2 DRFT DES OINES DOWNTOWN LEVEES STORWTER PP STTION SSESSENT REPORT 2.0 D-I: EST 1ST & RKET PP STTION The East 1 st & arket Street pump station (sometimes referred to as the Eastside Business District Pump Station) was completed in It has two Peerless axial flow pumps (models 36F and 42F) rated at a total nominal capacity of approximately 100 cfs with 31-feet of head. The pumps are driven by two vertical electric Siemens llis motors rated at 200 and 300 horsepower respectively that are mounted unenclosed on an elevated platform above the intake and discharge line. Other equipment present includes associated motor controls, SCD system, a trash rack with an electric hoist operated rake, an adjacent pad mounted transformer with associated metering and controls, and a 750KW diesel backup generator. The inflow chamber, trash racks, and wet well are located below grade, while the discharge chamber extends above grade. concrete block wall surrounds the pump station. Visible exterior portions of the wall are cladded in brick. Within the wall enclosure, the electric equipment and controls are housed in weather rated cabinets, but these are exposed and starting to corrode. Weatherproof lighting fixtures are provided on the interior and exterior portions of the enclosure. set of concrete steps with steel handrails are provided in the interior of the pump station to provide access to the elevated motor and control platform. Reportedly, this pump station is initiated at a low river stage (19.7 feet at 6th St), which results in the station being utilized multiple times each season. 2.1 INSPECTION General Observations Each pump was operated during the inspection and no obvious signs of deficiencies (vibrations, unexplained noises, etc.) were noted. Reportedly, the motors were rebuilt in 2012 and 2014 respectively. Pump 1 (the 36F) exhibited signs of leakage of bearing oil. Operation of instrumentation, bearing sensors, alarms, and auto shutdowns could not be fully assessed during the limited operation cycle. Documentation of operation and maintenance were not available. Extensive cracking of the perimeter block wall and brick cladding was noted along the northwest corner of the pump station. Cracking was also noted on the exterior surface of the discharge chamber (structural concrete), but the extent to which it affects the overall stability of the structure was not able to be determined at the time of this visual inspection. photo of the cracking is shown. ec u:\ \engineer\pump station report\appendix c - attachments\attachment narratives.docx

3 DES OINES DOWNTOWN LEVEES STORWTER PP STTION SSESSENT REPORT DRFT Extensive Cracking at East 1st & arket PS The trash rack (bar screen) was present and appeared to be in functional condition. However, the hoist operated trash rake system used to clean the rack was not functional and had been disconnected. The hoist system did not appear to be functional. etallic railings and miscellaneous equipment at the pump station exhibits some rust and needs painting and maintenance. Given the age of this pump station (1983), the float switches for the pumps could possibly contain ercury. Controls for the pump motors are exposed to elements and could be difficult to repair during a storm. The telemetry system at the pump station is radio based, but most other infrastructure in the City is based on cellular communications. Power Source Observations The electric utility power source is a 3-phase pad mounted transformer that is operational and appears to be in fair condition. Its primary surge protection and secondary configuration were indeterminate because the transformer s interior was not examined. The alternate power source is a 750KW diesel engine driven generator. The generator started and ran, but was not loaded. The generator did not implement battery warming blankets. The fuel tank was 5/8 full. The service equipment (SE) does not implement a surge protective device. ec u:\ \engineer\pump station report\appendix c - attachments\attachment narratives.docx

4 DES OINES DOWNTOWN LEVEES STORWTER PP STTION SSESSENT REPORT DRFT Electrical System Observations Equipment cabinets are exposed to the elements and a weatherproof operator building has not been provided. The SE, CC and LCP are outdated and likely beyond their service life. n exterior lighting system does not exist. Equipment enclosures exhibit corrosion. The panel that contains the radio contains unsecured parts and trash. Hazardous voltage warning labels are missing from the enclosure covers for the SE and CC. rc flash information labels are located on the SE and CC but are missing from the TS & generator. 2.2 STORWTER SSESSENT The pump station capacity is approximately 100 cfs, but the gravity drain system delivers between 529 and 756 cfs for the 2-year through 100-year storm events. The model indicates the pump station is substantially under capacity and contributes to flooding during events as frequent as the 2-year flood in a number of locations east of SE 6 th Street and northward as far as E. Locust Street. Flooding also occurs north and east of E. Court venue and E. 4 th Street, but it is thought to be a function of the storm sewer network rather than the pump station. Since most of the watershed is urbanized, there does not appear to be an opportunity to add additional storm sewer system storage, so a substantial increase in the size of the pump station would be required to significantly reduce flooding. ec u:\ \engineer\pump station report\appendix c - attachments\attachment narratives.docx

5 DRFT

6 East 1st & arket Pump Station Photograph Log DRFT Levee Pump Station ssessment Des oines, Iowa Date Taken: November 17-20, 2014 \01_North Exterior.JPG: \02_East Exterior.JPG: \03_South Exterior.JPG: \04_Cracking SE Corner Exterior.JPG: Stantec Project #: Page 1 of 8

7 East 1st & arket Pump Station Photograph Log DRFT Levee Pump Station ssessment Des oines, Iowa Date Taken: November 17-20, 2014 \05_Cracking SW Corner Exterior.JPG: \06_Cracking SW Corner Exterior_2.JPG: \07_NW Corner Interior.JPG: \08_Cracking Interior.JPG: Stantec Project #: Page 2 of 8

8 East 1st & arket Pump Station Photograph Log DRFT Levee Pump Station ssessment Des oines, Iowa Date Taken: November 17-20, 2014 \09_Interior.JPG: \10_Interior_2 Pump Platform.JPG: \11_Interior & Interior Gate.JPG: \12_Bypass Gate Disassembled.JPG: Stantec Project #: Page 3 of 8

9 East 1st & arket Pump Station Photograph Log DRFT Levee Pump Station ssessment Des oines, Iowa Date Taken: November 17-20, 2014 \13_Trash Rack Rake ssembly (Not Functional).JPG: \14_Trash Rack Rake Hoist (Not Functional).JPG: \15_Trash Rack Rake Hoist (Not Functional).JPG: \16_Trash Rack & Gate.JPG: Stantec Project #: Page 4 of 8

10 East 1st & arket Pump Station Photograph Log DRFT Levee Pump Station ssessment Des oines, Iowa Date Taken: November 17-20, 2014 \17_Discharge Chamber.JPG: \18_Power System.JPG: \19_Power System_2.JPG: \20_Backup Generator Exterior.JPG: Stantec Project #: Page 5 of 8

11 East 1st & arket Pump Station Photograph Log DRFT Levee Pump Station ssessment Des oines, Iowa Date Taken: November 17-20, 2014 \21_Backup Generator Exterior.JPG: \22_Backup Generator Controls.JPG: \23_Backup_Generator_Label.JPG: \24_otor & Power Control Cabinets.JPG: Stantec Project #: Page 6 of 8

12 East 1st & arket Pump Station Photograph Log DRFT Levee Pump Station ssessment Des oines, Iowa Date Taken: November 17-20, 2014 \25_Panel Typical.JPG: \26_Panel Typical.JPG: \27_Telemetry System.JPG: \28_Pump otors Typical.JPG: Stantec Project #: Page 7 of 8

13 East 1st & arket Pump Station Photograph Log DRFT Levee Pump Station ssessment Des oines, Iowa Date Taken: November 17-20, 2014 \29_Pump otor Label.JPG: \30_Typical Railing.JPG: \31_Typical Electrical Grounding.JPG: Stantec Project #: Page 8 of 8

14 Pump Stations East 1 st and arket DRFT Rated Item Rating Rating Guidelines Location/Remarks/Recommendations 1. Pump Stations Operating, aintenance, Training, & Inspection Records 2. Pump Station Operations and aintenance Equipment anuals Operation, maintenance and inspection records are present at the pump station and are being used and updated, and personnel have been trained in pump station operations. Names and last training date shown in the record book. Operation, maintenance and inspection records are present but not adequately used and updated. No operation, maintenance and inspection records are present, or refresher training for personnel has not been conducted. Operation and aintenance Equipment anuals and/or posted operating instructions are present and updated as required, and adequately cover all pertinent pump station features. O& manuals include points of contact for manufacturers and suppliers of major equipment used in the facility. Operation and aintenance Equipment anuals and/or posted operating instructions are present and adequately cover all pertinent pump station features. However, they are incomplete and the necessary updates have not been made. Operation and aintenance Equipment anuals are not available. 3. Safety Compliance Safety compliance inspection reports by applicable local, state, or federal agencies available for review. No safety issues were observed. Safety Inspection Records were not available. No safety compliance inspection reports are available for review. 4. Communications ( or only) telephone, cellular phone, two-way radio, or similar device is available to pump station operator and maintenance personnel. Radio telemetry to 24-7 facility (WWTP). Operators notified with cell phone alarms telephone, cellular phone, two-way radio, or similar device is not available to pump station operator and maintenance personnel. 5. Plant Building The building is in good structural condition with no major foundation settlement problems. The roof is not leaking, intake & exhaust louvers are clear of debris, fans are operational, etc. Extensive cracking to perimeter wall system. Some cracking to structural concrete There are minor structural defects, minimal foundation settlement, leaks, or other conditions noted that need repair. Defects do not threaten the structural integrity or stability of the building, and will not impact pumping operations. The structural integrity or stability of the building is threatened, or there is damage to the building that threatens safety of the operator or impacts pumping operations. 6. Fencing and Gates 1 Fencing is in good condition and provides protection against falling or unauthorized access. Gates open and close freely, locks are in place, and there is little corrosion on metal parts. Damage to block perimeter wall but site appears to be secure Fencing or gates are damaged or corroded but appear to be maintainable. Locks may be missing or damaged. Fencing and gates are damaged or corroded to the point that replacement is required, or potentially dangerous features are not secured. Key: = cceptable. = inimally cceptable; aintenance is required. = nacceptable. N/ = Not pplicable. FDR = Flood Damage Reduction Flood Damage Reduction Segment / System Inspection Report Pump Stations Page 1 of 5

15 Pump Stations East 1 st and arket DRFT Rated Item Rating Rating Guidelines Location/Remarks/Recommendations 7. Pumps 1 8. otors, Engines, Fans, Gear Reducers, Back Stop Devices, etc. 9. Sumps / Wet well 10. echanical Operating Trash Rakes Non-echanical Trash Racks N/ There are no features noted that require safety fencing. ll pumps are properly maintained and lubricated. Systems are periodically tested and documented for review. No vibration, cavitation noises or unusual sounds are noted when the pump is operated. Bearing temperature sensor records don't indicate any problems. inor deficiencies noted that need to be closely monitored or repaired, such as the presence of slight vibrations, leakage of packing gland, bearing temperature sensors are inoperable or no record is present. However, the pumps are operational and are expected to perform through the next period of usage. ajor deficiencies identified that may significantly reduce pumping operations. For example, bearing sensor records indicate problems, excessive vibration noted, impellers are badly corroded, or there are eroded or missing blades. ll items are operational. Preventative maintenance and lubrication is being performed and the system is periodically subjected to performance testing. Instrumentation, alarms, bearing sensors and auto shutdowns are operational. Systems have minor deficiencies, but are operational and will function adequately through the next flood. Bearing sensors are not operational. One or more of the primary motors or systems is not operational, or noted deficiencies have not been corrected. Clear of debris, sediment, or other obstructions. Procedures are in place to remove debris accumulation during operation. Debris, sediment, or other obstructions may be present and must be removed, but the sump/ wet well will function as intended during the next flood. Procedures are in place to remove debris accumulation during operation. Large debris or excessive silt present which will hinder or damage pumps during operation, or no procedures established to remove debris accumulation during operation. Drive chain, bearing, gear reducers, and other components are in good operating condition and are being properly maintained. The trash rake is in need of maintenance, but is still operational. Trash rake not operational or deficiencies will inhibit operations during the next flood event. N/ There are no mechanical trash rakes. Trash racks are fastened in place and properly maintained. Trash racks are in place but are unfastened or have bent bars that allow debris to enter into the pipe or pump station, bars are corroded to the point that up to 10% of the sectional area may be lost. Repair or replacement is required. Pump 1 Evidence of leakage of bearing oil. Spare oil in reservoir. Pump started and ran for 1 minute. Pumped water. Stopped turning within 10 seconds of pump shut off Pump 2 Spare oil in reservoir. Pump started and ran for 1 minute. Pumped water. Stopped turning within 10 seconds of pump shut off. Pump HP at 40 cfs Pump HP at 60 cfs Pump 1 motor rebuilt in 2014 Pump 2 motor rebuilt in 2012 otors are operational. Indeterminate if instrumentation, alarms, bearing sensors and auto shutdowns are operational. P and testing records not available onsite. ppears to be structurally sounds Cleaned annually with vacuum truck Bar screen trash rack and rake system ineffective Bar screen is not functional and has been removed from wet well Key: = cceptable. = inimally cceptable; aintenance is required. = nacceptable. N/ = Not pplicable. FDR = Flood Damage Reduction Flood Damage Reduction Segment / System Inspection Report Pump Stations Page 2 of 5

16 Pump Stations East 1 st and arket DRFT Rated Item Rating Rating Guidelines Location/Remarks/Recommendations 12. Fuel System for Pump Engines 13. Power Source N/ Trash racks are missing or damaged to the extent that they are no longer functional and must be replaced. (For example, more than 10% of the sectional area may be lost.) There are no trash racks, or they are covered in the pump stations section of the report. Fuel system is operational, day tank present and operational, fuel fresh and rotated regularly. Fuel system is operational. The fuel is not polished or rotated regularly. Fuel tank was less than ¾ full. Fuel system is operational and of adequate capacity, but day tank is missing or fuel is not fresh and rotated regularly. N/ Fuel system not functional. No fuel system. The normal power source and backup generators, if installed, are operational, properly exercised and well maintained. Surge protection, grounding, lightning protection, transformers, and automatic/manual transfer of main power to backup system is working. Normal power source and backup units, if applicable, are operational with minor discrepancies or maintenance, inspection and exercising record is present but not up to date. Preventative maintenance or repairs are required. Normal power source or generators are not operational and must be repaired; or generator, if required, is not on site. The normal power source is a 3 phase compartmental type pad mounted transformer owned by the electric utility company. It was operational. The 2 nd source is a diesel engine driven generator. The generator is rated standby and not prime or continuous. The generator operated correctly but was not loaded. The starting batteries do not have warming blankets. No P, exercising or testing records available onsite. Surge protection and lightning protection systems were not observed to be installed. 14. Electrical Systems egger Testing on Pump otors Operational and maintained free of damage, corrosion, and debris. Preventative maintenance and system testing is being performed periodically. Operational with minor discrepancies. Preventative maintenance or repairs are required, but the components are expected to function adequately during the next flood event. Components of the electrical system will not function adequately during the next flood event and must be replaced. Results of megger tests on pump motors or critical power cables show that the insulation meets manufacturer's or industry standards. Tested within the last year. It is indeterminate if the TS is a 3 pole (un-swtiched neutral) or 4 pole (switched neutral). Systems that implement ground fault protection should implement a 4 pole TS and the generator should be grounded as a separately derived system. The electrical system has minor discrepancies. The pump station does not have a lighting system. The main breaker and CC starter section had arc flash information labels. The generator had only hazard warning labels. The TS had no labels. The CC is old and beyond its service life. The LCP panel did not have any indicating lights. The radio panel had loose parts inside of it. The pumps were operated and they are expected to function adequately during the next flood event. P records were not available onsite. No megger testing records were available onsite. The City had megger testing records for the motors located in a Key: = cceptable. = inimally cceptable; aintenance is required. = nacceptable. N/ = Not pplicable. FDR = Flood Damage Reduction Flood Damage Reduction Segment / System Inspection Report Pump Stations Page 3 of 5

17 Pump Stations East 1 st and arket DRFT Rated Item Rating Rating Guidelines Location/Remarks/Recommendations and Critical Power Cables 16. Enclosures, Panels, Conduit and Ducts 17. Intake and Discharge Pipelines egger testing not conducted within the past year. If megger tests on pump motors indicate that insulation resistance is below the manufacturer's or industry standard, but the resistance can be corrected with proper application of heat, this is minimally acceptable. (The application of heat does not relate to critical power cables.) egger tests not conducted within past two years, or tests indicate that insulation resistance is low enough that the equipment will not be able to meet design standards of operation; or evidence of arcing or shorting is detected visually. ll enclosures, panels, conduits, and ducts are protected from corrosion damage and show no rust, damage, or deterioration that would cause a safety concern. inor surface corrosion which appears to be maintainable. Cleaning and painting required. Severely corroded and must be replaced to prevent failure, equipment damage, or safety issues. Intake and discharge pipelines have no corrosion and paint is intact, except for minor touch up required. Pipe couplings and anchors have no leakage or corrosion. Intake and discharge pipelines have minor corrosion and repair and painting is required. Pipe coupling with anchors have minor leakage, corrosion and require bolts to be tightened. central location. The records were for last year. This year s testing was complete and the testing agency was preparing the reports. No testing was performed for critical cables. The electrical equipment and conduits exhibited minor corrosion. They should be cleaned and repainted. Intake and discharge pipelines have major corrosion and replacement is required. Pipe coupling with anchors have major leakage and is heavily corroded and requires replacement. 18. Sluice/ Slide Gates 3 Gates open and close freely to a tight seal or minor leakage. Gate operators are in good working condition and are properly maintained. Sill is free of sediment and other obstructions. Gates and lifters have been maintained and are free of corrosion. Documentation provided during the inspection. Gates and/or operators have been damaged or have minor corrosion, and open and close with resistance or binding. Leakage quantity is controllable, but maintenance is required. Sill is free of sediment and other obstructions. Gates do not open or close and/or operators do not function. Gate, stem, lifter and/or guides may be damaged or have major corrosion. Gate 591B has a new operator. Gate was exercised during inspection Gate 591 is in a state of disassemble N/ There are no sluice/ slide gates. 19. Flap Gates/ Flap Valves/ Pinch Valves 1 N/ Gates/ valves open and close easily with minimal leakage, have no corrosion damage, and have been exercised and lubricated as required. N/ Key: = cceptable. = inimally cceptable; aintenance is required. = nacceptable. N/ = Not pplicable. FDR = Flood Damage Reduction Flood Damage Reduction Segment / System Inspection Report Pump Stations Page 4 of 5

18 Pump Stations East 1 st and arket DRFT Rated Item Rating Rating Guidelines Location/Remarks/Recommendations Gates/ valves will not fully open or close because of obstructions that can be easily removed, or have minor corrosion damage that requires maintenance. N/ Gates/ valves are missing, have been damaged, or have deteriorated to the point that they need to be replaced. There are no gates on discharge lines from pump station. 20. Cranes 1 Cranes operational and have been inspected and load tested in accordance with applicable standards within the last year. Documentation is on hand. Crane for the bar screen system is dysfunctional Cranes have not been inspected or operationally tested within the past year, or there are visible signs of corrosion, oil leakage, etc, requiring maintenance. Cranes are not operational, and this may prevent the pump station from functioning as required. No documentation available on cranes. N/ There are no cranes. 21. Other etallic Items (Equipment, Ladders, Platform nchors, etc) ll metal parts are protected from corrosion damage and show no rust, damage, or deterioration that would cause a safety concern. Corrosion seen on metallic parts appears to be maintainable. etallic parts are severely corroded and require replacement to prevent failure, equipment damage, or safety issues. N/ There are no other significant metallic items. Some rust Stair well rust 1 Proper operation of this item must be demonstrated during the inspection. 2 Check motor control center, circuit breakers, pilot lights, volt meters, ammeters, sump level indicator, gate position indicators, remote operating systems, including SCD and telemetry systems. lso, check interior and exterior lighting; especially lighting near trash rack screens, ladders, walkways, etc. 3 Proper operation of the gates (full open and closed) must be demonstrated during the inspection if no documentation is available. Be aware of both manual and electrical operators. - No site lighting - Float switches possibly mercury - otor control is exposed to weather. aintenance and repair during a storm event would be problematic - Due to the depth of the intake and at Gate 591, this station will be used multiple times per season - System is on radio telemetry. Current City standard is for all remote system components to be on a broadband internet connection. Key: = cceptable. = inimally cceptable; aintenance is required. = nacceptable. N/ = Not pplicable. FDR = Flood Damage Reduction Flood Damage Reduction Segment / System Inspection Report Pump Stations Page 5 of 5

19 DRFT

20 DRFT

21 DRFT

22 DRFT

23 DRFT

24 DRFT

25 DRFT

26 DRFT

27 DRFT

28 DRFT

29 DRFT

30 DRFT

31 DRFT

32 DRFT

APPENDIX A USACE INSPECTION ITEMS AND RATINGS GUIDELINES

APPENDIX A USACE INSPECTION ITEMS AND RATINGS GUIDELINES DES OINES DOWNTOWN LEVEES STORWTER PP STTION SSESSENT REPORT PPENDIX SCE INSPECTION ITES ND RTINGS GIDELINES mah \\us1276- f02\workgroup\1756\active\175603005\environmental\report\interior_drainage\pump_sta_assess\draft_b_20160307\rpt_pumpstnassess_draft_20160308.docx

More information

ATTACHMENT 11 SE 1 ST & VAN BUREN PUMP STATION DATA DRAFT

ATTACHMENT 11 SE 1 ST & VAN BUREN PUMP STATION DATA DRAFT TTCHENT 11 SE 1 ST & VN BREN PP STTION DT DRFT DES OINES DOWNTOWN LEVEES STORWTER PP STTION SSESSENT REPORT DRFT 11.0 D-III: SE 1ST & VN BREN PP STTION The SE 1 st & Van Buren pump station was completed

More information

GCG ASSOCIATES, INC. PROFESSIONAL CIVIL ENGINEERS AND LAND SURVEYORS 84 Main Street Wilmington, Massachusetts 01887

GCG ASSOCIATES, INC. PROFESSIONAL CIVIL ENGINEERS AND LAND SURVEYORS 84 Main Street Wilmington, Massachusetts 01887 GCG ASSOCIATES, INC. PROFESSIONAL CIVIL ENGINEERS AND LAND SURVEYORS 84 Main Street Wilmington, Massachusetts 01887 Phone: (978) 657-9714 Fax: (978) 657-7915 December 31,2.012 Mr. Charles Aspinwall Town

More information

STRUCTURE 5A PURPOSE

STRUCTURE 5A PURPOSE STRUCTURE 5A This structure is a six unit pumping plant located on the south side of U.S. Highway 441 and Canal 51 (West Palm Beach Canal) between the canal and the borrow canals of Levees 7 and 40 about

More information

Table Summary of Sprinkler System Inspection, Testing, and Maintenance. Reference. Inspection , ,

Table Summary of Sprinkler System Inspection, Testing, and Maintenance. Reference. Inspection , , Table 5.1.1.2 Summary of Sprinkler System Inspection, Testing, and Maintenance Item Frequency Reference Inspection Gauges (dry, preaction, and deluge systems) Quarterly 5.2.4.2, 5.2.4.3, 5.2.4.4 Control

More information

of Fire Pump Assemblies

of Fire Pump Assemblies A.1.0 A.1.1 A.2.0 A.2.1 A.2.2 A.2.3 A.2.4 A.2.5 A.2.6 A.3.0 A.3.1 A.4.0 A.4.1 Report of Inspection, Testing & Maintenance System in service before conducting tasks Pertinent parties notified before conducting

More information

Installation and Maintenance Manual CORRUGATED RIVETED GALVANIZED STEEL WATER STORAGE TANKS

Installation and Maintenance Manual CORRUGATED RIVETED GALVANIZED STEEL WATER STORAGE TANKS BH TANK A Division Of American Tank Co., Inc. Installation and Maintenance Manual CORRUGATED RIVETED GALVANIZED STEEL WATER STORAGE TANKS American Tank Co., Inc. P.O. Box 340 Windsor CA 95492 www.bhtank.com

More information

UNDERSTANDING ELECTRICAL EQUIPMENT AND CONDITIONS OF INCREASED RISK

UNDERSTANDING ELECTRICAL EQUIPMENT AND CONDITIONS OF INCREASED RISK UNDERSTANDING ELECTRICAL EQUIPMENT AND CONDITIONS OF INCREASED RISK 5 October 2017 John A. Weber Principal Electrical Engineer, Hartford Steam Boiler Inspection and Insurance Company Electrical Power Transmission

More information

Evaluating Wind vs. Water

Evaluating Wind vs. Water Evaluating Wind vs. Water By Jeffery H. Warren, Ph.D., P.E., CSP In hurricane situations, wind or water or both may cause damage. Determining the cause of the damage is critical in the claim settlement.

More information

CHAPTER 20: Operation and maintenance

CHAPTER 20: Operation and maintenance Pressurized Irrigation Techniques 20.1 CHAPTER 20: Operation and maintenance INTRODUCTION The efficient operation of an irrigation system depends mainly on the ability of the farmer to make the best use

More information

6. Document tasks performed during visit and report any observations to the appropriate

6. Document tasks performed during visit and report any observations to the appropriate Chiller Annual Maintenance RFP Attachment B Services Required Tasking: Vibration Analysis 1. All work shall be performed in accordance with safety policies 2. Check with appropriate customer representative

More information

CAUTION. Start & Stop Procedures. Section 1-2. Engine Oil Level

CAUTION. Start & Stop Procedures. Section 1-2. Engine Oil Level Section 1-2 Start & Stop Procedures Before operating this machine, the operator must have: received operator training, a familiarity with this manual, and a complete understanding of all the procedures

More information

Monthly Checklist For Depot

Monthly Checklist For Depot Monthly Checklist For Depot ANNEXURE 1.L(iv) TANK FARM Notes : i. The scope covers piping, valve & fittings, general housekeeping, pumps & motors, effluent management, fire protection and security within

More information

ANNUAL UST SYSTEM INSPECTION CHECKLIST

ANNUAL UST SYSTEM INSPECTION CHECKLIST APPENDIX A-3: SAMPLE FORM FOR ANNUAL UNDERGROUND STORAGE SYSTEM INSPECTION CHECKLIST Page 1 ANNUAL UST SYSTEM INSPECTION CHECKLIST Facility ID# Facility Name/Address Qualified Technician Signature Date

More information

CAUTION. Start & Stop Procedures. Section 4-2. Engine Oil Level

CAUTION. Start & Stop Procedures. Section 4-2. Engine Oil Level Section 4-2 Start & Stop Procedures Before operating this machine, the operator must have: received operator training, a familiarity with this manual, and a complete understanding of all the procedures

More information

KEEP FOR FUTURE REFERENCE DC VACUUM BACK-UP SYSTEM READ ALL INSTRUCTIONS AND WARNINGS BEFORE USING THIS PRODUCT

KEEP FOR FUTURE REFERENCE DC VACUUM BACK-UP SYSTEM READ ALL INSTRUCTIONS AND WARNINGS BEFORE USING THIS PRODUCT KEEP FOR FUTURE REFERENCE P.O. Box 368 908 West Main Laurel, MT USA 59044 phone 800-548-7341 phone 406-628-8231 fax 406-628-8354 INSTRUCTIONS International Version STOCK NUMBERS: SEE SPECIFICATIONS DC

More information

Operators Manual ECO-AIR-IVS Internal Valve Actuation System

Operators Manual ECO-AIR-IVS Internal Valve Actuation System 2534-A Shell Road Georgetown, TX 78628 www.parafour.com 512-626-4099 Operators Manual ECO-AIR-IVS Internal Valve Actuation System Ver 1.0 Warnings:!! This device is electrically operated and should only

More information

ANDERSON, ECKSTEIN AND WESTRICK, INC.

ANDERSON, ECKSTEIN AND WESTRICK, INC. ANDERSON, ECKSTEIN AND WESTRICK, INC. 51301 Schoenherr Civil Engineers Road, Shelby Township, Michigan 48315 Surveyors Architects 586-726-1234 Mr. Matthew Tepper City of Grosse Pointe Farms 90 Kerby Road

More information

Dial-A-Ride Coles County Council on Aging, Inc. Facilities/Equipment Maintenance

Dial-A-Ride Coles County Council on Aging, Inc. Facilities/Equipment Maintenance Dial-A-Ride Coles County Council on Aging, Inc. Facilities/Equipment Maintenance The Maintenance Guideline Handbook for Facilities/Equipment which begins on the following page identifies specific items

More information

ISO 9001 CERTIFIED COMPANY INDUSTRIAL PUMPS. Installation & Operational Manual For BACK-PULL-OUT PUMP

ISO 9001 CERTIFIED COMPANY INDUSTRIAL PUMPS. Installation & Operational Manual For BACK-PULL-OUT PUMP ISO 9001 CETIFIE COPANY Installation & Operational anual For BACK--OT P EX Assembly isassembly Erection Starting unning Stopping and aintenance Cautions in use of echanical Seal Stuffing Box and Packing

More information

Inspection Points - Motor Homes

Inspection Points - Motor Homes Inspection Points - Motor Homes We at RVIS, LLC appreciate your business and look forward to providing you with the professional RV inspection you deserve. So that we may provide you with a thorough inspection,

More information

EVALUATION OF THE 200,000 GALLON ELEVATED SINGLE PEDESTAL SPHEROID SPECKS RUN ROAD (RIDGEWAY) TANK BUNKER HILL, WEST VIRGINIA

EVALUATION OF THE 200,000 GALLON ELEVATED SINGLE PEDESTAL SPHEROID SPECKS RUN ROAD (RIDGEWAY) TANK BUNKER HILL, WEST VIRGINIA EVALUATION OF THE 200,000 GALLON ELEVATED SINGLE PEDESTAL SPHEROID SPECKS RUN ROAD (RIDGEWAY) TANK BUNKER HILL, WEST VIRGINIA FOR DEWBERRY CONSULTANTS, LLC FAIRFAX, VIRGINIA November 9 and 10, 2016 Page

More information

Routine Compressor Maintenance

Routine Compressor Maintenance Establishing a regular, well-organized maintenance program and strictly following it is critical to maintaining the performance of a compressed air system. One person should be given the responsibility

More information

Elevator Hydraulic Machine Room Instructor s Guide

Elevator Hydraulic Machine Room Instructor s Guide Table of Contents Overview.......4 Sensory Inspection 13 Operational Inspection and Maintenance 20 Summary..53 1 Icons Used In This Guide Agenda Topic # Topic Title Duration 1 Overview 30 Minutes 2 3 4

More information

BENNETT CNG DISPENSER MAINTENANCE SCHEDULE

BENNETT CNG DISPENSER MAINTENANCE SCHEDULE BENNETT CNG DISPENSER MAINTENANCE SCHEDULE Serial #: DIN #: Company Name: CAUTION: Only trained personnel may work on dispensers. CAUTION: The emergency shut off valve if installed must be closed. CAUTION:

More information

BOILER PM & INSPECTION

BOILER PM & INSPECTION BOILER PM & INSPECTION Record inspection log for Gaming Commission and Safety Department. The following listed maintenance items are not intended to be a complete list. Follow any additional maintenance

More information

.2 Section Waste Management and Disposal..5 Section Thermometers and Pressure Gauges Piping Systems.

.2 Section Waste Management and Disposal..5 Section Thermometers and Pressure Gauges Piping Systems. Issued 2005/06/01 Section 15440 Plumbing Pumps Page 1 of 9 PART 1 GENERAL 1.1 RELATED SECTIONS.1 Section 01330 Submittal Procedures..2 Section 01355 Waste Management and Disposal..3 Section 01780 Closeout

More information

GUIDE TO MAINTENANCE PRACTICES FOR DISTRIBUTION NETWORKS IN THE DISTRIBUTION SECTOR OF THE NAMIBIAN ELECTRICITY SUPPLY INDUSTRY

GUIDE TO MAINTENANCE PRACTICES FOR DISTRIBUTION NETWORKS IN THE DISTRIBUTION SECTOR OF THE NAMIBIAN ELECTRICITY SUPPLY INDUSTRY PART B-04 TITLE: DISTRIBUTION SUBSTATIONS SPECIFICATION NO: B-04 INCEPTION DATE: AFTER GAZETTING (WORKING DOCUMENT FOR A 2 YEAR PERIOD) AMENDMENTS/REVISIONS DATE PAGE PARAGRAPH DESCRIPTION ORIGINATOR APPROVED

More information

SAFETY GUIDANCE MATERIAL

SAFETY GUIDANCE MATERIAL SAFETY GUIDANCE MATERIAL SAFETY OPERATIONS GUIDANCE MONDAY MARCH 23, 2015 This safety resource was written for the scrap industry by the scrap industry and was developed to assist you in making your scrap

More information

SEASONAL MAINTENANCE CHECKLISTS Johnson Controls

SEASONAL MAINTENANCE CHECKLISTS Johnson Controls SPRING CHECK LIST ABSORPTION CHILLERS Check starter and control panel. Leak test. Check hand valve diaphragms and replace as required. Check operation of purge unit. Change oil in the purge pump. Lubricate

More information

User s Manual. Automatic Switch-Mode Battery Charger

User s Manual. Automatic Switch-Mode Battery Charger User s Manual Automatic Switch-Mode Battery Charger IMPORTANT Read, understand, and follow these safety rules and operating instructions before using this battery charger. Only authorized and trained service

More information

A. This Section includes ac, enclosed controllers rated 600 V and less, of the following types:

A. This Section includes ac, enclosed controllers rated 600 V and less, of the following types: SECTION 262913 600 VOLT ENCLOSED CONTROLLERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 0 Specification

More information

PAGE 1 OF 5 HEALTH, SAFETY & ENVIRONMENTAL MANUAL PROCEDURE: S360 Overhead Cranes & Lifts Procedure REV 4.0 8/14/2012

PAGE 1 OF 5 HEALTH, SAFETY & ENVIRONMENTAL MANUAL PROCEDURE: S360 Overhead Cranes & Lifts Procedure REV 4.0 8/14/2012 PAGE 1 OF 5 PURPOSE: OVERHEAD CRANES AND LIFTS PROCEDURE The purpose of this procedure is to define the safety and training requirements for use of overhead cranes and lifts. Procedure: Definitions Designated

More information

Missing recessed or flush escutcheons, concealed cover plates with deflector and operating element in correct position

Missing recessed or flush escutcheons, concealed cover plates with deflector and operating element in correct position Water-Based Fire Protection System Inspection Guidelines for Tagging - 2014 NFPA 25 Inspection Deficiencies and Maintenance Deficiencies (Revised 4-21-2017) Item Deficiency Tag NFPA Reference SPRINKLER

More information

Vehicle and Equipment Fueling

Vehicle and Equipment Fueling Vehicle and Equipment Fueling SC-20 Objectives Cover Contain Educate Reduce/Minimize Description Spills and leaks that occur during vehicle and equipment fueling can contribute hydrocarbons, oil and grease,

More information

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY BY ORDER OF THE COMMANDER KADENA AIR BASE AIR FORCE INSTRUCTION 23-204 KADENA AIR BASE Supplement 30 MAY 2013 Certified Current, 8 June 2017 Material Management ORGANIZATIONAL FUEL TANKS COMPLIANCE WITH

More information

Sweetwater Authority Fire Hydrant Maintenance Program Standards and Procedures

Sweetwater Authority Fire Hydrant Maintenance Program Standards and Procedures Introduction Fire hydrants constitute a critical component providing fire protection for the City of National City, Chula Vista and the County of San Diego. In case of emergencies fire hydrants must be

More information

.3 Section Waste Management and Disposal.

.3 Section Waste Management and Disposal. Issued 2005/06/01 Section 16261 Uninterruptible Power Systems Static Page 1 of 10 PART 1 GENERAL 1.1 RELATED SECTIONS.1 Section 01330 Submittal Procedures..2 Section 01780 Closeout Submittals..3 Section

More information

Operation & Maintenance Manual

Operation & Maintenance Manual Operation & Maintenance Manual Submersible pumps type LANDY DWP & Submersible pumps type LANDY DNP Explosion proof version Landustrie Sneek BV Tel. +31 515-486888 Pieter Zeemanstraat 6 Fax +31 515-412398

More information

Commercial Vehicle Trip Inspection Schedule Heavy Passenger Vehicles and Trailers

Commercial Vehicle Trip Inspection Schedule Heavy Passenger Vehicles and Trailers Accessibility devices Air brake system Cargo ment Coupling devices Alarm does not operate Equipment does not operate Interlock system does not operate Audible air leak Slow air pressure build-up rate Cargo

More information

Hydro Plant Risk Assessment Guide

Hydro Plant Risk Assessment Guide September 2006 Hydro Plant Risk Assessment Guide Appendix E11: Emergency Closure Gate and Valve Condition Assessment E11.1 GENERAL Emergency closure gates and valves are key safety components in the power

More information

EMERGENCY GENERATOR SET

EMERGENCY GENERATOR SET PART 8.1: EMERGENCY GENERATOR SET PART 1 - GENERAL I SCOPE A. This specification covers the design, furnishing, installation and start up of a factory built, production tested, operable, liquid cooled

More information

GUIDELINES FOR THE MAINTENANCE AND INSPECTIONS OF FIXED CARBON DIOXIDE FIRE-EXTINGUISHING SYSTEMS

GUIDELINES FOR THE MAINTENANCE AND INSPECTIONS OF FIXED CARBON DIOXIDE FIRE-EXTINGUISHING SYSTEMS INTERNATIONAL MARITIME ORGANIZATION 4 ALBERT EMBANKMENT LONDON SE1 7SR Telephone: 020 7735 7611 Fax: 020 7587 3210 IMO E Ref: T4/4.01 11 June 2009 GUIDELINES FOR THE MAINTENANCE AND INSPECTIONS OF FIXED

More information

BUREAU OF STANDARDS. Effective Date: 8/19/2016 Section No. 4. Version: 1.2 Procedure No. 3

BUREAU OF STANDARDS. Effective Date: 8/19/2016 Section No. 4. Version: 1.2 Procedure No. 3 BUREAU OF STANDARDS Effective Date: 8/19/2016 Section No. 4 Version: 1.2 Procedure No. 3 TITLE: LP Gas Bulk Plant Final Inspection PURPOSE: This document details the procedures used to conduct a Final

More information

Professional Séries. Professional Séries. Model T03828 SUBMERSIBLE SUMP DUPLEX SYSTEM SUBMERSIBLE SUMP DUPLEX SYSTEM. 1/3HP 2400 GPH Head of 20 (6 m)

Professional Séries. Professional Séries. Model T03828 SUBMERSIBLE SUMP DUPLEX SYSTEM SUBMERSIBLE SUMP DUPLEX SYSTEM. 1/3HP 2400 GPH Head of 20 (6 m) Model T0828 Primary pump 1/HP 200 GPH Head of 20 (6 m) SUBMERSIBLE SUMP DUPLEX SYSTEM Professional Séries Discharge: 1 1/2 ABS DWV pipe Electric cable: 9 piggyback type Oil cooled Cast iron construction

More information

5. What are other common issues with on farm fuel storage?

5. What are other common issues with on farm fuel storage? 5. What are other common issues with on farm fuel storage? Storing fuel on the farm poses some interesting challenges to producers in order to maintain the quality and quantity of the product. Changes

More information

EC-S SERIES COOLING TOWER. High Performance Counterflow Type SINGLE-CELL UP TO 1250HRT COOLING CAPACITY

EC-S SERIES COOLING TOWER. High Performance Counterflow Type SINGLE-CELL UP TO 1250HRT COOLING CAPACITY EC-S SERIES COOLING TOWER SINGLE-CELL UP TO 1HRT COOLING CAPACITY High Performance Counterflow Type ENERGY CONSERVATION SPACE SAVING DESIGN FLEXIBILITY MEMBER CERTIFICATE NUMBER: 12-41-01 EC-S Series is

More information

Heating and Gas Installations - December 2014

Heating and Gas Installations - December 2014 This is an example of good practice maintenance specifications. It is not exhaustive and should only be used to assist with facilities management or specification of a maintenance contract. Emergency Gas

More information

Driver Operator Aerials: Maintenance and Testing. 4 Skills Total. NFPA 1002, Standard for Driver Operator Professional Qualifications, 2014 Edition

Driver Operator Aerials: Maintenance and Testing. 4 Skills Total. NFPA 1002, Standard for Driver Operator Professional Qualifications, 2014 Edition Driver Operator Aerials: Maintenance and Testing 4 Skills Total NFPA 1002, Standard for Driver Operator Professional Qualifications, 2014 Edition Driver Operator Aerials Maintenance & Testing Skills Book

More information

Operators manual Bumpa 8 metre 110v Bumpa 10 metre 110v

Operators manual Bumpa 8 metre 110v Bumpa 10 metre 110v Operators manual Bumpa 8 metre 110v Bumpa 10 metre 110v SAFETY RULES Mk3 Bumpa Conveyor Danger Failure to obey the instructions and safety rules in this manual will result in death or serious injury. Do

More information

INSTALLATION and OPERATION BALL DISPENSER MODEL NOS: BD-001AN, -002, -003AN, -004, -010AN, -011

INSTALLATION and OPERATION BALL DISPENSER MODEL NOS: BD-001AN, -002, -003AN, -004, -010AN, -011 Easy Picker Golf Products, Inc. 415 Leonard Blvd. N., Lehigh Acres, FL 33971 PH: 239-368-6600 FAX: 239-369-1579 Service: 800-982-4653 SALES: 800-641-4653 www.easypicker.com salesdept@easypicker.com INSTALLATION

More information

CENTRIFUGAL CHILLER. Lubrication System Pull oil sample for spectroscopic analysis.

CENTRIFUGAL CHILLER. Lubrication System Pull oil sample for spectroscopic analysis. CENTRIFUGAL CHILLER Annual Inspection Refrigerant Circuit Check and record refrigerant level Inspect for leak results Calculate refrigerant lass and report to the customer. Repair minor leaks as required

More information

UBC Technical Guidelines Section Edition Commissioning of Electrical Systems Page 1 of 5

UBC Technical Guidelines Section Edition Commissioning of Electrical Systems Page 1 of 5 Page 1 of 5 1.0 GENERAL 1.1 Coordination Requirements.1 UBC Building Operations Electrical Technical Support.2 UBC Energy & Water Services 2.0 REQUIREMENTS FOR COMMISSIONING AND TESTING 2.1 Testing.1 Unit

More information

SPILL PREVENTION CONTROL AND COUNTERMEASURES PLAN (SPCCP) FOR FUELING AT STATION 63

SPILL PREVENTION CONTROL AND COUNTERMEASURES PLAN (SPCCP) FOR FUELING AT STATION 63 SPILL PREVENTION CONTROL AND COUNTERMEASURES PLAN (SPCCP) FOR FUELING AT STATION 63 The attached SPCC Plan contains introductory information, a description of facilities and practices employed to prevent

More information

OWNER S MANUAL EVOLUTION 3500, 4500, 5500, & 8500 SERIES PUMPS

OWNER S MANUAL EVOLUTION 3500, 4500, 5500, & 8500 SERIES PUMPS OWNER S MANUAL EVOLUTION 3500, 4500, 5500, & 8500 SERIES PUMPS IMPORTANT SAFETY INSTRUCTIONS When installing and using this electrical equipment, basic safety precautions should always be followed, including

More information

Operation & Maintenance Manual

Operation & Maintenance Manual Operation & Maintenance Manual Submersible pumps type LANDY DTP. Landustrie Sneek BV Tel. +31 515-486888 Pieter Zeemanstraat 6 Fax +31 515-412398 P. O. Box 199 info@landustrie.nl 8600 AD Sneek, Holland

More information

ALTERNATOR STARTUP Turning gear to full operation. Procedure initiated by:. 7/03 Before starting procedure, remove all check marks.

ALTERNATOR STARTUP Turning gear to full operation. Procedure initiated by:. 7/03 Before starting procedure, remove all check marks. ALTERNATOR STARTUP Turning gear to full operation. Procedure initiated by:. 7/03 Before starting procedure, remove all check marks. 1. Check log book for incomplete compliance for further operation. 2.

More information

South Tacoma Groundwater Protection District Spill Prevention and Response Plan

South Tacoma Groundwater Protection District Spill Prevention and Response Plan Name of Business Address Facility Phone ( ) - Types of Work or Hazardous Substances Used This spill plan is designed to handle the requirements for this system and associated hazardous substances. Update

More information

Crispin Valves Operating Guide. Crispin

Crispin Valves Operating Guide. Crispin Crispin Valves Operating Guide Crispin Since 1905 Crispin Multiplex Manufacturing Co. 600 Fowler Avenue Berwick, PA 18603 1-800-AIR-VALV T: (570) 752-4524 F: (570) 752-4962 www.crispinvalve.com sales@crispinvalve.com

More information

SPRING CENTER PIVOT AND LATERAL

SPRING CENTER PIVOT AND LATERAL SPRING CENTER PIVOT AND LATERAL IRRIGATION SYSTEM PREPARATION Wesley Porter, University of Georgia, Department of Crop and Soil Sciences Calvin D. Perry, University of Georgia, C.M. Stripling Irrigation

More information

Cooling System. Table of Contents

Cooling System. Table of Contents Sub-Headings Safety 2 s 2 Cautions 2 Notes 2 Introduction 2 General Specifications 2 Engine 2 Coolant 2 Routine Maintenance 2 Hose Connections 4 Radiator, Charge Air and Heater Cores 4 Cooling System Leaks

More information

Before equipment use, please read this operation manual carefully. Serial Number: Date Purchased:

Before equipment use, please read this operation manual carefully. Serial Number: Date Purchased: Pushed & Geared Trolleys OPERATION MANUAL This operation manual is intended as an instruction manual for trained personnel who are in charge of installation, maintenance, repair etc. Before equipment use,

More information

TEMPORARY ELECTRIC WIRING FOR CARNIVALS, CONVENTIONS, EXHIBITIONS, FAIRS AND SIMILAR USES

TEMPORARY ELECTRIC WIRING FOR CARNIVALS, CONVENTIONS, EXHIBITIONS, FAIRS AND SIMILAR USES INFORMATION BULLETIN / PUBLIC - ELECTRICAL CODE REFERENCE NO.: LAMC 93.0230 Effective: 3-24-69 DOCUMENT NO. P/EC 2002-006 Revised: 11-17-00 Previously Issued As: RGA #7-69 TEMPORARY ELECTRIC WIRING FOR

More information

Battery Backup Sump Pump System Instruction Manual

Battery Backup Sump Pump System Instruction Manual Battery Backup Sump Pump System Instruction Manual Push button second to test or reset alarm. Push 5 seconds to silence alarm for 24 hours. Warning alarms The fluid in the battery is low. Add distilled

More information

OPERATION & MAINTENANCE MANUAL HANGZHOU FLYING TECHNOLOGY CO., LTD.

OPERATION & MAINTENANCE MANUAL HANGZHOU FLYING TECHNOLOGY CO., LTD. CENTRIFUGAL PUMP ZPD6-25*7 OPERATION & MAINTENANCE MANUAL HANGZHOU FLYING TECHNOLOGY CO., LTD. CONTENTS 1. GENERAL (1) 2. NOMENCLATURE OF THE TYPE (1) 3. MAIN TECHNICAL SPECIFICATIONS RANGE (1) 4. STANDARD

More information

University of Houston Master Construction Specifications Insert Project Name

University of Houston Master Construction Specifications Insert Project Name SECTION 26 13 13 MEDIUM VOLTAGE SWITCHGEAR PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The Conditions of the Contract and applicable requirements of Divisions 0 and 1 and Section 26 00 01, Electrical General

More information

Notice. Overhead Crane Safety and Inspection Requirements. Daily Operator Inspection Reuirements. Daily Operator Inspection Requirements

Notice. Overhead Crane Safety and Inspection Requirements. Daily Operator Inspection Reuirements. Daily Operator Inspection Requirements Notice Overhead Crane Safety and Inspection Requirements It is the responsibility of the Owner/User to install, inspect, test, maintain, and operate a crane or associated lifting equipment in accordance

More information

SUBMERSIBLE PUMP HSE RANGE

SUBMERSIBLE PUMP HSE RANGE SUBMERSIBLE PUMP HSE RANGE OPERATION & MAINTENANCE INSTRUCTIONS 0806 SPECIFICATIONS Model No. HSE120* HSE200 HSE300*/ HSE360*/ HSEC400* HSE301 HSE361 Outlet Dia. (mm/inches) 32/1-1/4 38/1-1/2 50/2 50/2

More information

SECTION ENCLOSED SWITCHES AND CIRCUIT BREAKERS

SECTION ENCLOSED SWITCHES AND CIRCUIT BREAKERS SECTION 26 28 16 ENCLOSED SWITCHES AND PART 1 - GENERAL 1.1 SUMMARY A. Section includes the following individually mounted, enclosed switches and circuit breakers rated 600V AC and less: 1. Fusible switches.

More information

OBAE, OBAEXU, ON BOARD Battery Chargers

OBAE, OBAEXU, ON BOARD Battery Chargers C O R P O R A T IO N O P E R A T I N G I N S T R U C T I O N S OBAE, OBAEXU, ON BOARD Battery Chargers INTRODUCTION: The OBAE line of chargers are designed for the permanent installation on battery powered

More information

Example Maintenance Schedule 1. The attached document is an example of an acceptable maintenance schedule.

Example Maintenance Schedule 1. The attached document is an example of an acceptable maintenance schedule. IRRIGATION TRAINING & RESEARCH CENTER California Polytechnic State University San Luis Obispo, CA 93407-0730 Phone: 805.756.2434 FAX: 805.756.2433 www.itrc.org Example Maintenance Schedule 1 The attached

More information

SECTION 14: AERIAL LIFT PROGRAM

SECTION 14: AERIAL LIFT PROGRAM SECTION 14: AERIAL LIFT PROGRAM Fisher Auto Parts is committed to promoting a safe and healthy environment for all employees and customers. Protection from accidental loss of any resources, especially

More information

Operators manual Hoddi 6 metre 110v Bumpa 8 metre 110v Bumpa 10 metre 110v

Operators manual Hoddi 6 metre 110v Bumpa 8 metre 110v Bumpa 10 metre 110v Operators manual Hoddi 6 metre 110v Bumpa 8 metre 110v Bumpa 10 metre 110v SAFETY RULES Mk3 Bumpa Conveyor Danger Failure to obey the instructions and safety rules in this manual will result in death or

More information

User s Manual D-Series Blowers and Exhausters

User s Manual D-Series Blowers and Exhausters User s Manual D-Series Blowers and Exhausters D05-1 ½ HP TEFC 115/230 VOLTS, 1 PH D05-3 ½ HP TEFC 208/230/460 VOLTS, 3 PH D10-1 1 HP TEFC 115/230 VOLTS, 1 PH D10-3 1 HP TEFC 208/230/460 VOLTS, 3 PH D15-1

More information

Regular inspections are recommended to ensure that the system is functioning as designed.

Regular inspections are recommended to ensure that the system is functioning as designed. SiteSaver Manufacturer s Instruction Manual Regular inspections are recommended to ensure that the system is functioning as designed. Please contact your Authorized SiteSaver Representative if you have

More information

NGR NGR NEUTRAL GROUNDING RESISTOR

NGR NGR NEUTRAL GROUNDING RESISTOR NGR NGR NEUTRAL GROUNDING RESISTOR Installation and Maintenance Instruction Manual C-100EM, September 2014 NEUTRAL GROUNDING RESISTORS WARNING Neutral Grounding (Earthing) resistors, like all high voltage

More information

WIRING DESIGN & PROTECTION REQUIREMENTS CHECKLIST

WIRING DESIGN & PROTECTION REQUIREMENTS CHECKLIST WIRING DESIGN & PROTECTION REQUIREMENTS CHECKLIST Use & Identification of Grounded and Grounding Conductors YES NO N/A Grounded conductors are identifiable and distinguishable from all other conductors.

More information

TC Series Cooling Systems

TC Series Cooling Systems TC Series Cooling Systems Table of Contents Table of Contents...1 List of Figures...1 Safety...2 Introduction...2 General Specifications...2 Types of Coolant...2 Routine Maintenance...2 Surge Tank Coolant

More information

INSTALLATION & OPERATING INSTRUCTIONS

INSTALLATION & OPERATING INSTRUCTIONS INSTALLATION & OPERATING INSTRUCTIONS WARNING RISK OF ELECTRIC SHOCK. CONNECT ONLY TO A CIRCUIT PROTECTED BY A GROUND-FAULT CIRCUIT-INTERRUPTER. THE UNIT SHOULD BE INSTALLED BY A QUALIFIED SERVICE REPRESENTATIVE.

More information

Danfoss Butterfly Valve

Danfoss Butterfly Valve Triple Eccentric Danfoss Butterfly Valve Operating, installation and maintenance instructions Edition 1 / January 2015. Table of Contents: 1 Overview... - 1-2 General... - 1-2.1 Safety notes... - 1-2.2

More information

Thermal Wraps. GT Exhaust Accessories Installation and Operation Manual. Rev. A. Copyright 2012 GT Exhaust, Inc. All Rights Reserved

Thermal Wraps. GT Exhaust Accessories Installation and Operation Manual. Rev. A. Copyright 2012 GT Exhaust, Inc. All Rights Reserved Thermal Wraps GT Exhaust Accessories Installation and Operation Manual Rev. A Copyright 2012 GT Exhaust, Inc. All Rights Reserved Published: December 20, 2012 NOTICE The instructions herein must be expressly

More information

Sentinel Field Satellite Controller

Sentinel Field Satellite Controller WARNING HIGH VOLTAGE 115V M AP Sentinel Field Satellite Controller Installation Instructions Important: For your protection and the safety of the product user, please comply with all Caution and Warning

More information

Above Ground Oil Tanks

Above Ground Oil Tanks Helping you identify and manage risk Above Ground Oil Tanks In many regions across Canada particularly in Québec and the Atlantic provinces above ground oil tanks are still being used to heat institutional

More information

INSTALLATION and OPERATION BALL DISPENSER MODEL NOS: BD-001 THRU BD-004, BD-010, BD-011

INSTALLATION and OPERATION BALL DISPENSER MODEL NOS: BD-001 THRU BD-004, BD-010, BD-011 Easy Picker Golf Products, Inc. 415 Leonard Blvd. N., Lehigh Acres, FL 33971 PH: 239-368-6600 FAX: 239-369-1579 Service: 800-982-4653 SALES: 800-641-4653 www.easypicker.com salesdept@easypicker.com INSTALLATION

More information

Operating & Maintenance Manual

Operating & Maintenance Manual Operating & Maintenance Manual CONTENTS CONTENTS INTRODUCTION Introduction 2 Operating Specifications 3 Working Envelope Diagram 3 Do s and Don ts 4 Primary Components 5 Operating Procedures (incl. Emergency

More information

SLR / SLR-S/N. Instruction Manual. Walrus America Inc

SLR / SLR-S/N. Instruction Manual. Walrus America Inc SLR / SLR-S/N Instruction Manual Walrus America Inc 1. Installation and Connection 1.1. Pump Installation The pump should be sited in a well ventilated and frost-free position. The distance between pumps-motors

More information

INSTALL SERVICE- ENTRANCE SYSTEMS

INSTALL SERVICE- ENTRANCE SYSTEMS SUBCOURSE EN5141 EDITION B US ARMY ENGINEER SCHOOL INSTALL SERVICE- ENTRANCE SYSTEMS INSTALL SERVICE- ENTRANCE SYSTEMS Subcourse Number EN5141 EDITION B United States Army Engineer School Fort Leonard

More information

Operations and Service Manual. X30208 Load Bank

Operations and Service Manual. X30208 Load Bank Operations and Service Manual Read all instructions before using the load bank Contents 1. Components... 3 Total Assembly... 3 2) Specifications... 4 a)... 4 3) Receiving... 5 4) Safety... 5 a) Ground

More information

Provide the following information: Site Address: City: Zip: Project Contact Name: Phone No.: ( ) ext.

Provide the following information: Site Address: City: Zip: Project Contact Name: Phone No.: ( ) ext. UNDERGROUND STORAGE TANK SYSTEM INSTALLATION/UPGRADE SUPPLEMENT For use by Unidocs Member Agencies or where approved by your Local Jurisdiction Authority Cited: California Fire (CFC); Chapter 6.7, Health

More information

CIRCLE SEAL CONTROLS

CIRCLE SEAL CONTROLS CIRCLE SEAL CONTROLS ATKOMATIC SOLENOID VALVES INSTALLATION, MAINTENANCE, AND OPERATION INSTRUCTIONS 3000 SERIES Bronze, Normally Closed, Direct Lift Installation Instructions WARNING: These instructions

More information

Cla-Val. Service Training Manual. Simple solutions plus learning with a purpose

Cla-Val. Service Training Manual. Simple solutions plus learning with a purpose Cla-Val Service Training Manual Simple solutions plus learning with a purpose 5 Application Series Section General Identify What Valve You Have 5-1 Rate of Flow 40 Series 5-2 Pressure Relief 50 Series

More information

Seabee Annual Inspection Procedures

Seabee Annual Inspection Procedures Procedures Due to the wide variety of Seabee s flying out there, these procedures should be modified to fit YOUR Seabee. Make sure that all AD s are complied with as well as any required Service Bulletins

More information

AVOIDING ELECTROCUTION HAZARDS

AVOIDING ELECTROCUTION HAZARDS Print AVOIDING ELECTROCUTION HAZARDS MODULE DESCRIPTION This module will provide information that helps you recognize and avoid common electrocution hazards in your work environment. OBJECTIVES After completing

More information

Submersible Turbine Pump (Volute) STM type (T, TU, and TU3) SSTM type (TUA)

Submersible Turbine Pump (Volute) STM type (T, TU, and TU3) SSTM type (TUA) Instruction Manual Installation Manual Submersible Turbine Pump (Volute) STM type (T, TU, and TU3) SSTM type (TUA) Thank you for your purchase of Teral (Volute) Submersible Turbine Pump. To the customers

More information

OWNER S MANUAL SELF-PRIMING PORTABLE UTILITY PUMP

OWNER S MANUAL SELF-PRIMING PORTABLE UTILITY PUMP Model 54011-0 OWNER S MANUAL SELF-PRIMING PORTABLE UTILITY PUMP Questions, problems, missing parts? Before returning to the store call AQUAPRO Customer Service 8 a.m. - 5 p.m., EST, Monday-Friday 1-844-242-2475

More information

USER S MANUAL FOR F & Q. Submersible Sewage Pumps

USER S MANUAL FOR F & Q. Submersible Sewage Pumps USER S MANUAL FOR F & Q Submersible Sewage Pumps 100WQ Series The F&Q pumps are carefully inspected and tested to ensure operating performance and safety. However, failure to follow the instructions and

More information

Earthsafe Systems, Inc. Page 1

Earthsafe Systems, Inc. Page 1 ESS.WP.531. YQA Fuel Transfer Your Questions Answered (47) Fuel Transfer Systems earth safe Fuel Systems for Critical Power. 5.1 What types of pumps are used for fuel transfer? Fuel transfer pumps are

More information

An average of one worker is electrocuted on the job every day There are four main types of electrical injuries:

An average of one worker is electrocuted on the job every day There are four main types of electrical injuries: Electrical Safety Introduction An average of one worker is electrocuted on the job every day There are four main types of electrical injuries: Electrocution (death due to electrical shock) Electrical shock

More information

Operating Manual for Rotary Gear Pumps CMI, S.A. (Mendaro, Guipuzkoa, Spain)

Operating Manual for Rotary Gear Pumps CMI, S.A. (Mendaro, Guipuzkoa, Spain) Operating Manual for Rotary Gear Pumps CMI, S.A. (Mendaro, Guipuzkoa, Spain) Pre-Installation 1. Choose a location that is easily accessible for pump servicing. Ensure adequate electrical service is available.

More information

Instruction Booklet for the Installation, Operation and Maintenance of Type 5-15 kv VCP-WG Vacuum Circuit Breaker 4000A MiniMod

Instruction Booklet for the Installation, Operation and Maintenance of Type 5-15 kv VCP-WG Vacuum Circuit Breaker 4000A MiniMod Instruction Booklet for the Installation, Operation and Maintenance of Type 5-15 kv VCP-WG Vacuum Circuit Breaker 4000A MiniMod Eaton Corporation Moon Twp, PA. U.S.A. 15108 1 INTRODUCTION READ AND UNDERSTAND

More information