Voorkomen van schade door derden aan land- en zeekabels. Dik van Houwelingen Risico Management Stedin Cigre B1-NL

Size: px
Start display at page:

Download "Voorkomen van schade door derden aan land- en zeekabels. Dik van Houwelingen Risico Management Stedin Cigre B1-NL"

Transcription

1 Voorkomen van schade door derden aan land- en zeekabels Dik van Houwelingen Risico Management Stedin Cigre B1-NL 1

2 Third-Party Damage to Underground and Submarine Cables Technical Brochure 398 Cigré Working Group B1.21 December

3 Contents Working group B1.21 Background Underground cables Submarine cables Risk based approach Summary and conclusion 3

4 Working Group B1.21 members Christian Jensen - Denmark (Convenor) Bart Mampaey - Belgium Josip Antic - Croatia Peggy Chevalier - France Sergio Tricoli - Italy Georg Balog - Norway Fer van Stekelenburg - The Netherlands Cristian Sorin Pispiris - Romania Maria Dolores Lopez Menchero Cordoba - Spain Allen MacPhail Canada (corresponding) 4

5 Background Frequently damage to power cables by external agencies, or third-parties Greatest threats Excavating for underground cables Anchors or fishing for submarine cables Much has already been done to minimize 'internal' failures Protection from third-party damage usually treated somewhat arbitrarily industry guidelines to reduce such risks are minimal Damage results in high repair costs and loss of reliability 5

6 Third party threats: Underground Cables Main threats to underground cables: Excavators Horizontal drilling, pipe jacking, etc. Vertical drilling (e.g. geotechnical boreholes) Incorrect information on cable location (X,Y, Z) Incorrect use of information: The information about cable route and cable depth is used incorrectly (i.e. map upside down). 6

7 Third party threats: Underground Cables Other threats: Traffic and heavy-duty vehicles (e.g. vibration) Vegetation (e.g. depleting soil moisture and root damage) Vandalism Influence from other installations (e.g. adjacent building foundations) Change in the thermal conditions of the surroundings Farmers draining fields (lowering water table) High depth ploughing 7

8 Average annual failure rate by installation type: Underground Cables Indication of which type of installation is most exposed to thirdparty damage (based on international survey by Cigre) Voltage level 60 to 219 kv Average Yearly Fault rate per 100 km circuit beginning 2001 to end 2005 km installed (Info B1.10 and B1.21) External - Other Physical External Parameters Direct Burial Ducts + pipes Tunnels Others (Bridges, troughs, Air) External - Third Party Mechanical External - Total Internal (cable only) to 500 kv km installed (Info B1.10 and B1.21) External - Other Physical External Parameters External - Third Party Mechanical External - Total Internal (cable only)

9 Survey conclusions: Underground Cables Failure caused by external agents is the most frequent About 70% of the failures are caused by mechanical works About 40% of third-party damage is related to insufficient information exchange Concrete encased ducts, pipes and tunnels gives a very good reduction in external damage by third-parties Cables in ducts or pipes can result in a reduction in transmission capacity Decide whether extra costs are justified, considering other possible benefits, e.g. lower construction impact, reduced repair costs, reliability improvements, etc. 9

10 How to reduce the risk of third-party damage: Underground Cables Improve mechanical protection by installing cables in ducts or pipes and encasing with concrete or equal Improve warning marker systems near cables Dialogue with third parties - excavation and construction companies Keep accurate and up-to-date cable location records Provide accurate and timely information to third-parties 10

11 How to reduce the risk of third-party damage: Underground Cables Establish processes for third-parties to get permission to do their construction work. Assist the third-party to understand the cable location information and consequences of damage. Monitor third party activities at the work site. Implement a Dial-before-you-dig program. 11

12 GBKN How to reduce the risk of third-party damage: Dutch approach Dial-before-you-dig program: Wet Informatie Uitwisseling Ondergrondse Netten Kadaster KOL Netbeheerders Grondroerder Predecessor of KOL was KLIC (kabel- en leidingen informatie centrum) Diggers must contact KOL >= 3 days before work starts Grid operators must supply grid information within 24 hours after request of digger Works with internet-portal 12

13 How to discover and detect third party damage to underground cables It may be possible to detect the damaged state before the final destroying effect is reached The following methods are possible for detecting shortterm effects, that may not immediately result in failure Regular DC-voltage testing of cable sheath insulation On-line monitoring of the sheath current in crossbonded systems On-line monitoring of corrosion potentials or cathodic protection current 13

14 How to discover and detect third party damage to underground cables Apply Distributed Temperature Sensing systems to monitor abnormal changes in temperature profiles along cable route Install simple pilot wires or fibres in the vicinity of the cables; if continuity is broken, an alarm could be raised Apply sensitive on-line monitoring of fluid pressures, volumes, flow rates, etc., for fluid-filled cable systems Regular patrols of cable routes 14

15 Submarine Cables: Conclusions from the service experience survey (not including internal failures) Questionnaire did not provide reliable conclusions about the relation between installation method and failure probability. The average annual failure rate seems to be significantly lower for submarine cables than for underground cables. External damage is the most common cause of submarine cable failures. Fishing trawler and beam-trawl shoe Penetration of smaller anchors and fishing gear versus soil hardness 15

16 Submarine cables: Results from the service experience survey (not including internal failures) Voltage level 60 to 219 kv 220 to 500 kv km circuit installed (cumulative up to 2005) AC SCFF/SCOF AC HPFF/HPOF AC XLPE DC MI Internal (Cable only) External - Total External - Anchor External - Trawling External - Excavation Other + Unknown Total km circuit installed (cumulative up to 2005) DC SCFF/SCOF Internal (Cable only) External - Total External - Anchor External - Trawling External - Excavation Other + Unknown Total

17 Third party threats to submarine (onder rivier) cables Main threats to submarine cables are: Anchor contact Dragging of anchor chain Abrasion by tugboat tow lines Fishing (trawlers) Vessels running aground 17

18 Third party threats to submarine cables Ocean dredging and dumping of dredged material or garbage Military activity and unexploded ordnance Other installations including pipes, telecommunication cables, etc. The influence of other existing cables 18

19 Reducing the risk of third-party damage to submarine cables Bury submarine cables to reduce risk from fishing gear and very small anchors. Inform fishing authorities, marine pilots and owners/captains of vessels of cable corridor locations and areas where fishing/anchoring is restricted. 19

20 Reducing the risk of third-party damage to submarine cables The information shared between fishermen, mariners and utilities can be divided into two types: Information that fishermen and mariners must have on board Submarine cable routes Restrictions of activities in areas where submarine cables are positioned Protection corridors near submarine cables Information that utilities are required to provide to relevant organisations New cables installed Re-laid cable after maintenance or repair operations 20

21 Reducing the risk of third-party damage to submarine cables Maintain a good relationship with local fishermen and commercial vessel operators so that everyone is aware of the cables. Maintain accurate as-laid records of cable locations. Provide accurate records to appropriate marine charting authorities. 21

22 How to discover and detect third party damage to submarine cables Cable inspection using a ROV Optical or acoustic when unburied cable A survey showing the cable burial depth using an electronic cable tracker on an ROV 22

23 How to discover and detect third party damage to submarine cables Monitor cables with integrated optical fibres using DTS systems. DTS used for temperature sensing and ampacity determination. Place optical fibre above main cable: Highest temperature First to be hit by anchors 23

24 How to discover and detect third party damage to submarine cables (naar achteren) Other events identified using periodic geophysical surveys A side scan sonar survey to show the trawling activity in the area any objects (anchors, fishing net and trawl, anchor chains etc.) fastened to the cable whether the cable is visible and therefore unprotected. A high resolution multi-beam echo-sounder survey shortly after the cables are installed periodically repeated and changed conditions noted, such as new trawler scars, anchor drag marks, sand wave migration, sea bed mobility exposing buried cables, etc. 24

25 Risk assessment of cable systems Third-party damage can be a complex process which sometimes consists of several interdependent events. To minimise the overall risk of the cable system look at possible events followed by damaged states damage effects for the damaged states how severe is the damage effect for the cable system? Mitigation efforts must be prioritised correctly Focus must be on the damage events and damaged states with the most severe effects and the highest probability 25

26 Criticality (Risk) Matrix Criticality = Probability x Severity To help analyse, each are shown in a criticality matrix (risk matrix). Red: Action and studies needed to reduce the criticality. Yellow: Action and studies needed to check criticality and possibly improve. Green: Area with low risk, where no further studies or action are required. Probability of damaged state V IV III II I Severity of effect I II II I I V V There are two possible ways of reducing the criticality or risk: Reduce probability Reduce severity 26

27 Probability classes (example) Level Probability Description V > 0.5 /(100 km x year) Very high probability IV 0.5/(100 km x year) High probability III 0.25/(100 km x year) Average probability for cable systems II 0.1/(100 km x year) Low probability I 0.05/(100 km x year) Very low probability 27

28 Consequences classes (example) Level Consequence Description V Catastrophic Breakdown of all or part of the network Very high costs for the market IV Critical Breakdown of part of network High costs for the market III Major Breakdown of more than one line High costs for the market II Minor Breakdown of one line Moderate costs for the market I Negligible Planned disconnection of line for repair Low costs for the market 28

29 Summary and Conclusions The risk of internal damage has already been reduced The risk of underground cable damage by a third party is about 2.5 times higher than an internal failure for XLPE cable systems. Risk of external damage is approximately ten times greater for direct buried cables compared to in ducts or pipes. 29

30 Summary and Conclusions The number of third-party damage events can be reduced Good cable location records with geographical coordinates Improvement of information provided to parties on how to obtain permission for planned excavation or drilling activities Improved education and exchange of information between the enterprises regarding the problem Improved mechanical protection of cables Applying structured risk assessment methods 30

Curriculum Vitae Fredrik Rüter 19 December 2013

Curriculum Vitae Fredrik Rüter 19 December 2013 Name RÜTER Fredrik Date of Birth 8 May 1960 Nationality Position Languages Coordinates Swedish Senior Consultant Swedish: mother tongue English: fluent (business, conversation, reading, writing) German,

More information

Hans Kvarme Nexans Norway AS. Offshore vindkraft Oslo, 14. desember 2010

Hans Kvarme Nexans Norway AS. Offshore vindkraft Oslo, 14. desember 2010 Hans Kvarme Nexans Norway AS Offshore vindkraft Oslo, 14. desember 2010 Nexans Norway AS Rognan Oslo (HQ) Namsos Langhus Karmøy Halden Telecom and Building Energy Networks Energy 2 Turn-key Supplier 1

More information

Maintenance for HV Cables and Accessories. December 2014 Tutorial, WG B1.40

Maintenance for HV Cables and Accessories. December 2014 Tutorial, WG B1.40 Maintenance for HV Cables and Accessories December 2014 Tutorial, WG B1.40 1 Table of Contents Introduction Definitions Maintenance strategies Survey of presently used maintenance programs Failure modes/related

More information

THE PROTEAN AND POC-MAST DESIGN

THE PROTEAN AND POC-MAST DESIGN THE PROTEAN AND POC-MAST DESIGN Contents 1. The changing landscape of generation for power transmission and distribution. 2. The Holford rules and recommendations for OHL routing and design. 3. The current

More information

Pipeline Safety Information. for public officials

Pipeline Safety Information. for public officials Pipeline Safety Information for public officials statoil emergency NUMBERS Statoil s highest priority is safe and reliable delivery of natural gas and petroleum products. We would like for you to know

More information

European technology leadership to address infrastructure bottlenecks

European technology leadership to address infrastructure bottlenecks European technology leadership to address infrastructure bottlenecks Presentation tot&d and Smart Grids Europe 2012 Dr. Volker Wendt, Director Public Affairs Amsterdam, 10 October 2012 Europacable, Boulevard

More information

Installation and Service. We provide equipment and skilled personnel for installation, testing, maintenance and repair of cable systems worldwide.

Installation and Service. We provide equipment and skilled personnel for installation, testing, maintenance and repair of cable systems worldwide. Installation and Service We provide equipment and skilled personnel for installation, testing, maintenance and repair of cable systems worldwide. Installation Over many decades ABB has collected a vast

More information

the power to be transmitted; the length of the connection; the characteristics and the accessibility of the route; environmental constraints.

the power to be transmitted; the length of the connection; the characteristics and the accessibility of the route; environmental constraints. 1 Introduction This note has been prepared by Europacable. Its purpose is to provide a high level overview of current developments in Extra High Voltage (EHV) Alternating Current (AC) and Direct Current

More information

Guideline for Parallel Grid Exit Point Connection 28/10/2010

Guideline for Parallel Grid Exit Point Connection 28/10/2010 Guideline for Parallel Grid Exit Point Connection 28/10/2010 Guideline for Parallel Grid Exit Point Connection Page 2 of 11 TABLE OF CONTENTS 1 PURPOSE... 3 1.1 Pupose of the document... 3 2 BACKGROUND

More information

Ricardo-AEA. Passenger car and van CO 2 regulations stakeholder meeting. Sujith Kollamthodi 23 rd May

Ricardo-AEA. Passenger car and van CO 2 regulations stakeholder meeting. Sujith Kollamthodi 23 rd May Ricardo-AEA Data gathering and analysis to improve understanding of the impact of mileage on the cost-effectiveness of Light-Duty vehicles CO2 Regulation Passenger car and van CO 2 regulations stakeholder

More information

Jack Hammering of Electrical Conduit Incident Root Cause Analysis Final Report

Jack Hammering of Electrical Conduit Incident Root Cause Analysis Final Report Root Cause Analysis Final Report Department: O&M Incident Date: Jobsite: Sun Valley Mall just outside of Lucille s Smokehouse BBQ Nature/Severity: No injury; Damage to 480 V electrical power line Incident

More information

Frequently Asked Questions Directive 079: Surface Development in Proximity to Abandoned Wells

Frequently Asked Questions Directive 079: Surface Development in Proximity to Abandoned Wells Frequently Asked Questions Directive 079: Surface Development in Proximity to Abandoned Wells July 2018 General Q1. How can I determine if a well is abandoned? A1. A third party can see if it is abandoned

More information

STAY SAFE NEAR ELECTRICITY

STAY SAFE NEAR ELECTRICITY IMPORTANT SAFETY INFORMATION STAY SAFE NEAR ELECTRICITY Your guide to working safely around Aurora Energy s electricity and communications networks Keep safe around electricity At Aurora Energy we want

More information

REDUCING THE OCCURRENCES AND IMPACT OF FREIGHT TRAIN DERAILMENTS

REDUCING THE OCCURRENCES AND IMPACT OF FREIGHT TRAIN DERAILMENTS REDUCING THE OCCURRENCES AND IMPACT OF FREIGHT TRAIN DERAILMENTS D-Rail Final Workshop 12 th November - Stockholm Monitoring and supervision concepts and techniques for derailments investigation Antonella

More information

Achievement and experience in service of long length HV DC electrical links by insulated power cables

Achievement and experience in service of long length HV DC electrical links by insulated power cables Achievement and experience in service of long length HV DC electrical links by insulated power cables Marco Marelli, Italy Foz do Iguaçu September 6 th, 2013 1 HVDC Systems 2 3 4 5 HVDC Cables Service

More information

Labour Market Latest Trends- 1st quarter 2008 data 1

Labour Market Latest Trends- 1st quarter 2008 data 1 Population and social conditions Author: Fabrice ROMANS Data in focus 34/2008 Labour Market Latest Trends- 1st quarter 2008 data 1 Chart 1: Employment rate 2 (15-64 years) for from 2000Q1 to 2008Q1 % 66.5

More information

COMMISSION IMPLEMENTING DECISION

COMMISSION IMPLEMENTING DECISION L 188/50 Official Journal of the European Union 19.7.2011 COMMISSION IMPLEMENTING DECISION of 11 July 2011 on a Union financial contribution towards Member States fisheries control, inspection and surveillance

More information

Brill (Scophthalmus rhombus) in Subarea 4 and divisions 3.a and 7.d e (North Sea, Skagerrak and Kattegat, English Channel)

Brill (Scophthalmus rhombus) in Subarea 4 and divisions 3.a and 7.d e (North Sea, Skagerrak and Kattegat, English Channel) ICES Advice on fishing opportunities, catch, and effort Celtic Seas and Greater North Sea Ecoregions Published 30 June 2017 DOI: 10.17895/ices.pub.3058 Brill (Scophthalmus rhombus) in Subarea 4 and divisions

More information

TACOMA PUMP STATION 4103 FORCE MAIN HDD PROJECT: A SHORT BORE WITH TALL CHALLENGES

TACOMA PUMP STATION 4103 FORCE MAIN HDD PROJECT: A SHORT BORE WITH TALL CHALLENGES North American Society for Trenchless Technology (NASTT) No-Dig Show 2011 Washington, D.C. March 27-31, 2011 Paper D-2-04 TACOMA PUMP STATION 4103 FORCE MAIN HDD PROJECT: A SHORT BORE WITH TALL CHALLENGES

More information

Flounder (Platichthys flesus) in Subarea 4 and Division 3.a (North Sea, Skagerrak and Kattegat)

Flounder (Platichthys flesus) in Subarea 4 and Division 3.a (North Sea, Skagerrak and Kattegat) ICES Advice on fishing opportunities, catch, and effort Greater North Sea Ecoregion Published 30 June 2017 DOI: 10.17895/ices.pub.3113 Flounder (Platichthys flesus) in Subarea 4 and Division 3.a (North

More information

DEPLOYMENT STRATEGIES FOR CLEAN AND FUEL EFFICIENT VEHICLES: EFFECTIVENESS OF INFORMATION AND SENSITIZATION IN INFLUENCING PURCHASE BEHAVIOUR

DEPLOYMENT STRATEGIES FOR CLEAN AND FUEL EFFICIENT VEHICLES: EFFECTIVENESS OF INFORMATION AND SENSITIZATION IN INFLUENCING PURCHASE BEHAVIOUR DEPLOYMENT STRATEGIES FOR CLEAN AND FUEL EFFICIENT VEHICLES: EFFECTIVENESS OF INFORMATION AND SENSITIZATION IN INFLUENCING PURCHASE BEHAVIOUR Leen GOVAERTS, Erwin CORNELIS VITO, leen.govaerts@vito.be ABSTRACT

More information

Advanced emergency braking systems for commercial vehicles

Advanced emergency braking systems for commercial vehicles German Road Safety Council 2016 Advanced emergency braking systems for commercial vehicles Resolution taken on 9 September 2016 based on recommendations of the DVR Executive Committee on Vehicle Technology

More information

Enelion Vertica. Installation manual. 22 kw. for the specialists

Enelion Vertica. Installation manual. 22 kw. for the specialists Enelion Vertica kw Installation manual for the specialists ver..6 Enelion 05.07 Enelion VERTICA General notes At various points in this manual you will see notes and precautionary warnings regarding possible

More information

Coriolis Fuel Mass Flow Metering for Fishing Vessels

Coriolis Fuel Mass Flow Metering for Fishing Vessels 1st International Symposium on Fishing Vessel Energy Efficiency Vigo, Spain, 18th - 20th of May 2010 Coriolis Fuel Mass Flow Metering for Fishing Vessels www.ismar.cnr.it Antonello Sala, Francesco De Carlo,

More information

2 x 25 kv ac / 1 x 25 kv ac Grounding and Bonding

2 x 25 kv ac / 1 x 25 kv ac Grounding and Bonding 2 x 25 kv ac / 1 x 25 kv ac Grounding and Bonding By George Ardavanis, PhD Keywords: overhead catenary system (OCS), electric multiple unit (EMU), grounding and bonding (G&B), overhead contact line (OCL),

More information

5th PIANC YP-Com (BTV) Friday, May 8 Ghent Port of Ghent Visitors centre 11:30 12:00 Ir. Bart Moens

5th PIANC YP-Com (BTV) Friday, May 8 Ghent Port of Ghent Visitors centre 11:30 12:00 Ir. Bart Moens 5th PIANC YP-Com (BTV) Friday, May 8 Ghent Port of Ghent Visitors centre 11:30 12:00 Ir. Bart Moens 1 State-of-the-art Cable Installation Projects 2 Presentation Overview Introduction Case study: Race

More information

DAY 2 Breakouts II and III. POWER CABLE Day 2

DAY 2 Breakouts II and III. POWER CABLE Day 2 POWER CABLE DAY 2 Breakouts II and III Assumptions Offshore Less than 20 miles Water depth 1,200 m or less Floating Moored Cable and termination design depends on dynamics and azimuth constraints on platform

More information

TUTORIAL TB 680. Implementation of Long AC HV and EHV Cable Systems WG B1.47

TUTORIAL TB 680. Implementation of Long AC HV and EHV Cable Systems WG B1.47 TUTORIAL TB 680 Implementation of Long AC HV and EHV Cable Systems WG B1.47 Convener: Secretary: Ken Barber (AU) Gert Aanhaanen (NL) Presented by Ken Barber Technical Director NAN Electrical Cable Australia

More information

TABLE OF CONTENTS FIGURES: MAP EXHIBITS: TABLES:

TABLE OF CONTENTS FIGURES: MAP EXHIBITS: TABLES: TransWest Express Transmission Project TABLE OF CONTENTS 7.0 DESIGN OPTIONS... 7-1 7.1 OVERVIEW OF DESIGN OPTIONS... 7-1 7.2 DESIGN OPTIONS PURPOSE AND NEED AND DESIGN CHARACTERISTICS... 7-4 7.2.1 Design

More information

WLTP DHC subgroup. Draft methodology to develop WLTP drive cycle

WLTP DHC subgroup. Draft methodology to develop WLTP drive cycle WLTP DHC subgroup Date 30/10/09 Title Working paper number Draft methodology to develop WLTP drive cycle WLTP-DHC-02-05 1.0. Introduction This paper sets out the methodology that will be used to generate

More information

Oil filter analysis (OFA) on continuously operating wind turbines The black holes of oil analysis

Oil filter analysis (OFA) on continuously operating wind turbines The black holes of oil analysis Oil filter analysis (OFA) on continuously operating wind turbines The black holes of oil analysis Gerrit van Middelkoop Bianca Coolen Page 1 2015 DEKRA 06.11.2015 Contents Company introduction Condition

More information

Spill of heavy fuel oil in an oil terminal 21 June, 2003 Oil harbour of Göteborg - Sweden

Spill of heavy fuel oil in an oil terminal 21 June, 2003 Oil harbour of Göteborg - Sweden Spill of heavy fuel oil in an oil terminal 21 June, 2003 Oil harbour of Göteborg - Sweden Surface water contamination Flammable liquids farm Storage tank Manhole Heavy fuel oil Maintenance Procedures THE

More information

Electrical Safety in the Workplace

Electrical Safety in the Workplace Electrical Safety in the Workplace Increasing Electrical Safety in the Workplace through Purchasing and Procurement Robert Mitchell, Safety and Technical Safety Advisor Safety Risk, Policy and Innovation

More information

Hydro Plant Risk Assessment Guide

Hydro Plant Risk Assessment Guide September 2006 Hydro Plant Risk Assessment Guide Appendix E8: Battery Condition Assessment E8.1 GENERAL Plant or station batteries are key components in hydroelectric powerplants and are appropriate for

More information

Summary of survey results on Assessment of effectiveness of 2-persons-in-the-cockpit recommendation included in EASA SIB

Summary of survey results on Assessment of effectiveness of 2-persons-in-the-cockpit recommendation included in EASA SIB Summary of survey results on Assessment of effectiveness of 2-persons-in-the-cockpit recommendation included in EASA SIB 2015-04 23 May 2016 EXECUTIVE SUMMARY The European Aviation Safety Agency (EASA)

More information

APPENDIX B. POTENTIAL CONSTRUCTION EQUIPMENT

APPENDIX B. POTENTIAL CONSTRUCTION EQUIPMENT . POTENTIAL CONSTRUCTION EQUIPMENT Table B-1. Alternative 1 (Options A and B) and Alternative 3 Alternative 1 (Options A and B) and Alternative 3 Overhead Transmission Line and Poles Removal of conductors

More information

Practical Tools to Assist in Preventing or Reducing Dangers Associated with Flow Line Overpressure Events. Nuder Said

Practical Tools to Assist in Preventing or Reducing Dangers Associated with Flow Line Overpressure Events. Nuder Said Practical Tools to Assist in Preventing or Reducing Dangers Associated with Flow Line Overpressure Events Nuder Said Dynamic Restraint Systems & Relief Valves General Guidelines Presented by Said Nuder

More information

Overburden drilling catalogue

Overburden drilling catalogue Atlas Copco Ground Engineering Products Overburden catalogue Symmetrix overburden systems Overburden Drilling Catalogue Atlas Copco Overburden Drilling System... 3 The Symmetrix System... 4 Drilling overburden...

More information

Luigi Giacalone CEO Autostrade Tech. SICVe Safety Tutor

Luigi Giacalone CEO Autostrade Tech. SICVe Safety Tutor Luigi Giacalone CEO Autostrade Tech SICVe Safety Tutor What is it? It is a complete average speed enforcement system. It includes every feature, from road sensors to central systems, also including interfaces

More information

Baltic Marine Environment Protection Commission

Baltic Marine Environment Protection Commission Baltic Marine Environment Protection Commission Maritime Working Group Tallinn, Estonia, 6-8 September 2016 MARITIME 16-2016 Document title Information about remote sensing of SO 2 emissions from ships

More information

City of Palo Alto (ID # 6416) City Council Staff Report

City of Palo Alto (ID # 6416) City Council Staff Report City of Palo Alto (ID # 6416) City Council Staff Report Report Type: Informational Report Meeting Date: 1/25/2016 Summary Title: Update on Second Transmission Line Title: Update on Progress Towards Building

More information

OPTIMATE. Platform overview. Adrien Atayi RTE. 2015/05/22 - Brussels. Co-funded by the Intelligent Energy Europe Programme of the European Union

OPTIMATE. Platform overview. Adrien Atayi RTE. 2015/05/22 - Brussels. Co-funded by the Intelligent Energy Europe Programme of the European Union OPTIMATE Platform overview Adrien Atayi RTE 2015/05/22 - Brussels Co-funded by the Intelligent Energy Europe Programme of the European Union Agenda Context OPTIMATE Platform Focus on reference equilibrium

More information

IMPROVING FUEL EFFICIENCY IN THE UK FISHING FLEET

IMPROVING FUEL EFFICIENCY IN THE UK FISHING FLEET IMPROVING FUEL EFFICIENCY IN THE UK FISHING FLEET Kate Graham, Sea Fish Industry Authority (UK), k_graham@seafish.co.uk ABSTRACT The financial performance of the UK fishing fleet has been directly affected

More information

SENTINEL BATTERY MONITORING

SENTINEL BATTERY MONITORING Protecting your power supply SENTINEL BATTERY MONITORING Helios Power Solutions If you re operating mission critical systems and relying on the protection of a UPS and battery bank, then it has to make

More information

AIR POLLUTION AND ENERGY EFFICIENCY. Update on the proposal for "A transparent and reliable hull and propeller performance standard"

AIR POLLUTION AND ENERGY EFFICIENCY. Update on the proposal for A transparent and reliable hull and propeller performance standard E MARINE ENVIRONMENT PROTECTION COMMITTEE 64th session Agenda item 4 MEPC 64/INF.23 27 July 2012 ENGLISH ONLY AIR POLLUTION AND ENERGY EFFICIENCY Update on the proposal for "A transparent and reliable

More information

Evaluation of Renton Ramp Meters on I-405

Evaluation of Renton Ramp Meters on I-405 Evaluation of Renton Ramp Meters on I-405 From the SE 8 th St. Interchange in Bellevue to the SR 167 Interchange in Renton January 2000 By Hien Trinh Edited by Jason Gibbens Northwest Region Traffic Systems

More information

Monitoring of switches & crossings (turnouts) and tracks

Monitoring of switches & crossings (turnouts) and tracks Monitoring of switches & crossings (turnouts) and tracks Elias Kassa, Amund Skavhaug Norwegian University of Science and Technology Amir M. Kaynia NGI Outline Background Analysis of turnout failure statistics

More information

Overview. MISTRAS Overview

Overview. MISTRAS Overview 1 MISTRAS 2 Improved RBI Analysis of Above Ground Storage Tanks Through the Use of On Stream Inspections Sam Ternowchek Mistras Group Internal Inspections of Tank Floors is Expensive Inspection Frequency

More information

Collision between a train and an engineering trolley, Stowe Hill Tunnel, 7 December 2016

Collision between a train and an engineering trolley, Stowe Hill Tunnel, 7 December 2016 Collision between a train and an engineering trolley, Stowe Hill Tunnel, 7 December 2016 1. Important safety messages This accident demonstrates the importance of: Track workers and managers being aware

More information

Energy efficiency policies and measures in transport in the EU 27, Norway and Croatia

Energy efficiency policies and measures in transport in the EU 27, Norway and Croatia ODYSSEE MURE Final Meeting Paris, May 18-19 2009 Energy efficiency policies and measures in transport in the EU 27, Norway and Croatia B Lapillonne Karine Pollier Enerdata Content Overview of measures:

More information

Ground Penetrating Radar Survey of a Cemetery: Interpretation

Ground Penetrating Radar Survey of a Cemetery: Interpretation GPR Cemetery Survey Ground Penetrating Radar Survey of a Cemetery: Interpretation Dr. Andy R. Bobyarchick Department of Geography and Earth Sciences UNC Charlotte Overview This investigation is appropriate

More information

Installation & Operation Manual

Installation & Operation Manual Installation & Operation Manual Thank you for purchasing our AS4795.1 Butterfly Valve. Before installing or operating, please carefully read this manual to know thoroughly how to install or operate. The

More information

Monitoring of Shoring Pile Movement using the ShapeAccel Array Field

Monitoring of Shoring Pile Movement using the ShapeAccel Array Field 2359 Royal Windsor Drive, Unit 25 Mississauga, Ontario L5J 4S9 t: 905-822-0090 f: 905-822-7911 monir.ca Monitoring of Shoring Pile Movement using the ShapeAccel Array Field Abstract: A ShapeAccel Array

More information

Permanent Multipath Clamp-On Transit Time Flow Meter

Permanent Multipath Clamp-On Transit Time Flow Meter Permanent Multipath Clamp-On Transit Time Flow Meter By: Dr. J. Skripalle HydroVision GmbH, Germany Introduction For many years now, ultrasonic flow measurements with wetted sensors have been a well established

More information

CER/EIM Position Paper Ballast Pick-up due to Aerodynamic Effects. October Version 1.0

CER/EIM Position Paper Ballast Pick-up due to Aerodynamic Effects. October Version 1.0 CER/EIM Position Paper Ballast Pick-up due to Aerodynamic Effects October 2015 Version 1.0 Introduction Aerodynamic loads on the trackbed generated by the passing of trains at high speed may cause individual

More information

Offshore Wind China 2010 Bergen, 15th March Olivier Angoulevant Nexans Norway AS

Offshore Wind China 2010 Bergen, 15th March Olivier Angoulevant Nexans Norway AS Offshore Wind China 2010 Bergen, 15th March 2010 Olivier Angoulevant Nexans Norway AS At the core of performance At the core of performance : a worldwide leader Worldwide leader in cables, cabling systems

More information

PC.DEL/854/07 7 September 2007

PC.DEL/854/07 7 September 2007 Organization for Security and Co-operation in Europe Secretariat PC.DEL/854/07 7 September 2007 ENGLISH only Conference Services Please find attached the presentation by Ms. Eva Descamps, Agency for Maritime

More information

AURELIA LTD A59 EXCAVATOR 360 ABOVE 10 TONNES INC LIFTING TECHNICAL TEST THEORY CPCS Issue 09-Jul-2012

AURELIA LTD A59 EXCAVATOR 360 ABOVE 10 TONNES INC LIFTING TECHNICAL TEST THEORY CPCS Issue 09-Jul-2012 Name THREE ways that a plant operator can contribute in ensuring repeat business with the client or principal contractor. What is the meaning of this hand signal (being demonstrated by the tester)? What

More information

Spillage from a semi-buried jet fuel tank 30 December, 2005 Sainte-Marie [Reunion Island] France

Spillage from a semi-buried jet fuel tank 30 December, 2005 Sainte-Marie [Reunion Island] France Spillage from a semi-buried jet fuel tank 30 December, 2005 Sainte-Marie [Reunion Island] France Spillage Flammable liquid farms Valves Jet fuel Human and organisational factor Soil contamination Level

More information

NEC 2014 Code Changes

NEC 2014 Code Changes NEC 2014 Code Changes Articles 310 310.120 CHANGES FROM 2011 TO 2014 CODE ARE IN RED ARTICLE 310 Conductors for General Wiring I. General 310.2 Definitions Electrical Ducts Electrical conduits, or other

More information

First South East European Regional CIGRÉ Conference, Portoroz KV 2 X 1000MW SUBMARINE CABLE CROSSING OF THE DARDANELLES STRAIT IN TURKEY

First South East European Regional CIGRÉ Conference, Portoroz KV 2 X 1000MW SUBMARINE CABLE CROSSING OF THE DARDANELLES STRAIT IN TURKEY First South East European Regional CIGRÉ Conference, Portoroz 2016 SEERC 2-03 400KV 2 X 1000MW SUBMARINE CABLE CROSSING OF THE DARDANELLES STRAIT IN TURKEY GÜLNAZİ YÜCE Turkish Electricity Transmission

More information

Europe s % Interconnection Target:

Europe s % Interconnection Target: Europe s 2030 15% Interconnection Target: Challenges & solutions for a timely project implementation Presentation for Power Transmission Tech 2015 Dr. Volker Wendt, Director Public Affairs, Europacable

More information

D IETEREN GROUP 2. A family-controlled, publicly listed company

D IETEREN GROUP 2. A family-controlled, publicly listed company D IETEREN GROUP 2 A family-controlled, publicly listed company D IETEREN GROUP 3 An international group serving some 12 million motorists in 35 countries Vehicle Glass Repair and Replacement Automobile

More information

Electrical Safety Slide Show Presenter s Notes

Electrical Safety Slide Show Presenter s Notes Contractor Beware Electrical Safety Slide Show Presenter s Notes Slide 1 Before darkening the room, offer a welcome and overview. Begin by introducing the program and its topic: Today s training session

More information

Presenter s Notes SLIDE 1. Before darkening the room, offer a welcome and overview. Begin by introducing the program and its topic:

Presenter s Notes SLIDE 1. Before darkening the room, offer a welcome and overview. Begin by introducing the program and its topic: Before darkening the room, offer a welcome and overview. Begin by introducing the program and its topic: Today s training session focuses on working safely around overhead and underground electric power

More information

Davis Wind Speed and Direction Smart Sensor (S-WCF-M003) Manual

Davis Wind Speed and Direction Smart Sensor (S-WCF-M003) Manual Davis Wind Speed and Direction Smart Sensor (S-WCF-M003) Manual The Davis Wind Speed and Direction smart sensor is designed to work with HOBO stations. The smart sensor has a plug-in modular connector

More information

CASE STUDY ON PIPELINE UNDER-PROTECTION ALONG WITH MITIGATION METHODS. Vipul Vilas Sawant. Mahanagar Gas Ltd, Mumbai, India

CASE STUDY ON PIPELINE UNDER-PROTECTION ALONG WITH MITIGATION METHODS. Vipul Vilas Sawant. Mahanagar Gas Ltd, Mumbai, India Paper No. CAP34 CASE STUDY ON PIPELINE UNDER-PROTECTION ALONG WITH MITIGATION METHODS Vipul Vilas Sawant Mahanagar Gas Ltd, Mumbai, India vsawant@mahanagargas. com ABSTRACT Mahanagar Gas Ltd is a City

More information

Kettle River Transmission Project

Kettle River Transmission Project April 2012 Why are you receiving this project information package? New transmission facilities are needed in the Fort McMurray area. ATCO Electric has been directed by the Alberta Electric System Operator

More information

Modelling and monitoring Dutch highway traffic noise production

Modelling and monitoring Dutch highway traffic noise production Modelling and monitoring Dutch highway traffic noise production Teun Veger Anne Dijkstra Renez Nota Richard Jonker Summary In 2012, the Environmental Management Act, a new legislation on noise production

More information

Leak Detection in Large Diameter Mains

Leak Detection in Large Diameter Mains Leak Detection in Large Diameter Mains Waterloss Europe 2017 Pedro Pina, Regional Director for Europe and Africa We Help Prevent Pipe Leaks & Breaks 2 Why do pipes fail? Operational Pressure Weakening

More information

Median Barriers in North Carolina -- Long Term Evaluation. Safety Evaluation Group Traffic Safety Systems Management Section

Median Barriers in North Carolina -- Long Term Evaluation. Safety Evaluation Group Traffic Safety Systems Management Section Median Barriers in North Carolina -- Long Term Evaluation Safety Evaluation Group Traffic Safety Systems Management Section Background In 1998 North Carolina began a three pronged approach to prevent and

More information

Deployment status and users willingness to pay results on selected invehicle

Deployment status and users willingness to pay results on selected invehicle Deployment status and users willingness to pay results on selected invehicle ITS systems Background Expectations towards traffic: Reduced burden on environment less CO2 emissions Vision zero of traffic

More information

Viking Link confirms preferred underground cable route corridor

Viking Link confirms preferred underground cable route corridor Post: FREEPOST VIKING LINK Tel: 0800 731 0561 Email: vikinglink@communityrelations.co.uk News Release Viking Link confirms preferred underground cable route corridor The project has identified the purple

More information

Magnetic Extensometer Systems GXM Range

Magnetic Extensometer Systems GXM Range DATASHEET Magnetic Extensometer Systems GXM Range The Geosense GEO-XM settlement system is used typically to monitor settlement and heave in foundations, excavations and embankments Overview Access Casing

More information

POLLUTION PREVENTION AND RESPONSE. Application of more than one engine operational profile ("multi-map") under the NOx Technical Code 2008

POLLUTION PREVENTION AND RESPONSE. Application of more than one engine operational profile (multi-map) under the NOx Technical Code 2008 E MARINE ENVIRONMENT PROTECTION COMMITTEE 71st session Agenda item 9 MEPC 71/INF.21 27 April 2017 ENGLISH ONLY POLLUTION PREVENTION AND RESPONSE Application of more than one engine operational profile

More information

Lemon sole (Microstomus kitt) in Subarea 4 and divisions 3.a and 7.d (North Sea, Skagerrak and Kattegat, eastern English Channel)

Lemon sole (Microstomus kitt) in Subarea 4 and divisions 3.a and 7.d (North Sea, Skagerrak and Kattegat, eastern English Channel) ICES Advice on fishing opportunities, catch, and effort Greater North Sea Ecoregion Published 30 June 2017 DOI: 10.17895/ices.pub.3153 Lemon sole (Microstomus kitt) in Subarea 4 and divisions 3.a and 7.d

More information

Hazards Requiring Attention: AS AT Friday, 29 January Next Review Saturday, 28 January Total Hazards Recorded 12. Critical Risk Hazards 0

Hazards Requiring Attention: AS AT Friday, 29 January Next Review Saturday, 28 January Total Hazards Recorded 12. Critical Risk Hazards 0 EF26 Risk Assessment Hazards Requiring Attention: AS AT Friday, 29 January 2016 0 Next Review Saturday, 28 January 2017 Total Hazards Recorded 12 Critical Risk Hazards 0 High Risk Hazards 0 Moderate Risk

More information

Submarine Power Cables

Submarine Power Cables Submarine Power Cables Submarine Power Cables Since decades Nexans plant in Hannover is specialised in the design, production and installation of low and medium voltage submarine power cables required

More information

OVERVIEW OF UNDERGROUND POWER CABLES AT HIGH/EXTRA HIGH VOLTAGE LEVELS

OVERVIEW OF UNDERGROUND POWER CABLES AT HIGH/EXTRA HIGH VOLTAGE LEVELS OVERVIEW OF UNDERGROUND POWER CABLES AT HIGH/EXTRA HIGH VOLTAGE LEVELS 2006 WWW.EUROPACABLE.COM Introduction to Europacable Europacable is The Association of European Cable Manufacturers including ABB,

More information

MAKING MODERN LIVING POSSIBLE. Danfoss Air. Installation manual for Danfoss Air Flex duct systems DANFOSS HEATING SOLUTIONS

MAKING MODERN LIVING POSSIBLE. Danfoss Air. Installation manual for Danfoss Air Flex duct systems DANFOSS HEATING SOLUTIONS MAKING MODERN LIVING POSSIBLE Danfoss Air Installation manual for duct systems DANFOSS HEATING SOLUTIONS Index 1 Before you start...........................................................................

More information

HOW OFFSHORE WIND CONCERNS THE SECURITY OF SUPPLY

HOW OFFSHORE WIND CONCERNS THE SECURITY OF SUPPLY Public funding by Programme: Research for Civil Security Maritime Security Offshore Wind Energy Safety and Security HOW OFFSHORE WIND CONCERNS THE SECURITY OF SUPPLY Presentation at the International Conference

More information

Railway noise control in urban areas. Jakob Oertli, SBB Infrastructure, Noise Abatement; Chair UIC Noise Groups

Railway noise control in urban areas. Jakob Oertli, SBB Infrastructure, Noise Abatement; Chair UIC Noise Groups Railway noise control in urban areas Jakob Oertli, SBB Infrastructure, Noise Abatement; Chair UIC Noise Groups Contents. 1. Railway noise situation 2. Policy and legislation 3. Noise reduction technology

More information

Electromagnetic Coordination Study Objectives for Railroad and Electric Utility Shared Corridors

Electromagnetic Coordination Study Objectives for Railroad and Electric Utility Shared Corridors Electromagnetic Coordination Study Objectives for Railroad and Electric Utility Shared Corridors Eilis M. Logan UPRR Marvin J. Frazier Corr. Comp Co. Electromagnetic Interference Magnet and Paper Clip

More information

Studies on Oil and Ice*

Studies on Oil and Ice* Studies on Oil and Ice* Göran Wilkman 1, Esa Ritari 1, and Arto Uuskallio 1 Search and Discovery Article #80345 (2013)** Posted December 9, 2013 *Adapted from an oral presentation given at AAPG 3P Arctic

More information

OHL AC Cable DC Cable Submarine

OHL AC Cable DC Cable Submarine OHL AC Cable DC Cable Submarine HVAC Innovative Applications Focus on reliability and safety From high energy city links to regional reinforcements John Owen Business Development Manager Nexans - Land

More information

First South East European Regional CIGRÉ Conference. Portoroz, Slovenia, 7 8 June 2016

First South East European Regional CIGRÉ Conference. Portoroz, Slovenia, 7 8 June 2016 First South East European Regional CIGRÉ Conference Portoroz, Slovenia, 7 8 June 2016 Submarine projects in the Mediterranean Sea. Technology developments and future challenges 2-01 Paolo Maioli on behalf

More information

MARINE STEERING COMPASS

MARINE STEERING COMPASS MARINE STEERING COMPASS INTRODUCTION PRE-TEST OF INSTRUMENT INSTALLATION OF SENSOR SENSOR REMOVAL INSTALLING THE DISPLAY NORMAL OPERATION CHANGING THE BACKLIGHT SETTING CHANGING THE DAMPING ASSISTED STEERI

More information

Installation and Maintenance Manual CORRUGATED RIVETED GALVANIZED STEEL WATER STORAGE TANKS

Installation and Maintenance Manual CORRUGATED RIVETED GALVANIZED STEEL WATER STORAGE TANKS BH TANK A Division Of American Tank Co., Inc. Installation and Maintenance Manual CORRUGATED RIVETED GALVANIZED STEEL WATER STORAGE TANKS American Tank Co., Inc. P.O. Box 340 Windsor CA 95492 www.bhtank.com

More information

Guidelines when working near TasNetworks electrical assets

Guidelines when working near TasNetworks electrical assets Guidelines when working near TasNetworks electrical assets About TasNetworks Tasmanian Networks Pty Ltd (ACN 167 357 299) ( TasNetworks ) is the owner and operator of the regulated electricity network

More information

Securitex SBR120 & SBR121 Road Blocker

Securitex SBR120 & SBR121 Road Blocker Securitex SBR120 & SBR121 Road Blocker Technical Manual Securitex Electronic Systems Engineering Traffic Security Engineering division 2005-10-16 0 Introduction The Securitex Road blocker SRB120 and SRB121

More information

Median Barriers in North Carolina

Median Barriers in North Carolina Median Barriers in North Carolina AASHTO Subcommittee on Design - 2006 June 13-16, 2006 Jay A. Bennett North Carolina DOT State Roadway Design Engineer Brian Murphy, PE Traffic Safety Engineer Safety Evaluation

More information

OREGON FISHERMEN S CABLE COMMITTEE REPORT ON THE NORTHSTAR CABLE INSTALLATION

OREGON FISHERMEN S CABLE COMMITTEE REPORT ON THE NORTHSTAR CABLE INSTALLATION OREGON FISHERMEN S CABLE COMMITTEE REPORT ON THE NORTHSTAR CABLE INSTALLATION BY Scott McMullen August 26, 1999 2 Installation of the Alaska NorthStar Cable Oregon Coast Segment On July 9 th, 1998, WCI

More information

1 of 5 4/19/11 2:15 PM

1 of 5 4/19/11 2:15 PM Top Page > About JAMSTEC > Research Vessels, Facilities and Equipment > Research Vessels and Vehicles > URASHIMA Research, Development and Promotion Research Vessels, Facilities and Equipment Research

More information

SYSTEM 001 INFO PACK 2018

SYSTEM 001 INFO PACK 2018 SYSTEM 001 INFO PACK 2018 SYSTEM 001 After 273 scale model tests, six at-sea prototypes, a comprehensive mapping of the Great Pacific Garbage Patch (GPGP) with 30 vessels and an airplane, and several technology

More information

Alberta Electric System Operator Needs Identification Document Application. Mowat 2033S Substation

Alberta Electric System Operator Needs Identification Document Application. Mowat 2033S Substation Decision 21781-D01-2016 Alberta Electric System Operator Needs Identification Document Application Facility Applications September 7, 2016 Alberta Utilities Commission Decision 21781-D01-2016: Alberta

More information

NSW SUBMARINE POWER. Cables for the future, delivered today.

NSW SUBMARINE POWER. Cables for the future, delivered today. SUBMARINE POWER. Cables for the future, delivered today. NORDDEUTSCHE SEEKABELWERKE GMBH () SUBMARINE POWER CABLES FOR RENEWABLE ENERGIES The submarine competence center within the General Cable Group

More information

Hydrant Security. Taking that first step. A White Paper Published by. Chattanooga, TN 37450

Hydrant Security. Taking that first step. A White Paper Published by. Chattanooga, TN 37450 Hydrant Security Taking that first step A White Paper Published by Chattanooga, TN 37450 Form 12714 Rev. 7/11 Copyright - Mueller Co., Chattanooga, TN - April 2011 Hydrant Security Taking that First Step

More information

SC 77C -- EMC: High Power Transient Phenomena and Smart Grid Implications

SC 77C -- EMC: High Power Transient Phenomena and Smart Grid Implications SC 77C -- EMC: High Power Transient Phenomena and Smart Grid Implications Seattle, USA 24 October 2010 Dr. William A. Radasky Chairman IEC SC 77C Metatech Corporation Goleta, CA USA Outline Introduction

More information

Rogers Road to Clubhouse 230kV New Transmission Line April 1, 2016

Rogers Road to Clubhouse 230kV New Transmission Line April 1, 2016 New Transmission Line April 1, 2016 The enclosed information is proprietary to PSE&G and is provided solely for your use. It should not be copied, reproduced, or shared with others without PSE&G s prior

More information

Operator Qualification (OQ) Report

Operator Qualification (OQ) Report AOCF 66102/67107 Abnormal Operating Conditions Field for Natural Gas and Hazardous Liquids 5/15/2014 5/15/2017 AOCG 67107 Abnormal Operating Conditions for Natural Gas 5/16/2014 5/16/2017 TM001 66101 02

More information