1 ADVANCED CALCULATIONS 101. Why is it permissible in some cases to fuse a #14 AWG motor conductor with a 60 amp breaker when normally a #14 AWG should only be fused at 15 amps? a) the motor can't start at 15 amps b) the motor is protected by an overload device c) the inspector said so d) a #14 AWG copper conductor can't be fused at 60 amps e) a and b 102. What is the efficiency of a 2 HP 208 V single phase motor? a) 88% b) 90% c) 54% d) 95% 103. What is the maximum size time delay fuse for a Design E, 30HP- 480 V 3-phase, squirrel- cage motor? a) 30 A b) 80 A c) 50 A d) 70 A 104. What is the minimum size TW copper feeder for a 3-phase 460Volt 10HP motor and three single-phase 115Volt 2HP motors? a) #8 b) #6 c) #4 d) # Size the THW feeder conductors for 1-3-phase 7.5HP 208V motor and 2-3-phase 208V 5HP motors. a) #8 b) #6 c) #4 d) #2
2 106. Size feeder inverse time OCD for the following motors: 1-10HP 460V 3-phase and 1-2HP 460V 3-phase. a) 30A b) 35A c) 40A d) 45A 107. Size branch circuit non-time delay fusing for a 50HP, 460 Volt, three-phase squirrel cage motor. a) 100A b) 150A c) 200A d) 250A 108. Select minimum size square junction box for 2-#12AWG THHN with an equipment ground; 2-#14AWG THW with an equipment ground and terminating on a single pole switch; 2-#6AWG THHN passing through the box; and finally 2 clamps. a) 4 x 1 1/4 b) 4 11/16 x 1 1/2 c) 4 11/16 x 1 1/4 d) 4 x 1 1/ What minimum size box is needed for ten #14 AWG TW conductors, no grounds? a) 4 x 1 1/4 square b) 4 x 1 1/2 square c) 4 11/16 x 1 1/4 d) 4 11/16 x 1 ½ 110. Size minimum square box for U-Pull entering and leaving through a 4" Rigid Metal Conduit. a) 16" x 16 b) 24" x 24 c) 12" x 12 d) 32" x 32
3 111. A 24" nipple may be filled to what cross sectional capacity? a) 53% b) 40% c) 60% d) 75% 112. What size Schedule 40 PVC conduit is required for 8- #12 TW, 12- #14 THW, 8- #10 THHN, and 6- #6 THWN conductors? a) 1.5 b) 2 c) 2.5" d) What is the internal diameter of a 3" rigid conduit? a) 3.356" b) 3.042" c) 3.090" d) 3.000" 114. What is the voltage drop for a 220 Volt system supplying power to a 1000Watt load, 500 feet from the last fuse box, using #10THWN stranded, coated copper conductors? a) 5.14Volts b) 5.26 Volts c) 5.65 Volts d) 5.86 Volts 115. What is the total percentage of voltage drop on a 240 Volt service supplying a subpanel 1500 feet away that feeds a well pump 600 more feet from there, when the sub-panel feeder drops 7.9 volts and the well pump branch circuit drops 5.8volts? a) 4.20% b) 5.70% c) 6.30% d) 14.0%
4 116. What is the demand load on a single dwelling service for a 12KW Electric Range? a) 12 KW b) 8 3/4 KW c) 8 KW d) 12.6 KW 117. Calculate the service demand load for a 12KW household oven and a 4KWcounter-top cooking unit. a) 9.6 KW b) 8 KW c) 16 KW d) 11.2 KW 118. What is the combined demand load in KW, for 1-14KW range, and 1-12KW pizza oven in a bar downtown? a) b) c) d) What is the minimum service demand in a motel restaurant kitchen that contains a 14KW range; a 16KW oven; a 5KW dishwasher; a 5KW disposal; and a 1KW trash compactor? a) 41 KW b) 20 KW c) 25 KW d) 30 KW 120. What is the total range load for Mrs. Smith's Home Economics Class 3-12KW ranges? a) 12 KW b) 14 KW c) 16 KW d) 24 KW
5 121. A 3-phase 4-wire 208Volt system powers twenty 12KW ranges and nine 8.75KW ranges in an apartment complex. What is the range load demand on the service? a) 24 KW b) 30 KW c) 35 KW d) 53 KW 122. The net calculated load for a 1500sq.ft. home with a 12KW range and a 5.5KW clothes dryer is VA? a) 18,600VA b) 9,000VA c) 12,000VA d) 4,000VAA 123. Now add to problem 122. one 6A Volt A/C unit; one 12A - 115Volt room A/C unit; one 8A Volt disposal; and one-10a - 120Volt dishwasher. Calculate the size of the service. a) 80 A b) 100 A c) 110 A d) 125 A 124. In a 40 unit apartment house, each unit is provided with a built-in dishwasher and disposal with a combined nameplate load of 3KW. What is the demand on the service for these extras? a) 90 KW b) 100 KW c) 120 KW d) 140 KW 125. The same apartment house in problem 124: Each unit has a 12KW range on the single phase 240/120Volt service. What is the combined neutral load on these ranges? a) 270 A b) 480 A c) 160 A d) 190 A
6 126. What is the minimum KW load used for calculating a range in an apartment building that is supplied by a three-phase AC service? a) 18 b) 12 c) 8 d) 1 ¾ 127. A mobile home park has 50 slots, each expecting 16KVA double-wides. What would the service demand load be? a) 150 KVA b) 800 KVA c) 1640 KVA d) 184 KVA 128. An RV park has 100 slots. 50 have 50 amp receptacles; 30 have 20 and 30 amp receptacles; and the remaining 20 are tent sites with 20 amp outlets. What is the demand on the service? a) 123 KVA b) 246 KVA c) 268 KVA d) 494 KVA 129. When installing an electric sign on the top of a downtown building, which of the following are true? Pick the best answer. a) The power supply may be located inside the building's attic. b) The thermal ballast shall be listed as thermally protected. c) A 3ft x 2ft access door must be provided d) all of the above 130. A jeweler needs to remodel his 30ft by 45ft ground floor office space to catch the attention of pedestrians who pass by his entrance. He also needs 40ft of show window lighting and, since it's very hot, a 230V single-phase 2HP A/C. What will the service load on his 230V/115V feeder be? a) 64.90A b) 82.84A c) 87.66A d) 89.88A
7 Answers 101. e), 430 Motors Read whole section 102 c) eff. = Output/input; 1HP = 746 watts; FLC Table d), Table ; Table b) Start at Fig ; Draw out the 3-phase diagram and balance the load 105. c) (24.2 x 1.25) =63.5 Motor & Ampacity tables 106. b) Fig ; Motor Tables; ; c) Table ; Table ; b) Table (A)-(B) 109. b) Table (A) 110. b) Table (A)(2) 111. c) Chapter 9; note a) Chapter. 9; Tables c) Chapter. 9; Table c) Chapter 9; Table 8; VD = (2 x 12.9Copper x 500ft x 4.54A)/10380 = b) (7.9V + 5.8V)/240V (don t make it harder than it is) 116. c), Table d) Table a)table note d) b) Table note c) Table ;
8 122. a) Annex D Examples 123. c) Annex D Examples 124. a) c) (B) 126. b) note d) ; Table c) ; Table d) (E) 130. a) Article ft. x 45ft. = 1350sq.ft. x 3VA x1.25 = 5062VA General Lighting load then the show window lighting is 200VA per foot = 200 x 40 = 8000VA; the A/C will be on all day so that s another 2 x 746VA x 1.25 = 1865VA adds up to 14927VA/230V = 64.90A
CHAPTER V RESIDENTIAL WIRING
CHAPTER V RESIDENTIAL WIRING 5.1. THE SERVICE ENTRANCE Buildings and other structures receive the electrical energy through the service entrance. In residential wiring, the electric company supply this
More informationPretest Module 24 Three-phase Service Entrance
Pretest Module 24 Three-phase Service Entrance 1. What is the most widely used three-phase service entrance system? 2. What are the three most common voltage combinations for three-phase, four-wire systems?
More informationSpring Test 7 due 05/03/2013
Spring Test 7 due 05/03/2013 Multiple Choice Identify the choice that best completes the statement or answers the question. 1. A raceway contains two 3-phase, 3-wire circuits that supply 38 ampere continuous
More informationChapter 1 Electrical Theory...1
Electrical Formulas with Sample Calculations Table of Contents Chapter 1 Electrical Theory...1 Unit 1 Electrician s Math and Basic Electrical Formulas...3 Part A Electrician s Math...3 1 1 Fractions...3
More information(The actual state exam will be closer to 50 questions in 4 hours time) Master Electrician Practice Test
(The actual state exam will be closer to 50 questions in 4 hours time) Master Electrician Practice Test 1. Accessible as applied to wiring methods means capable of being removed or exposed without damaging
More informationTABLE OF CONTENTS CHAPTER 1 ELECTRICAL THEORY About This Textbook...xi. Passing Your Exam...xiv. How to Use the National Electrical Code...
TABLE OF CONTENTS About This Textbook...xi Passing Your Exam...xiv How to Use the National Electrical Code... 1 CHAPTER 1 ELECTRICAL THEORY... 7 Unit 1 Electrician s Math and Basic Electrical Formulas...
More informationElectrical Design/Build Guide
2017 Electrical Design/Build Guide Based on the 2017 National Electrical Code Copyright Durand & Associates 1986-2016 60 C Copper Ampacity 4 - Wire Fill - (Non-Current Carrying Neutral) 4 or 5 - Parallel
More informationTABLE OF CONTENTS. About the Mike Holt Enterprises Team... xviii CHAPTER 1 ELECTRICAL THEORY... 1
TABLE OF CONTENTS Introduction...xv About the Mike Holt Enterprises Team... xviii CHAPTER 1 ELECTRICAL THEORY... 1 Unit 1 Electrician s Math and Basic Electrical Formulas... 1 Part A Electrician s Math...
More informationTable of Contents. CHAPTER 1 ElECTRiCAl THEoRY Mike Holt enterprises, inc neC.Code ( )
CHAPTER 1 ElECTRiCAl THEoRY... 1 UniT 1 electrician s MaTH and BasiC electrical formulas... 3 Introduction to Unit 1... 3 Part A Electrician s Math... 3 Introduction... 3 1.1 Whole Numbers... 3 1.2 Decimals...
More informationUNIT 1 ELECTRICIAN S MATH AND BASIC ELECTRICAL FORMULAS...1 Introduction...1. UNIT 2 ELECTRICAL CIRCUITS...49 Introduction...49
UNIT 1 ELECTRICIAN S MATH AND BASIC ELECTRICAL FORMULAS...1 Introduction...1 PART A ELECTRICIAN S MATH...1 Introduction...1 1.1 Whole Numbers...1 1.2 Decimal...1 1.3 Fractions...1 1.4 Percentages...2 1.5
More informationSpring Test 10 due 05/11/2013
Spring Test 10 due 05/11/2013 Multiple Choice Identify the letter of the choice that best completes the statement or answers the question. 1. When installed in an agricultural building that houses livestock
More informationTable of Contents. CHAPTER 1 BASIC ELECTRICAL THEORY (Essential for Journeyman and Master s Licensing Exams)... 1
Introduction... x About This Textbook...xi Passing Your Exam...xiv How to Use the National Electrical Code... xviii About the Author...xxi About the Graphic Illustrator...xxii Mike Holt Enterprises Team...
More informationBASIC ELECTRICAL ENGINEERING FOR CE
EE24 BASIC ELECTRICAL ENGINEERING FOR CE LECTURE NO. B-2 Residential Motor Loads Full Load Current of Motors 2 Example #1 Engr. Oliver Dy and Engr. Mechelle Perez bought an airconditioner for Engr. Marijo
More informationCorrections most seen on plan review October 18, 2017 David Rankin Seattle Department of Construction and Inspections
Corrections most seen on plan review October 18, 2017 David Rankin Seattle Department of Construction and Inspections One-Line / Riser Diagrams Drawings are not reviewed prior to submission. Because of
More informationMECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 9/14/11 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions
MECKLENBURG COUNTY Land Use and Environmental Service Agency Code Enforcement 9/14/11 ELECTRICAL CONSISTENCY MEETING Code Consistency Questions 1. I recently installed a 45-KVA transformer, 480-volt primary
More informationPART A General Conductor Requirements
PART A General Conductor Requirements 6.1 Conductor Insulation Property Table 310.13 of the NEC provides information on conductor properties such as permitted use, maximum operating temperature, and other
More informationPermitting, Installation and Inspection Residential EV Chargers Be aware that there are different types of Electric Vehicle (EV) Chargers.
Be aware that there are different types of Electric Vehicle (EV) Chargers. There are 2 basic types of EV chargers for home use (Level 1 and Level 2). Level 1 Chargers are smaller units that plug directly
More informationEV Charging Station Submittal Requirements
EV Charging Station Submittal Requirements To obtain a permit for an Electric Vehicle Charging Station, please provide the following: Plan and details of the charging system installation o Print applicable
More informationMECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 2/8/12 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions
MECKLENBURG COUNTY Land Use and Environmental Service Agency Code Enforcement 2/8/12 ELECTRICAL CONSISTENCY MEETING Code Consistency Questions 1. I am inspecting a building addition. They have a 480V to
More informationThe Reliable Choice. Field Pocket Guide
The Reliable Choice Field Pocket Guide Allowable Ampacities of STABILOY Brand XHHW-2 and Copper 75 C (167 F) 90 C (194 F) 75 C (167 F) 90 C (194 F) Conductor Size (AWG or kcmil) Types RHW, THHW, THW, THWN,
More informationCity of Perris Development Services Building & Safety
Western Riverside County Code Uniformity Program City of Perris Development Services Building & Safety Residential Electric Vehicle (EV) Charger Guidelines PHONE NUMBER 951-943-5003 Inspection Request
More informationElectrical Tech Note 106
Electrical Tech Note 106 Biosystems & Agricultural Engineering Department Michigan State University Master Exam Study Guide and Sample Questions 1 Based on the 2014 NEC, Part 8 of PA 230, PA 407, and the
More informationCity of Walnut Creek Development Review Services 1666 N. Main Street, Walnut Creek, CA (925) phone (925) fax
City of Walnut Creek Development Review Services 1666 N. Main Street, Walnut Creek, CA 94596 (925) 943-5834 phone (925) 256-3500 fax Issued September 30, 2017 Policy Bulletin No. PB-72 Background Residential
More informationRESIDENTIAL GUIDELINE FOR ELECTRICAL VEHICLE (EV) CHARGER INSTALLATION
RESIDENTIAL GUIDELINE FOR ELECTRICAL VEHICLE (EV) CHARGER INSTALLATION The purpose of this guideline is to assist homeowners and contractors in streamlining the permitting and installation process for
More informationOvercurrent Protection According to the 2011 NEC
Overcurrent Protection According to the 2011 NEC Utah Electrical License This course will cover overcurrent protection according to the 2011 NEC. The key sections of Article 240 will be discussed. Overcurrent
More informationECET Circuit Design Motor Loads. Branch Circuits. Article 210
ECET 4520 Industrial Distribution Systems, Illumination, and the NEC Circuit Design Motor Loads Branch Circuits Article 210 210.1 Scope This article covers branch circuits except for those that supply
More informationCOUNTY OF RIVERSIDE BUILDING AND SAFETY DEPARTMENT
COUNTY OF RIVERSIDE BUILDING AND SAFETY DEPARTMENT RESIDENTIAL ELECTRIC VEHICLE (EV) CHARGER GUIDELINES Mike Lara Director The purpose of this guideline is to assist permit applicants in streamlining the
More informationWestern Section IAEI Code Panel Questions
Western Section IAEI 2013 Code Panel Questions 1. Do the factory wings that many fluorescent troffers have designed to fold out over the grid meet the requirements for securely fastened to the framing?
More informationChapter 2 Wiring and Protection Article 200 Use and Identification of Grounded Neutral Conductor Chapter 1 General...9
Article 90 Introduction...1 90.1 Purpose of the NEC...1 90.2 Scope of the NEC...2 90.3 Code Arrangement...4 90.4 Enforcement...5 90.5 Mandatory Requirements and Explanatory Material...6 90.6 Formal Interpretations...6
More informationElectric Drive Vehicle Infrastructure Training. Instructor s Manual. National Alternative Fuels Training Consortium
Electric Drive Vehicle Infrastructure Training Instructor s Manual National Alternative Fuels Training Consortium Part 4: : Service Panel to Receptacle Overview of Service Panel The role of the service
More informationElectric Vehicle Charging Station Article California Electrical code (CEC) General Requirements:
Checklist for Multi-Family Residential Electric Vehicle Charging Station Article 625 2016 California Electrical code (CEC) General Requirements: Level 1 Charger: 110V dedicated 20 amp circuit No electrical
More informationCustomer Requirements Downtown Secondary Network Service
Application This standard describes the limitations and requirements for receiving service from the Tacoma Power secondary network system within the City of Tacoma downtown core area. In This Standard
More informationMetering and Control Standards OFF-PEAK & DUAL FUEL WIRING DIAGRAMS
Metering and Control Standards OFF-PEAK & DUAL FUEL WIRING DIAGRAMS REVISED FEBRUARY 2017 TABLE OF CONTENTS Metering Equipment & Installation Standards... 1 Metering Equipment & Installation Standards
More informationCalculating AC Line Voltage Drop for M215 Microinverters with Engage Cables
Technical Brief Calculating AC Line Voltage Drop for M215 Microinverters with Engage Cables Contents Overview... 1 Voltage Rise for M215s with the 240 VAC Engage Cable... 2 Voltage Rise for M215s with
More informationWestern Section 101 st Annual Meeting Hot Springs, Arkansas September 21, 2005 Charlie Trout Code Breakfast
Western Section 101 st Annual Meeting Hot Springs, Arkansas September 21, 2005 Charlie Trout Code Breakfast 1.Question: An add on unit for a hydromassage bathtub consists of a small 1-gallon water heater
More informationOvercurrent Protection (2014 NEC) (Homestudy)
Overcurrent Protection (2014 NEC) (Homestudy) Oregon Electrical License The key sections of Article 240 will be discussed. Overcurrent protection for panelboards, appliances, motors, motor compressors,
More informationA. Submit manufacturer's literature and technical data before starting work.
SECTION 16425 SWITCHBOARD PART 1 GENERAL 1.01 SUMMARY A. Related Section: 1. 16450 - Grounding. 1.02 SUBMITTALS A. Submit manufacturer's literature and technical data before starting work. B. Submit Shop
More informationAssessing a Site for Installation of Consumption Monitoring
TECHNICAL BRIEF Assessing a Site for Installation of Consumption Monitoring About the Enphase Envoy-S Metered The Enphase Envoy-S Metered communications gateway enables performance monitoring and remote
More informationSECTION PANELBOARDS
SECTION 16470 PANELBOARDS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. The general provisions of the contract including General and Special Conditions and General Requirements shall apply to all work under
More informationElectrical Tech Note 105 Agricultural Engineering Department Michigan State University
Electrical Tech Note 105 Agricultural Engineering Department Michigan State University Journey Exam Study Guide and Sample Questions 1 Based on the 2002 NEC, Part 8 of PA 230, and the 2003 MRC The Journey
More informationMecklenburg County Common Code Defects
Electrical Code Defects Improper Over Current Protection Code Description 310.15 Ampacities for s Rated 0 2000 Volts. (A) General. (1) Tables or Engineering Supervision. Ampacities for conductors shall
More informationVolume 2 Charts, Formulas, and Other Useful Information
Volume 2 Charts, Formulas, and Other Useful Information Aluminum Conductor Conductor Terminations 61 Compact Aluminum (Conduit Fill Tables) 68-79 Ampacity Dwelling Services 48 1-phase Loads on a 3-phase
More informationElectric Vehicle Charging Station Article California Electrical code (CEC) General Requirements:
Checklist for Non-Residential Electric Vehicle Charging Station Article 625 2016 California Electrical code (CEC) General Requirements: Level 1 Charger: 110V dedicated 20 amp circuit No electrical plans
More informationInstalling a Downstream Distribution Panelboard
Job Sheet 5 Installing a Downstream Distribution Panelboard OBJECTIVE To install a downstream distribution panelboard (DDP) on the Mobile Workstation. To mechanically and electrically connect the DDP to
More informationADDENDUM #2 TO BID # BID NUMBER: ISSUE DATE: Friday, January 18, 2019
Georgetown County, South Carolina 129 Screven Street, Suite 239 Post Office Drawer 421270 Georgetown, SC 29442-4200 (843) 545-3083 Fax (843) 545-3500 E-Mail purch@gtcounty.org Website http://www.gtcounty.org
More informationSOUTHWEST LOUISIANA ELECTRIC MEMBERSHIP COORPORATION COMMERCIAL SERVICE REQUIREMENTS
SOUTHWEST LOUISIANA ELECTRIC MEMBERSHIP COORPORATION COMMERCIAL SERVICE REQUIREMENTS November 17, 2016 Engineering Service Specifications Table of Contents Commercial Service Requirements SLEMCO Commercial
More informationLearning Module 10: Loadcenters. 101 Basic Series
Learning Module 10: Loadcenters 101 Basic Series What You Will Learn We ll step through each of these topics in detail: What Does a Loadcenter Do? 4 Applications 4 Basic Circuitry and Wiring 5 Residential
More informationgrounded in service wired to innovate STABILOY Type XHHW-2 and USE-2/RHH/RHW-2
grounded in service wired to innovate STABILOY Type XHHW-2 and USE-2/RHH/RHW-2 grounded in service wired to innovate www.cable.alcan.com Type XHHW-2 and Type USE-2/RHH/RHW-2 Alcan manufactures XHHW-2 and
More informationMotor Branch Circuit Over-Current Protection
Motor Branch Circuit Over-Current Protection For HVAC Project Engineers Fachgesprach 9 WTF Institute of Higher Learning By Mat Ansari PE 2-18-2016 For HVAC Project Engineer's Reference Use Only Not for
More informationDEWALT Electrical Licensing Exam Guide CONTENTS
DEWALT Electrical Licensing Exam Guide v ONTENTS How to Prepare for the Exam................................................ 2 How to Study.............................................................
More informationWhat is included in a circuit diagram?
Circuit Diagrams What is included in a circuit diagram? Circuit diagrams use symbols to represent parts of a circuit, including a source of electrical energy and devices that are run by the electrical
More informationData Bulletin. Wire Temperature Ratings and Terminations INTRODUCTION WHY ARE TEMPERATURE RATINGS IMPORTANT?
Data Bulletin March 2002 Lexington, KY, USA Wire Temperature Ratings and Terminations INTRODUCTION WHY ARE TEMPERATURE RATINGS IMPORTANT? Table 1: Insulation Type Figure 1: Figure 2: Ampacity of a 1/0
More informationDISCONTINUED PRODUCT POWER PROTECTION. Series 600 UPS. Multi-Module Three Phase 338 kva to 1000 kva; 60 Hz. Installation Manual
POWER PROTECTION Series 600 UPS Multi-Module Three Phase 338 kva to 1000 kva; 60 Hz Installation Manual TABLE OF CONTENTS IMPORTANT SAFETY INSTRUCTIONS.............................................1 1.0
More informationPretest Module 21 Units 1-3 AC Generators & Three-Phase Motors
Pretest Module 21 Units 1-3 AC Generators & Three-Phase Motors 1. What are the two main parts of a three-phase 2. Which part of a three-phase squirrel-cage induction motor is a hollow core? 3. What are
More informationHigh Reliability Power System Design
High Reliability Power System Design Buenos Aires, Argentina June 25 & 26, 2009 Keene M. Matsuda, P.E. Regional Electrical Manager Senior Member IEEE IEEE/PES Distinguished Lecturer ke.matsuda@ieee.org
More informationStandby Electric Generators for Alaskan Residences. Advice & Installation
Standby Electric Generators for Alaskan Residences Advice & Installation 452-1151 1-800-770-GVEA www.gvea.com Use of this publication is not a substitute for the use of sound judgement by the user. This
More informationCode Calculations. for an Off-Grid PV System
Code Calculations for an Off-Grid PV System John Wiles Sponsored by the Photovoltaic Systems Assistance Center, Sandia National Laboratories Judy LaPointe s home is on its way to becoming a finished, off-grid
More informationSouth Dock Replacement Prescott Park. This addendum forms part of the original document marked: Bid#44-14 South Dock Replacement Prescott Park.
City of Portsmouth Public Works Department June 27, 2014 Addendum #3 Bid #44-14 South Dock Replacement Prescott Park This addendum forms part of the original document marked: Bid#44-14 South Dock Replacement
More informationSolar PV Standard Electrical Plan
*** Provide this document to the inspector along with ALL system installation instructions *** Project Address: Permit Number: SCOPE: Standard plan for installation of solar PV systems utilizing 2 wire
More informationChapter 8 Interior Wiring and Lighting
Chapter 8 Interior Wiring and Lighting Review Questions 1. What tool if any, is used to remove a fuse that is to be replaced? 1. Pliers 2. Screwdriver 3. Fuse puller 4. None 2. OSHA has established specific
More informationElectrical Wiring Practices
Chapter 2 Electrical Wiring Practices and Diagrams MElec-Ch2-1 Overview Safety Standards Wiring Considerations Wire Terminations Coaxial Cable Wiring Installations Wiring Diagrams MElec-Ch2-2 Safety Lethal
More informationNEC 2014 Code Changes
NEC 2014 Code Changes Articles 310 310.120 CHANGES FROM 2011 TO 2014 CODE ARE IN RED ARTICLE 310 Conductors for General Wiring I. General 310.2 Definitions Electrical Ducts Electrical conduits, or other
More information90.2 Scope. The installation of electrical conductors, equipment and raceways for:
NEC Generator Primer Rules on the installation of generators and transfer switches 1 90.2 Scope The installation of electrical conductors, equipment and raceways for: public and private premises Conductors
More informationPHOTOVOLTAIC ELECTRICAL POWER SYSTEMS INSPECTOR/INSTALLER CHECKLIST
PHOTOVOLTAIC ELECTRICAL POWER SYSTEMS INSPECTOR/INSTALLER CHECKLIST The following checklist is an outline of the general requirements found in the 2005 National Electrical Code (NEC) Article 690 for Photovoltaic
More informationWIRING DESIGN & PROTECTION REQUIREMENTS CHECKLIST
WIRING DESIGN & PROTECTION REQUIREMENTS CHECKLIST Use & Identification of Grounded and Grounding Conductors YES NO N/A Grounded conductors are identifiable and distinguishable from all other conductors.
More informationSERVICE ATTACHMENT ON A BUILDING WITH BUS DUCT SERVICE ENTRANCE AND INDOOR METERING
SERVICE ATTACHMENT ON A BUILDING WITH BUS DUCT SERVICE ENTRANCE AND INDOOR METERING Obtain acceptance and specific details from the local Company office. 1. Service entrance duct (see Note 1). Company
More informationChapter 4 NEC & NEMA Standards 1
Chapter 4 NEC & NEMA Standards 1 This section lists excerpts from industry, national, and international standards The excerpts are for illustration and educational purposes There are often several related
More information5. What is the maximum number of#18 TEW control conductors permitted to be installed into a 6 inch rigid metal conduit? a. 196 b. 138 c. 259 d.
I Practice Exam Questions :loo(p c:.e.c... 1. A construction drawing has a scale of 1:200. If a line on the drawing measured 11.5mm, what would be the actual measured length on the project? a. 2300cm b.
More informationV High Efficiency Series
UNIT DISCONNECT(S) BEHIND THIS PANAL Commercial HVAC V High Efficiency Series Wallmount Air Conditioners PERFORMANCE: Efficiency rating of 9.0/9.5 EER Electric heat available from 5 kw to 18 kw Designed
More informationChoosing Household Wiring for Low EMF
Choosing Household Wiring for Low EMF from left to right: ROMEX 12/2, ROMEX 12/3, EMT conduit, IMC conduit, MC 12/2 Modern buildings have electrical wiring in all walls, and often in ceilings and under
More informationECET Distribution System Protection. Overcurrent Protection
ECET 4520 Industrial Distribution Systems, Illumination, and the NEC Distribution System Protection Overcurrent Protection One of the most important aspects of distribution system design is system protection.
More informationTHREE PHASE WIRING SPECIFICATIONS
THREE PHASE WIRING SPECIFICATIONS 1-866-MEC-ELEC (1-866-632-3532) Office Locations: Hondo Office 237 Hwy 173 N Hondo, TX 78661-0370 Fax 830.426.3335 Dilley Office 1718 W. FM 117 Dilley, TX 78017 Fax 830.965.1425
More informationChapter 4 Utility Systems Electrical
Chapter 4 Utility Systems Electrical Utility Systems Electrical The electrical supply to your home begins outside, where you will see either an overhead feed and piping down the side of your home or (if
More informationWestern Section IAEI Code Panel Questions
Western Section IAEI 2013 Code Panel Questions 1. Do the factory wings that many fluorescent troffers have designed to fold out over the grid meet the requirements for securely fastened to the framing?
More informationThe 84 th NC Electrical Institute Code Questions April 9 th & 10 th 2013 North Raleigh Hilton Raleigh, NC
The 84 th NC Electrical Institute Code Questions April 9 th & 10 th 2013 North Raleigh Hilton Raleigh, NC www.ncdoi.com www.ncbeec.org NC DEPARTMENT OF INSURANCE NC STATE BOARD OF EXAMINERS OF ELECTRICAL
More informationFuseology. Fuse Holders, Fuse Blocks, Power Distribution Blocks & Surge Suppression. Optima Fuse Holders & Overcurrent Protection Modules.
Fuseology Fuse Holders, Fuse Blocks, Power Distribution Blocks & Surge Suppression Optima Fuse Holders & Overcurrent Protection Modules Compact, full-featured modules that deliver Type 2 coordinated protection,
More informationSINGLE PHASE WIRING SPECIFICATIONS
SINGLE PHASE WIRING SPECIFICATIONS 1-866-MEC-ELEC (1-866-632-3532) Office Locations: Hondo Office 237 Hwy 173 N Hondo, TX 78661-0370 Fax 830.426.3335 Dilley Office 1718 W. FM 117 Dilley, TX 78017 Fax 830.965.1425
More information2. DEFINITIONS. 2.3 APPROVED Acceptable to the authority enforcing the National Electric Code
2. DEFINITIONS 2.1 ACCEPTABLE Acceptable to the Company. 2.2 ADVANCED METER A meter that is capable of remote reading, and is capable of storing electric consumption data at specified time intervals of
More informationELECTRICAL CONSISTENCY MEETING
ELECTRICAL CONSISTENCY MEETING Date: 10/14/2015 Our Goal is FOR ALL STAKEHOLDERS TO HAVE A SUCCESSFUL PROJECT with us and that together we keep people and structures safe and economically viable to serve
More informationCLIF NOTES SERIES (Competent Leveraging of Information and Facts) ELECTRICAL
CLIF NOTES SERIES (Competent Leveraging of Information and Facts) ELECTRICAL What basic information do you need to know about electrical systems in buildings and why? The Capital Partners Electrical CLIF
More informationCalculation of the Cross-sectional Areas of Circuit Live Conductors
Calculation of the Cross-sectional Areas of Circuit Live Conductors MOTOR CIRCUITS SUBJECT TO FREQUENT STOPPING AND STARTING Regulations requires that where a motor is intended for intermittent duty and
More informationMichigan State University Construction Standards SECONDARY UNIT SUBSTATIONS PAGE
PAGE 261116-1 SECTION 261116 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,
More informationSOLAR PHOTOVOLTAIC SYSTEMS INSPECTOR CHECKLIST
SOLAR PHOTOVOLTAIC SYSTEMS INSPECTOR CHECKLIST The following checklist is an outline of the general requirements found in the 1999 National Electrical Code (NEC) Article 690 for Photovoltaic (PV) Power
More informationSolar PV Standard Electric Plan
*** Provide this document to the inspector along with ALL system installation instructions *** SCOPE: Standard plan for the installation of microinverter solar PV systems, not exceeding a total AC output
More informationMicroinverters and AC PV modules are becoming. Microinverters and AC PV Modules. Different Beasts. Perspectives on PV.
Perspectives on PV Microinverters and AC PV Modules Are Different Beasts by John Wiles Microinverters and AC PV modules are becoming very common in residential and small commercial PV systems. See photos
More informationA. This Section includes Low Voltage Switchgear Work, as indicated on the drawings, and as specified herein.
16425 SWITCHBOARD ************************************************************************************************************* SPECIFIER: CSI MasterFormat 2004 number: 26 24 13 An optional keynote to
More information9/16/2010. Chapter , The McGraw-Hill Companies, Inc. TRANSMISSION SYSTEMS. 2010, The McGraw-Hill Companies, Inc.
Chapter 3 TRANSMISSION SYSTEMS 1 Transmitting large amounts of electric energy over long distances is accomplished most efficiently by using high-voltages. Without transformers the widespread distribution
More informationContents. Obtaining Electric Service from Your Cooperative...1. Bonding Frames of Major Appliances...4. Voltage Drop...8. Drawings...
Contents Obtaining Electric Service from Your Cooperative...1 Bonding Frames of Major Appliances...4 Voltage Drop...8 Drawings...14 Agricultural Buildings...23 Optional Standby Systems...42 Grounding &
More informationMetering and Service Installation:
Table of Contents 1. Metering Installation Requirements, General... 1 2. Type of Service... 2 3. Definitions... 2 4. Who Provides Metering Equipment?... 2 5. Establishment of Service... 2 6. Meter Access...
More informationSupply-Side PV Connections
Perspectives on PV Supply-Side PV Connections by John Wiles Plan reviewers and inspectors throughout the country are seeing increasing numbers of supply-side connected utility interactive photovoltaic
More informationSUPPLEMENTAL CORRECTION SHEET FOR SOLAR PHOTOVOLTAIC SYSTEMS - ELECTRICAL
SUPPLEMENTAL CORRECTION SHEET FOR SOLAR PHOTOVOLTAIC SYSTEMS - ELECTRICAL This is intended to provide uniform application of the codes by the plan check staff and to help the public apply the codes correctly.
More informationAppendix C. Design Calculations for Electrical Design. Chapter 9 Electrical Design Edition SPU Design Standards and Guidelines 9C-i
AppC_Ch9-DesignClac_8.9.10 Chapter 9 Electrical Design Appendix C Design Calculations for Electrical Design 2010 Edition SPU Design Standards and Guidelines 9C-i Appendix C Design Calculations 9C-ii 2010
More informationPretest Module 21 Units 1-4 AC Generators & Three-Phase Motors
Pretest Module 21 Units 1-4 AC Generators & Three-Phase Motors 1. What are the two main parts of a three-phase motor? Stator and Rotor 2. Which part of a three-phase squirrel-cage induction motor is a
More informationInstallation and Construction Notes for EVSE4
Installation and Construction Notes for EVSE4 You need to read and understand this if you want to build an EVSE that will be safe and need to pass a building inspectors review. Before beginning this process
More informationIs Your Wiring System Safe and Energy Efficient?
1 of 7 12/16/2010 1:27 PM University of Missouri Extension G1409, Reviewed October 1993 Is Your Wiring System Safe and Energy Efficient? Kenneth L. McFate and Fred M. Crawford Department of Agricultural
More information2011/2008/2005 NATIONAL ELECTRICAL CODE SOLAR PV CODE COMPLIANCE REFERENCE
2011/2008/2005 NATIONAL ELECTRICAL CODE SOLAR PV CODE COMPLIANCE REFERENCE PAGE 1 OF 5 This Reference provides a very comprehensive list of aspects of a solar PV installation that could be reviewed, clarifying
More informationKnow the Code: PV and NEC
Know the Code: PV and NEC September 2014 PV Installer's Course ---NEC Article 690 Highlights 1 First National Electrical Code 1881 September 2014 PV Installer's Course ---NEC Article 690 Highlights 2 The
More informationENGINEERING SPECIFICATION
December 206 ENGINEERING SPECIFICATION No. of 6 DATE: 2-9-6 CATEGORY SUBJECT TABLE OF CONTENTS. Overview... 2 2. General Requirements for Service... 3 3. Definitions... 3 4. Abbreviations... 5 5. References
More informationPRODUCT DRAWING WIRING DIAGRAM FIELD CONNECTIONS MILLENNIUM MODEL YT CHILLERS (STYLE J) WITH ELECTRO-MECHANICAL STARTER JOB DATA:
Supersedes: 160.55-PW4 (1199) FORM 160.55-PW4 (600) PRODUCT DRAWING YORK INTERNATIONAL CORPORATION P.O. Box 1592, YORK, PA 17405 CONTRACTOR ORDER NO. YORK CONTRACT NO. YORK ORDER NO. WIRING DIAGRAM FIELD
More information2011 NEC Changes Part 2 (Homestudy) (Homestudy)
2011 NEC Changes Part 2 (Homestudy) (Homestudy) North Carolina Electrical License This course will review the second half of the most important National Electrical Code changes from the 2011 NEC. Changes
More information