1 Government Of India Ministry of Power Central Electricity Authority New Delhi Power Sector Feb-217

2 Executive Summary for the Month of Feb, 217 Contents SN Section A - Highlights of Power Sector Page 1 Electricity Generation for Feb 217 (BU) 1A & 1B 2 Generating Capacity Addition for Feb 217 (MW) 2 3 List of Projects Commissioned in Feb All India Installed Capacity (MW) Region-wise as on All India Installed Capacity (MW) Sector-wise as on Transmission Lines Added during Feb 217 (Ckms) 5 7 Transformation Capacity Addition during Feb 217 (MVA) 6 8 Power Supply Position (Energy & Peak) in Feb Peak Shortage of Power Supply (MW) in Different Regions All India PLF Sector-wise for Feb T & D and AT & C Losses (%) 12 All India Village Electrification & Pumpsets Energised as on Average cost of Power & Average Realisation All India per capita consumption of Electricity (KWh) 15 All India Coal consumption for Power Generation (MT) Section B - Capacity Addition 1 Capacity Addition Targets and Achievements in 12th Plan 12 2 Capacity Addition Targets & Achievements during Feb Installed Capacity in various Regions including their shares Section C - Transmission Lines 1 Programme and Achievements of Transmission Lines in Feb List of Transmission Lines Commissioned/Ready for commissioning during Feb 217 Section D - Sub Stations 1 Programme and Achievements of Sub-Stations in Feb List of Sub Stations commissioned/ready for commisssioning during Feb 217 Section E - Electricity Generation 1 Electricity Generation (MU) Targets and Achievements for Section F - Power supply position 1 Power Supply Position (Provisional) for Feb Peak Demand and Peak Met (Provisional) for Feb Power Supply Position (Revised) for Jan Peak Demand and Peak Met (Revised) for Jan Notified Power cuts / Restrictions on Industries during Feb Power Supply to Agricultural Sector during Feb Section G - Growth of Power Sector 1 Growth of Installed Capacity since 6th Plan 29 2 Growth of Transmission Sector since 6th Plan 3 3 All India Yearly Coal consumption for Power Generation (Utilities) 4 All India Annual Per Capita Consumption of Electricity since Average cost of power supply & Average realisation (Paisa/kwh) 6 Growth of Rural Electrification & Pump Sets Energisation 32 7 Status of Hydro Schemes Cleared by the CEA upto Feb 217 Section H - Rate of sale of power for the year Rate of sale of power for the year

3 Section A - Highlights of Power Sector SN Contents Page 1 Electricity Generation (Conventional Sources) for Feb 217 (BU) Electricity Generation (Conventional & Renewable Sources) for Jan. 217 (BU) 1A 1B 2 Generating Capacity Addition for Feb 217 (MW) 2 3 List of Projects Commissioned in Feb All India Installed Capacity (MW) Region-wise as on All India Installed Capacity (MW) Sector-wise as on Transmission Lines Added during Feb 217 (Ckms) 5 7 Transformation Capacity Addition during Feb 217 (MVA) 6 8 Power Supply Position (Energy & Peak) in Feb Peak Shortage of Power Supply (MW) in Different Regions All India PLF Sector-wise for Feb T & D and AT & C Losses (%) 12 All India Village Electrification & Pumpsets Energised as on Average cost of Power & Average Realisation 14 All India per capita consumption of Electricity (KWh) All India Coal consumption for Power Generation (MT)

4 1. Electricity Generation for Feb, 217 (BU) Type Achievement Targets Achievement % Change Feb-16 Feb-17 Feb-17 w.r.t. 216 Thermal Hydro Nuclear Bhutan Import All India BU Feb-16 Feb-17 Electricity Generation During April 215 to Feb 216 & April 216 to Feb. 217 (BU) Type Thermal Hydro Nuclear Bhutan Import All India Apr '15 - Feb'16 Apr '16 - Feb '17 % Change BU Apr '15 - Feb'16 Apr '16 - Feb '17 1A

5 Month Generation (April-January, 217) Generation Generation from from Conventional Sources Renewable Sources Electricity Generation (Conventional & Renewable Sources) April-January, 217 vis-à-vis April- January, 216 Total Generation (April- January, 216) Generation from Conventional Sources Generation from Renewable Sources Total Growth in Conventional Generation % Growth Growth in Renewable Generation Growth in Total Generation (MU) (MU) (MU) (MU) (MU) (MU) (%) (%) (%) Apr-16 99,345 5,157 14,52 86,695 4,553 91, May-16 99,93 6,863 16,766 95,42 5,143 1, Jun-16 97,326 8,11 15,436 89,98 6,9 95, Jul-16 94,66 9,544 14,15 93,142 8,872 12, Aug-16 95,237 9,634 14,871 95,122 7,529 12, Sep-16 98,72 8,313 16,385 95,741 5,485 11, Oct-16 99,71 6,272 15,982 98,631 4,354 12, Nov-16 93,569 5,2 98,571 85,96 4,141 9, Dec-16 95,252 5,445 1,697 95,123 4,976 1, Jan-17 95,69 5,789 11,479 92,129 4,377 96, Total 968,711 7,129 1,38,84 74,546 55, , Source-Wise All India Generation from Renwables Wind Solar Biomass Bagasse Small Hydro Others Total Electricity Generation From Renewable (source wise) April-January, 217 vis-à-vis April-January, 216 Jan., 217 For the Month of Jan., Apr., 216 to Jan., Commulative for the period All Figure in MU Apr., 215 to Jan.,216 1B

6 2. Generating Capacity Addition for Feb, 217(MW) Type Achievement Targets Achievement Feb-16 Feb-17 % Change w.r.t. 216 Thermal Hydro Nuclear All India , Feb-16 1 Feb-17 Generating Capacity Addition during April '15 to Feb 16 & April '16 to Feb 17 (MW) Apr '15 - Feb '16 Apr '16 - Feb '17 % Change Thermal Hydro Nuclear NA All India Apr '15 - Feb '16 Apr '16 - Feb '17 2

7 3. List of Projects Commissioned During Feb 217 (i) Thermal Sembcorp Gayatri TPP U-2( 66) MW was Commisioned on Nasik TPP PH-I (27) MW was Commisioned on (ii) Hydro Teesta -III U-4 ( 2MW ) was Commisioned on Chanju -I U-1 ( 12 MW ) was Commisioned on Chanju-I U-2 ( 12 MW ) was Commisioned on (iii) Nuclear NIL 4. All India Installed Capacity (MW) Region-wise as on Thermal Nuclear Hydro RES Grand Total Region Coal Gas Diesel Total Northern Western Southern Eastern North-East Islands ALL INDIA Total = Thermal Nuclear Hydro RES Total Captive Thermal Nuclear Hydro RES Total Captive Note: Captive Genaration is not included in the total. RES as on

8 5. All India Installed Capacity (MW) Sector-wise as on Sector THERMAL Coal Gas Diesel Total Nuclear Hydro RES Grand Total State Private Central All India RES as on All India Installed Capacity(MW) as on (Sector-Wise) Central, , 24% State, , 33% State Private Central Private, , 43% 4

9 6. Transmission Lines Added during Feb, 217 (Ckms) Voltage Level +/- 5 KV HVDC +/- 8 KV HVDC 765 KV 4 KV 22 KV All India Feb Feb ckms Feb-17 Feb-16 Feb-17 Transmission Lines Added during Apr '15 to Feb '16 & Apr '16 to Feb'17 (Ckms) Voltage Level +/- 5 KV HVDC +/- 8 KV HVDC 765 KV 4 KV 22 KV All India Apr '15 - Feb '16 Apr '16 - Feb ' ckms Apr '15 - Feb '16 Apr '16 - Feb '17 5

10 7. Transformation Capacity Addition During Feb, 217 (MVA) Voltage Level +/- 8 KV HVDC +/- 5 KV HVDC 765 KV 4 KV 22 KV All India Feb-16 Feb Transformation Capacity Addition during Feb, MVA Feb-16 Feb-17 All India Transformation Capacity Addition during Apr '15 to Feb '16 & Apr '16 to Feb '17 (MVA) Voltage Level +/- 8 KV HVDC +/- 5 KV HVDC 765 KV 4 KV 22 KV All India April' 15 to Feb '16 April '16 to Jan' MVA April' 15 to Feb '16 1 April '16 to Jan'17 6

11 8. Power Supply Position (Energy & Peak) in Feb 217 Region Energy (MU) Deficit (%) Requirement Availability Feb'16 Feb '17 Feb '16 Feb'17 Jan.16 Jan '17 Northern , , Western , ,352.. Southern , , Eastern , , North Eastern , , All India , , Power (MW) Region Deficit (%) Peak Demand Peak Met Feb 16 Feb 17 Feb '16 Feb '17 Jan16 Jan. '17 Northern Western Southern Eastern North Eastern All India

12 9. Peak Shortage of Power Supply (MW) in Different Regions Chandigarh Delhi Haryana HP J&K Punjab Rajasthan UP Utrakhand Feb ' Feb ' MW Northern States (MW) Feb '17 Feb ' Chandi garh Delhi 4 Haryan a HP J&K Punjab Rajasth an UP Utrakh and 4 Western States (MW) Feb '17 Feb '16 Chattisgarh Gujarat MP Maharashtra Daman & Diu Dadar Nagar Haveli Goa 3 Feb ' Feb ' MW 8 Chattisgarh Gujarat 9 12 MP 6 76 Maharashtra 21 Daman & Diu Dadar Nagar Haveli Goa Southern State (MW) Feb '17 Feb ' AP Telengana Karnataka Kerala Tamil Nadu Puducherry Lakshyadeep Feb 5 ' Feb ' AP Telengana Karnataka Kerala Tamil Nadu Puducherry Lakshyadeep 8

13 Bihar DVC Jharkhand Odisha Eastern West States Bengal (MW) Sikkim A&N Island Feb '17 Feb '16 Feb ' Feb ' MW 15 Bihar 35 DVC 93 Jharkhand 27 Odisha 29 West Bengal Sikkim 8 A&N Island 8 8 North-Eastern States (MW) 6Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura Feb ' Feb ' MW Arunachal Assam Manipur Meghalay a Mizoram Nagaland Tripura

14 1. All India PLF* Sector-wise for Feb. 217 %PLF Sector Feb '16 Feb '17 Central State Private ALL INDIA Sector-Wise Plant Load Factor for Jan, 216 and Jan, 217 % PLF Central State Private ALL INDIA Feb '16 Feb '17 All India PLF Month-wise Month April May June July August September October November December January February March All India PLF Month-wise April May June July August September October November December January February March * For Coal and Lignite based Power Plants 1

15 11. T & D and AT&C Losses (%) T&D Losses (P) AT&C Losses (P) Note: As per PFC for utilities selling directly to consumers P: Provisional 12. All India Village Electrification & Pumpsets Energised as on Total Number of Villages Villiages Electrified (Nos.) as on * Pump sets Energised Pump sets Energised as on as on Figures are based on the data available in DDUGJY website. % Villages electrified *Disclaimer: The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as Indicated in all the reports. The data in the report prior to October, 215 was Updated every month based on the information received from states/distribution utilities as and when reported but the data for all the states for a particular month was generally not made available simultaneously to reflect the countrywide picture for a particular month. Number of total villages and number of electrified villages have also been adjusted for changes observed from Census 211 data. As such, each monthly report of Village electrification of CEA is independent of the earlier published reports Note: From the year 24-5 onwards Definition of Village Electrification:- A village would be declared Electrified if i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited locality as well as Dalit Basti / hemlet where it exists. (For electrification through Non-Conventional Energy Sources a Distribution Transformer mat not be necessary) ii) Electricity is provided to Public places like Schools, Panchayat Office, Health Centre, Dispensaries, Community Centres etc. and iii) The number of households electrified should be at least 1% of the total number of households in the village iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be obtained. 13. Average cost of Power & Average Realisation Average Revenue Realization(paise/unit) Gap ACS- Year verage cost of supply(acs) (paise/un Gap ACS- ARR( Without ARR (on subsidy booked Gap ACS- ARR (on subsidyrece Without Subsidy Subsidy) Paise/unit basis) paise/unit ived basis) paise/unit Source:- PFC Reports on the performance of State Power Utilities 14. All India per capita consumption of Electricity ( KWh) # * # (Gross Generation+Net Import) / Mid Year Population, * Provisional 15. All India Coal consumption for Power Generation (MT) * * Actual 11

16 Section B - Capacity Addition SN Contents Page 1 Capacity Addition Targets and Achievements in 12th Plan 12 2 Capacity Addition Targets & Achievements during Feb 217 and April 216 to Feb Installed Capacity in various Regions including their shares

17 1. Capacity Addtion Targets and Achievements in the 12th Plan (i) Targets (MW) Type/Sector Central State Private Total Thermal 14, , ,54. 72,34. Hydro 6,4. 1,68. 3,285. 1,897. Nuclear 5,3... 5,3. Total 26, ,53. 46, ,537. (ii) Achievements upto Feb, 217 during the 12th Plan (MW) Type/Sector Central State Private Total Thermal 13, , , , Hydro 2, , ,414.2 Nuclear 1,... 1,. Total 17, , , , Acievement % Achievement of Capacity Addition during the Current Plan upto Feb 217 9,. 8,. 7,. 6,. 5,. 4,. 3,. 2,. 1,.. 12th Plan Target 88,537 MW, Achieved so far MW 72,34. 88, ,897. 5, ,3. 1,. Thermal Hydro Nuclear Target Achievement 12

18 2. Capacity Addition Targets / Achievements During Feb 217 & April 216 to Feb 217 Schemes Sector (MW) Target Feb-17 April '16 - Feb '17 Deviation Target* Achievement Target* Achievement (+) / (-) Central Thermal State Pvt Total Central Hydro State Pvt Total Nuclear Central 15 Central All India State Pvt Total ,945 8,276 Targets and Achievement during ,264 9,87 Target Achievement MW ,319 1,594 Thermal Hydro Nuclear Total Capacity Addition Targets/Achievements during the Month of Feb 217 MW Targets and Achievement during Feb Thermal Hydro Nuclear Total Target Achievement 13

19 Region Northern Region Western Region Southern Region Eastern Region North Eastern Region Islands ALL INDIA ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS Modewise breakup Ownership/ Thermal RES * Sector Nuclear Hydro Coal Gas Diesel Total (MNRE) Grand Total State Private Central Sub Total State Private Central Sub Total State Private Central Sub Total State Private Central Sub Total State Private Central Sub Total State Private Central Sub Total State Private Central Total Figures at decimal may not tally due to rounding off (As on ) (UTILITIES) Abbreviation:-SHP=Small Hydro Project ( 25 MW), BP=Biomass Power, U&I=Urban & Industrial Waste Power, RES=Renewable Energy Sources Note : - 1.RES include SHP, BP, U&I, Solar and Wind Energy. Installed capacity in respect of RES (MNRE) as on (As per latest information available with MNRE) *Break up of RES all India as on is given below (in MW) : Small Bio-Power Total Wind Power Solar Power Hydro Power BM Power/Cogen. Waste to Energy Capacity SGPL TPP U-2 (66 MW) has been added to the Private sector of Andhra Pradesh 2. NASIK (P) TPS U-2 (27 MW) has been added to the Private sector of Maharashtra. 3. CHANJU-I HPS U-1&2 (2x12 MW) have been added to the Private sector of Himachal Pradesh. 4. D.P.L. TPS U-3,4&5 (7,75,75 MW) have been retired from the State sector of West Bengal. 5. TROMBAY TPS U-4 (15 MW) has been retired from the Private sector of Maharashtra. 6. TEESTA-III HPS U-4(2 MW) has been added to the State sector of Sikkim. 7. TEESTA-III HPS (12MW) tie-up of power is as under: Sikkim 36 MW Punjab 34 MW Haryana 2 MW U.P. 2 MW Rajasthan 1 MW 14

20 State Delhi Haryana Himachal Pradesh Jammu & Kashmir Punjab Rajasthan Uttar Pradesh Uttrakhnad Chandigarh INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATES/UTS LOCATED IN NORTHERN REGION Ownership/ Sector Central - Unallocated Total (Northern Region) INCLUDING ALLOCATED SHARES IN JOINT & CENTRAL SECTOR UTILITIES Thermal Modewise breakup Hydro (Renewable) (As on ) Grand Total Coal Gas Diesel Total Nuclear RES (MNRE) State Private Central Sub-Total State Private Central Sub-Total State Private Central* Sub-Total State Private Central Sub-Total State Private Central Sub-Total State Private Central Sub-Total State Private Central Sub-Total State Private Central Sub-Total State Private Central Sub-Total State Private Central Grand Total

21 State Goa Daman & Diu Gujarat Madhya Pradesh INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATES/UTS LOCATED IN WESTERN REGION INCLUDING ALLOCATED SHARES IN JOINT & CENTRAL SECTOR UTILITIES (As on ) Modewise breakup Ownership/ Thermal Hydro Sector Nuclear RES (MNRE) Coal Gas Diesel Total (Renewable) Grand Total State Private Central Sub-Total State Private Central Sub-Total State Private Central Sub-Total State Private Central Sub-Total Chhattisgarh Maharashtra Dadra & Nagar Naveli Central - Unallocated Total (Western Region) State Private Central Sub-Total State Private Central Sub-Total State Private Central Sub-Total State Private Central Grand Total

22 State Andhra Pradesh Telangana Karnataka Kerala Tamil Nadu INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATES/UTS LOCATED IN SOUTHERN REGION Ownership/ Sector INCLUDING ALLOCATED SHARES IN JOINT & CENTRAL SECTOR UTILITIES Thermal Modewise breakup Coal Gas Diesel Total Nuclear Hydro (Renewable) (As on ) RES (MNRE) Grand Total State Private Central Sub-Total State Private Central Sub-Total State Private Central Sub-Total State Private Central Sub-Total State Private Central Sub-Total NLC State Private Central Sub-Total Puducherry Central - Unallocated Total (Southern Region) State Private Central Sub-Total State Private Central Grand Total

23 State Bihar Jharkhand West Bengal DVC Odisha INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATES/UTS LOCATED IN EASTERN REGION Ownership/ Sector INCLUDING ALLOCATED SHARES IN JOINT & CENTRAL SECTOR UTILITIES Thermal Modewise breakup Hydro (Renewable) (As on ) Grand Total Coal Gas Diesel Total Nuclear RES (MNRE) State Private Central Sub-Total State Private Central Sub-Total State Private Central Sub-Total State Private Central Sub-Total State Private Central Sub-Total Sikkim Central - Unallocated Total (Eastern Region) State Private Central Sub-Total State Private Central Grand Total

24 INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATES/UTS LOCATED IN NORTH-EASTERN REGION State Assam Arunachal Pradesh Meghalaya Tripura Manipur Nagaland Mizoram Central - Unallocated Total (North- Eastern Region) Ownership/ Sector INCLUDING ALLOCATED SHARES IN JOINT & CENTRAL SECTOR UTILITIES Thermal Modewise breakup Hydro (Renewable) (As on ) Grand Total Coal Gas Diesel Total Nuclear RES (MNRE) State Private Central Sub-Total State Private Central Sub-Total State Private Central Sub-Total State Private Central Sub-Total State Private Central Sub-Total State Private Central Sub-Total State Private Central Sub-Total State Private Central Grand Total State Andaman & Nicobar lakshadweep Total (Islands) INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATES/UTS LOCATED IN ISLANDS Ownership/ Sector INCLUDING ALLOCATED SHARES IN JOINT & CENTRAL SECTOR UTILITIES Thermal Modewise breakup Coal Gas Diesel Total Nuclear Hydro (Renewable) (As on ) RES (MNRE) Grand Total State Private Central Sub-Total State Private Central Sub-Total State Private Central Grand Total

25 Section C - Transmission Lines SN Contents Page 1 Programme and Achievements of Transmission Lines in Feb 217 and during April 216 to Feb List of Transmission Lines Commissioned/Ready for commissioning during Feb 217

26 (Figs. in ckms) Voltage Level Programme Feb '17 Apr '16 to Feb17 /Sector Programme Achievement Programme Achievement +/- 8 kv HVDC Central Sector State Sector +/- 5 kv HVDC Total Central Sector JV/Private Sector 765 kv Total Central Sector State Sector JV/Private Sector kv 1. Programme and Achievementsof Transmission Lines in Feb 217 and during April 216 to Feb 217 Total Central Sector State Sector JV/Private Sector Total kV Central Sector State Sector JV/Private Sector 6 8 Total Grand Total Transmission Works (22 kv and above) for Transmission Lines Commissioned/Ready for commissioning During FEB-17 As on 28-FEB-217 Voltage Level (kv) Name of the Transmission Line Type Executing Agency Line Length (CKM) CENTRAL Sector: 4 PVT Sector: LILO of One Ckt Parbati Pooling Station - Amritsar at Jalandhar D/C PGCIL 34 4 Ajmer - Deedwana S/C 4 Bikaner - Deedwana S/C 4 Hindaun - Alwar S/C 4 JP Nigri TPP - Satna (PG) D/C 22 Sujangarh - Deedwana D/C APL 111 APL 129 APL 97 JAL 322 APL 6 STATE Sector: 4 Koradi II to Koradi -III line (ckt.ii) D/C 4 LILO of Jeerat - KTPS 4 kv S/C at N. Chanditala D/C+S/C 23 Kamudhi s/s - Tiruchulis/s (Muthuramlingapuram) - Ckt-I D/C 22 Bechraji - Maruti Suzuki line D/C 22 Chandrayanagutta - 22KV Imlibun GIS (UG Cable) D/C 22 HSR Layout - Nimhans S/S (UG Cable) UG Cable 22 Harsh Vihar - Patparganj line (U/G cable link) D/C 22 Interconnection of one ckt. of GSEG - Kosamba line with Essar - Ichhapore line 22 Karad - Koyna (Loc ) line S/C on D/C 22 LILO on one ckt of Nelamangala - Anchepalya line at Magadi D/C 22 LILO of (Ckt-II) of Miryalaguda - Khammam at Suryapet S/S D/C 22 LILO of (Ckt-I) of Miryalaguda - Khammam at Suryapet S/S D/C 22 LILO of Bakreswar - Gokarna at Sadaipur D/C 22 LILO of Ghanapur - Malkaram at Moulali D/C 22 LILO of Wanaparthy - Ragimanagadda at Singotam X Road SS 22 LILO of one Ckt of Chilakallu - Narkatpally at Suryapet S/S D/C 22 LILO of one ckt of Ramgarh GTPS - Dechu at Amarasagar D/C 22 Mitha - Becharji D/C 22 RSS (Ramagundam TPS)- Nirmal line (2nd Ckt Stringing) D/C D/C D/C MSETCL 38 WBSETCL 7 TANTRANSCO 69 GETCO 2 TSTRANSCO 1 KPTCL 11 DTL 29 GETCO 1 MSETCL 44 KPTCL 31 TSTRANSCO 48 TSTRANSCO 42 WBSETCL 13 TSTRANSCO 9 TSTRANSCO 1 TSTRANSCO 24 RVPNL 33 GETCO 59 TSTRANSCO 14

27 Section D - Sub Stations SN Contents Page 1 Programme and Achievements of Sub-Stations in Feb. 217 and during Apr 216 to Feb List of Sub Stations commissioned/ready for commisssioning during Feb

28 1. Programme & Achievement of sub- stations in Feb 217 and during April 216 to Feb 217 (Fig. in MVA) Voltage Level /Sector Programme Feb-17 Apr '16 - Jan ' Programme Achievement Programme Achievement ± 8 kv HVDC Central Sector State Sector JV/Private Sector Total kv Central Sector State Sector JV/Private Sector Total kv Central Sector State Sector JV/Private Sector Total kv Central Sector State Sector JV/Private Sector Total Grand Total

29 Transmission Works (22 kv and above) for Sub-Stations Commissioned/Ready for commissioning During FEB-17 As on 28-FEB-217 Voltage Level (kv) Name of Sub-Station Type Executing Agency Capacity Added (MW/MVA) CENTRAL Sector: 4 Extn. at Hyderabad S/s 4/22 PGCIL 5 PVT Sector: 4 Alwar S/S 4/22 APL 63 4 Deedwana S/S 4/22/132 APL KV Gonda S/s 22/132 SEUPPTCL 2 STATE Sector: 765 Agra (UP) S/S (ICT-II) 765/4 UPPTCL 15 4 Gr. Noida (Aug.) (5-315) 4/22 UPPTCL Kamavarapukota s/s (ICT-1) 4/22 APTRANSCO Kosamba (ICT addition) 4/22 GETCO 5 23 Tiruchuli (Near Muthuramalingap 23/11 TANTRANSCO 1 22 Amberi S/S 22/132 RVPNL Badaun (Aug.) ICT-II (2-15) 22/132 UPPTCL 5 22 Botad (Aug.) 22/132 GETCO Chilakalaguda GIS (Osmania 22/132 TSTRANSCO Dohna, Bareily (Aug.) ICT -I (16 22/132 UPPTCL 6 Page 1 of 2 Voltage Level (kv) Name of Sub-Station Type Executing Agency Capacity Added (MW/MVA) 22 Gondal (Aug.) 22/132 GETCO 5 22 Haldarwa (Aug.) 22/66 GETCO 1 22 Himmatpura S/s (Trf. 22/132 PSTCL 6 22 Imlibun (GIS) 22/132 TSTRANSCO Khanpur (Aug.) 22/66 GETCO 1 22 Kheralu (Aug.) 22/66 GETCO 6 22 Magadi S/S 22/66 KPTCL 2 22 Panandhro (KLTPS) (Aug.) 22/66 GETCO 5 22 Preet Vihar GIS (ICT-I) 22/33 DTL 1 22 Ranasan (Aug.) 22/132 GETCO 5 22 Sawaimadhopur S/s (Aug.) (16-22/132 RVPNL 6 22 Shamli (Aug.) ICT -II (2-16) 22/132 UPPTCL 4 22 Singotam X Roads S/s 22/33 TSTRANSCO 4 22 Sircilla S/s (Karimnagar 22/132 TSTRANSCO 3 22 Sultanpur (Aug.) ICT-I (2-16) 22/132 UPPTCL 4 22 Wagra (Aug.) 22/66 GETCO 5 21

30 Section E - Electricity Generation SN Contents Page 1 Electricity Generation (MU) Targets and Achievements for

31 1. Electricity Generation (MU) Targets and Achievememts for Thermal Programme Achievement* % Ach. Programme Achievement* % Ach. Central Sector 33, , , ,44. 36, State Sector 316, , , , , Pvt.IPP Sector 331, , , , , Pvt.UTL Sector 19,812. 1,436. 1, ,55. 17, Hydro Total 999,. 81, , , , Central Sector 53,4. 2,476. 2, , , State Sector 67,751. 4,479. 3, ,55. 46, Pvt.IPP Sector 11, ,58. 11, Pvt.UTL Sector 1, ,33. 1, Nuclear Sector Target (216-17) Feb '17 April '16 to Feb '17 Total 758,71.9 7,37. 6, , , Central Sector 4,. 3,543. 2, , , Total 4,. 3,543. 2, , , Bhutan Import 5, ,859. 5, Central Sector 424,32. 32,66. 32, , , State Sector 384,448. 3, , , , Pvt. Sector 364,52. 29, , , , Total 1,178,. 92,63. 88, ,76,436. 1,57, * Provisional based on actual-cum-assesment All India Energy Generation During April 216 to Feb 217 (MU) Programme Achievement Thermal Hydro Nuclear Total Renewable Energy Generation Figs in MU Achievement Cummulative Cummulative Achievement Achievement Jan-17 Jan-16 Upto Jan-17 Upto Jan

32 Section F - Power supply position SN Contents Page 1 Power Supply Position (Provisional) for Feb. 217 and April 217 to Feb Peak Demand and Peak Met (Provisional) for Feb. 217 and April 216 to Feb Power Supply Position (Revised) for Jan Peak Demand and Peak Met (Revised) for Jan Notified Power cuts / Restrictions on Industries during Feb Power Supply to Agricultural Sector during Feb

33 ऊज व य त आप त थ त रप ट (प व वल कन) /Energy Power Supply Position Report (Provisional) (Page 1 of 2) र य/State आ कड़ म लयन य नट न ट / Figures in MU net फ़रवर, 217 /February,217 अ ल,216 - फ़रवर,217/ April,216 to February,217 ऊज आव यकत ऊज उपल धत ऊज प त म कम ऊज आव यकत ऊज उपल धत ऊज प त म कम ण ल / System Energy Requirement Energy Supplied Energy not Supplied Energy Requirement Energy Supplied Energy not Supplied / Region ( MU ) ( MU ) ( MU ) ( % ) ( MU ) ( MU ) ( MU ) ( % ) च ड गढ़/ Chandigarh ,541 1,541. द ल / Delhi 1,71 1, ,862 28, ह रय ण / Haryana 3,253 3, ,324 45,324. हम चल द श / Himachal Pradesh ,87 8, ज म क म र / Jammu & Kashmir 1,469 1, ,929 12,887-3, प ज ब / Punjab 2,915 2, ,659 49,659. र ज थ न / Rajasthan 5,689 5, ,282 61, उ र द श / Uttar Pradesh 7,786 7, ,619 96,816-1, उ र ख ड / Uttarakhand ,13 11, उ र / Northern Region 24,6 24, , ,897-5, छ सगढ़ / Chhattisgarh 1,681 1, ,193 21, ग जर त / Gujarat 8,55 8,55. 94,366 94, म य द श / Madhya Pradesh 5,67 5,67. 6,52 6, मह र / Maharashtra 11,12 11, , , दमन और दउ / Daman & Diu ,19 2,19. द दर व नगर हव ल / Dadra & Nagar Haveli ,544 5,544. ग व / Goa ,971 3, प चम / Western Region 27,355 27, , , आ द श / Andhra Pradesh 4,451 4, ,283 49, त ल ग न / Telangana 4,752 4, ,61 47, कन टक / Karnataka 5,866 5,866. 6,472 6, क रल / Kerala 1,87 1, ,18 21, त मल न ड / Tamil Nadu 7,496 7, ,36 95, प ड च र / Puducherry ,316 2, ल - प / Lakshadweep # द ण / Southern Region 24,61 24, , , बह र / Bihar 1,754 1, ,616 23, द म दर घ ट नगम / DVC 1,514 1, ,43 16, झ रख ड / Jharkhand ,274 7, ओ डश / Odisha 1,919 1, ,343 24, प चम ब ग ल / West Bengal 3,379 3, ,342 44, स कम / Sikkim अ डम न- नक ब र/ Andaman- Nicobar # प व / Eastern Region 9,224 9, ,57 116, अ ण चल द श / Arunachal Pradesh असम / Assam ,387 8, म णप र / Manipur म घ लय / Meghalaya ,565 1,565. मज़ रम / Mizoram न ग ल ड / Nagaland प र / Tripura ,423 1, उ र-प व / North-Eastern Region 1,89 1, ,879 13, स प ण भ रत / All India 86,879 86, ,44,325 1,37,163-7, # Lakshadweep and Andaman & Nicobar Islands are stand- alone systems, power supply position of these,does not form part of regional requirement and availability. 23

34 अ धकतम व य त आप त थ त रप ट (प व वल कन) /Peak Power Supply Position Report (Provisional) आ कड़ म ग व ट न ट / Figures in MW net र य/State फ़रवर, 217 /February,217 अ ल,216 - फ़रवर,217/ April,216 to February,217 अ धकतम म ग अ धकतम उपल ध म ग क प त म कम अ धकतम म ग अ धकतम उपल ध म ग क प त म कम ण ल / System Peak Demand Peak Met Demand not Met Peak Demand Peak Met Demand not Met / Region ( MW ) ( MW ) ( MW ) ( % ) ( MW ) ( MW ) ( MW ) ( % ) च ड गढ़/ Chandigarh द ल / Delhi 3,882 3,882. 6,342 6, ह रय ण / Haryana 6,556 6,556. 9,262 9,262. हम चल द श / Himachal Pradesh 1,479 1,479. 1,492 1,492. ज म क म र / Jammu & Kashmir 2,622 2, ,675 2, प ज ब / Punjab 6,723 6, ,48 11,48. र ज थ न / Rajasthan 1,527 1, ,613 1, उ र द श / Uttar Pradesh 14,133 14, ,183 15,51-1, उ र ख ड / Uttarakhand 1,973 1,973. 2,37 2,37. उ र / Northern Region 43,262 42, ,372 52, छ सगढ़ / Chhattisgarh 3,397 3, ,875 3, ग जर त / Gujarat 13,36 13, ,724 14, म य द श / Madhya Pradesh 1,915 1, ,512 11, मह र / Maharashtra 21,281 21, ,281 21, दमन और दउ / Daman & Diu द दर व नगर हव ल / Dadra & Nagar Haveli ग व / Goa प चम / Western Region 47,962 47, ,962 47, आ द श / Andhra Pradesh 7,51 7,51. 7,969 7, त ल ग न / Telangana 8,927 8,927. 8,927 8,927. कन टक / Karnataka 1,257 1, ,257 1, क रल / Kerala 3,72 3, ,132 3, त मल न ड / Tamil Nadu 13,71 13, ,823 14,823. प ड च र / Puducherry ल - प / Lakshadweep # द ण / Southern Region 41,275 41, ,52 41, बह र / Bihar 3,619 3, ,883 3, द म दर घ ट नगम / DVC 2,58 2,58. 2,721 2,721. झ रख ड / Jharkhand 1,35 1,35. 1,498 1,498. ओ डश / Odisha 3,345 3,345. 4,12 4,12. प चम ब ग ल / West Bengal 7,177 7,177. 7,931 7, स कम / Sikkim अ डम न- नक ब र/ Andaman- Nicobar # प व / Eastern Region 17,174 17, ,79 18, अ ण चल द श / Arunachal Pradesh असम / Assam 1,398 1, ,673 1, म णप र / Manipur म घ लय / Meghalaya मज़ रम / Mizoram न ग ल ड / Nagaland प र / Tripura उ र-प व / North-Eastern Region 2,243 2, ,487 2, स प ण भ रत / All India 149, , , ,934-2, # Lakshadweep and Andaman & Nicobar Islands are stand- alone systems, power supply position of these,does not form part of regional requirement and availability 24

35 ऊज व य त आप त थ त रप ट (स श धत) /Energy Power Supply Position Report (Revised) (Page 1 of 2) आ कड़ म लयन य नट न ट / Figures in MU net र य/State जनवर, 217 /January,217 अ ल,216 - जनवर,217/ April,216 to January,217 ऊज आव यकत ऊज उपल धत ऊज प त म कम ऊज आव यकत ऊज उपल धत ऊज प त म कम ण ल / System Energy Requirement Energy Supplied Energy not Supplied Energy Requirement Energy Supplied Energy not Supplied / Region ( MU ) ( MU ) ( MU ) ( % ) ( MU ) ( MU ) ( MU ) ( % ) च ड गढ़/ Chandigarh ,448 1,448. द ल / Delhi 1,938 1, ,152 27, ह रय ण / Haryana 3,449 3, ,71 42,71. हम चल द श / Himachal Pradesh ,386 7, ज म क म र / Jammu & Kashmir 1,599 1, ,46 11,699-2, प ज ब / Punjab 3,13 3,13. 46,744 46,744. र ज थ न / Rajasthan 6,11 6, ,593 56, उ र द श / Uttar Pradesh 8,747 8, ,833 89,92-1, उ र ख ड / Uttarakhand 1,98 1, ,28 1, उ र / Northern Region 26,846 26, , ,675-5, छ सगढ़ / Chhattisgarh 1,939 1, ,512 19, ग जर त / Gujarat 8,496 8, ,311 86,31-1. म य द श / Madhya Pradesh 6,295 6, ,913 54, मह र / Maharashtra 1,963 1, , , दमन और दउ / Daman & Diu ,996 1,996. द दर व नगर हव ल / Dadra & Nagar ,45 5,45. Haveli ग व / Goa ,663 3, प चम / Western Region 28,77 28, , , आ द श / Andhra Pradesh 4,447 4, ,832 44, त ल ग न / Telangana 4,783 4, ,849 42, कन टक / Karnataka 5,961 5, ,66 54, क रल / Kerala 2,14 2,14. 2,148 2, त मल न ड / Tamil Nadu 8,136 8, ,54 87, प ड च र / Puducherry ,141 2, ल - प / Lakshadweep # द ण / Southern Region 25,531 25, , , बह र / Bihar 2,19 1, ,862 21, द म दर घ ट नगम / DVC 1,698 1, ,529 15, झ रख ड / Jharkhand ,663 6, ओ डश / Odisha 2,29 2,29. 22,424 22, प चम ब ग ल / West Bengal 3,495 3, ,963 4, स कम / Sikkim अ डम न- नक ब र/ Andaman- Nicobar # प व / Eastern Region 1,158 1, ,833 17, अ ण चल द श / Arunachal Pradesh असम / Assam ,762 7, म णप र / Manipur म घ लय / Meghalaya ,46 1,46. मज़ रम / Mizoram न ग ल ड / Nagaland प र / Tripura ,327 1, उ र-प व / North-Eastern Region 1,289 1, ,79 12, स प ण भ रत / All India 92,531 91, ,446 95,695-6, # Lakshadweep and Andaman & Nicobar Islands are stand- alone systems, power supply position of these,does not form part of regional requirement and availability. 25.

36 अ धकतम व य त आप त थ त रप ट (स श धत) /Peak Power Supply Position Report (Revised) आ कड़ म ग व ट न ट / Figures in MW net र य/State जनवर, 217 /January,217 अ ल,216 - जनवर,217/ April,216 to January,217 अ धकतम म ग अ धकतम उपल ध म ग क प त म कम अ धकतम म ग अ धकतम उपल ध म ग क प त म कम ण ल / System Peak Demand Peak Met Demand not Met Peak Demand Peak Met Demand not Met / Region ( MW ) ( MW ) ( MW ) ( % ) ( MW ) ( MW ) ( MW ) ( % ) च ड गढ़/ Chandigarh द ल / Delhi 4,168 4,168. 6,342 6, ह रय ण / Haryana 6,815 6,815. 9,262 9,262. हम चल द श / Himachal Pradesh 1,492 1,492. 1,492 1,492. ज म क म र / Jammu & Kashmir 2,675 2, ,675 2, प ज ब / Punjab 5,954 5, ,48 11,48. र ज थ न / Rajasthan 1,348 1,348. 1,613 1, उ र द श / Uttar Pradesh 14,344 14, ,183 15,51-1, उ र ख ड / Uttarakhand 2,37 2,37. 2,37 2,37. उ र / Northern Region 44,985 44, ,372 52, छ सगढ़ / Chhattisgarh 3,38 3, ,875 3, ग जर त / Gujarat 13,188 13, ,724 14, म य द श / Madhya Pradesh 11,353 11, ,512 11, मह र / Maharashtra 2,315 2, ,499 2, दमन और दउ / Daman & Diu द दर व नगर हव ल / Dadra & Nagar Haveli ग व / Goa प चम / Western Region 47,881 47, ,881 47, आ द श / Andhra Pradesh 7,372 7, ,969 7, त ल ग न / Telangana 8,47 8, ,47 8, कन टक / Karnataka 9,577 9, ,61 9, क रल / Kerala 3,594 3,594. 4,132 3, त मल न ड / Tamil Nadu 13,75 13, ,823 14,823. प ड च र / Puducherry ल - प / Lakshadweep # द ण / Southern Region 4,88 4, ,52 41, बह र / Bihar 3,81 3, ,883 3, द म दर घ ट नगम / DVC 2,721 2,721. 2,721 2,721. झ रख ड / Jharkhand 1,211 1,211. 1,498 1,498. ओ डश / Odisha 3,72 3,72. 4,12 4,12. प चम ब ग ल / West Bengal 6,63 6, ,931 7, स कम / Sikkim अ डम न- नक ब र/ Andaman- Nicobar # प व / Eastern Region 17,569 17, ,79 18, अ ण चल द श / Arunachal Pradesh असम / Assam 1,466 1, ,673 1, म णप र / Manipur म घ लय / Meghalaya मज़ रम / Mizoram न ग ल ड / Nagaland प र / Tripura उ र-प व / North-Eastern Region 2,33 2, ,487 2, स प ण भ रत / All India 148, ,94-1, , ,934-2, # Lakshadweep and Andaman & Nicobar Islands are stand- alone systems, power supply position of these,does not form part of regional requirement and availability 26

37 फ़रवर, 217 म इ ड ज पर व य त कट त क ववरण / Notified Power Cuts/Restrictions on Industries during February,217 र य / / State/ Region ऊज /म ग कट त / Energy/Demand Cut उ र / Northern Region च ड गढ़/ Chandigarh* द ल / Delhi ह रय ण / Haryana हम चल द श / Himachal Pradesh No Notified Cuts No Notified Cuts No Notified Cuts ज म क म र / Jammu & Kashmir* प ज ब / Punjab र ज थ न / Rajasthan उ र द श / Uttar Pradesh उ र ख ड / Uttarakhand No Notified Cuts No Notified Cuts No Notified Cuts No Notified Cuts प चम / Western Region छ सगढ़ / Chhattisgarh ग जर त / Gujarat म य द श / Madhya Pradesh मह र / Maharashtra ग व / Goa No Notified Cuts No Notified Cuts No Notified Cuts No Notified Cuts No Notified Cuts द ण / Southern Region आ द श / Andhra Pradesh त ल ग न / Telangana कन टक / Karnataka क रल / Kerala त मल न ड / Tamil Nadu प ड च र / Puducherry प व / Eastern Region बह र / Bihar झ रख ड / Jharkhand ओ डश / Odisha प चम ब ग ल / West Bengal No Notified Cuts No Notified Cuts No Notified Cuts No Notified Cuts No Notified Cuts No Notified Cuts No Notified Cuts No Notified Cuts No Notified Cuts No Notified Cuts * Data not received. 27

38 HPSEBL has only 2% agriculture consumers and uninterrupted power is being supplied to agriculture sector र य / / State/ Region औसत व त आप त घ ट म / Average Hours of Supply उ र / Northern Region च ड गढ़/ Chandigarh* द ल / Delhi ह रय ण / Haryana There is no agricultural load in Delhi. 9:25 hrs/day हम चल द श / Himachal Pradesh HPSEBL has only 2% agriculture consumers and uninterrupted power is being supplied to agriculture sector ज म क म र / Jammu & Kashmir* प ज ब / Punjab र ज थ न / Rajasthan 5:1 hrs/day 6:45 hrs/day उ र द श / Uttar Pradesh 18:5 hrs/day उ र ख ड / Uttarakhand 23:13 hrs/day प चम / Western Region छ सगढ़ / Chhattisgarh 18 hrs/day ग जर त / Gujarat 8 hrs/day म य द श / Madhya Pradesh मह र / Maharashtra ग व / Goa Three-Phase Supply(Irrigation)- 9:51hrs /day, Three-Phase (Mixed) Supply - 23:15 hrs /day 9 hrs/day No restriction द ण / Southern Region आ द श / Andhra Pradesh 7 hrs/day. त ल ग न / Telangana 9 hrs/day. कन टक / Karnataka क रल / Kerala त मल न ड / Tamil Nadu प ड च र / Puducherry 6 hrs/day No Restrictions 9 hrs/day (6 hrs during day time and 3 hrs during night time) No Restrictions प व / Eastern Region बह र / Bihar झ रख ड / Jharkhand ओ डश / Odisha प चम ब ग ल / West Bengal About 18 hrs About 2 hrs 24 hrs About 23 hrs 28

39 Section G - Growth of Power Sector SN Contents Page 1 Growth of Installed Capacity since 6th Plan 29 2 Growth of Transmission Sector since 6th Plan 3 3 All India Yearly Coal consumption for Power Generation (Utilities) 4 All India Annual Per Capita Consumption of Electricity since Average cost of power supply & Average realisation (Paisa/kwh) 6 Growth of Rural Electrification & Pump Sets Energisation 32 7 Status of Hydro Schemes Cleared by the CEA in Feb. 217

40 Plan / Year 1. Growth of Installed Capacity Since 6th Plan (In MW) Thermal Nuclear Hydro RES (MNRE) Total Coal Gas Diesel Total End of 6th Plan End of 7th Plan End of 8th Plan End of 9th Plan End of 1th Plan End of 11th Plan End of Feb Captive Generation Capacity in Industries having demand of 1 MW and above, grid interactive (as on ) = MW* *Provisional All India Generating Installed Capacity ( MW ) (As on ) Total Installed Capacity MW Coal Gas Diesel Nuclear Hydro Res Coal Gas Diesel Nuclear Hydro Res Total

Government Of India Ministry of Power Central Electricity Authority New Delhi. Executive Summary Power Sector February-16

Government Of India Ministry of Power Central Electricity Authority New Delhi. Executive Summary Power Sector February-16 Government Of India Ministry of Power Central Electricity Authority New Delhi Executive Summary Power Sector February-16 Executive Summary for the Month of February, 216 Contents SN Section A - Highlights

More information

Government Of India Ministry of Power Central Electricity Authority New Delhi

Government Of India Ministry of Power Central Electricity Authority New Delhi Government Of India Ministry of Power Central Electricity Authority New Delhi Power Sector April-217 Executive Summary for the Month of April 217 Contents SN Section A - Highlights of Power Sector Page

More information

Government Of India Ministry of Power Central Electricity Authority New Delhi

Government Of India Ministry of Power Central Electricity Authority New Delhi Government Of India Ministry of Power Central Electricity Authority New Delhi Power Sector Aug-216 Executive Summary for the Month of Aug, 216 Contents SN Section A - Highlights of Power Sector Page 1

More information

Government Of India Ministry of Power Central Electricity Authority New Delhi

Government Of India Ministry of Power Central Electricity Authority New Delhi Government Of India Ministry of Power Central Electricity Authority New Delhi Power Sector Dec-216 Executive Summary for the Month of Dec, 216 Contents SN Section A - Highlights of Power Sector Page 1

More information

Government Of India Ministry of Power Central Electricity Authority New Delhi

Government Of India Ministry of Power Central Electricity Authority New Delhi Government Of India Ministry of Power Central Electricity Authority New Delhi Power Sector March-217 Executive Summary for the Month of Mar 217 Contents SN Section A - Highlights of Power Sector Page 1

More information

Government Of India Ministry of Power Central Electricity Authority New Delhi. Power Sector

Government Of India Ministry of Power Central Electricity Authority New Delhi. Power Sector Government Of India Ministry of Power Central Electricity Authority New Delhi Power Sector Jan-218 Executive Summary for the Month of Jan 218 Contents SN Section A - Highlights of Power Sector Page 1 Electricity

More information

Government Of India Ministry of Power Central Electricity Authority New Delhi. Power Sector

Government Of India Ministry of Power Central Electricity Authority New Delhi. Power Sector Government Of India Ministry of Power Central Electricity Authority New Delhi Power Sector May-218 Executive SumMayy for the Month of May 218 Contents SN Section A - Highlights of Power Sector Page 1 Electricity

More information

Government Of India Ministry of Power Central Electricity Authority New Delhi

Government Of India Ministry of Power Central Electricity Authority New Delhi Government Of India Ministry of Power Central Electricity Authority New Delhi Power Sector Sep-217 Executive Summary for the Month of Sept 217 Contents SN Section A - Highlights of Power Sector Page 1

More information

Executive Summary on Power Sector. Jul-18

Executive Summary on Power Sector. Jul-18 भ रत सरक र Government of India व द य त म त र लय Ministry of Power क न द र य व द य त प र ध करण Central Electricity Authority Executive Summary on Power Sector Jul-18 Executive Summary for the Month of JUNE

More information

भ र त स र क र क न र य व द य त प ध क र ण C E N T R A L E L E C T R I C I T Y A U T H O R I T Y

भ र त स र क र क न र य व द य त प ध क र ण C E N T R A L E L E C T R I C I T Y A U T H O R I T Y भ र त स र क र G O V E R N M E N T O F I N D I A व द य त म त ल य M I N I S T R Y O F P O W E R क न र य व द य त प ध क र ण C E N T R A L E L E C T R I C I T Y A U T H O R I T Y ( व द य त अ ध नन य म, 2 3 क

More information

Government Of India Ministry of Power Central Electricity Authority New Delhi. Power Sector

Government Of India Ministry of Power Central Electricity Authority New Delhi. Power Sector Government Of India Ministry of Power Central Electricity Authority New Delhi Power Sector March-218 Executive Summary for the Month of Mar 218 Contents SN Section A - Highlights of Power Sector Page 1

More information

भ र उत प द स त लन रप टर LOAD GENERATION BALANCE REPORT

भ र उत प द स त लन रप टर LOAD GENERATION BALANCE REPORT भ र उत प द स त लन रप टर 214-15 LOAD GENERATION BALANCE REPORT 214-15 Distribu tion Transm ission Generation भ रत सरक र Government of India व त म लय Ministry of Power क न य व त धकरण Central Electrici Authori

More information

Employees' Provident Fund Organisation, India Ministry of Labour & Employment, Government of India

Employees' Provident Fund Organisation, India Ministry of Labour & Employment, Government of India Employees' Provident Fund Organisation, India Ministry of Labour & Employment, Government of India Date 20th December, 2018 NET PAYROLL DATA EPFO PROVISIONAL ESTIMATE OF NET PAYROLL IN AGE BUCKETS AS PER

More information

Government Of India Ministry of Power Central Electricity Authority New Delhi

Government Of India Ministry of Power Central Electricity Authority New Delhi Government Of India Ministry of Power Central Electricity Authority New Delhi Executive Summary Power Sector January-15 Executive Summary for the Month of January 215 Contents SN Section A - Highlights

More information

Chapter 1 POPULATION

Chapter 1 POPULATION Chapter 1 POPULATION Women & Men In India- 2016 1 2 Population related Statistics Population and related Statistics This chapter presents the important statistics on population characteristics from a gender

More information

POPULATION. Chapter 1

POPULATION. Chapter 1 Chapter 1 POPULATION Coverage Rural urban Distribution of Sex Ratio and Population Growth Rate in Post-Independence India State-wise percent share of Female population in Total Population Year-wise State-wise

More information

04-Jun-08 FILE NAME : GSDPCRNS STATE SERIES

04-Jun-08 FILE NAME : GSDPCRNS STATE SERIES 04-Jun-08 FILE NAME : GSDPCRNS STATE SERIES STATEMENT : GROSS STATE DOMESTIC PRODUCT AT CURRENT PRICES (1980-81 TO 1993-94) As on 26.11.1999 (Crore Rupees) Sl. State/U.T. 1980-81 1981-82 1982-83 1983-84

More information

¼ããÀ ¹ã㪠ã Ôãâ ãìêã ã ãäà¹ããñ Ã

¼ããÀ ¹ã㪠ã Ôãâ ãìêã ã ãäà¹ããñ à Central Electricity Authority LGBR: 211-12 ¼ããÀ ¹ã㪠ã Ôãâ ãìêã ã ãäà¹ããñ à Load Generation Balance Report 211-12 ¼ããÀ ã ÔãÀ ãšãà Government of India ãäìã²ãì ã ½ãâ ããêã¾ã Ministry of Power ãñš ³ãè¾ã ãäìã²ãì

More information

¼ããÀ ¹ã㪠ã Ôãâ ãìêã ã ãäà¹ããñ Ã

¼ããÀ ¹ã㪠ã Ôãâ ãìêã ã ãäà¹ããñ à ¼ããÀ ¹ã㪠ã Ôãâ ãìêã ã ãäà¹ããñ à Load Generation Balance Report 212-13 ¼ããÀ ã ÔãÀ ãšãà Government of India ãäìã²ãì ã ½ãâ ããêã¾ã Ministry of Power ãñš ³ãè¾ã ãäìã²ãì ã ¹ãÆããä ã ãšà ã Central Electricity

More information

Description Rural Urban Combined. Weights June 18 Index (Final) July 18 Index (Prov.) (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12)

Description Rural Urban Combined. Weights June 18 Index (Final) July 18 Index (Prov.) (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) Annexure I All India Consumer Price Indices Group Subgroup Description Rural Urban Combined () () (3) (4) (5) (6) (7) (8) (9) (0) () () Cereals.35 37.6 38.4 6.59 35.3 35.6 9.67 36.9 37.5 Meat fish 4.38

More information

INDIAN HORTICULTURE PRODUCTION - AT A GLANCE ( and to )

INDIAN HORTICULTURE PRODUCTION - AT A GLANCE ( and to ) 2 INDIAN HORTICULTURE PRODUCTION - AT A GLANCE (1991-92 and 2001-02 to 2012-13) Year Fruits Vegetables Flowers Nuts (Almond & Walnut) A P A P A P (Loose) A P 1991-92 2874 28632 5593 58532 NA NA NA NA 2001-02

More information

TRANSMISSION CAPACITY ADDITION PROGRAMME DURING No. 1 Introduction 1

TRANSMISSION CAPACITY ADDITION PROGRAMME DURING No. 1 Introduction 1 TRANSMISSION CAPACITY ADDITION PROGRAMME DURING 2006-07 Sl. No. Contents Page No. 1 Introduction 1 2 Chapter 1 Transmission Capacity Additions During 2005-06 of 10 th plan period 3 Chapter 2 Construction

More information

Chapter 2 HEALTH. Women & Men In India

Chapter 2 HEALTH. Women & Men In India Chapter 2 HEALTH Women & Men In India 2016 19 20 Health related statistics Health A healthy population being the basic necessity for development, it is essential to assess the variability in terms of gender

More information

GOVERNMENT OF INDIA MINISTRY OF HOME AFFAIRS LOK SABHA UNSTARRED QUESTION NO. 2009

GOVERNMENT OF INDIA MINISTRY OF HOME AFFAIRS LOK SABHA UNSTARRED QUESTION NO. 2009 GOVERNMENT OF INDIA MINISTRY OF HOME AFFAIRS LOK SABHA UNSTARRED QUESTION NO. 2009 TO BE ANSWERED ON THE 14 TH MARCH, 2017/ PHALGUNA 23, 1938 (SAKA) DOMESTIC VIOLENCE 2009. SHRI NIHAL CHAND: SHRI R. DHRUVA

More information

The Electric Power System

The Electric Power System The Electric Power System INDIA Indian Power System 1 2 Basic facts Area:3.288 million km² Population:1.25 Billion Electricity consumers: 216 Million- (31.3.2013) Number of TSOs: 14- (31.3.2013) Numbe

More information

14.Storage Infrastructure

14.Storage Infrastructure Infrastructure 393 394 14. STORAGE 14.1 There is no specific data source for this item, which compiles data for all types of storages in one place. Data has been individually obtained from Central Warehousing

More information

Gujarat Power Sector A Statistical Profile

Gujarat Power Sector A Statistical Profile Power Sector A Statistical Profile 6th Floor, GIFT ONE, Road 5C, Zone 5, GIFT CITY, Gandhinagar, 8 55. Ph.: +91796 Fax : +91796 5/55 Email : gerc@gercin.org Website : www.gercin.org 6th Floor, GIFT ONE,

More information

Remote Village Electrification

Remote Village Electrification Remote Village Electrification Gram Oorja s Journey August 2013 About Gram Oorja Gram Oorja Solutions Private Limited (www.gramoorja.in) founded in 2008, acts as a catalyst in commercialising on-the-ground

More information

Population and decadal change by residence -India: 2011 (Persons)

Population and decadal change by residence -India: 2011 (Persons) Population and decadal change by residence -India: 2011 (Persons) State/ UT Code India/ Population 2011 State/Union Territory # Percentage decadal change 2001-2011 Total Rural Urban Total Rural Urban 1

More information

RPO-REC Framework: Emerging Challenges and way forward. Background Presentation

RPO-REC Framework: Emerging Challenges and way forward. Background Presentation RPO-REC Framework: Emerging Challenges and way forward Background Presentation Ashwin Gambhir, Vishal Toro, Vijaypal Singh Prayas (Energy Group), Pune 10 th June, 2013, IHC, New Delhi Prayas Energy Group,

More information

India Solar Market Update Q Executive Summary.

India Solar Market Update Q Executive Summary. India Solar Market Update Q4 2017 Executive Summary India Solar Demand Forecast India Solar Demand Forecast (MW) 12,000 Annual Rooftop Solar Installations (MW) 80,000 Solar installations rose 123 percent

More information

northeast group, llc India Smart Grid: Market Forecast ( ) January group.com

northeast group, llc India Smart Grid: Market Forecast ( ) January group.com northeast group, llc India Smart Grid: Market Forecast (2015 2025) January 2015 www.northeast- group.com India Smart Grid: Market Forecast (2015 2025) In many ways, India represents the best smart grid

More information

ECONOMIC SURVEY STATISTICAL APPENDIX

ECONOMIC SURVEY STATISTICAL APPENDIX ECONOMIC SURVEY 2011-12 STATISTICAL APPENDIX STATISTICAL APPENDIX : ECONOMIC SURVEY 2011-2012 PAGE 0.1 Select Indicators: 1950-51 to 2010-11... A1-A2 1. National Income and Production 1.1 Gross National

More information

Meeting with Commissioner, Kendriya Vidyalaya Sangathan (KVS) New Delhi 11 April 2016

Meeting with Commissioner, Kendriya Vidyalaya Sangathan (KVS) New Delhi 11 April 2016 Chariot Wheel Konark Sun Temple, Odisha Konark Sun Temple is a 13th Century Sun Temple Meeting with Commissioner, Kendriya Vidyalaya Sangathan (KVS) New Delhi 11 April 2016 Solar potential in the country

More information

य प र षण ल ख REGIONAL TRANSMISSION ACCOUNT. April 2018

य प र षण ल ख REGIONAL TRANSMISSION ACCOUNT. April 2018 भ रत सरक र GOVERNMENT OF INDIA उज म लय MINISTRY OF POWER क य व त धकरण CENTRAL ELECTRICITY AUTHORITY द ण य व त स म त SOUTHERN REGIONAL POWER COMMITTEE य प र षण ल ख REGIONAL TRANSMISSION ACCOUNT April 2018

More information

Status Review Report on Implementation of Batteries (Management and Handling) Rules, 2001 (as amended thereof)

Status Review Report on Implementation of Batteries (Management and Handling) Rules, 2001 (as amended thereof) Status Review Report on Implementation of Batteries (Management and Handling) Rules, 2001 (as amended thereof) 2016 CENTRAL POLLUTION CONTROL BOARD Ministry of Environment, Forest and Climate Change, Govt.

More information

Unnat Jyoti by Affordable LEDs for All Conserve Electricity, Conserve Energy

Unnat Jyoti by Affordable LEDs for All Conserve Electricity, Conserve Energy Unnat Jyoti by Affordable LEDs for All (UJALA) Ministry of Power www.swaniti.in Unnat Jyoti by Affordable LEDs for All Conserve Electricity, Conserve Energy Key Features of UJALA Unnat Jyoti by Affordable

More information

Solutions for Full Length Test - 4

Solutions for Full Length Test - 4 Solutions for Full Length Test - 4 1 - B 2 - D 3 - C 4 - D 5 - A 6 - C 7 - C 8 - A 9 - A 10 - B 11 - B 12 - D 13 - C 14 - A 15 - B 16 - D 17 - B 18 - B 19 - D 20 - B 21 - B 22 - C 23 - C 24 - C 25 - A

More information

Frequently Asked Questions for Grid Connected Solar Rooftop Systems

Frequently Asked Questions for Grid Connected Solar Rooftop Systems Frequently Asked Questions for Grid Connected Solar Rooftop Systems 1. What is a Solar Rooftop System? In a solar rooftop system, the solar panels are installed in the roof of any residential, commercial,

More information

06 April 2016, 12:17:18 IST Tender No : 206 Line No : 1 Item Ref No: Gat+Kramank+1+% 2D+Shaskiya+Puravatha+Dhanya गह (ल कवन) 7000 23.74 166180 त द ळ 4000 23.74 94960 total 47.48 261140 06 April 2016, 12:13:16

More information

CONTENTS. Table Subject. I Area under Rubber and Average Yield per hectare

CONTENTS. Table Subject. I Area under Rubber and Average Yield per hectare CONTENTS Table Subject Page I Area under Rubber and Average Yield per hectare 1 Area Newplanted and Replanted with Rubber 5 2 State-wise Area under Rubber at the end of each year 6 3 District/State-wise

More information

India Power Generation March 2018

India Power Generation March 2018 ESS 9/12/2018 1 India Power Generation March 2018 Total 379 GW 40, 10% 65, 17% 45, 12% 7, 2% 223, 59% Total 379 GW Thermal Nuclear Hydel Renewable Captive Renewable break up: 65 GW Solar : 19.5 GW Wind

More information

11-04-2016 11 April 2016, 12:22:46 IST Tender No : 209 Line No : 1 Item Ref No: Gat+Kramank+1+% 2D+Shaskiya+Puravatha+Dhanya गह (ल कवन) 40788 25 1019700 त द ळ 20531 24 492744 total 24.66 1512444 Compare

More information

Title of the Presentation

Title of the Presentation Trends in Emissions from Energy Sector Title of the Presentation Date: September 28, 2017 Venue: New Delhi Date Venue Sectoral Break-up & Approach Fuel Combustion National GHG Inventory Fugitive Emissions

More information

Solar Regulations Grid Connected, Ground Mounted and Solar Roof Top स र ऊर ज ग र ड कन क ट ड जउ ड मजउ ट ड और स लर र फट प एव म टरर ग ववननयम

Solar Regulations Grid Connected, Ground Mounted and Solar Roof Top स र ऊर ज ग र ड कन क ट ड जउ ड मजउ ट ड और स लर र फट प एव म टरर ग ववननयम Solar Regulations Grid Connected, Ground Mounted and Solar Roof Top स र ऊर ज ग र ड कन क ट ड जउ ड मजउ ट ड और स लर र फट प एव म टरर ग ववननयम Joint Electricity Regulatory Commission ( for Goa & Union Territories)

More information

Deen Dayal Upadhyaya Gram Jyoti Yojana Creating Efficiency in Electricity Distribution

Deen Dayal Upadhyaya Gram Jyoti Yojana Creating Efficiency in Electricity Distribution Deen Dayal Upadhyaya Gram Jyoti Yojana (DDUGJY) Ministry of Power Deen Dayal Upadhyaya Gram Jyoti Yojana Creating Efficiency in Electricity Distribution Key Features of DDUGJY The DDUGJY is a flagship

More information

PRESENTATION ON STRATEGIC APPROACH TOWARDS WIND SOLAR HYBRID SYSTEMS (SWES) FOR REMOTE TELECOM SITES IN INDIA & CASE STUDY OF RAJASTHAN

PRESENTATION ON STRATEGIC APPROACH TOWARDS WIND SOLAR HYBRID SYSTEMS (SWES) FOR REMOTE TELECOM SITES IN INDIA & CASE STUDY OF RAJASTHAN PRESENTATION ON STRATEGIC APPROACH TOWARDS WIND SOLAR HYBRID SYSTEMS (SWES) FOR REMOTE TELECOM SITES IN INDIA & CASE STUDY OF RAJASTHAN WORKSHOP ON SMALL WIND ENERGY AND HYBRID SYSTEMS & ITS RELEVANCE

More information

-As per List enclosed- 27 th meeting of the Standing Committee on Power System Planning of

-As per List enclosed- 27 th meeting of the Standing Committee on Power System Planning of स खय /No. 1/9/08-SP&PA/ भ रत सरक र/Government of India क य वध त धकरनण/Central Electricity Authority णल आय जन एव पर य जन म य कनण भ ग/SP&PA Division आर क प रम/R.K. Puram नई द ल /New Delhi -110606 [आई आई.एस

More information

Power Distribution Tariffs in India 2016 Discom Wise & Consumer Wise Comprehensive Track

Power Distribution Tariffs in India 2016 Discom Wise & Consumer Wise Comprehensive Track Power Distribution Tariffs in India 2016 Discom Wise & Consumer Wise Comprehensive Track E-REP Fact Factor Series March 2016 INR/Month INR/Month Power Distribution Tariffs in India 2016 2 CERC Final tariff

More information

भ रत सरक र Government of India व य त म लय Ministry of Power उ तर प व य व य त स म त. North Eastern Regional Power Committee

भ रत सरक र Government of India व य त म लय Ministry of Power उ तर प व य व य त स म त. North Eastern Regional Power Committee भ रत सरक र Government of India व य त म लय Ministry of Power उ तर प व य व य त स म त North Eastern Regional Power Committee एन ई आर प स क ल स, ड ग प रम ओ, ल प ल ङ, श ल ग-७९३००६, म घ लय NERPC Complex, Dong

More information

INDUSTRY SALES REVIEW. July 2017

INDUSTRY SALES REVIEW. July 2017 INDUSTRY SALES REVIEW July 2017 1 P a g e स ख य : ड -12013/01/2017-II 21.08.2017 व षय: प प एस क उद य ग ब क र सम क ष र प र ट: - ज ल ई 2017 ज ल ई 2017 म ह क प प एस क उद य ग ब क र सम क ष र प र ट भ जत ह ए

More information

Ph. No: Fax No: Website:

Ph. No: Fax No: Website: भ रत सरक र Government of India व य त म लय Ministry of Power उ तर प व य व य त स म त North Eastern Regional Power Committee एन ई आर प स क ल स, ड ग प रम ओ, ल प ल ङ, श ल ग-७९३००६, म घ लय NERPC Complex, Dong

More information

Issue 12. micrometer. data as of 31 st December 2014

Issue 12. micrometer. data as of 31 st December 2014 Issue 12 micrometer data as of 31 st December 2014 All rights reserved. No part of this publication may be reproduced or transmitted in any form or by any means without written permission from MFIN. However,

More information

Ph. No: Fax No: Website:

Ph. No: Fax No: Website: भ रत सरक र Government of India व य त म लय Ministry of Power उ तर प व य व य त स म त North Eastern Regional Power Committee एन ई आर प स क ल स, ड ग प रम ओ, ल प ल ङ, श ल ग-७९३००६, म घ लय NERPC Complex, Dong

More information

MANAK BHAVAN, 9 BAHADUR SHAH ZAFAR MARG, NEW DELHI

MANAK BHAVAN, 9 BAHADUR SHAH ZAFAR MARG, NEW DELHI MANAK BHAVAN, 9 BAHADUR SHAH ZAFAR MARG, NEW DELHI 110002 य प च ल म द ह द भ : ट ईड 29/ट -10, ट -11 31 अग़ त 2015 त पम प त : व ष र श षण द त ववषय त,ट ईड 29 र त कत त : 1 पर व हन इ ज ननयर ग ववभ ग पर ष क च खन

More information

Ph. No: Fax No: Website:

Ph. No: Fax No: Website: भ रत सरक र Government of India व य त म लय Ministry of Power उ तर प व य व य त स म त North Eastern Regional Power Committee एन ई आर प स क ल स, ड ग प रम ओ, ल प ल ङ, श ल ग-७९३००६, म घ लय NERPC Complex, Dong

More information

Ph. No: Fax No: Website:

Ph. No: Fax No: Website: भ रत सरक र Government of India व य त म लय Ministry of Power उ तर प व य व य त स म त North Eastern Regional Power Committee एन ई आर प स क ल स, ड ग प रम ओ, ल प ल ङ, श ल ग-७९३००६, म घ लय NERPC Complex, Dong

More information

च च म ज च द य त कम पन च चमट ड प र व व क स, म क व कल सम ह, तह-७, र इवज व यर पदक प रवतय व त त मक वलव त पर क ष क प ठ यक रम

च च म ज च द य त कम पन च चमट ड प र व व क स, म क व कल सम ह, तह-७, र इवज व यर पदक प रवतय व त त मक वलव त पर क ष क प ठ यक रम च च म ज च द य त कम पन च चमट ड प र व व क स, म क व कल सम ह, तह-७, र इवज व यर पदक प रवतय व त त मक वलव त पर क ष क प ठ यक रम १. श वक षक य ग यत व वलम लव द य त कम प वलवमट ड कमइ र स शतइ व व यम ल २०७१ म व य स थ

More information

Ñf"k funsóky;] vameku rfkk fudksckj izóklu] gsmks] iksvz Cys;j

Ñfk funsóky;] vameku rfkk fudksckj izóklu] gsmks] iksvz Cys;j NwjHkkÔ 03192-233257 Phone: 03192-233257 Ñf"k funsóky;] vameku rfkk fudksckj izóklu] gsmks] iksvz Cys;j 744102 DIRECTORATE OF AGRICULTURE, ANDAMAN & NICOBAR ADMINISTRATION HADDO, PORT BLAIR 744102 F. No:

More information

SOLAR PLANT PERFORMANCE IN INDIA

SOLAR PLANT PERFORMANCE IN INDIA Now Available SOLAR PLANT PERFORMANCE IN INDIA 2017-18 Report (PDF) Data-set (Excel) India Infrastructure Research SOLAR PLANT PERFORMANCE IN INDIA 2017-18 Table of Contents 1. Solar Power Sector Overview

More information

Doc: TED 7(743)W November 2009 Draft Indian Standard AUTOMOTIVE VEHICLES TUBES FOR PNEUMATIC TYRES SPECIFICATION (First Revision of IS 13098)

Doc: TED 7(743)W November 2009 Draft Indian Standard AUTOMOTIVE VEHICLES TUBES FOR PNEUMATIC TYRES SPECIFICATION (First Revision of IS 13098) For BIS Use Only Doc: TED 7(743)W November 2009 Draft Indian Standard AUTOMOTIVE VEHICLES TUBES FOR PNEUMATIC TYRES SPECIFICATION (First Revision of IS 13098) 0 FOREWORD (Formal Clause. Will be added later

More information

Comments, if any, may please be made in the enclosed format and mailed to the undersigned at the above address.

Comments, if any, may please be made in the enclosed format and mailed to the undersigned at the above address. DRAFT IN WIDE CIRCULATION DOCUMENT DESPATCH ADVICE Ref. Date TED 6/T - 56 & 31 25-01-2012 AUTOMOTIVE BODY, CHASSIS, ACCESSORIES AND GARAGE EQUIPMENT SECTIONAL COMMITTEE, TED 6 ADDRESSED TO: 1. All Interested

More information

SOUTHERN REGIONAL POWER COMMITTEE

SOUTHERN REGIONAL POWER COMMITTEE क व प र CEA दव ण त र य व द य त सव वत SOUTHERN REGIONAL POWER COMMITTEE ब गल र BENGALURU र ष क र प र ट ANNUAL REPORT 2014-15 C O N T E N T S COMMITTEE MEMBERS INDEX OF ANNEXURES INDEX OF EXHIBITS HIGHLIGHTS

More information

GOVERNMENT OF INDIA MINISTRY OF POWER LOK SABHA STARRED QUESTION NO.35 ANSWERED ON

GOVERNMENT OF INDIA MINISTRY OF POWER LOK SABHA STARRED QUESTION NO.35 ANSWERED ON STARRED QUESTION NO.35 SAUBHAGYA SCHEME *35. SHRIMATI POONAMBEN MAADAM: be pleased to state: (a) the aims and objectives of the Pradhan Mantri Sahaj Bijli Har Ghar Yojana Saubhagya and the type of assistance

More information

Industry Performance Review Report of PPAC: May18

Industry Performance Review Report of PPAC: May18 1 P a g e This report analyses the trend of consumption of petroleum products in the country during the month of May, 2018. Data on product-wise monthly consumption of petroleum products for May, 2018

More information

Ph. No: Fax No: Website:

Ph. No: Fax No: Website: भ रत सरक र Government of India व य त म लय Ministry of Power उ तर प व य व य त स म त North Eastern Regional Power Committee एन ई आर प स क ल स, ड ग प रम ओ, ल प ल ङ, श ल ग-७९३००६, म घ लय NERPC Complex, Dong

More information

भ रत सरक र Government of India व य त म लय Ministry of Power उ तर प व य व य त स म त. North Eastern Regional Power Committee

भ रत सरक र Government of India व य त म लय Ministry of Power उ तर प व य व य त स म त. North Eastern Regional Power Committee भ रत सरक र Government of India व य त म लय Ministry of Power उ तर प व य व य त स म त North Eastern Regional Power Committee एन ई आर प स क ल स, ड ग प रम ओ, ल प ल ङ, श ल ग-७९३००६, म घ लय NERPC Complex, Dong

More information

Enhancing Grid Stability in India

Enhancing Grid Stability in India India Japan Energy Forum 2017 Enhancing Grid Stability in India 9 January 2017 Nomura Research Institute 7 th Floor, Tower A, Building 5 DLF Cyber City, Phase III Gurgaon, India Otemachi Financial City

More information

ईट ड 11/ ट

ईट ड 11/ ट वय पक पररच लन म मस द प रल ख प र षण स ज ञ पन स दभ ददन क ईट ड 11/ ट -64 24-01-2019 तकन क सममतत ईट 11 प र षत : 1. ईट ड 11 क सभ सदसय 2. ववद य त तक क ववभ र पररषद क सभ सदसय तथ 3. र च रख व ल अ य सभ न क य मह दय,

More information

ETHANOL BLENDED PETROL PROGRAMME

ETHANOL BLENDED PETROL PROGRAMME ETHANOL BLENDED PETROL PROGRAMME To achieve blending levels for delivering multiple outcomes such as Environmental benefits, Forex savings and Value addition in the economy EBP PROGRAMME VISION Achieve

More information

HVDC Systems in India

HVDC Systems in India HVDC Systems in India Outline Introduction HVDC Systems presently in operation Main Data/Salient Features Upcoming Projects Future Challenges Transmission Network - Present 765kV/400kV lines: about 1,03,000

More information

File No.CEA-PS-13-22(13)/1/2018-PSPM Division

File No.CEA-PS-13-22(13)/1/2018-PSPM Division भ रत सरक र Government of India व द य त म त र लय Ministry of Power क न द र य व द य त प र ध क र ण Central Electricity Authority व द य त प र ण ल पर र य ज न प र ब ध न प र भ ग Power System Project Monitoring

More information

Government of India क ष एव ककस न कल य ण म त र लय, Ministry of Agriculture and Farmers Welfare (क ष, सहक ररत एव ककस न कल य ण षवभ ग)

Government of India क ष एव ककस न कल य ण म त र लय, Ministry of Agriculture and Farmers Welfare (क ष, सहक ररत एव ककस न कल य ण षवभ ग) SPECIFICATIONS OF POWER TILLER MOUNTED REAPER Page 1 of 10 Website http//srfmtti.dacnet.nic.in/ E-mail fmti-sr@nic.in Tele./FAX 08551-286441 भ रत सरक र Government of India क ष एव ककस न कल य ण म त र लय,

More information

Industry Consumption Review. July Industry Performance Review Report of PPAC: July18

Industry Consumption Review. July Industry Performance Review Report of PPAC: July18 Industry Consumption Review July 2018 1 P a g e HIGHLIGHTS OF THE REPORT 1. Total petroleum products consumption witnessed a growth of 7.4% during July, 2018 and a cumulative growth of 4.8% for the period

More information

Target October (Month) April-October (Cumulative) (Apr- Mar)

Target October (Month) April-October (Cumulative) (Apr- Mar) Government of India Ministry of Petroleum and Natural Gas Economic & Statistics Division ****** New Delhi Dated the 21 st November, 2017 Monthly Production Report October, 2017 Crude Oil 1. Crude oil 1

More information

(URL: F /KV Damoh/ / Date:

(URL:    F /KV Damoh/ / Date: क न द र य व द य लय दम ह KENDRIYA VIDYALAYA DAMOH ककल ल ई न क ब ल क ट र ड, दम ह-(म.प र.) 470661 KILLAI NAKA BALAKOT ROAD DAMOH (M.P) 470661 (URL:www.kvdamoh.edu.in, e-mail: damohkv@gmail.com,phone-223224

More information

INDRA MARSHAL POWER TILLER

INDRA MARSHAL POWER TILLER य वस ययक पर षण यरप टZ स य @ No.: PT-99/741 TEST REPORT म ह:@ Month: March, 2017 FIRST BATCH TEST INDRA MARSHAL POWER TILLER भ रत सरक र Government of India क ष एव षकस न क य ण म र लय Ministry of Agriculture

More information

Indian Power System Framework

Indian Power System Framework R P SASMAL 1 ST JUNE 2016 Indian Power System Framework Electricity - A Concurrent Subject Both Central & State Govt. are responsible for overall development of Power Sector Generators Central Level Central

More information

INDUSTRY SALES REVIEW. October 2017

INDUSTRY SALES REVIEW. October 2017 INDUSTRY SALES REVIEW October 2017 1 P a g e This report analyses the trend of consumption of petroleum products in the country during the month of October, 2017. Data on product-wise monthly consumption

More information

ईट ड 16/ ट

ईट ड 16/ ट य पक प रच लन म मस द ल ख षण स पन तकन क स म त ईट ड : 16 ---------------------------------------------------------------------------------------------------------------------------------- षत : 1. ईट ड 16

More information

Session IV ESMAP Approach and Pilot Overview

Session IV ESMAP Approach and Pilot Overview Session IV ESMAP Approach and Pilot Overview ESCBS Knowledge Exchange Workshop 04 September 2017 LUTP The World Bank Why Focus on Bus Fuel Efficiency? Fuel is the largest cost item Typically 35-45% of

More information

Industry Sales Review March 2018

Industry Sales Review March 2018 Industry Sales Review ch 2018 I, 1 P a g e Apr-16 Jan-17 Apr-17 Jan-18 This report analyses the trend of consumption of petroleum products in the country during the month of ch, 2018. Data on product-wise

More information

क न द र य म ह व भ ग भ स द भ- स ए ड -III/16: IS न म बभ ग षय म ह- आई एस : 2003 क परभप लन ललए एस ट आई Doc: STI/12406/3, October 2017

क न द र य म ह व भ ग भ स द भ- स ए ड -III/16: IS न म बभ ग षय म ह- आई एस : 2003 क परभप लन ललए एस ट आई Doc: STI/12406/3, October 2017 क न द र य म ह व भ ग - III भ स द भ- स ए ड -III/16: IS 12406 07 न म बभ 2017 ग षय म ह- आई एस 12406 : 2003 क परभप लन ललए एस ट आई Doc: STI/12406/3, October 2017 इस उपर क त व षय क स दर भ ह सक षम प र ध क र न

More information

Bangladesh s Power Sector : At a Glance

Bangladesh s Power Sector : At a Glance Bangladesh s Power Sector : At a Glance December, 2014 Installed Capacity (MW) : 10,709 De-rated Capacity (MW) : 10,130 Maximum Generation (MW) : 7,418 Total Consumers (in Million) : 15.4 Transmission

More information

Indian Energy Exchange December For Public Use

Indian Energy Exchange December For Public Use Indian Energy Exchange December 2017 For Public Use In this presentation Installed RE Capacity Total Installed Capacity Renewable Installed Capacity RES 60157 Solar, 14,771 Hydro 44963 W to P; 114 Biopower;

More information

Power Sector Trends: Focus on States

Power Sector Trends: Focus on States Power Sector Trends: Focus on States Japan-India Climate Policy Research Workshop December 2017 Dr. Kartikeya Singh Deputy Director and Fellow Wadhwani Chair in U.S.-India Policy Studies CSIS ksingh@csis.org

More information

Unorganised Manufacturing Sector in India Its Size, Employment and Some Key Estimates

Unorganised Manufacturing Sector in India Its Size, Employment and Some Key Estimates Report No. 433(51/2.2/1) Unorganised Manufacturing Sector in India Its Size, Employment and Some Key Estimates NSS Fifty-first round July 1994 - June 1995 National Sample Survey Organisation Department

More information

DOC: STI/10322(Part 5/Sec 3)/2, September 2016

DOC: STI/10322(Part 5/Sec 3)/2, September 2016 क न द र य म ह व भ ग 3 भ स द भ- क न द र य म ह व भ ग -3/16: आई एस IS 10322 5(Part /sec3) 04 अक त बभ 2016 ग षय म ह- आईएस IS 10322 5 (Part /sec3): 2012 क पवनभ क ष त एसट आई (एसट आई/10322 Part 5/Sec (3)/2, ससत

More information

ANNUAL REPORT

ANNUAL REPORT lr;eso t;rs CONSUMER PRICE INDEX NUMBERS (for AL/RL) on base 1986-87 = 100 ANNUAL REPORT 2008-2009 GOVERNMENT OF INDIA MINISTRY OF LABOUR & EMPLOYMENT LABOUR BUREAU SHIMLA/CHANDIGARH PREFACE Consumer Price

More information

vlk/kj.k EXTRAORDINARY Hkkx II [k.m 3 mi&[k.m (i) PART II Section 3 Sub-section (i) izkf/dkj ls izdkf'kr PUBLISHED BY AUTHORITY

vlk/kj.k EXTRAORDINARY Hkkx II [k.m 3 mi&[k.m (i) PART II Section 3 Sub-section (i) izkf/dkj ls izdkf'kr PUBLISHED BY AUTHORITY jftlvªh laö Mhö,yö&33004@99 REGD. NO. D. L.-33004/99 vlk/kj.k EXTRAORDINARY Hkkx II [k.m 3 mi&[k.m (i) PART II Section 3 Sub-section (i) izkf/dkj ls izdkf'kr PUBLISHED BY AUTHORITY la- 119] ubz fnyyh]

More information

Rajasthan Public Service Commission 2016

Rajasthan Public Service Commission 2016 Rajasthan Public Service Commission 2016 Paper : Mathematics II Ques: 150 Time: 3 Hours Ques # :1 Ques # :2 1/57 Ques # :3 Ques # :4 Ques # :5 2/57 It is an odd function of x for n even. It is an even

More information

Different Techniques of Loss Minimization in Distribution System

Different Techniques of Loss Minimization in Distribution System Different Techniques of Loss Minimization in Distribution System Gurpreet kour 1, R. K. Sharma 2 1 M. Tech Scholar, Electrical Engineering, Lovely Professional University, Punjab, India 2 HOD, Electrical

More information

INSTITUTE FOR PLASMA RESEARCH. An Aided Institute of Department of Atomic Energy, Government of India

INSTITUTE FOR PLASMA RESEARCH. An Aided Institute of Department of Atomic Energy, Government of India ल म अन स ध न स थ न INSTITUTE FOR PLASMA RESEARCH परम ण ऊज वभ ग, भ रत सरक र क एक सह यत त स थ न An Aided Institute of Department of Atomic Energy, Government of India इ र प ल क प स, भ ट, ग ध नगर 382 428

More information

क न द र य म ह व भ ग भ स द भ- स ए ड -III/16: IS न म बभ ग षय म ह- आई एस : 1998 क परभप लन ललए एस ट आई Doc: STI/14587/3, October 2017

क न द र य म ह व भ ग भ स द भ- स ए ड -III/16: IS न म बभ ग षय म ह- आई एस : 1998 क परभप लन ललए एस ट आई Doc: STI/14587/3, October 2017 क न द र य म ह व भ ग - III भ स द भ- स ए ड -III/16: IS 14587 07 न म बभ 2017 ग षय म ह- आई एस 14587 : 1998 क परभप लन ललए एस ट आई Doc: STI/14587/3, October 2017 इस उपर क त व षय क स दर भ ह सक षम प र ध क र न

More information

Target December (Month) April-December (Cumulative) (Apr- Mar)

Target December (Month) April-December (Cumulative) (Apr- Mar) Government of India Ministry of Petroleum and Natural Gas Economic & Statistics Division ****** New Delhi Dated the 19 th January, 2018 Monthly Production Report December, 2017 Crude Oil 1. Crude oil 1

More information

Unit-wise production details with reasons for shortfall have been given in following subsections:

Unit-wise production details with reasons for shortfall have been given in following subsections: Government of India Ministry of Petroleum and Natural Gas Economic & Statistics Division ****** New Delhi Dated the May, 2017 Monthly Production Report April 2017 Crude Oil 1. Crude oil production 1 during

More information

File No.CEA-PS-13-17(14)/2/2018-PSPM Division. CEA /PS/PSPM/07/07/2018/ Dated:

File No.CEA-PS-13-17(14)/2/2018-PSPM Division. CEA /PS/PSPM/07/07/2018/ Dated: भ रत सरक र Government of India वव द य त द त लय Ministry of Power क न द य वव द य त प धध क र ण Central Electricity Authority वव द य त प ण ल प रर य ज न प ब धन प भ ग Power System Project Monitoring Division

More information

LT ATUL KATARYA MEMORIAL SCHOOL. Affiliated to ICSE New Delhi (Affiliation No. HA023) Lt AtulKatarya Marg, Near Sheetla Mata Parisar, Gurgaon,

LT ATUL KATARYA MEMORIAL SCHOOL. Affiliated to ICSE New Delhi (Affiliation No. HA023) Lt AtulKatarya Marg, Near Sheetla Mata Parisar, Gurgaon, LT ATUL KATARYA MEMORIAL SCHOOL Affiliated to ICSE New Delhi (Affiliation No. HA023) Lt AtulKatarya Marg, Near Sheetla Mata Parisar, Gurgaon, Ph. No. 0124-4238225, akmsggn@rediffmail.com, www.akmsggn.com

More information

प 7 म, ज र करन क त र ख.., व ट क न च, न न ल खत अ त: थ पत

प 7 म, ज र करन क त र ख.., व ट क न च, न न ल खत अ त: थ पत 8 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II SEC. 3(i)] (vi) (vii) प 4 क ल प कय ज एग ; प 6 म ज र करन क त र ख.., व ट क न च, न न ल खत अ त: थ पत कय ज एग, अथ त :- अ ग/ऊतक द त ह /नह ; (viii) प 7 म, ज र करन

More information

Report. the feasibility of

Report. the feasibility of Report on the feasibility of Additional Interconnection between India and Bangladesh Joint Technical Team (JTT) of India and Bangladesh July 2016 Contents 1.0 Background 1 2.0 Additional power export to

More information