SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE TO CONTRACTORS FOR REGULAR HIGHWAY LETTING April 10, 2018

Size: px
Start display at page:

Download "SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE TO CONTRACTORS FOR REGULAR HIGHWAY LETTING April 10, 2018"

Transcription

1 SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE TO CONTRACTORS FOR REGULAR HIGHWAY LETTING April 10, 2018 Letting Location: SCDOT Headquarters Building Conference Room Park Street Columbia, SC Electronic Bids for the contracts listed herein will be publicly opened. All bid totals will be printed and posted on the SCDOT web site, Bid Express, and the Construction Extranet. Visitors are welcome and should sign in at the Park Street entrance. Please contact the Contract Administration Office at (803) with all Letting related questions. The following items will be made available on March 13, 2018 unless otherwise noted: EBS (Electronic Bidding System) files via Bid Express website Hardcopy plans & proposals will be printed upon request only via Engineering Publications o Located in room G23 SCDOT Headquarters o Phone (803) / Fax (803) Call ahead for pickup orders o Cash, check, money order, VISA/MC accepted (Payable to SCDOT. No refunds) Access the Construction Extranet for the following items: Plans Announcements Bids as Received CPM Schedule Templates Contractors are encouraged to utilize the Extranet Discussion Board to make contact with other Prime and Subcontractors to request/offer quotes. There is no charge to access this site, but you must register for a user name and password. See link for details Certain projects will require bidders to have a minimum quarterly CPS (Contractor Performance Score) issued by SCDOT. These projects will be noted accordingly to include the minimum score and quarter issued. Contractors wishing to verify their CPS may call SCDOT Construction Data Support at (803) The SCDOT Standard Drawings are available for download at Quantities shown herein are approximate for information only and should not be used for bidding purposes. The Department reserves the right to change these quantities without notice.

2 Call No.: 010 Page: 1 SC File NO(S).: PCN: P Project No.: P Letting Date: April 10, 2018 CO(S).: Anderson DBE Goal Percent: 0.00% Cost of Road Plans: Description: ANDERSON COUNTY LONGLINE PAINT CONTRACT Completion Date: 11/30/ MOBILIZATION LS TRAFFIC CONTROL LS PVMT.MRKS.(TEMP-HIGH BUILD PNT.W.WET REFL.) 4" WH. BRK.LNS. 22, LF PVMT.MRKS.(TMP-H BD PNT.W.WET REFL.) 4" YEL. BRK.LNS , LF PVT MRK(TEMP-HI.BUIILD.PNT W.WET REFLECT.EL)-4"WH.SOLID 001 1,387, LF PVT MRK(TEMP-HI.BUIILD.PNT W.WET REFLECT.EL)4"YEL.S 001 1,350, LF

3 Call No.: 020 Page: 2 SC File NO(S).: Letting Date: April 10, 2018 PCN: P CO(S).: Cherokee Project No.: P DBE Goal Percent: 0.00% Cost of Road Plans: Description: 2018 CHEROKEE CTC RESURFACING Completion Date: 11/30/ MOBILIZATION LS TRAFFIC CONTROL LS REMOVAL & DISPOSAL OF EXISTING PAVEMENT SY REMOVAL & DISPOSAL OF EXISTING CONCRETE CY REMOVAL OF EXIST. GUARDRAIL LF BORROW EXCAVATION CY STATION GRADING STA CEMENT MODIFIED RECYCLED BASE (12" UNIFORM) CURING METHOD 2 31, SY PORTLAND CEMENT FOR CEMENT MODIFIED RECYCLED BASE COURSE 1, TON MAINTENANCE STONE TON HOT MIX ASPHALT BASE COURSE - TYPE B TON LIQUID ASPHALT BINDER PG TON FULL DEPTH ASPH. PAV. PATCHING 10"UNIF SY MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 2, SY MILLED-IN RUMBLE STRIP MI HOT MIX ASPHALT SURFACE COURSE TYPE C 2, TON HOT MIX ASPHALT SURFACE COURSE TYPE E 1, TON PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) SF 4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT LF 4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 53, LF 8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT LF 24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 1, LF RAILROAD CROSSING SYMBOLS - FAST DRY PAINT EA 4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 2, LF 4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 42, LF 4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL LF 4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 23, LF 8" WHITE SOLID LINES THERMOPLASTIC MIL LF 24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL LF

4 Call No.: 020 Page: 3 RAILROAD CROSSING SYMBOLS - THERMOPLASTIC MIL EA 4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL LF 4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 21, LF PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" EA 15" SMOOTH WALL PIPE LF ADJUST DROP INLET ADJUST D. I EA CONCRETE SIDEWALK(4" UNIFORM) SY DETECTABLE WARNING MATERIAL SF PEDESTRIAN RAMP CONSTRUCTION SY END TERMINAL - TYPE T EA PERMANENT GRASSING FOR SMALL PROJECTS ACRE SILT FENCE 1, LF REPLACE/REPAIR SILT FENCE LF REMOVAL OF SILT RETAINED BY SILT FENCE LF

5 Call No.: 030 Page: 4 SC File NO(S).: Letting Date: April 10, 2018 PCN: P CO(S).: Kershaw Project No.: P DBE Goal Percent: 0.00% Cost of Road Plans: Description: SHLD PAVING, FDP,CHIP SEALING Completion Date: 10/31/ MOBILIZATION LS TRAFFIC CONTROL LS BORROW EXCAVATION CY EXCAVATION FOR SHOULDER PAVING STA HAULING OF EXCAVATED SHOULDER MATERIAL STA MAINTENANCE STONE TON HMA SHOULDER WIDENING COURSE 2, TON LIQUID ASPHALT BINDER PG TON FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 2, SY ASPHALT SURFACE TREATMENT(SINGLE TREATMENT) 129, SY PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) SF 4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT LF 4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 159, LF 24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT LF 4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 4, LF 4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 134, LF 4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL LF 4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 116, LF 24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL LF 4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 2, LF 4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 103, LF PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 1, EA PERMANENT GRASSING FOR SMALL PROJECTS ACRE

6 Call No.: 040 Page: 5 SC File NO(S).: Letting Date: April 10, 2018 PCN: P CO(S).: Laurens Project No.: P DBE Goal Percent: 0.00% Cost of Road Plans: Description: LAURENS COUNTY CTC PROJECT Completion Date: 5/31/ MOBILIZATION LS CONSTRUCTION STAKES, LINES & GRADES EA TRAFFIC CONTROL LS BORROW EXCAVATION CY CEMENT MODIFIED RECYCLED BASE (10" UNIFORM) CURING METHOD 4 8, SY CEMENT MODIFIED RECYCLED BASE (12" UNIFORM) CURING METHOD 4 28, SY PORTLAND CEMENT FOR CEMENT MODIFIED RECYCLED BASE COURSE 1, TON LIQUID ASPHALT BINDER PG TON MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 1, SY MILLED-IN RUMBLE STRIP MI HOT MIX ASPHALT INTERMEDIATE COURSE TYPE C 1, TON HOT MIX ASPHALT SURFACE COURSE TYPE C 3, TON PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) SF 4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 1, LF 4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 91, LF 24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT LF 4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 2, LF 4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 72, LF 4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL LF 4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 22, LF 24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL LF 4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL LF 4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 18, LF PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" EA PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" EA PERMANENT GRASSING FOR SMALL PROJECTS ACRE

7 Call No.: 050 Page: 6 SC File NO(S).: PCN: P Project No.: P Letting Date: April 10, 2018 CO(S).: Lexington DBE Goal Percent: 9.50% Cost of Road Plans: $35.00 Description: ST. PETER'S CHURCH ROAD IMPROVEMENTS Completion Date: 6/30/2019 $ MOBILIZATION LS CONSTRUCTION STAKES, LINES & GRADES EA TRAFFIC CONTROL LS CLEARING & GRUBBING WITHIN RIGHT OF WAY ACRE UNCLASSIFIED EXCAVATION 10, CY BORROW EXCAVATION 5, CY EXCAVATION FOR SHOULDER PAVING STA HAULING OF EXCAVATED SHOULDER MATERIAL STA MAINTENANCE STONE TON HMA SHOULDER WIDENING COURSE 3, TON LIQUID ASPHALT BINDER PG TON FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 1, SY FULL DEPTH ASPH. PAV. PATCHING 8" UNIF 2, SY MILLING EXISTING ASPHALT PAVEMENT 1.75" 12, SY MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 1, SY CLEAN AND SEAL CRACKS IN ASPHALT PAVEMENT LaMi MILLED-IN RUMBLE STRIP MI HOT MIX ASPHALT INTERMEDIATE COURSE TYPE C 1, TON HOT MIX ASPHALT SURFACE COURSE TYPE C 1, TON PREVENTATIVE MAINTENANCE SURFACE TREATMENT 49, SY PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) SF 4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT LF 4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 89, LF 24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT LF 4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 3, LF 4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 71, LF 4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL LF 4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 44, LF 24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL LF

8 Call No.: 050 Page: 7 4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 1, LF 4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 35, LF PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" EA 24" R. C. PIPE CUL. BEVELED END SECTN-CL EA 36" R. C. PIPE CUL. BEVELED END SECTN-CL EA 18" SMOOTH WALL PIPE 3, LF 24" SMOOTH WALL PIPE LF 36" SMOOTH WALL PIPE LF CATCH BASIN -TYPE 9 MH EA RIP-RAP (CLASS B) 1, TON HAND PLACED RIPRAP TON GEOTEXTILE FOR EROSION CONTROL UNDER RIPRAP(CLASS 2)TYPE C 2, SY STEEL BEAM GUARDRAIL STEEL BEAM GR. 1, LF END TERMINAL - TYPE T EA THRIE BEAM G.R.BRIDGE CONN EA RESET FENCE 1, LF PERMANENT COVER ACRE TEMPORARY COVER ACRE HYDRAULIC MULCH (HM) ACRE FERTILIZER (NITROGEN) 2, LB FERTILIZER (PHOSPHORIC ACID) 2, LB FERTILIZER (POTASH) 2, LB AGRICULTURAL GRANULAR LIME 40, LB SELECTIVE WATERING 135, GAL MOWING ACRE TEMPORARY EROSION CONTROL BLANKET (CLASS A) MSY SEDIMENT TUBES FOR DITCH CHECKS 2, LF SILT FENCE 18, LF DITCH CHECK TON

9 Call No.: 060 Page: 8 SC File NO(S).: PCN: P Project No.: P Letting Date: April 10, 2018 CO(S).: Richland DBE Goal Percent: 0.00% Cost of Road Plans: $21.00 Description: I-77 DYNAMIC SIGN STRUCTURES AND CAMERA INSTALLATION Completion Date: 12/31/ MOBILIZATION LS TRAFFIC CONTROL LS BORROW EXCAVATION CY FURNISH & INSTALL 2.0" SCHEDULE 80 PVC CONDUIT LF 2" SCHEDULE 80 HDPE CONDUIT LF FURNISH & INSTALL 2" SCHEDULE 80 HDPE CONDUIT (TRENCHLESS) LF 16 IN. ABOVE GROUND UTILITY MARKER EA 12 SMFO LOOSE TUBE - DROPS LF ELECTRICAL SERVICE FOR ITS - IN EXCESS OF 50FT EA 17"X30"X28"D.ELEC.FLUSH UNDGRD.ENCLOSURE-(STR.POLY.CONC.)HD EA 30"X48"X30"D.ELEC.FLUSH UNDGRD.ENCLOSURE-(STR.POLY.CONC.)HD EA 60' CONCRETE STRAIN POLE EA VARIABLE MESSAGE SIGN (PERMANENT WITH STRUCTURE) EA CAMERA LOWERING DEVICE EA INSTALL ITS CABINET - BASE MOUNTED EA STEEL BEAM GUARDRAIL STEEL BEAM GR LF END ANCHOR-TYPE B EA END TERMINAL - TYPE T EA

10 Call No.: 070 Page: 9 SC File NO(S).: PCN: P Project No.: P Letting Date: April 10, 2018 CO(S).: DISTRICT 1 DBE Goal Percent: 0.00% Cost of Road Plans: Description: NON-INTERSTATE GUARDRAIL REPAIR DISTRICT ONE Completion Date: 6/30/ MOBILIZATION (SEVERE DAMAGE TO GUARDRAIL) EA TRAFFIC CONTROL EA REMOVAL OF EXIST. GUARDRAIL LF REMOVE & DISPOSE SEMI-RIGID GR DEVICE LF STEEL BEAM GUARDRAIL STEEL BEAM GR LF MT3 LEADING END TREATMENT TL EA MT2 LEADING END TREATMENT TL EA REMOVE AND REPLACE W BEAM GUARDRAIL 7, LF GUARDRAIL THRIE-BEAM WITH BASE PLATE 6.25 POST SPACING LF STEEL BEAM GUARDRAIL (THRIE) LF REMOVE AND REPLACE THRIE BEAM GUARDRAIL LF REMOVE AND REPLACE CRITICAL OFFSET THRIE BEAM GUARDRAIL LF MB TRAILING END TREATMENT EA MGS3 GR STANDARD SHOULDER LF MGS3CS GR COMPRESSED SHOULDER LF MGS2C GR BEHIND CURB LF END ANCHOR-TYPE B EA REMOVE AND REPLACE END ANCHOR-TYPE B EA REMOVE AND REPLACE END ANCHOR-TYPE B (THRIE) EA END TERMINAL - TYPE T EA REMOVE AND REPLACE END TERMINAL - TYPE T EA THRIE BEAM G.R.BRIDGE CONN EA REMOVE AND REPLACE THRIE BEAM G.R.BRIDGE CONN EA ADDITIONAL LENGTH GUARDRAIL POST LF MTBBC3 MASH THRIE-BEAM BARRIER CONNECTOR TL EA MTBBC2 MASH THRIE-BEAM BARRIER CONNECTOR TL EA FLEXIBLE DELINEATOR POST WITH GROUND ANCHOR EA END TREATMENT TYPE IA EA GUARDRAIL LEADING END IA-1 TEST LEVEL 3 UNIDIRECTION SYSTEM EA

11 Call No.: 070 Page: 10 GUARDRAIL LEADING END IA-1 TEST LEVEL 3 BIDIRECTION SYSTEM EA GUARDRAIL LEADING END IA-2 TEST LEVEL 3 BRAKEMASTER EA GUARDRAIL LEADING END IA-3 TEST LEVEL 3 CAT EA 2' CRASH CUSHION 2A EA 2' CRASH CUSHION 2B EA 2' CRASH CUSHION 2C EA WIDE CRASH CUSHION 2A EA WIDE CRASH CUSHION 2B EA WIDE CRASH CUSHION 2C EA 2' CRASH CUSHION 3A EA 2' CRASH CUSHION 3B EA 2' CRASH CUSHION 3C EA WIDE CRASH CUSHION 3A EA WIDE CRASH CUSHION 3B EA WIDE CRASH CUSHION 3C EA

12 Call No.: 080 Page: 11 SC File NO(S).: PCN: P Project No.: P PCN: P Project No.: P PCN: P Project No.: P PCN: P Project No.: P PCN: P Project No.: P Letting Date: April 10, 2018 CO(S).: Lexington Richland DBE Goal Percent: 0.00% Cost of Road Plans: Description: FDP AND PVMT MARKINGS Completion Date: 4/30/ MOBILIZATION LS TRAFFIC CONTROL LS MAINTENANCE STONE TON FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 20, SY 4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 67, LF 24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT LF 4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 2, LF 4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 67, LF 4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 1, LF 4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 1, LF PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" EA

13 Call No.: 090 Page: 12 SC File NO(S).: Letting Date: Letting Time: April 10, :00 PM Completion Date: 4/30/2019 PCN: P PCN: P PCN: P CO(S).: Kershaw Lee Sumter Description: FD PATCHING AND PVMT MARKINGS Project No.: P Project No.: P Project No.: P DBE Goal Percent: 0.00% Cost of Road Plans: MOBILIZATION LS TRAFFIC CONTROL LS MAINTENANCE STONE TON FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 25, SY 4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 127, LF 24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT LF 4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 5, LF 4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 111, LF 4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 1, LF 4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL LF 4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 1, LF PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 1, EA

14 Call No.: 100 Page: 13 SC File NO(S).: PCN: P Project No.: P PCN: P Project No.: P Letting Date: April 10, 2018 CO(S).: Lexington Richland DBE Goal Percent: 0.00% Cost of Road Plans: Description: SHLD PAVING, FDP, LEVEL, CHIP SEAL Completion Date: 6/30/ MOBILIZATION LS TRAFFIC CONTROL LS CSX RAILROAD INSURANCE AND FLAGGING LS BORROW EXCAVATION CY EXCAVATION FOR SHOULDER PAVING STA HAULING OF EXCAVATED SHOULDER MATERIAL STA MAINTENANCE STONE TON HMA SHOULDER WIDENING COURSE TON LIQUID ASPHALT BINDER PG TON FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 2, SY HOT MIX ASPHALT SURFACE COURSE TYPE D TON ASPHALT SURFACE TREATMENT(SINGLE TREATMENT) 125, SY PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 2, SF 4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 55, LF 24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT LF RAILROAD CROSSING SYMBOLS - FAST DRY PAINT EA 4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT LF 4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 71, LF 4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 15, LF 24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL LF RAILROAD CROSSING SYMBOLS - THERMOPLASTIC MIL EA 4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL LF 4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 14, LF PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" EA PERMANENT GRASSING FOR SMALL PROJECTS ACRE

15 Call No.: 110 Page: 14 SC File NO(S).: PCN: P Project No.: P Letting Date: April 10, 2018 CO(S).: DISTRICT 1 DBE Goal Percent: 0.00% Cost of Road Plans: Description: 2018 RPMS PRIMARY & SECONDARY ROUTES - DISTRICT 1 Completion Date: 10/15/ MOBILIZATION LS TRAFFIC CONTROL LS PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 19, EA PERMANENT YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X 4" PERM. YEL. 12, EA PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 69, EA

16 Call No.: 120 Page: 15 SC File NO(S).: PCN: P Project No.: P Letting Date: April 10, 2018 CO(S).: DISTRICT 1 DBE Goal Percent: 0.00% Cost of Road Plans: Description: ON CALL INTERSTATE GUARDRAIL DISTRICT 1 Completion Date: 6/30/ MOBILIZATION (SEVERE DAMAGE TO GUARDRAIL) EA BONDS AND INSURANCE LS TRAFFIC CONTROL EA REMOVAL OF EXIST. GUARDRAIL LF REMOVE & DISPOSE SEMI-RIGID GR DEVICE LF STEEL BEAM GUARDRAIL STEEL BEAM GR LF MT3 LEADING END TREATMENT TL EA MT2 LEADING END TREATMENT TL EA REMOVE AND REPLACE W BEAM GUARDRAIL , LF GUARDRAIL THRIE-BEAM WITH BASE PLATE 6.25 POST SPACING LF STEEL BEAM GUARDRAIL (THRIE) LF REMOVE AND REPLACE THRIE BEAM GUARDRAIL LF REMOVE AND REPLACE CRITICAL OFFSET THRIE BEAM GUARDRAIL LF MB TRAILING END TREATMENT EA MGS3 GR STANDARD SHOULDER LF MGS3CS GR COMPRESSED SHOULDER LF MGS2C GR BEHIND CURB LF END ANCHOR-TYPE B EA REMOVE AND REPLACE END ANCHOR-TYPE B EA REMOVE AND REPLACE END ANCHOR-TYPE B (THRIE) EA END TERMINAL - TYPE T EA REMOVE AND REPLACE END TERMINAL - TYPE T EA THRIE BEAM G.R.BRIDGE CONN EA REMOVE AND REPLACE THRIE BEAM G.R.BRIDGE CONN EA ADDITIONAL LENGTH GUARDRAIL POST LF MTBBC3 MASH THRIE-BEAM BARRIER CONNECTOR TL EA MTBBC2 MASH THRIE-BEAM BARRIER CONNECTOR TL EA FLEXIBLE DELINEATOR POST WITH GROUND ANCHOR EA END TREATMENT TYPE IA EA REMOVE AND REPLACE END TREATMENT TYPE IA EA

17 Call No.: 120 Page: 16 GUARDRAIL LEADING END IA-1 TEST LEVEL 3 UNIDIRECTION SYSTEM EA GUARDRAIL LEADING END IA-1 TEST LEVEL 3 BIDIRECTION SYSTEM EA GUARDRAIL LEADING END IA-2 TEST LEVEL 3 BRAKEMASTER EA GUARDRAIL LEADING END IA-3 TEST LEVEL 3 CAT EA 2' CRASH CUSHION 2A EA 2' CRASH CUSHION 2B EA 2' CRASH CUSHION 2C EA WIDE CRASH CUSHION 2A EA WIDE CRASH CUSHION 2B EA WIDE CRASH CUSHION 2C EA 2' CRASH CUSHION 3A EA 2' CRASH CUSHION 3B EA 2' CRASH CUSHION 3C EA WIDE CRASH CUSHION 3A EA WIDE CRASH CUSHION 3B EA WIDE CRASH CUSHION 3C EA

18 Call No.: 130 Page: 17 SC File NO(S).: PCN: P Project No.: P Letting Date: April 10, 2018 CO(S).: DISTRICT2 DBE Goal Percent: 0.00% Cost of Road Plans: Description: NON-INTERSTATE GUARDRAIL PROGRAM Completion Date: 6/30/ MOBILIZATION (SEVERE DAMAGE TO GUARDRAIL) EA TRAFFIC CONTROL EA REMOVE & DISPOSE SEMI-RIGID GR DEVICE LF MT3 LEADING END TREATMENT TL EA MT2 LEADING END TREATMENT TL EA REMOVE AND REPLACE W BEAM GUARDRAIL 20, LF REMOVE AND REPLACE THRIE BEAM GUARDRAIL 5, LF REMOVE AND REPLACE CRITICAL OFFSET THRIE BEAM GUARDRAIL LF MB TRAILING END TREATMENT EA MGS3 GR STANDARD SHOULDER LF MGS3CS GR COMPRESSED SHOULDER LF MGS2C GR BEHIND CURB LF REMOVE AND REPLACE END ANCHOR-TYPE B EA REMOVE AND REPLACE END ANCHOR-TYPE B (THRIE) EA REMOVE AND REPLACE END TERMINAL - TYPE T EA REMOVE AND REPLACE THRIE BEAM G.R.BRIDGE CONN EA ADDITIONAL LENGTH GUARDRAIL POST LF MTBBC3 MASH THRIE-BEAM BARRIER CONNECTOR TL EA MTBBC2 MASH THRIE-BEAM BARRIER CONNECTOR TL EA FLEXIBLE DELINEATOR POST WITH GROUND ANCHOR EA REMOVE AND REPLACE END TREATMENT TYPE IA EA 2' CRASH CUSHION 2A EA 2' CRASH CUSHION 2B EA 2' CRASH CUSHION 2C EA WIDE CRASH CUSHION 2A EA WIDE CRASH CUSHION 2B EA WIDE CRASH CUSHION 2C EA 2' CRASH CUSHION 3A EA 2' CRASH CUSHION 3B EA

19 Call No.: 130 Page: 18 2' CRASH CUSHION 3C EA WIDE CRASH CUSHION 3A EA WIDE CRASH CUSHION 3B EA WIDE CRASH CUSHION 3C EA

20 Call No.: 140 Page: 19 SC File NO(S).: PCN: P Project No.: P Letting Date: April 10, 2018 CO(S).: DISTRICT2 DBE Goal Percent: 0.00% Cost of Road Plans: Description: 2018 RPMS ON PRIMARY & SECONDARY ROUTES - DISTRICT 2 Completion Date: 10/15/ MOBILIZATION LS TRAFFIC CONTROL LS PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 8, EA PERMANENT YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X 4" PERM. YEL. 6, EA PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 80, EA

21 Call No.: 150 Page: 20 SC File NO(S).: PCN: P Project No.: P Letting Date: April 10, 2018 CO(S).: DISTRICT2 DBE Goal Percent: 0.00% Cost of Road Plans: Description: INTERSTATE GUARDRAIL PROGRAM Completion Date: 6/30/ MOBILIZATION (SEVERE DAMAGE TO GUARDRAIL) EA TRAFFIC CONTROL EA REMOVE & DISPOSE SEMI-RIGID GR DEVICE LF MT3 LEADING END TREATMENT TL EA MT2 LEADING END TREATMENT TL EA REMOVE AND REPLACE W BEAM GUARDRAIL 10, LF REMOVE AND REPLACE THRIE BEAM GUARDRAIL 1, LF REMOVE AND REPLACE CRITICAL OFFSET THRIE BEAM GUARDRAIL LF MB TRAILING END TREATMENT EA MGS3 GR STANDARD SHOULDER LF MGS3CS GR COMPRESSED SHOULDER LF MGS2C GR BEHIND CURB LF REMOVE AND REPLACE END ANCHOR-TYPE B EA REMOVE AND REPLACE END ANCHOR-TYPE B (THRIE) EA REMOVE AND REPLACE END TERMINAL - TYPE T EA REMOVE AND REPLACE THRIE BEAM G.R.BRIDGE CONN EA MTBBC3 MASH THRIE-BEAM BARRIER CONNECTOR TL EA MTBBC2 MASH THRIE-BEAM BARRIER CONNECTOR TL EA FLEXIBLE DELINEATOR POST WITH GROUND ANCHOR EA REMOVE AND REPLACE END TREATMENT TYPE IA EA 2' CRASH CUSHION 2A EA 2' CRASH CUSHION 2B EA 2' CRASH CUSHION 2C EA WIDE CRASH CUSHION 2A EA WIDE CRASH CUSHION 2B EA WIDE CRASH CUSHION 2C EA 2' CRASH CUSHION 3A EA 2' CRASH CUSHION 3B EA 2' CRASH CUSHION 3C EA

22 Call No.: 150 Page: 21 WIDE CRASH CUSHION 3A EA WIDE CRASH CUSHION 3B EA WIDE CRASH CUSHION 3C EA

23 Call No.: 160 Page: 22 SC File NO(S).: PCN: P Project No.: P Letting Date: April 10, 2018 CO(S).: DISTRICT3 DBE Goal Percent: 0.00% Cost of Road Plans: Description: NON-INTERSTATE GUARDRAIL PROGRAM DISTRICT-3 Completion Date: 6/30/ MOBILIZATION (SEVERE DAMAGE TO GUARDRAIL) EA TRAFFIC CONTROL EA REMOVAL OF EXIST. GUARDRAIL LF REMOVE & DISPOSE SEMI-RIGID GR DEVICE LF STEEL BEAM GUARDRAIL STEEL BEAM GR LF MT3 LEADING END TREATMENT TL EA MT2 LEADING END TREATMENT TL EA REMOVE AND REPLACE W BEAM GUARDRAIL 15, LF GUARDRAIL THRIE-BEAM WITH BASE PLATE 6.25 POST SPACING LF STEEL BEAM GUARDRAIL (THRIE) LF REMOVE AND REPLACE THRIE BEAM GUARDRAIL LF REMOVE AND REPLACE CRITICAL OFFSET THRIE BEAM GUARDRAIL LF MB TRAILING END TREATMENT EA MGS3 GR STANDARD SHOULDER LF MGS3CS GR COMPRESSED SHOULDER LF MGS2C GR BEHIND CURB LF END ANCHOR-TYPE B EA REMOVE AND REPLACE END ANCHOR-TYPE B EA REMOVE AND REPLACE END ANCHOR-TYPE B (THRIE) EA END TERMINAL - TYPE T EA REMOVE AND REPLACE END TERMINAL - TYPE T EA THRIE BEAM G.R.BRIDGE CONN EA REMOVE AND REPLACE THRIE BEAM G.R.BRIDGE CONN EA ADDITIONAL LENGTH GUARDRAIL POST LF MTBBC3 MASH THRIE-BEAM BARRIER CONNECTOR TL EA MTBBC2 MASH THRIE-BEAM BARRIER CONNECTOR TL EA FLEXIBLE DELINEATOR POST WITH GROUND ANCHOR EA END TREATMENT TYPE IA EA REMOVE AND REPLACE END TREATMENT TYPE IA EA

24 Call No.: 160 Page: 23 GUARDRAIL LEADING END IA-1 TEST LEVEL 3 UNIDIRECTION SYSTEM EA GUARDRAIL LEADING END IA-1 TEST LEVEL 3 BIDIRECTION SYSTEM EA GUARDRAIL LEADING END IA-2 TEST LEVEL 3 BRAKEMASTER EA GUARDRAIL LEADING END IA-3 TEST LEVEL 3 CAT EA 2' CRASH CUSHION 2A EA 2' CRASH CUSHION 2B EA 2' CRASH CUSHION 2C EA WIDE CRASH CUSHION 2A EA WIDE CRASH CUSHION 2B EA WIDE CRASH CUSHION 2C EA 2' CRASH CUSHION 3A EA 2' CRASH CUSHION 3B EA 2' CRASH CUSHION 3C EA WIDE CRASH CUSHION 3A EA WIDE CRASH CUSHION 3B EA WIDE CRASH CUSHION 3C EA

25 Call No.: 170 Page: 24 SC File NO(S).: PCN: P Project No.: P Letting Date: April 10, 2018 CO(S).: DISTRICT3 DBE Goal Percent: 0.00% Cost of Road Plans: Description: INTERSTATE GUARDRAIL PROGRAM DISTRICT 3 Completion Date: 6/30/ MOBILIZATION (SEVERE DAMAGE TO GUARDRAIL) EA TRAFFIC CONTROL EA REMOVAL OF EXIST. GUARDRAIL LF REMOVE & DISPOSE SEMI-RIGID GR DEVICE LF STEEL BEAM GUARDRAIL STEEL BEAM GR LF MT3 LEADING END TREATMENT TL EA MT2 LEADING END TREATMENT TL EA REMOVE AND REPLACE W BEAM GUARDRAIL 3, LF GUARDRAIL THRIE-BEAM WITH BASE PLATE 6.25 POST SPACING LF STEEL BEAM GUARDRAIL (THRIE) LF REMOVE AND REPLACE THRIE BEAM GUARDRAIL LF REMOVE AND REPLACE CRITICAL OFFSET THRIE BEAM GUARDRAIL LF MB TRAILING END TREATMENT EA MGS3 GR STANDARD SHOULDER LF MGS3CS GR COMPRESSED SHOULDER LF MGS2C GR BEHIND CURB LF END ANCHOR-TYPE B EA REMOVE AND REPLACE END ANCHOR-TYPE B EA REMOVE AND REPLACE END ANCHOR-TYPE B (THRIE) EA END TERMINAL - TYPE T EA REMOVE AND REPLACE END TERMINAL - TYPE T EA THRIE BEAM G.R.BRIDGE CONN EA REMOVE AND REPLACE THRIE BEAM G.R.BRIDGE CONN EA ADDITIONAL LENGTH GUARDRAIL POST LF MTBBC3 MASH THRIE-BEAM BARRIER CONNECTOR TL EA MTBBC2 MASH THRIE-BEAM BARRIER CONNECTOR TL EA FLEXIBLE DELINEATOR POST WITH GROUND ANCHOR EA END TREATMENT TYPE IA EA REMOVE AND REPLACE END TREATMENT TYPE IA EA

26 Call No.: 170 Page: 25 GUARDRAIL LEADING END IA-1 TEST LEVEL 3 UNIDIRECTION SYSTEM EA GUARDRAIL LEADING END IA-1 TEST LEVEL 3 BIDIRECTION SYSTEM EA GUARDRAIL LEADING END IA-2 TEST LEVEL 3 BRAKEMASTER EA GUARDRAIL LEADING END IA-3 TEST LEVEL 3 CAT EA 2' CRASH CUSHION 2A EA 2' CRASH CUSHION 2B EA 2' CRASH CUSHION 2C EA WIDE CRASH CUSHION 2A EA WIDE CRASH CUSHION 2B EA WIDE CRASH CUSHION 2C EA 2' CRASH CUSHION 3A EA 2' CRASH CUSHION 3B EA 2' CRASH CUSHION 3C EA WIDE CRASH CUSHION 3A EA WIDE CRASH CUSHION 3B EA WIDE CRASH CUSHION 3C EA

27 Call No.: 180 Page: 26 SC File NO(S).: PCN: P Project No.: P Letting Date: April 10, 2018 CO(S).: DISTRICT3 DBE Goal Percent: 0.00% Cost of Road Plans: Description: 2018 RPMS ON PRIMARY AND SECONDARY ROUTES - DISTRICT 3 Completion Date: 10/31/ MOBILIZATION LS TRAFFIC CONTROL LS PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 22, EA PERMANENT YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X 4" PERM. YEL. 14, EA PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 86, EA

28 Call No.: 190 Page: 27 SC File NO(S).: PCN: P Project No.: P Letting Date: April 10, 2018 CO(S).: DISTRICT4 DBE Goal Percent: 0.00% Cost of Road Plans: Description: REPAIR/REPLACE OF INTERSTATE GR IN DISTRICT 4 Completion Date: 6/30/ MOBILIZATION (SEVERE DAMAGE TO GUARDRAIL) EA TRAFFIC CONTROL EA REMOVE & DISPOSE SEMI-RIGID GR DEVICE LF MT3 LEADING END TREATMENT TL EA MT2 LEADING END TREATMENT TL EA REMOVE AND REPLACE W BEAM GUARDRAIL 10, LF REMOVE AND REPLACE THRIE BEAM GUARDRAIL LF REMOVE AND REPLACE CRITICAL OFFSET THRIE BEAM GUARDRAIL LF MB TRAILING END TREATMENT EA MGS3 GR STANDARD SHOULDER LF MGS3CS GR COMPRESSED SHOULDER LF MGS2C GR BEHIND CURB LF REMOVE AND REPLACE END ANCHOR-TYPE B EA REMOVE AND REPLACE END ANCHOR-TYPE B (THRIE) EA REMOVE AND REPLACE END TERMINAL - TYPE T EA THRIE BEAM G.R.BRIDGE CONN EA REMOVE AND REPLACE THRIE BEAM G.R.BRIDGE CONN EA MTBBC3 MASH THRIE-BEAM BARRIER CONNECTOR TL EA MTBBC2 MASH THRIE-BEAM BARRIER CONNECTOR TL EA FLEXIBLE DELINEATOR POST WITH GROUND ANCHOR EA END TREATMENT TYPE IA EA

29 Call No.: 200 Page: 28 SC File NO(S).: PCN: P Project No.: P Letting Date: April 10, 2018 CO(S).: DISTRICT4 DBE Goal Percent: 0.00% Cost of Road Plans: Description: REPAIR/REPLACEMENT OF NON-INTERSTATE GR IN DISTRICT 4 Completion Date: 6/30/ MOBILIZATION (SEVERE DAMAGE TO GUARDRAIL) EA TRAFFIC CONTROL EA REMOVAL OF EXIST. GUARDRAIL LF REMOVE & DISPOSE SEMI-RIGID GR DEVICE LF STEEL BEAM GUARDRAIL STEEL BEAM GR. 6, LF MT3 LEADING END TREATMENT TL EA MT2 LEADING END TREATMENT TL EA REMOVE AND REPLACE W BEAM GUARDRAIL 1, LF GUARDRAIL THRIE-BEAM WITH BASE PLATE 6.25 POST SPACING LF STEEL BEAM GUARDRAIL (THRIE) 2, LF REMOVE AND REPLACE THRIE BEAM GUARDRAIL LF REMOVE AND REPLACE CRITICAL OFFSET THRIE BEAM GUARDRAIL LF MB TRAILING END TREATMENT EA MGS3 GR STANDARD SHOULDER LF MGS3CS GR COMPRESSED SHOULDER LF MGS2C GR BEHIND CURB LF END ANCHOR-TYPE B EA REMOVE AND REPLACE END ANCHOR-TYPE B EA REMOVE AND REPLACE END ANCHOR-TYPE B (THRIE) EA END TERMINAL - TYPE T EA REMOVE AND REPLACE END TERMINAL - TYPE T EA THRIE BEAM G.R.BRIDGE CONN EA REMOVE AND REPLACE THRIE BEAM G.R.BRIDGE CONN EA ADDITIONAL LENGTH GUARDRAIL POST LF MTBBC3 MASH THRIE-BEAM BARRIER CONNECTOR TL EA MTBBC2 MASH THRIE-BEAM BARRIER CONNECTOR TL EA FLEXIBLE DELINEATOR POST WITH GROUND ANCHOR EA END TREATMENT TYPE IA EA GUARDRAIL LEADING END IA-1 TEST LEVEL 3 UNIDIRECTION SYSTEM EA

30 Call No.: 200 Page: 29 GUARDRAIL LEADING END IA-1 TEST LEVEL 3 BIDIRECTION SYSTEM EA GUARDRAIL LEADING END IA-2 TEST LEVEL 3 BRAKEMASTER EA GUARDRAIL LEADING END IA-3 TEST LEVEL 3 CAT EA

31 Call No.: 210 Page: 30 SC File NO(S).: Letting Date: Letting Time: April 10, :00 PM Completion Date: 10/31/2019 PCN: P CO(S).: Cherokee Chesterfield Fairfield Lancaster York Description: FY17 TRAFFIC SIGNAL REBUILDS IN DISTRICT 4 Project No.: P DBE Goal Percent: 0.00% Cost of Road Plans: $ MOBILIZATION LS TRAFFIC CONTROL LS 4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL LF 8" WHITE SOLID LINES THERMOPLASTIC MIL LF 4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL LF REMOVAL OF PAVEMENT MARKINGS LF Flat Sheet, Type XI, Size Determined by MSG, Overhead SF FURNISH & INSTALL 1.0" GALVANIZED RIGID CONDUIT LF FURNISH & INSTALL 2.0" GALVANIZED RIGID CONDUIT LF FURNISH & INSTALL 3.0" GALVANIZED RIGID CONDUIT LF FURNISH & INSTALL 1.0" SCHEDULE 80 PVC CONDUIT LF FURNISH & INSTALL 2.0" SCHEDULE 80 PVC CONDUIT 1, LF FURNISH & INSTALL 3.0" SCHEDULE 80 PVC CONDUIT LF FURNISH & INSTALL 2" SCHEDULE 80 HDPE CONDUIT (DIRECTIONAL BORED) LF FURNISH & INSTALL NO. 14 COPPER WIRE, 4 CONDUCTOR - BLACK 6, LF FURNISH & INSTALL NO. 14 COPPER WIRE, 4 CONDUCTOR - GRAY 9, LF FURNISH & INSTALL NO. 14 COPPER WIRE, 8 CONDUCTOR (BLACK) 5, LF FURNISH & INSTALL NO. 14 COPPER WIRE, 8 CONDUCTOR (GRAY) LF FURNISH & INSTL NO. 14 COPPER WIRE,1-CONDUCTOR FOR LOOP WIRE 5, LF FURNISH & INSTALL FIBER OPTIC CABLE-SINGLE MODE LF FURNISH & INSTALL FIBER OPTIC INTERCONNECT CENTER EA SAWCUT FOR LOOP DETECTOR 2, LF FURNISH & INSTALL ELECTRICAL SERVICE FOR TRAFFIC SIGNAL EA F&I-12"X12"X12"D.ELEC.FLUSH UNDGRD.ENCLOS-(STR.POLY.CONC.)HD EA F&I-13"X24"X18"D.ELEC.FLUSH UNDGRD.ENCLOS-(STR.POLY.CONC.)HD EA F&I-17"X30"X26"D.ELEC.FLUSH UNDGRD.ENCLOS-(STR.POLY.CONC.)HD EA FURNISH & INSTALL 13" X 26' STEEL STRAIN POLE AND FOUNDATION EA FURNISH & INSTALL 13" X 28' STEEL STRAIN POLE AND FOUNDATION EA FURNISH & INSTALL 3/8" GALVANIZED STEEL CABLE 1, LF

32 Call No.: 210 Page: 31 FURNISH & INSTALL 4' BREAK-AWAY ALUMINUM PEDESTAL POLE EA FURNISH & INSTALL 10' BREAK-AWAY ALUM PEDESTAL POLE AND BASE EA F&I - CONTR 332/336 CABINET ASSEMBLY - BASE MOUNTED EA FURNISH & INSTALL -12" 4 SECTION SIGNAL HEAD EA FURNISH & INSTALL - 12" 3 SECTION SIGNAL HEAD EA F&I - 1-WAY-1SECT.HAND/MAN EMBLEM PEDESTRIAN SIGNAL HEAD EA FURNISH & INSTALL PEDESTRIAN PUSH BUTTON AND SIGN (R-10-4B) EA F&I-PED PUSH BUTTON MICRO ASSEMBLY(9"X15")AND SIGN(R-10-3E or R10-4a) EA BACKPLATE W/ RETROREFL.BORDERS FOR TRAFF. SIG EA REMOVAL,SALVAGE,&DISP.OF EXISTING TRAF. SIGNAL EQUIPMENT LS TEMPORARY ADJUSTMENT OF TRAFFIC SIGNAL EQUIPMENT LS F&I - VIDEO DETECTION SYSTEM W/ ONE CAMERA, HARDWARE & LEAD-IN EA FURNISH & INSTALL VIDEO DETECTION CAMERA W/ HARDWARE & LEAD-IN EA FURNISH & INSTALL CONCRETE CABINET FOUNDATION EA DETECTABLE WARNING MATERIAL SF CONCRETE MEDIAN SY PEDESTRIAN RAMP CONSTRUCTION SY SURFACE APPLIED DETECTABLE WARNING SF

33 Call No.: 220 Page: 32 SC File NO(S).: PCN: P PCN: P Project No.: P Project No.: P Letting Date: April 10, 2018 CO(S).: Cherokee York DBE Goal Percent: 0.00% Cost of Road Plans: Description: DRAINAGE REPAIR AND REPLACEMENT Completion Date: 11/30/ MOBILIZATION LS TRAFFIC CONTROL LS REMOVAL & DISPOSAL OF EXISTING DROP INLET EA REMOVAL & DISPOSAL OF EXISTING CURB LF SITE EXCAVATION LS 48" DIAMETER PIPE ADDITIONAL FOUNDATION WORK LF 36" SMOOTH WALL PIPE LF 42" SMOOTH WALL PIPE LF 48" SMOOTH WALL PIPE LF CATCH BASIN -TYPE EA MANHOLE WITH STANDARD 6' X 6' BOX EA CONCRETE COLLAR FOR UP TO 48" PIPE EA ADJUST CATCH BASIN EA CONCRETE CURB AND GUTTER(1'-6") VERTICAL FACE LF CONCRETE CURB AND GUTTER(2'-0") VERTICAL FACE LF CONCRETE FLUME LF RIP-RAP (CLASS B) TON GEOTEXTILE FOR EROSION CONTROL UNDER RIPRAP(CLASS 1)TYPE A SY PERMANENT GRASSING FOR SMALL PROJECTS ACRE TEMPORARY EROSION CONTROL BLANKET (CLASS A) MSY SILT FENCE LF STABILIZED CONSTRUCTION ENTRANCE SY

34 Call No.: 230 Page: 33 SC File NO(S).: PCN: P Project No.: P Letting Date: April 10, 2018 CO(S).: DISTRICT4 DBE Goal Percent: 0.00% Cost of Road Plans: Description: 2018 RPMS ON PRIMARY AND SECONDARY ROUTES Completion Date: 10/31/ MOBILIZATION LS TRAFFIC CONTROL LS PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 11, EA PERMANENT YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X 4" PERM. YEL. 7, EA PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 66, EA

35 Call No.: 240 Page: 34 SC File NO(S).: PCN: P Project No.: P Letting Date: April 10, 2018 CO(S).: DISTRICT5 DBE Goal Percent: 0.00% Cost of Road Plans: Description: NON-INT REPAIR/REPLACEMENT OF GUARDRAIL & ATTENUATORS Completion Date: 6/30/ MOBILIZATION (SEVERE DAMAGE TO GUARDRAIL) EA TRAFFIC CONTROL EA REMOVE & DISPOSE SEMI-RIGID GR DEVICE LF STEEL BEAM GUARDRAIL STEEL BEAM GR. 3, LF MT3 LEADING END TREATMENT TL EA MT2 LEADING END TREATMENT TL EA REMOVE AND REPLACE W BEAM GUARDRAIL 12, LF GUARDRAIL THRIE-BEAM WITH BASE PLATE 6.25 POST SPACING LF STEEL BEAM GUARDRAIL (THRIE) LF REMOVE AND REPLACE THRIE BEAM GUARDRAIL LF MB TRAILING END TREATMENT EA MGS3 GR STANDARD SHOULDER LF MGS3CS GR COMPRESSED SHOULDER LF MGS2C GR BEHIND CURB LF END ANCHOR-TYPE B EA REMOVE AND REPLACE END ANCHOR-TYPE B EA REMOVE AND REPLACE END ANCHOR-TYPE B (THRIE) EA END TERMINAL - TYPE T EA REMOVE AND REPLACE END TERMINAL - TYPE T EA THRIE BEAM G.R.BRIDGE CONN EA REMOVE AND REPLACE THRIE BEAM G.R.BRIDGE CONN EA MTBBC3 MASH THRIE-BEAM BARRIER CONNECTOR TL EA MTBBC2 MASH THRIE-BEAM BARRIER CONNECTOR TL EA FLEXIBLE DELINEATOR POST WITH GROUND ANCHOR EA 2' CRASH CUSHION 2A EA 2' CRASH CUSHION 2B EA 2' CRASH CUSHION 2C EA WIDE CRASH CUSHION 2A EA WIDE CRASH CUSHION 2B EA

36 Call No.: 240 Page: 35 WIDE CRASH CUSHION 2C EA 2' CRASH CUSHION 3A EA 2' CRASH CUSHION 3B EA 2' CRASH CUSHION 3C EA WIDE CRASH CUSHION 3A EA WIDE CRASH CUSHION 3B EA WIDE CRASH CUSHION 3C EA

37 Call No.: 250 Page: 36 SC File NO(S).: PCN: P Project No.: P Letting Date: April 10, 2018 CO(S).: DISTRICT5 DBE Goal Percent: 0.00% Cost of Road Plans: Description: REPAIR/REPLACEMENT OF GUARDRAIL AND ATTENUATORS INT Completion Date: 6/30/ MOBILIZATION (SEVERE DAMAGE TO GUARDRAIL) EA TRAFFIC CONTROL EA REMOVE & DISPOSE SEMI-RIGID GR DEVICE LF STEEL BEAM GUARDRAIL STEEL BEAM GR LF MT3 LEADING END TREATMENT TL EA MT2 LEADING END TREATMENT TL EA REMOVE AND REPLACE W BEAM GUARDRAIL 3, LF STEEL BEAM GUARDRAIL (THRIE) LF REMOVE AND REPLACE THRIE BEAM GUARDRAIL LF MB TRAILING END TREATMENT EA MGS3 GR STANDARD SHOULDER LF MGS3CS GR COMPRESSED SHOULDER LF MGS2C GR BEHIND CURB LF REMOVE AND REPLACE END ANCHOR-TYPE B EA REMOVE AND REPLACE END ANCHOR-TYPE B (THRIE) EA END TERMINAL - TYPE T EA REMOVE AND REPLACE END TERMINAL - TYPE T EA REMOVE AND REPLACE THRIE BEAM G.R.BRIDGE CONN EA MTBBC3 MASH THRIE-BEAM BARRIER CONNECTOR TL EA MTBBC2 MASH THRIE-BEAM BARRIER CONNECTOR TL EA FLEXIBLE DELINEATOR POST WITH GROUND ANCHOR EA REMOVE AND REPLACE END TREATMENT TYPE IA EA 2' CRASH CUSHION 2A EA 2' CRASH CUSHION 2B EA 2' CRASH CUSHION 2C EA WIDE CRASH CUSHION 2A EA WIDE CRASH CUSHION 2B EA WIDE CRASH CUSHION 2C EA 2' CRASH CUSHION 3A EA

38 Call No.: 250 Page: 37 2' CRASH CUSHION 3B EA 2' CRASH CUSHION 3C EA WIDE CRASH CUSHION 3A EA WIDE CRASH CUSHION 3B EA WIDE CRASH CUSHION 3C EA

39 Call No.: 260 Page: 38 SC File NO(S).: PCN: P Project No.: P Letting Date: April 10, 2018 CO(S).: DISTRICT6 DBE Goal Percent: 0.00% Cost of Road Plans: Description: ON CALL INTERSTAE GUARDRAIL IN DISTRCIT SIX Completion Date: 6/30/ MOBILIZATION (SEVERE DAMAGE TO GUARDRAIL) EA TRAFFIC CONTROL EA REMOVE & DISPOSE SEMI-RIGID GR DEVICE LF MT3 LEADING END TREATMENT TL EA MT2 LEADING END TREATMENT TL EA REMOVE AND REPLACE W BEAM GUARDRAIL 3, LF REMOVE AND REPLACE THRIE BEAM GUARDRAIL LF REMOVE AND REPLACE CRITICAL OFFSET THRIE BEAM GUARDRAIL LF MB TRAILING END TREATMENT EA MGS3 GR STANDARD SHOULDER LF MGS3CS GR COMPRESSED SHOULDER LF MGS2C GR BEHIND CURB LF REMOVE AND REPLACE END ANCHOR-TYPE B EA REMOVE AND REPLACE END ANCHOR-TYPE B (THRIE) EA REMOVE AND REPLACE END TERMINAL - TYPE T EA REMOVE AND REPLACE THRIE BEAM G.R.BRIDGE CONN EA MTBBC3 MASH THRIE-BEAM BARRIER CONNECTOR TL EA MTBBC2 MASH THRIE-BEAM BARRIER CONNECTOR TL EA FLEXIBLE DELINEATOR POST WITH GROUND ANCHOR EA END TREATMENT TYPE IA EA POWDER COATING OF GUARDRAIL COMPONENTS LF 2' CRASH CUSHION 2A EA 2' CRASH CUSHION 2B EA 2' CRASH CUSHION 2C EA WIDE CRASH CUSHION 2A EA WIDE CRASH CUSHION 2B EA WIDE CRASH CUSHION 2C EA 2' CRASH CUSHION 3A EA 2' CRASH CUSHION 3B EA

40 Call No.: 260 Page: 39 2' CRASH CUSHION 3C EA WIDE CRASH CUSHION 3A EA WIDE CRASH CUSHION 3B EA WIDE CRASH CUSHION 3C EA

41 Call No.: 270 Page: 40 SC File NO(S).: Letting Date: April 10, 2018 PCN: P CO(S).: DISTRICT6 Project No.: P DBE Goal Percent: 0.00% Cost of Road Plans: Description: ON CALL GUARDRAIL DISTRICT SIX Completion Date: 6/30/ MOBILIZATION (SEVERE DAMAGE TO GUARDRAIL) EA TRAFFIC CONTROL EA REMOVE & DISPOSE SEMI-RIGID GR DEVICE LF MT3 LEADING END TREATMENT TL EA MT2 LEADING END TREATMENT TL EA REMOVE AND REPLACE W BEAM GUARDRAIL 1, LF REMOVE AND REPLACE THRIE BEAM GUARDRAIL LF REMOVE AND REPLACE CRITICAL OFFSET THRIE BEAM GUARDRAIL LF MB TRAILING END TREATMENT EA MGS3 GR STANDARD SHOULDER LF MGS3CS GR COMPRESSED SHOULDER LF MGS2C GR BEHIND CURB LF REMOVE AND REPLACE END ANCHOR-TYPE B EA REMOVE AND REPLACE END ANCHOR-TYPE B (THRIE) EA REMOVE AND REPLACE END TERMINAL - TYPE T EA REMOVE AND REPLACE THRIE BEAM G.R.BRIDGE CONN EA MTBBC3 MASH THRIE-BEAM BARRIER CONNECTOR TL EA MTBBC2 MASH THRIE-BEAM BARRIER CONNECTOR TL EA FLEXIBLE DELINEATOR POST WITH GROUND ANCHOR EA END TREATMENT TYPE IA EA THRIE BEAM GUARDRAIL BRACKET CONNECTION EA POWDER COATING OF GUARDRAIL COMPONENTS LF 2' CRASH CUSHION 2A EA 2' CRASH CUSHION 2B EA 2' CRASH CUSHION 2C EA WIDE CRASH CUSHION 2A EA WIDE CRASH CUSHION 2B EA WIDE CRASH CUSHION 2C EA 2' CRASH CUSHION 3A EA

42 Call No.: 270 Page: 41 2' CRASH CUSHION 3B EA 2' CRASH CUSHION 3C EA WIDE CRASH CUSHION 3A EA WIDE CRASH CUSHION 3B EA

43 Call No.: 280 Page: 42 SC File NO(S).: Letting Date: April 10, 2018 PCN: P CO(S).: Beaufort Berkeley Project No.: P DBE Goal Percent: 0.00% Charleston Colleton Cost of Road Plans: Dorchester Jasper Description: 2017 RUMBLE STRIPES DISTRICT Completion Date: 5/31/2019 MOBILIZATION LS TRAFFIC CONTROL LS MILLED-IN RUMBLE STRIP MI 4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 1,253, LF 4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 92, LF 4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 685, LF 4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 9, LF 4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 1,119, LF 4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 92, LF 4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 683, LF PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" EA PERMANENT YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X 4" PERM. YEL EA PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 7, EA REMOVAL OF PAVEMENT MARKINGS 1,905, LF EVALUATION OF PAVEMENT MARKING RETROREFLECTIVITY LS 4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO. PROFILE 134, LF

44 Call No.: 290 Page: 43 SC File NO(S).: PCN: P Project No.: P Letting Date: April 10, 2018 CO(S).: DISTRICT7 DBE Goal Percent: 0.00% Cost of Road Plans: Description: INTERSTATE GUARDRAIL PROGRAM - DISTRICT 7 Completion Date: 6/30/ MOBILIZATION (SEVERE DAMAGE TO GUARDRAIL) EA TRAFFIC CONTROL EA REMOVE & DISPOSE SEMI-RIGID GR DEVICE LF GUARDRAIL POST GR. POST EA MT3 LEADING END TREATMENT TL EA MT2 LEADING END TREATMENT TL EA REMOVE AND REPLACE W BEAM GUARDRAIL 5, LF REMOVE AND REPLACE THRIE BEAM GUARDRAIL LF REMOVE AND REPLACE CRITICAL OFFSET THRIE BEAM GUARDRAIL LF MB TRAILING END TREATMENT EA RESET GUARDRAIL RESET GR LF MGS3 GR STANDARD SHOULDER LF MGS3CS GR COMPRESSED SHOULDER LF MGS2C GR BEHIND CURB LF REMOVE AND REPLACE END ANCHOR-TYPE B EA REMOVE AND REPLACE END ANCHOR-TYPE B (THRIE) EA REMOVE AND REPLACE END TERMINAL - TYPE T EA REMOVE AND REPLACE THRIE BEAM G.R.BRIDGE CONN EA MTBBC3 MASH THRIE-BEAM BARRIER CONNECTOR TL EA MTBBC2 MASH THRIE-BEAM BARRIER CONNECTOR TL EA FLEXIBLE DELINEATOR POST WITH GROUND ANCHOR EA END TREATMENT TYPE IA EA

45 Call No.: 300 Page: 44 SC File NO(S).: PCN: P Project No.: P Letting Date: April 10, 2018 CO(S).: DISTRICT7 DBE Goal Percent: 0.00% Cost of Road Plans: Description: NON-INTERSTATE GUARDRAIL PROGRAM Completion Date: 6/30/ MOBILIZATION (SEVERE DAMAGE TO GUARDRAIL) EA TRAFFIC CONTROL EA REMOVE & DISPOSE SEMI-RIGID GR DEVICE LF GUARDRAIL POST GR. POST EA MT3 LEADING END TREATMENT TL EA MT2 LEADING END TREATMENT TL EA REMOVE AND REPLACE W BEAM GUARDRAIL 1, LF REMOVE AND REPLACE THRIE BEAM GUARDRAIL LF REMOVE AND REPLACE CRITICAL OFFSET THRIE BEAM GUARDRAIL LF STEEL BEAM GUARDRAIL BRIDGE RAIL LF MB TRAILING END TREATMENT EA RESET GUARDRAIL RESET GR LF MGS3 GR STANDARD SHOULDER LF MGS3CS GR COMPRESSED SHOULDER LF MGS2C GR BEHIND CURB LF REMOVE AND REPLACE END ANCHOR-TYPE B EA REMOVE AND REPLACE END ANCHOR-TYPE B (THRIE) EA REMOVE AND REPLACE END TERMINAL - TYPE T EA REMOVE AND REPLACE THRIE BEAM G.R.BRIDGE CONN EA MTBBC3 MASH THRIE-BEAM BARRIER CONNECTOR TL EA MTBBC2 MASH THRIE-BEAM BARRIER CONNECTOR TL EA FLEXIBLE DELINEATOR POST WITH GROUND ANCHOR EA 2' CRASH CUSHION 2C EA 2' CRASH CUSHION 3C EA

46 Call No.: 310 Page: 45 SC File NO(S).: PCN: P Project No.: P Letting Date: Letting Time: April 10, :00 PM CO(S).: Aiken Allendale Barnwell Calhoun Clarendon Hampton Orangeburg Description: 2017 RUMBLE STRIPES DISTRICT7 Completion Date: 6/30/2019 DBE Goal Percent: 0.00% Cost of Road Plans: MOBILIZATION LS TRAFFIC CONTROL LS MILLED-IN RUMBLE STRIP MI 4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 3, LF 4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 1,357, LF 4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 117, LF 4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 767, LF 4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 12, LF 4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 1,357, LF 4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 117, LF 4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 728, LF PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" EA PERMANENT YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X 4" PERM. YEL EA PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 8, EA REMOVAL OF PAVEMENT MARKINGS 2,216, LF EVALUATION OF PAVEMENT MARKING RETROREFLECTIVITY LS

47 MINIMUM WAGE RATES FOR FAP CONTRACTS HAVE BEEN PREDETERMINED BY THE SECRETARY OF LABOR IN ACCORDANCE WITH THE TERMS OF THE DAVIS BACON ACT AS AMENDED AND THE FEDERAL HIGHWAY ACT OF 1956, AND LATER ACTS, AND THESE RATES WILL BE SET FORTH IN THE PROPOSAL FORM. THIS CONTRACT IS ALSO SUBJECT TO THE WORK HOURS AND SAFETY ACT OF 1962 AS AMENDED, PL , PL 91-54, AND IMPLEMENTING REGULATIONS. CONTRACTORS ATTENTION IS ALSO CALLED TO THE FEDERAL REQUIREMENTS GOVERNING SPECIFIC EQUAL EMPLOYMENT OPPORTUNITY RESPONSIBILITIES, WHICH WILL BE INCLUDED IN THIS CONTRACT. In addition to the Standard Specifications for Highway Construction, Edition of 2007, the "Supplemental Specifications", and the "Project Special Provisions", the following govern SCDOT Highway Lettings: STATUTES, CODES, AND REGULATIONS. The Federal-Aid Projects embraced in this advertisement contemplates the expenditure of funds pursuant to Title 23, United States Code, "Highways. The Contractor's attention is called to the fact that the SC Department of Transportation, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78) Sta. 252 and the Regulations of the Federal Highway Administration (15 C.F.R., Part 8), issued pursuant to such act, hereby notifies all bidders that it will affirmatively insure that in any contract entered into pursuant to this advertisement minority business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, sex, religion or national origin in consideration for award. All bidders on Federal Aid Projects must comply with the Instructions to Bidders and Special Provision covering Disadvantaged and Women Business Enterprise (DBE/WBE) included as a part of the proposal. Attention is directed to the Fair Labor Standards Act of 1938, as amended. Contractors will be responsible for carrying out all of the provisions of this Act, which may affect these contracts. Attention is also called to the fact that any Federal Aid Project or Projects included in this notice will be subject to the Work Hours and Safety Act of 1962 as amended, PL , PL and implementing regulations. PREQUALIFICATION. The Contractor's attention is called to the requirements of the SC Department of Transportation for Prequalification. ONLY CONTRACTORS WHO HAVE BEEN ISSUED A PREQUALIFICATION CERTIFICATE BY THE SC DEPARTMENT OF TRANSPORTATION WILL BE ALLOWED TO SUBMIT BIDS. Information concerning prequalification can be obtained at the Contracts Administration office, Room 334 in the Headquarters building, 955 Park Street, Columbia, SC, or by calling Jeff Elliott at (803) BID BONDS FOR SCDOT WORK. Unless otherwise indicated in the advertisement, no proposal will be considered unless accompanied by a bid bond in the amount of 5% of the APPROXIMATE BID AMOUNT, written by a SURETY satisfactory to the Department, properly executed in South Carolina Department of Transportation Form 674 (furnished by the Department in each proposal). If an electronic bond is utilized, the Bond ID number must be provided on the Surety 2000 or SurePath Network electronic bond form. NO OTHER FORM OF PROPOSAL GUARANTY WILL BE ACCEPTED. SUBMISSION OF BID BONDS. Bid Bonds may be submitted electronically, by US mail, express delivery service or hand-delivered. Bid Bonds not submitted electronically must be submitted in advance of the bid opening. 1. BID BONDS SUBMITTED BY US MAIL OR EXPRESS DELIVERY SERVICE. Sealed bid bonds submitted by US mail or express delivery service shall be enclosed in sealed envelope or container with Contractor Name and "Bid Bond for SC File No. ", and enclosed in an outer, sealed envelope or container addressed to Contract Administrator, SCDOT, PO Box 365, Columbia, SC , or 955 Park Street, Columbia, South Carolina, Bid bonds submitted by US mail or express delivery service must be received by the Contract Administrator, or designee, prior to the time and date for opening of proposals indicated in the beginning of this Notice. The department will not be responsible for delays in the US mail or express delivery service. 2. BID BONDS HAND DELIVERED. Bid bonds that are hand delivered shall be enclosed in a sealed envelope marked with Contractor Name and "Bid Bond for SC File No. ", and must be delivered directly to the Contract Administrator or designee prior to the time and date for opening of proposals indicated in the beginning of this Notice. IRREGULAR ELECTRONIC BIDS. Electronic bids may be declared irregular for any of the following

SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE TO CONTRACTORS FOR REGULAR HIGHWAY LETTING April 10, 2018 REVISED

SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE TO CONTRACTORS FOR REGULAR HIGHWAY LETTING April 10, 2018 REVISED SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE TO CONTRACTORS FOR REGULAR HIGHWAY LETTING April 10, 2018 REVISED Rev 2: Call No. 320, File No. 0247541 - Added Rev 1: Call No. 010, File No. 0425551

More information

Maine Turnpike Authority

Maine Turnpike Authority Company Name Total Bid Amount R J Grondin & Sons - Gorham, ME $1,436,720.00 Shaw Brothers Construction, Inc. - Gorham, ME $1,476,398.83 Pratt & Sons, Inc. - Minot, ME $1,733,615.00 Page 1 of 13 R J Grondin

More information

Maine Turnpike Authority

Maine Turnpike Authority Company Name Total Bid Amount Shaw Brothers Construction, Inc. - Gorham, ME $659,771.50 R J Grondin & Sons - Gorham, ME $690,828.50 Gendron & Gendron - Lewiston, ME $753,187.00 Gordon Contracting - Sangerville,

More information

Maine Turnpike Authority

Maine Turnpike Authority Company Name Total Bid Amount Liddell Brothers, Inc. - Halifax, MA $1,590,213.00 Northeast Traffic Control Services, Inc. - Plymouth, MA $1,932,117.00 Page 1 of 5 Liddell Brothers, Inc. Halifax, MA 202.2061

More information

CITY OF ALAMO HEIGHTS WATER, STREET AND SIDEWALK CAPITAL IMPROVEMENT PROJECTS

CITY OF ALAMO HEIGHTS WATER, STREET AND SIDEWALK CAPITAL IMPROVEMENT PROJECTS CITY OF ALAMO HEIGHTS WATER, STREET AND SIDEWALK CAPITAL IMPROVEMENT PROJECTS CITY OF SAN ANTONIO DEPT. OF CAPITAL IMPROVEMENTS MANAGEMENT SERVICES N. NEW BRAUNFELS AVE. SIDEWALK PROJECT FROM RITTIMAN

More information

ADDENDUM No. 1 Prospective Bidders

ADDENDUM No. 1 Prospective Bidders Page 1 of 1 Attachment to Addendum # 1 Revised Itemized Bid ADDENDUM No. 1 TO: Prospective Bidders FROM: Gregory Tate, Construction Contracts Administrator DATE: January 24, 2019 PROJECT: Traffic Signal

More information

Maine Turnpike Authority

Maine Turnpike Authority Company Name Total Bid Amount CPM Constructors - Freeport, ME $1,309,765.25 Scott Construction Corporation - Portland, ME $1,528,840.00 Wyman & Simpson Inc. - Richmond, ME $1,674,845.00 Page 1 of 10 CPM

More information

Project Book Worksheet for Cost Estimation

Project Book Worksheet for Cost Estimation 001.01 MOBILIZATION LS $34,716.18 007 3/17/2039 001.02 INCIDENTAL LS $23,929.43 019 3/17/2039 001.03 CONSTRUCTION STAKING LS $10,504.39 201 5/9/2013 001.04 REESTABLISH PROPERTY CORNERS EA $496.08 201 5/9/2013

More information

MoDOT 2016 UNIT BID PRICES Northwest District

MoDOT 2016 UNIT BID PRICES Northwest District MoDOT 2016 UNIT BID PRICES Northwest District 2013000 CLEARING AND GRUBBING ACRE 7.95 20 1926.49132 20000 1 159 2022010 REMOVAL OF IMPROVEMENTS L.S. 1.00 56 24479.13304 201719 750 56 2024043 REMOVAL OF

More information

Wentzville Parkway South Phase 2 & 2A

Wentzville Parkway South Phase 2 & 2A Wentzville Parkway South Phase 2 & 2A Sponsor Wentzville Project No. RB18-000034 Project Type New Road TOTAL FUNDING Phase 2 Total County Sponsor Federal $10,000,000 $8,000,000 $2,000,000 $0 Phase 2A Total

More information

Fertilizer Type B 2 CWT $ $ $60.00 $ $60.00 $ Sod Water 60 MGAL $60.60 $3, $30.00 $1, $30.00 $1,

Fertilizer Type B 2 CWT $ $ $60.00 $ $60.00 $ Sod Water 60 MGAL $60.60 $3, $30.00 $1, $30.00 $1, BID TABS PROJECT 18-1029 22 nd AVENUE RECONSTRUCTION BID DATE: MAY 9, 2018 Stark Pavement Corp. Lalonde Contractors Cornerstone Pavers LLC Brookfield, WI Waukesha, WI Racine, WI Item Number Roadway Quantity

More information

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 140123 PID 82645 LOR- SR 0057 19.42 Federal Type: INTERCHANGE Letting Date: 4/17/2014 Completion Date: 7/15/2016

More information

Maine Turnpike Authority

Maine Turnpike Authority Interchange 44 Barrier Toll Plaza Open Road Tolling Conversion Mile 44.3 201.11 CLEARING 3.50 AC 202.071 REMOVING ASBESTOS CONTAINING MATERIALS, TOLL BOOTH LAB TOPS 1.00 LS 202.081 REMOVING EXISTING BUILDING

More information

BID TABULATION PAGE 1 OF 4. BL S.R. Harbins Road/Alcovy Road - Intersection Improvements Department of Transporation. CMES, Inc.

BID TABULATION PAGE 1 OF 4. BL S.R. Harbins Road/Alcovy Road - Intersection Improvements Department of Transporation. CMES, Inc. BID TABULATION PAGE 1 OF 4 E.R. Snell Contractor, Inc. G.P.'s Enterprises, Inc. Est. 1 005 Traffic Control Project No M-0679 1 LS $27,811.00 $27,811.00 $48,800.00 $48,800.00 $22,021.80 $22,021.80 2 010

More information

Ohio Department of Transportation Official Bid Tabulation Jolene M. Molitoris, Director

Ohio Department of Transportation Official Bid Tabulation Jolene M. Molitoris, Director Ohio Department of Transportation Official Bid Tabulation Jolene M. Molitoris, Director Project No. 100281 PID 77255 LUC-IR-475-14.18 Federal Type: MAJOR RECONSTRUCTION Letting Date: 6/3/2010 Completion

More information

CT Consultants, Inc.

CT Consultants, Inc. Cost 1 202 AHRESTY DRIVE REMOVAL 1 LS 2 202 EXISTING SILO DEMOLISHED AND REMOVED, AS PER PLAN 1 LS 3 203 EXCAVATION (NOT INCLUDING UNDERCUT) 2,372 CY 4 203 EMBANKMENT 3,306 CY 5 204 PROOF ROLLING 10 HRS

More information

Steese Rd - Curb & Sidewalk Improvement

Steese Rd - Curb & Sidewalk Improvement REF. NO. ITEM NO. Steese Rd - Curb & Sidewalk Improvement DESCRIPTION QTY UNITS UNIT COST SUB-TOTAL 1 103.05 Requirement of Contract Bid 1 LS 24,048.00 24,048.00 2 201 Clearing and Grubbing 1 LS 11,077.00

More information

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS Engineering Division PROJECT NO INCA STREET MULTI-USE PATH 38 TH AVE. TO 43 RD AVE.

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS Engineering Division PROJECT NO INCA STREET MULTI-USE PATH 38 TH AVE. TO 43 RD AVE. 201-00000 Clearing and Grubbing 1 LS 202-00010 Removal of Tree 9 EA 202-00019 Removal of Inlet 8 EA 202-00034 Removal of Pipe (6 Inch) 196 LF 202-00035 Removal of Pipe (18 Inch) 10 LF 202-00036 Removal

More information

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS STATEMENT OF QUANTITIES. Item No. Description Estimated Quantity

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS STATEMENT OF QUANTITIES. Item No. Description Estimated Quantity 202-00019 Removal of Inlet 15 EA 202-00035 Removal of Pipe 121 LF 202-00200 Removal of Sidewalk 1,057 SY 202-00203 Removal of Curb and Gutter 2,142 LF 202-00206 Removal of Concrete Curb Ramp 320 SY 202-00207

More information

DELETE first sentence of first paragraph that reads: REPLACE with the following:

DELETE first sentence of first paragraph that reads: REPLACE with the following: To Bidder of Record: SAN ANTONIO WATER SYSTEM Addendum 2 To Construction Documents For 2012 WATER & SEWER CONSTRUCTION CONTRACT, PACKAGE I SAWS WATER JOB NO. 12-5001 SAWS SEWER JOB NO. 12-5501 Solicitation

More information

Federal Project No.: OC-095-1(348)

Federal Project No.: OC-095-1(348) Order : N83 Schedule of Items Page: 2 Oversight/State Project : (NFO)0095-127-857, C501 Federal Project : OC-095-1(348) 0010 513 00100 MOBILIZATION LUMP SUM LUMP SUM 0020 517 00101 CONSTRUCTION SURVEYING

More information

2015 PAVEMENT MAINTENANCE SECTION 15-PVMTC-05-GM

2015 PAVEMENT MAINTENANCE SECTION 15-PVMTC-05-GM ADDENDUM NO. 1 March 17, 2015 2015 PAVEMENT MAINTENANCE SECTION 15-PVMTC-05-GM SCHEDULE OF PRICES (BLR 12000a) Replace the schedule of prices with the attached pages. SUMMARY OF QUANTITIES Replace the

More information

Maine Turnpike Authority

Maine Turnpike Authority York Toll Plaza Mile 8.8 201.11 Clearing 17.00 AC 202.15 Removing Existing Manhole or Catch Basin 22.00 EA 202.151 Abandoning Existing Manhole or Catch Basin 10.00 EA 202.16 Removing Existing Pipe 575.00

More information

ALABAMA DEPARTMENT OF TRANSPORTATION DATE : 06/14/13 PAGE : VENDOR RANKING

ALABAMA DEPARTMENT OF TRANSPORTATION DATE : 06/14/13 PAGE : VENDOR RANKING PAGE : 001-1 VENDOR RANKING CONTRACT TIME : 09/01/13 COMPLETION DATE CONTRACT DESCRIPTION : PROJECT(S) : IM-I059(370) for constructing the Ramp Widening and Auxiliary Lane (Grade, Drain, Base, Pave and

More information

Town of Medley Office of Capital Projects & Development Services 7777 NW 72 Avenue, Medley, Florida 33166

Town of Medley Office of Capital Projects & Development Services 7777 NW 72 Avenue, Medley, Florida 33166 Town of Medley Office of Capital Projects & Development Services 7777 NW 72 Avenue, Medley, Florida 33166 Date: August 10, 2016 Subject: Bid for Construction of NW 89 th Avenue, NW 93 rd Street and NW

More information

BIDDER'S PROPOSAL (continued) CITY OF BERKELEY BID PROPOSAL ITEM NO. A: BASE BID

BIDDER'S PROPOSAL (continued) CITY OF BERKELEY BID PROPOSAL ITEM NO. A: BASE BID SPECIFICATION 16-11031-C CITY OF BERKELEY BID PROPOSAL A: BASE BID 1 MOBILIZATION 1 LS 2 TRAFFIC CONTROL 1 LS 3 CONTRACTOR INFORMATION SIGN 2 EA 4 CONSTRUCTION AREA SIGN 18 EA 5 PROJECT IDENTIFICATION

More information

Items Unit Quantity Unit Price Total Unit Price Total

Items Unit Quantity Unit Price Total Unit Price Total Engineer's Plote Construction, Inc. Estimate 1100 Brandt Drive Hoffman Estates, IL 60192 s Unit Quantity 1 SUPPLEMENTAL WATERING UNIT 4 $100.00 400.00 $40.00 160.00 2 TOP SOIL FURNISH AND PLACE, 6 INCH

More information

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 110146 PID 82278 HAM-IR-75-5.58 Federal Type: INTERCHANGE Letting Date: 5/5/2011 Completion Date: 7/31/2014 Contract

More information

ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS

ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS CONTRACT # 2016153 TRACS No. Project No. County District Gross

More information

Maine Turnpike Authority

Maine Turnpike Authority Company Name Total Bid Amount Sargent Corporation - Stillwater, ME $29,888,765.79 Reed & Reed, Inc. - Woolwich, ME $34,900,974.90 Page 1 of 25 Sargent Corporation Stillwater, ME 201.11 CLEARING AC 4.00

More information

2015 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR 2015 ENGLISH

2015 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR 2015 ENGLISH Page 1 2015 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR 2015 ENGLISH ITEM ITEM DESCRIPTION UNITS N TOTAL QUANTITY AVERAGE PRICE 106.05100 FIELD LABORATORY

More information

Ohio Department of Transportation Official Bid Tabulation James G. Beasley, P.E., P.S., Director

Ohio Department of Transportation Official Bid Tabulation James G. Beasley, P.E., P.S., Director Ohio Department of Transportation Official Bid Tabulation James G. Beasley, P.E., P.S., Director Project No. 080598 PID 21272 CUY-SR-237-4.93 - PART I (FRONT STREET); CUY-237-4.55 - P Federal Type: RAILROAD

More information

SPECIAL GRADING INTERSECTION IMPROVEMENT JOHN WARD RD AT IRWIN RD REVISION DATES

SPECIAL GRADING INTERSECTION IMPROVEMENT JOHN WARD RD AT IRWIN RD REVISION DATES 9/20/2017 2:39:11 PM GPLOT-V8 2016104_18-001.dgn Project Number Sheet Total Sheets djackson gplotborder-v8i-po.tbl X2802 30 118 966.5 21+00 L.P. EL. 966.34 L.P. EL. 966.58 0.29% 0.11% 965 H.P. EL. 966.54

More information

Kansas Department of Transportation DISTRICT 2. Project(s): Min: Max:

Kansas Department of Transportation DISTRICT 2. Project(s): Min: Max: Page 1 of 23 518122 SECTION: 01 COMMON ITEMS 1 020100 CONTRACTOR CONSTRUCTION STAKING 2 025602 FIELD OFFICE AND LABORATORY (TYPE C) 3 025323 MOBILIZATION 4 070626 MOBILIZATION (DBE) 5 020001 MAINTENANCE

More information

Riverside County Transportation Department Summary of Bids

Riverside County Transportation Department Summary of Bids Company Name Dartmouth St. Base Bid Sch. Yale St. Base Bid Sch. Alternate Bid Sch. Alternate Bid Sch. Alternate Bid Sch. Alternate Bid Sch. 4 Total COUNTY'S ESTIMATE,87,.50,444,6.00 9,400.00 9,400.00 800.00,00.00

More information

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 170559 PID 102381 SCI-US 52-19.01 Federal Type: TWO LANE RESURFACING Letting Date: 11/2/2017 Completion Date:

More information

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 180573 PID 93496 FRA-IR 71-01.53 Federal Type: BRIDGE REPLACEMENT (2 BRIDGES) Letting Date: 12/20/2018 Completion

More information

DESCRIPTION QUANTITY PRICE TOTAL

DESCRIPTION QUANTITY PRICE TOTAL GENERAL 1 TRAFFIC CONTROL LS 1 $40,000 $40,000 $8,500.00 $8,500.00 $5,000.00 $5,000.00 $5,000.00 $5,000.00 $15,000.00 $15,000.00 2 MOBILIZATION LS 1 $557,000 $557,000 $629,500.00 $629,500.00 $350,000.00

More information

McCRORY & WILLIAMS, INC. HILLCREST ROAD CONNECTOR MCR ROADWAY ITEMS

McCRORY & WILLIAMS, INC. HILLCREST ROAD CONNECTOR MCR ROADWAY ITEMS BID TABULATION Hillcrest Road Connector John G. Walton Construction M. C. Williams Contracting Hosea. Weaver & Sons, Inc. BID OPENING: March 25, 29 Company, Inc. Company, Inc. QTY DESCRIPTION DOLLARSjCTS

More information

2016 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR 2016 ENGLISH

2016 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR 2016 ENGLISH Page 1 2016 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR 2016 ENGLISH ITEM ITEM DESCRIPTION UNITS N TOTAL QUANTITY AVERAGE PRICE 106.05100 FIELD LABORATORY

More information

THORNTON ROAD WIDENING PROJECT NO. PW1428 B I D D I N G S C H E D U L E

THORNTON ROAD WIDENING PROJECT NO. PW1428 B I D D I N G S C H E D U L E THORNTON ROAD WIDENING PROJECT NO. PW1428 B I D D I N G S C H E D U L E Each bidder shall bid each item of the Base Bid Schedule and Alternate A Bid Schedule. Failure to bid an item shall be just cause

More information

INDIANA DEPARTMENT OF TRANSPORTATION PAGE 1 NOTICE TO HIGHWAY CONTRACTORS

INDIANA DEPARTMENT OF TRANSPORTATION PAGE 1 NOTICE TO HIGHWAY CONTRACTORS INDIANA DEPARTMENT OF TRANSPORTATION PAGE 1 NOTICE TO HIGHWAY CONTRACTORS DATE OF LETTING: March 04, 2015 TIME OF LETTING: 10:00 AM EASTERN STD DESIGN BUILD CONTRACTS Sealed proposals for certain highway

More information

(1 ) Active Construction Inc River Road East Tacoma, WA AMOUNT , , ,

(1 ) Active Construction Inc River Road East Tacoma, WA AMOUNT , , , 78th Avenue Eastl184th Street EastlCRP 5661 I hereby certify this to be a true copy of the tabulation of the bids as received and opened. BID OPENING: FRIDAY, March 3, 2017 County Engine (1 ) Active Construction

More information

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. District(s): 8 30=047 Start Dt: 05/01/17 Comp. Dt:

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. District(s): 8 30=047 Start Dt: 05/01/17 Comp. Dt: Letting: 17030200 Letting Dt: March 02, 2017 9:30 A.M. State Proj.: 5101-14 Contract ID: Contract Description: Contract Location: Recommendation: 170020 STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION

More information

Project # & Name: # CDBG - Pugh Street Streetscape - East College Ave to East Beaver Ave & East Beaver Ave/Locust Lane Improvements

Project # & Name: # CDBG - Pugh Street Streetscape - East College Ave to East Beaver Ave & East Beaver Ave/Locust Lane Improvements Bid Opening Date: May 6, 2014 Time: 11:00 a.m. Surety NCA Surety NCA Yes Yes Yes Yes Total Amount Bid: $1,358,851.00 Total Amount Bid: $1,386,098.72 Item Nos. Approx. Quantities Unit Item & Unit Prices

More information

HILLS MATERIALS COMPANY UNIT COST TOTAL COST UNIT COST TOTAL COST UNIT COST $294, $294, $74, $74, $35, $35,000.

HILLS MATERIALS COMPANY UNIT COST TOTAL COST UNIT COST TOTAL COST UNIT COST $294, $294, $74, $74, $35, $35,000. PROJECT NAME: Anamosa Street Reconstruction - Midway Street to Miiwuakee Street PROJECT NUMBER: PROJECT NO. 07-1473 / CIP NO. 50559 LET DATE: April 11, 2017 LOW BID AMOUNT: $3,941,397.20 ENGINEER'S ESTIMATE

More information

Federal Project No.: HSIP-5A27(567)

Federal Project No.: HSIP-5A27(567) Order : A11 Schedule of Items Page: 2 Oversight/State Project : (NFO)0001-020-S82,C501 Federal Project : HSIP-5A27(567) 0010 513 00100 0020 517 00101 MOBILIZATION LUMP SUM LUMP SUM CONSTRUCTION SURVEYING

More information

Licensed Class C Virginia Contractor No.

Licensed Class C Virginia Contractor No. month period is seven hundred and fifty thousand dollars (750,000) or more, the Bidder is required under Title 54.11100, Code of Virginia (1950), as amended, to be licensed by the State Board of Contractors

More information

S T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 05/01/00 PAGE : 1 TABULATION OF BIDS

S T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 05/01/00 PAGE : 1 TABULATION OF BIDS PAGE : 1 CONTRACT DESCRIPTION : MILL & OVERLAY, GRADING, BIT SURFACING, BR NO 02038 ETC CONTRACT LOCATION: LOCATED ON TH 47 FROM 153RD AVE NW IN RAMSEY TO 180TH LANE NW AND AT FORD BROOK IN BURNS TOWNSHIP

More information

McCRORY & WILIJAMS, INC. PROJECT NO. MCR-2008-OO1

McCRORY & WILIJAMS, INC. PROJECT NO. MCR-2008-OO1 McCRORY & WILIJAMS, INC. THEODORE DAWES ROADISCHILLINGER ROAD SOUTH BID TABULATION: Theodore DaweslSchillingor Road PROJECT NO.: M5700-2033 BIDDER #1 BIDDER #2 BIDDER #3 Hosea 0. Weaver & Sons, Inc. John

More information

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/15/17 Comp. Dt: 08/04/17. Contract Time: Min: Max:

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/15/17 Comp. Dt: 08/04/17. Contract Time: Min: Max: Letting: 17012700 Letting Dt: January 27, 2017 9:30 A.M. State Proj.: 1401-171 Contract ID: Contract Description: Contract Location: Recommendation: 170002 STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION

More information

2017 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR ENGLISH (10)

2017 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR ENGLISH (10) 106.05100 FIELD LABORATORY EA 33 33.00 $12,605.17 201.03201 CLEARING AND GRUBBING ACRE 2 76.00 $1,269.74 201.03206 CLEARING TREES 6 in EA 1 53.00 $122.27 201.03210 CLEARING TREES 10 in EA 3 66.00 $227.33

More information

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/08/17 Comp. Dt:

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/08/17 Comp. Dt: Letting: 17012700 Letting Dt: January 27, 2017 9:30 A.M. State Proj.: 4308-34 Contract ID: Contract Description: Contract Location: Recommendation: 170004 STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION

More information

ADDENDUM NO. 1. Contractor shall fax back the recognition sheet acknowledging the receipt of this addendum, or include in their proposal.

ADDENDUM NO. 1. Contractor shall fax back the recognition sheet acknowledging the receipt of this addendum, or include in their proposal. ADDENDUM NO. 1 DATE: August 7, 2014 PROJECT: FROM: TO: 2014 MFT Section 14-00000-00-GM, SUPP1 United City of Yorkville Kendall County, IL Engineering Enterprises, Inc. 52 Wheeler Road Sugar Grove, Illinois

More information

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 170607 PID 85146 CUY-SR 21-10.04L Federal Type: BRIDGE REPLACEMENT (1 BRIDGE) Letting Date: 12/14/2017 Completion

More information

Federal Project No.: NHFP-081-1(346)

Federal Project No.: NHFP-081-1(346) Order : N27 Schedule of Items Page: 2 Oversight/State Project : (NFO)0081-098-778,B650-51,C501 Federal Project : NHFP-081-1(346) 0010 513 00100 0020 517 00101 MOBILIZATION CONSTRUCTION SURVEYING (CONSTRUCTION)

More information

BID PROPOSAL. Item Description Unit Quantity Unit Price Total Price No. (Unit Price to be written in Words) (Figures) (Figures)

BID PROPOSAL. Item Description Unit Quantity Unit Price Total Price No. (Unit Price to be written in Words) (Figures) (Figures) BID PROPOSAL PROPOSAL OF, a corporation a partnership consisting of an individual doing business as THE SAN ANTONIO WATER SYSTEM: Pursuant to Instructions and Invitations to Bidders, the undersigned proposes

More information

CUYAHOGA COUNTY DEPARTMENT OF PUBLIC WORKS TRAFFIC CONTROL STANDARDS

CUYAHOGA COUNTY DEPARTMENT OF PUBLIC WORKS TRAFFIC CONTROL STANDARDS CUYAHOGA COUNTY DEPARTMENT OF PUBLIC WORKS TRAFFIC CONTROL STANDARDS Supplement to O.D.O.T. TRAFFIC ENGINEERING MANUAL November 26, 2013 Revisions to the June 22, 2011 edition are noted by a vertical line

More information

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS STATEMENT OF QUANTITIES. Item No. Description Estimated Quantity

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS STATEMENT OF QUANTITIES. Item No. Description Estimated Quantity 202-00001 Removal of Structure 24 EA 202-00019 Removal of Inlet 24 EA 202-00195 Removal of Median cover 930 SY 202-00200 Removal of Sidewalk 1,188 SY 202-00201 Removal of Curb Head 273 LF 202-00203 Removal

More information

NOTIFICATION OF ADDENDUM ADDENDUM NO. 1 DATED 1/02/2018

NOTIFICATION OF ADDENDUM ADDENDUM NO. 1 DATED 1/02/2018 TIFICATION OF ADDENDUM ADDENDUM. 1 DATED 1/02/2018 Control 0483-02-021 Project STP 2018(077) Highway SH 72 County MCMULLEN Ladies/Gentlemen: Attached please find an addendum on the above captioned project.

More information

Federal Project No.: STP-5128(388)

Federal Project No.: STP-5128(388) Order : M48 Schedule of Items Page: 2 Oversight/State Project : (NFO) 0460-129-105, C501 Federal Project : STP-5128(388) 0010 513 00100 0020 517 00101 MOBILIZATION CONSTRUCTION SURVEYING (CONSTRUCTION)

More information

METRO Magnolia Transit Center - Bid Tab

METRO Magnolia Transit Center - Bid Tab Section A - GENERAL ITEMS A-1 01505 Mobilization LS 1 $ 100,000.00 $ 100,000.00 A-2 -- Payment and Performance Bonds LS 1 A-3 01310 Document Control LS 1 A-4 01311 CPM Schedule LS 1 A-5 01590 Engineer's

More information

Grays Ferry Cost Estimate Breakdown Budgetary Numbers for Machinery Drive Options 10 Nov 14

Grays Ferry Cost Estimate Breakdown Budgetary Numbers for Machinery Drive Options 10 Nov 14 Grays Ferry Cost Estimate Breakdown Budgetary Numbers for Machinery Drive Options 10 Nov 14 Hardesty & Hanover, LLC Alternative 1 Bogie Support System Alternative Based on AW Sketch of New Bridge Component

More information

County of Los Angeles Department of Public Works BID SUMMARY

County of Los Angeles Department of Public Works BID SUMMARY PROJECT NAME CENTRAL AVENUE, ET AL. PROJECT ID RDC0013675 Engineer's Estimate (1) All American Asphalt (2) Sequel Contractors, Inc. (3) Sully-Miller Contracting Company (4) Palp, Inc. 5,177,177.00 5,292,979.00

More information

County of Santa Cruz 0579

County of Santa Cruz 0579 County of Santa Cruz 0579 701 OCEAN STREET, ROOM 410, SANTA CRUZ, CA 95060-4070 (831) 454-2160 FAX (831) 454-2385 TOO (831) 454-2123 DIRECTOR OF PUBLIC WORKS SANTA CRUZ COUNTY BOARD OF SUPERVISORS 701

More information

BID ITEM ESTIMATED UNIT TOTAL UNIT TOTAL UNIT TOTAL NO. QUANTITY UNIT ITEM COST COST COST COST COST COST

BID ITEM ESTIMATED UNIT TOTAL UNIT TOTAL UNIT TOTAL NO. QUANTITY UNIT ITEM COST COST COST COST COST COST PAGE 1 BID OPENING: AUGUST 11, 2011 ENGINEER'S ESTIMATE: $3,108,320.60 CONTRACT NO.110269 SABINO CANYON AND TANQUE VERDE INTERSECTION IMPROVEMENTS *FOR A MORE DETAILED ITEM DESCRIPTION* *REFER TO PROPOSAL

More information

Franklin County Engineer's Office - Highway Design ALKIRE RD & DEMOREST RD ROUNDABOUT CR NO. 11 & CR NO. 25 Bid Tabulation

Franklin County Engineer's Office - Highway Design ALKIRE RD & DEMOREST RD ROUNDABOUT CR NO. 11 & CR NO. 25 Bid Tabulation 7/07/2015 Page 1 of 20 Strawser Paving Co., Inc. Shelly & Sands, Inc. Double Z Construction Co Columbus Asphalt Paving, Inc. 1595 Frank Road P.O.Box 2469 2550 Harrison Road 1196 Technology Dr Columbus,

More information

CIS 26.txt MIS.CIS.26 MATL VERIF & MISSING SOURCES CONTRACT MGR.NO. 055 PAGE 001

CIS 26.txt MIS.CIS.26 MATL VERIF & MISSING SOURCES CONTRACT MGR.NO. 055 PAGE 001 MIS.CIS.26 MATL VERIF & MISSING SOURCES CONTRACT 323216 MGR.NO. 55 PAGE 1 CONT 1 SEC 13 JOB 76 RES ENGR ICENHOWER, KENNETH PROJ MG 22(313) HWY US 67 BOX 538 TEXARKANA CNTY BOWIE DIST 19 CONTRACT PRICE

More information

S T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 02/27/06 PAGE : 1 TABULATION OF BIDS

S T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 02/27/06 PAGE : 1 TABULATION OF BIDS PAGE : 1 NUMBER OF DAYS: 63 BRIDGE COUNT : 9 CONTRACT DESCRIPTION : BITUMINOUS OVERLAY & BRIDGE APPROACH PANEL REPLACEMENT CONTRACT LOCATION: LOCATED ON TH 90 FROM 0.8 MILE WEST OF THE BLUE EARTH RIVER

More information

Federal Project No.: NHPP-967-7(083)

Federal Project No.: NHPP-967-7(083) Order : N20 Schedule of Items Page: 2 Oversight/State Project : (NFO)9999-967-430,N501 Federal Project : NHPP-967-7(083) 0010 ATTD 00124 ROCK EXCAVATION CY 0020 302 504 00525 CONCRETE CLASS A3 MISC. CY

More information

STREET IMPROVEMENTS PROPOSAL BID ITEMS

STREET IMPROVEMENTS PROPOSAL BID ITEMS STREET IMPROVEMENTS 1 Excavation 3,525 CY $ $ 2 A.C. Planing (2" to 4" Depth) 20,586 SY $ $ 3 Furnish & Install Asphalt Concrete 4,270 TON $ $ 4 Furnish & Install Aggregate Base 2,955 TON $ $ 5 Remove

More information

CONTRACTOR'S REQUEST FOR PAYMENT CHASKA VETERANS PARK IMPROVEMENTS STANTEC PROJECT NO

CONTRACTOR'S REQUEST FOR PAYMENT CHASKA VETERANS PARK IMPROVEMENTS STANTEC PROJECT NO Owner: City of Chaska, 1 City Hall Plz., Chaska, mn 55318 Date: December 12, 2017 For Period: 12/1/2017 to 1/31/2018 Request No: 1 Contractor: Blackstone Contractors, LLC, 9520 County Rd. 19, Ste. D, Loretto,

More information

BARRETT ROAD (C.R. 178) ROADWAY RESURFACING FROM LEWIS ROAD TO SPAFFORD ROAD IN OLMSTED TOWNSHIP, OHIO ITEMIZED UNIT PRICE BID ROADWAY

BARRETT ROAD (C.R. 178) ROADWAY RESURFACING FROM LEWIS ROAD TO SPAFFORD ROAD IN OLMSTED TOWNSHIP, OHIO ITEMIZED UNIT PRICE BID ROADWAY IZED PRICE BID DESCRIPTION PRICE BID ROADWAY 1 201 11000 CLEARING AND GRUBBING 1 - - LUMP 2 202 23000 PAVEMENT REMOVED NR SQ YD 20 3 202 35100 PIPE REMOVED, 24" AND UNDER NR FT 134 4 202 58000 MANHOLE

More information

BID FORM PART A. Total Quantity 1 LS $ - 2a Surveying, Layout, and Field Staking 1 LS $ - 2b Maintenance of Traffic 1 LS $ -

BID FORM PART A. Total Quantity 1 LS $ - 2a Surveying, Layout, and Field Staking 1 LS $ - 2b Maintenance of Traffic 1 LS $ - BID FORM PART A Name & Category Unit Unit Cost (B) Cost (AxB) GENERAL REQUIREMENTS 1 Mobilization (Maximum 3.0% of the total Contract Price) 1 LS $ - 2a Surveying, Layout, and Field Staking 1 LS $ - 2b

More information

Macomb County Department of Roads Bid Comparison

Macomb County Department of Roads Bid Comparison Macomb County Department of Roads Bid Comparison Contract ID: 1643 Description: M-53 Freeway to 33 Mile Road Connector to the proposed 33 Mile Road & McKay Road Roundabout Location: Projects(s): M-53 &

More information

ADDENDUM #2 WATERSHED IMPROVEMENTS ON AN ANNUAL CONTRACT RP031-18

ADDENDUM #2 WATERSHED IMPROVEMENTS ON AN ANNUAL CONTRACT RP031-18 November 29, 2018 ADDENDUM 2 WATERSHED IMPROVEMENTS ON AN ANNUAL CONTRACT RP031-18 Q1. Do contractors not need to be on the Watershed Improvements Pre-Qualifications List to submit on the RP031-18 Watershed

More information

AMENDMENT OF SOLICITATION Old Hueco Tanks Rd. Improvements

AMENDMENT OF SOLICITATION Old Hueco Tanks Rd. Improvements AMENDMENT OF SOLICITATION Old Hueco Tanks Rd. Improvements The above titled solicitation is amended. All amendments must be acknowledged on the PROPOSAL ; failure to do so may be cause for rejection of

More information

TENDER FOR COUNTY ROAD 44 MULTI-USE PATHWAY PHASE 1A & 1B. Tender No.: NG16-19 ADDENDUM #1. October 31, 2016

TENDER FOR COUNTY ROAD 44 MULTI-USE PATHWAY PHASE 1A & 1B. Tender No.: NG16-19 ADDENDUM #1. October 31, 2016 TENDER FOR COUNTY ROAD 44 MULTI-USE PATHWAY PHASE 1A & 1B Tender No.: NG16-19 ADDENDUM #1 October 31, 2016 A copy of this addendum must be enclosed with your tender. Failure to comply with this requirement

More information

Riverside County Transportation Department Summary of Bids

Riverside County Transportation Department Summary of Bids 1 COUNTY'S ESTIMATE R-JS General Construction Riverside, CA 92509 ITEM NO. ITEM CODE CONTRACT ITEM UNITS QUANTITY UNIT PRICE ENG ESTIMATE BID UNIT PRICE BID ESTIMATE 1 066102 DUST ABATEMENT LS 1 3,000.00

More information

Date: 04/20/2018 City Project No.: Addendum No.: 4. The following changes shall be made to the project plans and specifications:

Date: 04/20/2018 City Project No.: Addendum No.: 4. The following changes shall be made to the project plans and specifications: DEVELOPMENT SERVICES PHONE: (209) 668-5520 ENGINEERING DIVISION FAX: (209) 668-5563 156 S. BROADWAY, SUITE 150 TDD: (800) 735-2929 TURLOCK, CA 95380 engineering@turlock.ca.us Date: 04/20/2018 City Project

More information

PN /21/ SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS

PN /21/ SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS PN 420-10/21/2016 - SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS DESCRIPTION: The surface tolerance specification requirements are modified as follows for all pavements of constant width with at least

More information

Proposal, pages P-1 through P-8 of the Contract Documents and Specifications.

Proposal, pages P-1 through P-8 of the Contract Documents and Specifications. ADDENDUM 2 PROJECT: POKAGONEK AWAT HARTFORD CLIENT: ISSUE DATE: JUL 1, 2015 The following clarifications and changes shall be included in the Plans and Specifications for the above referenced project,

More information

BID TALLY AND ATTENDANCE SHEET BID #B BID TITLE: Replacement of Bridge No. LR over the Larimer and Weld Canal

BID TALLY AND ATTENDANCE SHEET BID #B BID TITLE: Replacement of Bridge No. LR over the Larimer and Weld Canal VENDOR BID TALLY AND ATTENDANCE SHEET BID #B15-21 BID TITLE: Replacement of Bridge LR50-0.2-17 over the Larimer and Weld Canal Addendum #1 Acknowled ged DATE: October 22, 2015 TIME: 2:00 p.m. DEPARTMENT:

More information

MO 370 Interchange Ramp at Salt River Road - Phase 1

MO 370 Interchange Ramp at Salt River Road - Phase 1 MO 3 Interchange Ramp at Salt River Road - Phase 1 Sponsor St Peters Project No. RB19-000023 Project Type New Road TOTAL FUNDING Total County Sponsor Federal $3,304,748.00 $1,652,298.00 $7,450.00 $945,000.00

More information

CATEGORY 500 PAVING SECTION 535 PAVEMENT SURFACE PROFILE

CATEGORY 500 PAVING SECTION 535 PAVEMENT SURFACE PROFILE CATEGORY 500 PAVING 1 of 9 SECTION 535.01 DESCRIPTION. This work shall consist of measuring the roughness of the final surface of hot mix asphalt (HMA) or portland cement concrete (PCC) pavements. The

More information

SUBTOTAL SITE WORK & DEMOLITION (UTILITIES) $180, $348, $319,943.71

SUBTOTAL SITE WORK & DEMOLITION (UTILITIES) $180, $348, $319,943.71 BASE BID 1.00 GENERAL CONDITIONS 1.01 Mobilization (Maximum 5% of Base Bid) LS 1 84,000.00 $ 84,000.00 100,000.00 $ 100,000.00 85,000.00 $ 85,000.00 1.02 Bonding, Insurance, Permits (including Plumbing,

More information

Otsego County Road Commission

Otsego County Road Commission Otsego County Road Commission William T. Holewinski, Jr., Commissioner Troy W. Huff, Commissioner David C. Matelski, Commissioner Jason T. Melancon, Manager Thomas A. Deans, Engineer Rebecca L. Jerry,

More information

DOES NOT INCLUDE STATE AID PROJECTS ALL ITEMS BETWEEN 01/01/10 AND 12/31/10 BY ITEM GROUP 211 CONTRACTS - AWARDED TOTAL: $649,895,273

DOES NOT INCLUDE STATE AID PROJECTS ALL ITEMS BETWEEN 01/01/10 AND 12/31/10 BY ITEM GROUP 211 CONTRACTS - AWARDED TOTAL: $649,895,273 AVERAGE BID PRICES FOR AWARDED PROJECTS 06:54 Friday, February 18, 2011 1 2011 2011.601/00003 CONSTRUCTION SURVEYING LS 9 $276 $30,713.33 9 2011.601/00010 VIBRATION MONITORING LS 2 $73 $36,700.00 2 2011

More information

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 190109 PID 96986 CUY-SR 10-16.13 Steel Federal Type: BRIDGE REPAIR Letting Date: 3/21/2019 Completion Date: 9/30/2020

More information

Federal Project No.: STP-5A27(380), STP-5A27(381)

Federal Project No.: STP-5A27(380), STP-5A27(381) Order : M42 Schedule of Items Page: 2 Oversight/State Project : (NFO)0649-020-136,C502, C503 Federal Project : STP-5A27(380), STP-5A27(381) 0010 513 00100 0020 517 00101 MOBILIZATION CONSTRUCTION SURVEYING

More information

NOTIFICATION OF ADDENDUM ADDENDUM NO. 2 DATED 3/28/2003

NOTIFICATION OF ADDENDUM ADDENDUM NO. 2 DATED 3/28/2003 TIFICATION OF ADDENDUM ADDENDUM. 2 DATED 3/28/2003 Control 0027-12-119 Project NH 2003(385) Highway US 59 County FORT BEND Ladies/Gentlemen: Attached please find an addendum on the above captioned project.

More information

County of Los Angeles Department of Public Works BID SUMMARY

County of Los Angeles Department of Public Works BID SUMMARY (1) McKenna General Engineering, (2) Zusser Company, (3) Palp, (4) C. W. Crosser Construction, 1,155,777.00 1,306,820.00 1,439,957.00 1,461,985.00 1 IMPLEMENTATION OF THE SWP 1 15,000.00 LS 15,000.00 2

More information

$6, CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/08/17 -30, PROJECT: STP 2013(839) GRAYSON

$6, CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/08/17 -30, PROJECT: STP 2013(839) GRAYSON -30,219.83 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/08/17 291 CONTRACT ID: 051002028 PROJECT: STP 2013(839) CONTRACT: 07133220 AWARD : $4,317,753.44 PROJECTED : $4,394,254.44 ADJ. PROJECTED : $4,364,034.61

More information

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 130407 PID 88799 AUG-VA-VAR-BRIDGES Federal Type: BRIDGE REPAIR Letting Date: 7/18/2013 Completion Date: 8/31/2014

More information

Public Information Workshop

Public Information Workshop Public Information Workshop Charlotte County-Punta Gorda MPO - Meeting Rooms A and B March 29, 2018 Welcome to the Public Information Workshop for Harborview Road Project Development and Environment (PD&E)

More information

BID TABULATION REPORT McKINNEY STREET DRAINAGE IMPROVEMENTS PROJECT No. PWDR10012 BID OPENED : TUESDAY, AUGUST 13, :00 P.M.

BID TABULATION REPORT McKINNEY STREET DRAINAGE IMPROVEMENTS PROJECT No. PWDR10012 BID OPENED : TUESDAY, AUGUST 13, :00 P.M. PAVING IMPROVEMENTS McKINNEY 101 Rightofway Preparation LS 1 75,000.00 75,000.00 200,000.00 200,000.00 67,000.00 67,000.00 110,000.00 110,000.00 102 12inch HMAC Street Pulvermix SY 11,650 3.00 34,950.00

More information

Lee County DOT Traffic Section Design Standard for Sign Installation

Lee County DOT Traffic Section Design Standard for Sign Installation Lee County DOT Traffic Section Design Standard for Sign Installation Traffic Section Table Of Contents Section Title 1. Sign Panel Material 2. Sign Shape 3. Posts 4. Fasteners 5. Retro reflectivity and

More information

DOES NOT INCLUDE STATE AID PROJECTS ALL ITEMS BETWEEN 01/01/04 AND 12/31/04 BY ITEM GROUP 201 CONTRACTS - AWARDED TOTAL: $340,971,276

DOES NOT INCLUDE STATE AID PROJECTS ALL ITEMS BETWEEN 01/01/04 AND 12/31/04 BY ITEM GROUP 201 CONTRACTS - AWARDED TOTAL: $340,971,276 AVERAGE BID PRICES FOR AWARDED PROJECTS 14:37 Wednesday, February 2, 2005 1 2011 2011.601/00003 CONSTRUCTION SURVEYING LS 17 $920 $54,140.65 17 2011.601/00040 DESIGN LS 1 $4 $3,500.00 1 2011 $924 2013

More information

SUMMARY 3-0 BRADFORD ALBANY TOWNSHIP. 1 OF 1 P:\8417\ Bridge A\AT\Albany A.MDB 7/21/2014 7:32:31 AM REVISION NO COUNTY

SUMMARY 3-0 BRADFORD ALBANY TOWNSHIP. 1 OF 1 P:\8417\ Bridge A\AT\Albany A.MDB 7/21/2014 7:32:31 AM REVISION NO COUNTY 7/18/2014 - UCTURE REVISION NO REVISIONS DATE BY DIICT COUNTY ROUTE SECTION SHEET - SEE SPECIAL PROVISIONS SUMMARY 3-0 BRADFORD ALBANY TOWNSHIP T-410 4 OF 8 QUANTITY ITEM NO UNIT DESCRIPTION DESIGN NO

More information

2150 F&I 4" PVC pipe LF 100 $ F&I 6" PVC pipe LF 100 $ F&I 8" PVC pipe LF 100 $ 90.00

2150 F&I 4 PVC pipe LF 100 $ F&I 6 PVC pipe LF 100 $ F&I 8 PVC pipe LF 100 $ 90.00 1 of 5 2100 F&I 4" ductile iron pipe LF 200 $ 143.00 $28,600.00 2102 F&I 6" ductile iron pipe LF 200 $ 135.00 $27,000.00 2104 F&I 8" ductile iron pipe LF 200 $ 141.00 $28,200.00 2105 F&I 10" ductile iron

More information