACEMENT (2 BRIDGES) Letting Date: 12/20/2018 Completion
More informationInformation Technology Solutions
Information Technology Solutions TEXAS CONSTRUCTION BULLETIN Section 1 Monday, August 31, 2015 Section 2 Section 3 Section 4 Since 1946 the Austin Chapter AGC has served as Austin s leading commercial
More informationSOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE TO CONTRACTORS FOR REGULAR HIGHWAY LETTING April 10, 2018
SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE TO CONTRACTORS FOR REGULAR HIGHWAY LETTING April 10, 2018 Letting Location: SCDOT Headquarters Building Conference Room 331 955 Park Street Columbia,
More informationMcCRORY & WILIJAMS, INC. PROJECT NO. MCR-2008-OO1
McCRORY & WILIJAMS, INC. THEODORE DAWES ROADISCHILLINGER ROAD SOUTH BID TABULATION: Theodore DaweslSchillingor Road PROJECT NO.: M5700-2033 BIDDER #1 BIDDER #2 BIDDER #3 Hosea 0. Weaver & Sons, Inc. John
More informationBID TALLY AND ATTENDANCE SHEET BID #B BID TITLE: Replacement of Bridge No. LR over the Larimer and Weld Canal
VENDOR BID TALLY AND ATTENDANCE SHEET BID #B15-21 BID TITLE: Replacement of Bridge LR50-0.2-17 over the Larimer and Weld Canal Addendum #1 Acknowled ged DATE: October 22, 2015 TIME: 2:00 p.m. DEPARTMENT:
More information2, total unit $ total unit $ total unit $ total $
BD TABULATON Bid No. : 697 North Bay Trail-1st Street North Project No. 0901-212 Engineering &Capital mprovements Department, City of 1. Petersburg, Florida Bid date: February 26,2010 ",,>,',-, t~..4":;
More informationMaine Turnpike Authority
Company Name Total Bid Amount Sargent Corporation - Stillwater, ME $29,888,765.79 Reed & Reed, Inc. - Woolwich, ME $34,900,974.90 Page 1 of 25 Sargent Corporation Stillwater, ME 201.11 CLEARING AC 4.00
More informationMaine Turnpike Authority
Company Name Total Bid Amount CPM Constructors - Freeport, ME $1,309,765.25 Scott Construction Corporation - Portland, ME $1,528,840.00 Wyman & Simpson Inc. - Richmond, ME $1,674,845.00 Page 1 of 10 CPM
More informationOhio Department of Transportation Official Bid Tabulation Jerry Wray, Director
Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 170559 PID 102381 SCI-US 52-19.01 Federal Type: TWO LANE RESURFACING Letting Date: 11/2/2017 Completion Date:
More informationWentzville Parkway South Phase 2 & 2A
Wentzville Parkway South Phase 2 & 2A Sponsor Wentzville Project No. RB18-000034 Project Type New Road TOTAL FUNDING Phase 2 Total County Sponsor Federal $10,000,000 $8,000,000 $2,000,000 $0 Phase 2A Total
More informationMaine Turnpike Authority
York Toll Plaza Mile 8.8 201.11 Clearing 17.00 AC 202.15 Removing Existing Manhole or Catch Basin 22.00 EA 202.151 Abandoning Existing Manhole or Catch Basin 10.00 EA 202.16 Removing Existing Pipe 575.00
More informationGrays Ferry Cost Estimate Breakdown Budgetary Numbers for Machinery Drive Options 10 Nov 14
Grays Ferry Cost Estimate Breakdown Budgetary Numbers for Machinery Drive Options 10 Nov 14 Hardesty & Hanover, LLC Alternative 1 Bogie Support System Alternative Based on AW Sketch of New Bridge Component
More informationArtist Rendering. Design-Build Project for. Route 29 Solutions. Albemarle County, Virginia Contract ID No. C DB80
Artist Rendering Design-Build Project for Route 29 Solutions Albemarle County, Virginia Contract ID No. C00077383DB80 Price Proposal January 20, 2015 ATTACHMENT 4.0.1.2 DESIGN-BUILD PRICE PROPOSAL CHECKLIST
More informationDOES NOT INCLUDE STATE AID PROJECTS ALL ITEMS BETWEEN 01/01/10 AND 12/31/10 BY ITEM GROUP 211 CONTRACTS - AWARDED TOTAL: $649,895,273
AVERAGE BID PRICES FOR AWARDED PROJECTS 06:54 Friday, February 18, 2011 1 2011 2011.601/00003 CONSTRUCTION SURVEYING LS 9 $276 $30,713.33 9 2011.601/00010 VIBRATION MONITORING LS 2 $73 $36,700.00 2 2011
More informationOTTAWA COUNTY ROAD COMMISSION Bid Comparison
OTTAWA COUNTY ROAD COMMISSION Bid Comparison Contract ID: Description: Location: Projects(s): 28th & Mason Reconstruct with pavement 28th Ave. and Mason St between Adams St. and 32nd Ave. Jamestown Township
More informationOhio Department of Transportation Official Bid Tabulation James G. Beasley, P.E., P.S., Director
Ohio Department of Transportation Official Bid Tabulation James G. Beasley, P.E., P.S., Director Project No. 080598 PID 21272 CUY-SR-237-4.93 - PART I (FRONT STREET); CUY-237-4.55 - P Federal Type: RAILROAD
More informationBID ITEM ESTIMATED UNIT TOTAL UNIT TOTAL UNIT TOTAL NO. QUANTITY UNIT ITEM COST COST COST COST COST COST
PAGE 1 BID OPENING: AUGUST 11, 2011 ENGINEER'S ESTIMATE: $3,108,320.60 CONTRACT NO.110269 SABINO CANYON AND TANQUE VERDE INTERSECTION IMPROVEMENTS *FOR A MORE DETAILED ITEM DESCRIPTION* *REFER TO PROPOSAL
More information(1 ) Active Construction Inc River Road East Tacoma, WA AMOUNT , , ,
78th Avenue Eastl184th Street EastlCRP 5661 I hereby certify this to be a true copy of the tabulation of the bids as received and opened. BID OPENING: FRIDAY, March 3, 2017 County Engine (1 ) Active Construction
More informationDOES NOT INCLUDE STATE AID PROJECTS ALL ITEMS BETWEEN 01/01/04 AND 12/31/04 BY ITEM GROUP 201 CONTRACTS - AWARDED TOTAL: $340,971,276
AVERAGE BID PRICES FOR AWARDED PROJECTS 14:37 Wednesday, February 2, 2005 1 2011 2011.601/00003 CONSTRUCTION SURVEYING LS 17 $920 $54,140.65 17 2011.601/00040 DESIGN LS 1 $4 $3,500.00 1 2011 $924 2013
More informationDate: 04/20/2018 City Project No.: Addendum No.: 4. The following changes shall be made to the project plans and specifications:
DEVELOPMENT SERVICES PHONE: (209) 668-5520 ENGINEERING DIVISION FAX: (209) 668-5563 156 S. BROADWAY, SUITE 150 TDD: (800) 735-2929 TURLOCK, CA 95380 engineering@turlock.ca.us Date: 04/20/2018 City Project
More informationMaine Turnpike Authority
Company Name Total Bid Amount Liddell Brothers, Inc. - Halifax, MA $1,590,213.00 Northeast Traffic Control Services, Inc. - Plymouth, MA $1,932,117.00 Page 1 of 5 Liddell Brothers, Inc. Halifax, MA 202.2061
More informationSTATEWIDE AVERAGES 31, 2014 THROUGH 1, 2016 ITEM ITEM DESCRIPTION UNIT MINIMUM MAXIMUM AVERAGE
100 MOBILIZATION LS 6779 693000 101486.5179 100 101 CONSTRUCTION SURVEYING (CONSTR.) LS 2500 250000 28927.32021 101 102 CONSTRUCTION SURVEYING(MIN. PLAN) LS 6000 30200 14340 102 104 DESIGN BUILD EA 1 83499998
More informationBID FORM PART A. Total Quantity 1 LS $ - 2a Surveying, Layout, and Field Staking 1 LS $ - 2b Maintenance of Traffic 1 LS $ -
BID FORM PART A Name & Category Unit Unit Cost (B) Cost (AxB) GENERAL REQUIREMENTS 1 Mobilization (Maximum 3.0% of the total Contract Price) 1 LS $ - 2a Surveying, Layout, and Field Staking 1 LS $ - 2b
More informationSchedule of Pay Items
Schedule of Pay Items 4/27/2018 9:33 AM AASHTOWare Project Version 4.0 Revision 189 Report v1 Letting Call: 180601 001 Letting Date: June 1, 2018 Contract ID: 392144-202845 Description: Runway 17/35 rehabilitation
More informationOhio Department of Transportation Official Bid Tabulation Jerry Wray, Director
Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 190109 PID 96986 CUY-SR 10-16.13 Steel Federal Type: BRIDGE REPAIR Letting Date: 3/21/2019 Completion Date: 9/30/2020
More informationS T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 05/01/00 PAGE : 1 TABULATION OF BIDS
PAGE : 1 CONTRACT DESCRIPTION : MILL & OVERLAY, GRADING, BIT SURFACING, BR NO 02038 ETC CONTRACT LOCATION: LOCATED ON TH 47 FROM 153RD AVE NW IN RAMSEY TO 180TH LANE NW AND AT FORD BROOK IN BURNS TOWNSHIP
More informationCOST ESTIMATES: Curb-Running
COST ESTIMATES: Curb-Running PROJECT FEASIBILITY COST ESTIMATE SUMMARY Geary Bus Rapid Transit Study Alternative: Side Lane (Curb Running) Date: 4/12/07 Percent Cost Total Project Capital Outlay I- Roadway
More informationMO 370 Interchange Ramp at Salt River Road - Phase 1
MO 3 Interchange Ramp at Salt River Road - Phase 1 Sponsor St Peters Project No. RB19-000023 Project Type New Road TOTAL FUNDING Total County Sponsor Federal $3,304,748.00 $1,652,298.00 $7,450.00 $945,000.00
More informationCity of Grand Island Tuesday, February 13, 2018 Council Session
City of Grand Island Tuesday, February 13, 2018 Council Session Item G-7 #2018-34 - Approving Certificate of Final Completion for the Construction of North Interceptor Phase I; Project No. 2012-S-6 Staff
More information