2 TRAFFIC STUDY - MEMORANDUM OF UNDERSTANDING (MOU) This MOU acknowledges that the traffic study for the following project will be prepared in accordance with the latest version of LADOT s Traffic Study Policies and Procedures: Project Name: Martin Expo Town Center Project Address: W. Olympic Boulevard, Los Angeles, CA Project Description: See Attachment A and Figure 1. Geographic Distribution: N _17 _ % S _25_ % E _ 37_ % W _21 % See Attached Figure 2. Attach graphic illustrating project trip distribution percentages at the studied intersections Trip Generation Rate(s): ITE 9th Edition / Other See Attached Table 1. Attach trip generation table with a description of the proposed land uses, ITE rates, estimated morning and afternoon peak hour volumes (ins/outs/totals), proposed trip credits, etc. in out total AM Trips PM Trips Project Buildout Year: 2018 Ambient or CMP Growth Rate: 1 % Per Yr. Related Projects: (to be researched by the consultant and approved by LADOT) See Attached Table 2 and Figure 3. Study Intersections (Subject to LADOT revision after initial impact analysis) 1. See Attached Table 3 and Figure Trip Credits: (Exact amount of credit subject to approval by LADOT) Transit Usage Transportation Demand Management Existing Active Land Use Previous Land Use Internal Trip Pass-By Trip Yes X X X X X No X Consultant Developer Name: Tom Gaul (Fehr & Peers) Philena Properties, L.P. Address: 201 Santa Monica Blvd, Santa Monica, CA W. Olympic Blvd, Los Angeles, CA Phone No.: (310) (310) Approved by: Consultant's Representative Date LADOT Representative Date LA\

3 Attachment A Project Description Existing Uses The Site contains the Martin Cadillac dealership, which consists of surface parking, a service building with rooftop parking, and a dealership/office building. The buildings total approximately 99,399 square feet (sf) and provide 611 parking spaces. The buildings are approximately 38 years old. The Site's assessor parcel number (APN), zoning, census tract, land use, and acreage is listed in Table I-1, Project Site Information. Table I-1 Project Site Information Address APN Zoning Census Tract Land Use Designation Size West Olympic M Light Manufacturing 4.76 acres APN = assessor parcel numbers Source: Table by CAJA Environmental Services, October The Site is approximately 207,162 sf or approximately 4.76 acres, and is zoned M2-1, where M2 refers to Light Industrial Zone and the 1 refers to Height District 1. For a Height District of 1 in an M zone, the floor-area-ratio (FAR) is limited to 1.5:1. The Site is in the West Los Angeles Community Plan and West Los Angeles Transportation Improvement and Mitigation Specific Plan and has a General Plan Land Use Designation of Light Manufacturing. The breakdown of existing uses is listed in Table I-2. Table I-2 Existing Uses Use Size (sf) Showroom/New Car Delivery 17,659 Parts Department 7,803 Service Department 61,980 Service Reception 6,194 General Office 4,628 Customer Convenience 1,135 Total Building 99,399 Table by CAJA Environmental Services, October Proposed Project The Project would include a Land Use Equivalency Program (LUEP) to allow development flexibility of the Project s land uses and floor areas so that the Project could, if necessary, respond to the changing needs of the Southern California economy. The LUEP would define a framework

4 within which a mix of land uses could be modified within the development envelope defined by the approved entitlements without resulting in any new significant impacts. Therefore, the Site Plan represents a concept plan, but the timing and nature of actual development would respond to market conditions and be subject to the allowances and limitations set forth by the LUEP. The Project is seeking flexible land use entitlements (based on equivalent environmental impacts) with a base plan of 516 dwelling units (540,200 gross sf), 67,000 sf of retail floor area, and 200,000 sf of creative office floor area. The total floor area would be 807,200 sf. The Project Site is 4.76 acres (207,162 square feet). The floor-area-ratio (FAR) would be 3.90:1. The 516 dwelling units would include 78 studio units, bedroom units, bedroom units, and 25 3-bedroom units. All existing uses would be removed.

5 Source: The Simmons Group Inc N Not to Scale Note: The Project will include a Land Use Equivalency Program (LUEP) to allow development flexibility of the Project's land uses and floor areas so that the Project could, if necessary, respond to the changing needs of the Southern California economy. The LUEP will define a framework within which the proposed mix of land uses could be modified within the development envelope defined by the approved entitlements without resulting in any new significant impacts. Therefore, the Site Plan depicted herein represents a "base plan," but the timing and nature of actual development would respond to market conditions and be subject to the allowances and limitations set forth by the LUEP. \\FpLA1\Data\Jobs\Active\2500s\ Martin Cadillac\Graphics\GIS\MXD SITE PLAN FIGURE 1

6 2

7 TABLE 1 MARTIN EXPO TOWN CENTER TRIP GENERATION Land Use ITE Land Use Code Trip Generation Rates [a] Estimated Trip Generation Size Daily AM Peak Hour PM Peak Hour [b] Trip Rate Daily AM Peak Hour Trips PM Peak Hour Trips Rate Rate % In % Out Rate % In % Out Unit Trips In Out Total In Out Total PROPOSED PROJECT Office ksf % 12% % 83% per ksf 2, Internal capture [c] 10% 5% 15% (221) (14) (2) (16) (8) (39) (47) Creative office flex hours [d] 0% 15% 15% 0 (39) (5) (44) (7) (32) (39) Transit credit [e] 15% 15% 15% (298) (33) (5) (38) (6) (28) (34) Net External Office 1, Residential [f] du % 80% % 35% per du 3, Internal capture [c] 10% 5% 15% (343) (3) (10) (13) (28) (15) (43) Transit credit [e] 15% 15% 15% (463) (8) (30) (38) (23) (13) (36) Net External Residential 2, Retail General Retail ksf [Eq] [Eq] 62% 38% % 52% per ksf Internal capture [c] 15% 15% 15% (126) (2) (1) (3) (3) (3) (6) Transit credit [e] 15% 15% 15% (107) (2) (1) (3) (2) (3) (5) Pass-by from net trips [g] 50% 50% 50% (303) (5) (3) (8) (7) (8) (15) Net External General Retail Grocery Store ksf % 38% % 49% per ksf 4, Internal capture [c] 15% 15% 15% (690) (14) (9) (23) (36) (34) (70) Transit credit [e] 15% 15% 15% (587) (12) (8) (20) (30) (29) (59) Pass-by from net trips [g] 40% 40% 40% (1,330) (27) (17) (44) (68) (66) (134) Net External Grocery Store 1, Quality Restaurant ksf % 18% % 33% per ksf Internal capture [c] 15% 15% 15% (54) (3) (2) (5) Transit credit [e] 15% 15% 15% (46) (3) (1) (4) Pass-by from net trips [g] 10% 10% 10% (26) (1) (1) (2) Net External Quality Restaurant High-Turnover Sit-Down Restaurant ksf % 38% % 49% per ksf Internal capture [c] 15% 15% 15% (76) (4) (3) (7) (4) (4) (8) Transit credit [e] 15% 15% 15% (65) (4) (2) (6) (4) (3) (7) Pass-by from net trips [g] 20% 20% 20% (74) (4) (3) (7) (4) (3) (7) Net External High-Turnover Rest Fast Food Restaurant ksf % 40% % 49% per ksf 7, Internal capture [c] 15% 15% 15% (1,074) (40) (26) (66) (31) (29) (60) Transit credit [e] 15% 15% 15% (913) (34) (22) (56) (26) (25) (51) Pass-by from net trips [g] 50% 50% 50% (2,587) (95) (64) (159) (74) (71) (145) Net External Fast Food 2, Subtotal Retail 67.0 ksf 5, Project Total 9, EXISTING USE CREDIT Automobile Dealer ksf Vehicles Entering/Exiting Site [h] (1,213) (44) (48) (92) (61) (76) (137) Showroom Employees Parking Off-Site [i] (15) (2) 0 (2) 0 (4) (4) Service Employees Parking Off-Site [j] (87) (40) 0 (40) 0 (39) (39) Total Existing Use Credit (1,315) (86) (48) (134) (61) (119) (180) NET INCREMENTAL TRIPS 8, Notes: [a] Source: Institute of Transportation Engineers (ITE), Trip Generation, 9th Edition, 2012, unless otherwise noted. [b] PM peak hour trip rates derived from West Los Angeles Transportation Improvement & Mitigation Specific Plan (West LA TIMP, 1997) [c] Internal capture represents the percentage of trips between land uses that occur within the site. This percentage is informed by the Multi-Use Trip Generation Calculation methodology described in Chapter 7 of the ITE Trip Generation Handbook, 2nd Edition, Internalization percentages are derived from NCHRP Project 8-51 as described in "Improved Estimation for Internal Trip Capture for Mixeduse Developments," ITE Journal, August [d] The reduction in trip generation attributable to flex hours accounts for the off-peak arrival and departure patterns of creative office employees; the percentage was supplied by LADOT. [e] The transit credit is based on LADOT's Traffic Study Policies and Procedures, May The guidelines state that a 15% transit credit may be taken for projects within 1/4 mile of a transit station. [f] For flexibility, the trip generation analysis uses the most conservative (higher) rates for apartments versus condominiums. [g] The pass-by credit is based on Attachment I of LADOT's Traffic Study Policies and Procedures, June [h] Counts conducted at existing Martin Cadillac driveways on Wednesday, May 9th, [i] Credit derived from analyzing data in the MAG Showroom Employee Transportation Poll, November 11th, This credit only covers off-site parking because on-site parking is covered by the credit [j] Credit derived from analyzing data in the MAG Service Employee Transportation Poll, November 11th, This credit only covers off-site parking because on-site parking is covered by the credit derived from driveway counts. There are 116 service employees, of which 90 (78%) commute by automobile. On a typical day, 87 (97%) of these employees park off-site, of which 40 travel during the AM peak hour and 39 travel during the PM peak hour.

8 TABLE 2 RELATED PROJECTS No. Project Location Land Use Size W Pico Blvd Retail ksf West Wilshire Blvd Mixed Use 49 ksf Mixed Use 15 ksf West Wilshire Blvd Hotel 134 rooms 1, Condominiums 10 units Other (to be removed) ksf Gas Station (to be removed) -8 fuel positions -1, Retail Other West Wilshire Blvd Apartments 108 units Retail 13 ksf Mixed Use (to be removed) ksf Westgate Ave YMCA Recreation Center 65 ksf 1, Santa Monica Blvd Other (Supermarket - Vons) ksf 1, Santa Monica Blvd [1] Mixed Use (Retail) 9.2 ksf Mixed Use (Office) Wilshire Blvd Apartments units ksf Retail ksf Wilshire Blvd Condominium units Retail ksf Restaurant ksf Santa Monica Blvd Apartments units Retail ksf Colorado Avenue (Village Trailer Park) [6] Apartments 1, Colorado Avenue (Roberts Center) [7] 1, Colorado Avenue (Lionsgate) [5] Post Production 170 ksf 1, Retail 9 ksf Nebraska Ave (Paseo Nebraska) Residential units 2, Retail ksf 2, Stewart St (SMC AET Campus) School ksf th St (Bergamot Transit Village) [4] Creative Office ksf 3, Residential 498 units 1, Restaurant 15.5 ksf 1, Retail ksf Olympic Blvd (New Roads) [8] School ksf 1, West Olympic Blvd [3] Hudson Pacific Adaptive Reuse Office ksf Armacost Ave [2] School Expansion 175 students High Place Condominium 45 units Kansas Ave Edison School ksf Pico Blvd Apartments units 1, Retail ksf West Pico Blvd Condominimums units Other (to be removed) ksf South Pontius Ave Office ksf West Pico Blvd [9] Apartments units (Casden Expo Sepulveda Station Mixed-Use Development) Retail ksf 3115 South Sepulveda Blvd Mixed Use (Specialty Retail) 28 ksf Mixed Use (Condominiums) West National Blvd Supermarket ksf units Supermarket ksf West Santa Monica Blvd Condominiums units Retail Other ksf ksf Daily Trip Generation AM Total -1, Total 3, PM

9 TABLE 2 RELATED PROJECTS No. Project Location Land Use Size Daily Trip Generation AM West Olympic Blvd School students 1, West Olympic Blvd Apartments units Specialty Retail ksf Cloverfield Blvd Condominiums units Retail ksf Santa Monica Blvd Apartments units Auto Dealership ksf Franklin St Condominiums units Warehouse ksf Retail ksf Cloverfield Blvd Apartments units Retail ksf Wilshire Blvd Apartments units Retail ksf Santa Monica Blvd Auto Dealership ksf 1, Colorado Ave Apartments units Retail ksf Colorado Ave Residential units Retail ksf S Sawtelle Blvd Mixed Use units Network Related Projects A I-405 Sepulveda Pass Improvements Project B Wilshire Bus Rapid Transit Project C Exposition Transit Corridor, Phase 2 Total PM Total Notes: = dwelling units thousand square feet 1. The project has currently been completed but remains mostly vacant. Thus, it is accounted for as a related project. 2. The LADOT related projects list states that New West Charter School is expecting to expand by 875 students. The revised figure in the table is informed by a conversation with the school's director, Dr. Sharon Weir. As the school's conditional use permit obtained in February was only for 750 students, of which 575 are already enrolled, only the difference in enrollment, 175 students, is inculded as a related project. 3. Although the LADOT Case Logging and Tracking System lists two projects for West Olympic Boulevard, the Hudson Pacific Adaptive Reuse Office is the most current proposal for the site. 4. Trip generation for th St comes from the Bergamot Transit Village DEIR, Trip generation for 1834 Colorado Avenue comes from 2834 Colorado Avenue Creative Studio Project EIR 6. Trip generation for 2930 Colorado Avenue comes from Village Trailer Park Revised Final EIR, 2012, Appendix P Table 3 7. Trip generation for 2848 Colorado Avenue comes from Roberts Center DEIR, 2012, Trip generation for 3131 Olympic Boulevard comes from New Roads School EIR, Trip generation based on Hirsch/Green Trip Generation Memo (June 2013) for updated land use mix * LADOT traffic study guidelines require traffic studies to be prepared if a project adds 25 or more trips in the AM or PM peak hour or 500 or more daily trips to the system. Projects contributing fewer trips do not a require a traffic study because it is assumed that their trips are accounted for in annual cumulative traffic growth. Using this guideline, projects generating fewer than 25 trips in the AM or PM peak hour or projects generating fewer than 500 daily trips are not included as related projects because they will be accounted for in the annual growth factor. Projects omitted as a result of these criteria include: 2200 Virginia Avenue (Pico Branch Library), Virginia Avenue, Pico Boulevard 2802 Pico Boulevard, th Street, th Street, th St, th Street, th Street, th Street, th St, st Street, 1707 Cloverfield Blvd, 1802 Santa Monica Blvd, 1131 Arizona Avenue, Virginia Park Expansion (Pico & Cloverfield), 1502 Broadway, 2602 Broadway, and 1800 Stewart Street (Agensys). Although it does not add more than 25 trips in the AM or PM peak hours or 500 total trips daily, West Santa Monica has been included since its daily trip removals are greater than 500. ** Palms Boulevard has been omitted because student enrollment is just short of capacity. Maximum enrollment is expected to be accounted for in the projected increase.

10 th St San Vicente Blvd Montana Ave 26th St! 9 20th St! 32! 36! 37 Yale St Olympic Blvd Pico Blvd 10th St! 38 Sunset Blvd Franklin St! 8! 35 Cloverfield Blvd 18th St Bay St 11th St Crescenda St Dorothy St Wilshire Blvd Broadway Pearl St! 10 11! 12! 13! 16 Oak St S Barrington Ave! 4 Wellesley Ave! 33! 20! 31! 21! 34 21st St Hill St Farlin St B! th St! 2 Texas Ave S Sepulveda Blvd Bonsall Ave! 5 S Bundy Dr Federal Ave! 18! 17! 28! 6! 19 34th St 31st St Ocean Park Blvd! 23! 22 Ohio Ave Barry Ave Stoner Ave Iowa Ave! 29 Gayley Ave Butler Ave W Pico Blvd! 3 Westwood Blvd Veteran Ave S Bentley Ave 10 Armacost Ave! 30 28th StMoore St Ashland Ave Midvale Ave Dowlen Dr C A Warren Ave Airport Ave Stewart Ave Ashton Ave 405 Hilgard Ave! 24! 1! 25 Santa Monica Fwy S Barrington Ave Westholme Ave Colby Ave Manning Ave! 7 W Olympic Blvd Santa Monica Blvd Exposition Blvd Sawtelle Blvd Colbert St S Beverly Glen Blvd Warner Ave! 26 Prosser Ave Military Ave S Sepulveda Blvd! 27! Related Project Related Project Martin Cadillac Site 3rd St N Not to Scale Marine St Lake St \\fpla1\data\jobs\active\2500s\ Martin Cadillac\Graphics\GIS\MXD\MartinCad_RelatedProjs Grand View Blvd RELATED PROJECTS FIGURE 3

11 TABLE 3 MARTIN EXPO TOWN CENTER - STUDY LOCATIONS Intersections 1. Olympic Boulevard & 20 th Street 2. I-10 Westbound On-Ramp & 20 th Street 3. I-10 Eastbound Off-Ramp & 20 th Street 4. Olympic Boulevard & Cloverfield Boulevard 5. Olympic Boulevard & 26 th Street 6. Olympic Boulevard & Stewart Street 7. Santa Monica Boulevard & Centinela Avenue 8. Colorado Avenue/Idaho Avenue & Centinela Avenue 9. Nebraska Avenue & Centinela Avenue 10. Olympic Boulevard & Centinela Avenue (west) 11. Pico Boulevard & I-10 Eastbound Off-Ramp/34 th Street 12. Olympic Boulevard & Centinela Avenue (east) 13. Centinela Avenue & I-10 Westbound On/Off Ramps 14. Pico Boulevard & Centinela Avenue 15. Centinela Avenue & I-10 Eastbound On-Ramp 16. Wilshire Boulevard & Bundy Drive 17. Texas Avenue & Bundy Drive 18. Santa Monica Boulevard & Bundy Drive 19. Ohio Avenue & Bundy Drive 20. Idaho Avenue & Bundy Drive 21. Nebraska Avenue & Bundy Drive (north) 22. Nebraska Avenue & Bundy Drive (south) 23. Missouri Avenue & Bundy Drive 24. La Grange Avenue & Bundy Drive 25. Olympic Boulevard & Bundy Drive 26. Pico Boulevard & Bundy Drive 27. Bundy Drive & I-10 Westbound Off-Ramp 28. Bundy Drive & I-10 Eastbound On-Ramp 29. Pearl Street & Bundy Drive 30. Ocean Park Boulevard & Bundy Drive 31. National Boulevard & Bundy Drive 32. Wilshire Boulevard & Barrington Avenue 33. Santa Monica Boulevard & Barrington Avenue 34. Nebraska Avenue & Barrington Avenue 35. La Grange Avenue & Barrington Avenue 36. Mississippi Avenue & Barrington Avenue 37. Olympic Boulevard & Barrington Avenue 38. Pico Boulevard & Barrington Avenue 39. Gateway/Ocean Park Boulevard & Barrington Avenue 40. Olympic Boulevard & Colby Avenue 41. Olympic Boulevard & Purdue Avenue 42. Olympic Boulevard & Sawtelle Boulevard 43. Tennessee Avenue/I-405 Southbound Off Ramp & Sawtelle Boulevard

12 44. Pico Boulevard & Sawtelle Boulevard 45. Santa Monica Boulevard & Beloit Avenue/I-405 Southbound Ramps 46. Santa Monica Boulevard & Cotner Avenue/I-405 Northbound Ramps 47. Olympic Boulevard & Cotner Avenue 48. Santa Monica Boulevard & Sepulveda Boulevard 49. Olympic Boulevard & Sepulveda Boulevard 50. Pico Boulevard & Sepulveda Boulevard 51. Pico Boulevard & Gateway Boulevard 52. Olympic Boulevard & 17 th Street 53. Santa Monica Boulevard & 26 th Street 54. Colorado Avenue & 26 th Street 55. Wilshire Boulevard & Centinela Avenue 56. Palms Boulevard & Centinela Avenue Segments 1. Nebraska Avenue west of Centinela Avenue 2. Nebraska Avenue west of Bundy Drive 3. Iowa Avenue east of Bundy Drive 4. Nebraska Avenue east of Bundy Drive 5. Missouri Avenue east of Bundy Drive 6. La Grange Avenue east of Bundy Drive 7. Mississippi Avenue east of Bundy Drive

APPENDIX C-2. Traffic Study Supplemental Analysis Memo

APPENDIX C-2. Traffic Study Supplemental Analysis Memo APPENDIX C-2 Traffic Study Supplemental Analysis Memo The Mobility Group Transportation Strategies & Solutions Memorandum To: From: Subject: Tomas Carranza, LADOT Matthew Simons Traffic Review - Revised

More information

4.1 Traffic, Circulation, and Parking

4.1 Traffic, Circulation, and Parking 4.1 Traffic, This section describes the existing transportation and parking conditions within and adjacent to the project area. A traffic report describing the potential impacts of the proposed project

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS J. TRANSPORTATION AND TRAFFIC

IV. ENVIRONMENTAL IMPACT ANALYSIS J. TRANSPORTATION AND TRAFFIC IV. ENVIRONMENTAL IMPACT ANALYSIS J. TRANSPORTATION AND TRAFFIC This Section summarizes the information provided in the Traffic Study for the Santa Monica College Bundy Campus Master Plan (Traffic Study),

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS N. TRANSPORTATION AND TRAFFIC

IV. ENVIRONMENTAL IMPACT ANALYSIS N. TRANSPORTATION AND TRAFFIC IV. ENVIRONMENTAL IMPACT ANALYSIS N. TRANSPORTATION AND TRAFFIC The following section summarizes the information provided in the traffic report entitled Traffic Impact Analysis for a Proposed Residential

More information

III. CORRECTIONS AND ADDITIONS TO THE DRAFT EIR

III. CORRECTIONS AND ADDITIONS TO THE DRAFT EIR III. CORRECTIONS AND ADDITIONS TO THE DRAT EIR DRAT EIR I. INTRODUCTION/SUMMARY In response to Comment No. 2.1 on the Draft EIR, the following mitigation measure is added to Table I- 1, Summary of Environmental

More information

Trip Generation & Parking Occupancy Data Collection: Grocery Stores Student Chapter of Institute of Transportation Engineers at UCLA Spring 2014

Trip Generation & Parking Occupancy Data Collection: Grocery Stores Student Chapter of Institute of Transportation Engineers at UCLA Spring 2014 Trip Generation & Parking Occupancy Data Collection: Grocery Stores Student Chapter of Institute of Transportation Engineers at UCLA Spring 2014 Page 1 Introduction The UCLA Institute of Transportation

More information

TRANSPORTATION STUDY FOR THE 8899 BEVERLY BOULEVARD PROJECT

TRANSPORTATION STUDY FOR THE 8899 BEVERLY BOULEVARD PROJECT DRAFT TRANSPORTATION STUDY FOR THE 8899 BEVERLY BOULEVARD PROJECT WEST HOLLYWOOD, CALIFORNIA NOVEMBER 2013 PREPARED FOR BEVERLY BOULEVARD ASSOCIATION PREPARED BY DRAFT TRANSPORTATION STUDY FOR THE 8899

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS B. TRAFFIC AND CIRCULATION

IV. ENVIRONMENTAL IMPACT ANALYSIS B. TRAFFIC AND CIRCULATION IV. ENVIRONMENTAL IMPACT ANALYSIS B. TRAFFIC AND CIRCULATION 1. INTRODUCTION This section is based on the technical report, Traffic Study for 10131 Constellation Boulevard Residential Project, prepared

More information

2.4 Build Alternatives

2.4 Build Alternatives Table 2-1. Future Transit Network Changes between No Build and TSM Alternatives Operator Route Group No. Route ID and Description Peak Headway (min) No Build Off-peak Headway (min) Peak Headway (min) TSM

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS L. TRAFFIC, TRANSPORTATION, AND PARKING

IV. ENVIRONMENTAL IMPACT ANALYSIS L. TRAFFIC, TRANSPORTATION, AND PARKING IV. NVIRONMNTAL IMPACT ANALYSIS L. TRAFFIC, TRANSPORTATION, AND PARKING INTRODUCTION The following summarizes the information provided in the traffic report prepared by Hirsch/Green Transportation Consulting,

More information

King Soopers #116 Thornton, Colorado

King Soopers #116 Thornton, Colorado Traffic Impact Study King Soopers #116 Thornton, Colorado Prepared for: Galloway & Company, Inc. T R A F F I C I M P A C T S T U D Y King Soopers #116 Thornton, Colorado Prepared for Galloway & Company

More information

Project Scoping Report Appendix B Project Web Site. APPENDIX B Project Web Site

Project Scoping Report Appendix B Project Web Site. APPENDIX B Project Web Site Project Scoping Report Appendix B Project Web Site APPENDIX B Project Web Site WESTSIDE EXTENSION TRANSIT CORRIDOR STUDY February 4, 2008 News and Info of 1 http://metro.net/projects_programs/westside/news_info.htm#topofpage

More information

Expo Light Rail Line. Expo Line Project Westside/Central Metro Service Council November 2014

Expo Light Rail Line. Expo Line Project Westside/Central Metro Service Council November 2014 Expo Line Project Westside/Central Metro Service Council November 2014 2 Expo Line Project Description Phase 2 Expo Line from Culver City to Santa Monica: 6.6 mile corridor 7 new Stations 64,000 Daily

More information

Exposition Corridor Transit Project

Exposition Corridor Transit Project Exposition Corridor Transit Project Phase 2 Environmental Planning Community Meeting June 9, 2008 Exposition Corridor Transit Project Phase 2 AGENDA Remaining Grade Crossing Recommendations June 9, 2008

More information

TRANSPORTATION 1. INTRODUCTION

TRANSPORTATION 1. INTRODUCTION IV.F TRANSPORTATION 1. INTRODUCTION This section evaluates potential impacts associated with Project-related traffic, circulation, and access. The analysis summarizes the findings of the traffic study

More information

Traffic Impact Analysis 5742 BEACH BOULEVARD MIXED USE PROJECT

Traffic Impact Analysis 5742 BEACH BOULEVARD MIXED USE PROJECT Traffic Impact Analysis 5742 BEACH BOULEVARD MIXED USE PROJECT CITY OF BUENA PARK Prepared by Project No. 14139 000 April 17 th, 2015 DKS Associates Jeffrey Heald, P.E. Rohit Itadkar, T.E. 2677 North Main

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS M. TRANSPORTATION AND TRAFFIC

IV. ENVIRONMENTAL IMPACT ANALYSIS M. TRANSPORTATION AND TRAFFIC IV. ENVIRONMENTAL IMPACT ANALYSIS M. TRANSPORTATION AND TRAFFIC INTRODUCTION This section of the (Draft EIR) addresses the subject of traffic and transportation with respect to the proposed (Project or

More information

2.0 Development Driveways. Movin Out June 2017

2.0 Development Driveways. Movin Out June 2017 Movin Out June 2017 1.0 Introduction The proposed Movin Out development is a mixed use development in the northeast quadrant of the intersection of West Broadway and Fayette Avenue in the City of Madison.

More information

Traffic Impact Statement (TIS)

Traffic Impact Statement (TIS) Traffic Impact Statement (TIS) Vincentian PUDA Collier County, FL 10/18/2013 Prepared for: Global Properties of Naples Prepared by: Trebilcock Consulting Solutions, PA 2614 Tamiami Trail N, Suite 615 1205

More information

Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT

Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT Prepared for Phelps Program Management 420 Sixth Avenue, Greeley, CO 80632 Prepared by 5050 Avenida Encinas, Suite

More information

Appendix Q Traffic Study

Appendix Q Traffic Study Appendices Appendix Q Traffic Study Crummer Site Subdivision Draft EIR City of Malibu Appendices This page intentionally left blank. The Planning Center April 2013 TRAFFIC IMPACT ANALYSIS Photo z here

More information

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project.

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project. EXECUTIVE SUMMARY This study addresses the traffic impacts associated with the proposed Shopko redevelopment located in Sugarhouse, Utah. The Shopko redevelopment project is located between 1300 East and

More information

Volume 1 Traffic Impact Analysis Turtle Creek Boulevard Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas.

Volume 1 Traffic Impact Analysis Turtle Creek Boulevard Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas. Volume 1 Traffic Impact Analysis 2727 Dallas, Texas June 18, 2018 Kimley-Horn and Associates, Inc. Dallas, Texas Project #064523000 Registered Firm F-928 Traffic Impact Analysis 2727 Dallas, Texas Prepared

More information

IRSCH REEN Hirsch/Green Transportation Consulting, Inc.

IRSCH REEN Hirsch/Green Transportation Consulting, Inc. IRSCH REEN Hirsch/Green Transportation Consulting, Inc. February 6, 2013 Mr. David Weil Director of Finance St. Matthew s Parish School 1031 Bienveneda Avenue Pacific Palisades, California 90272 RE: Trip

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS L. TRANSPORTATION/TRAFFIC

IV. ENVIRONMENTAL IMPACT ANALYSIS L. TRANSPORTATION/TRAFFIC IV. ENVIRONMENTAL IMPACT ANALYSIS L. TRANSPORTATION/TRAFFIC INTRODUCTION The following section summarizes the information provided in the traffic report entitled Traffic Impact Analysis for a Proposed

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS I. TRAFFIC / TRANSPORTATION

IV. ENVIRONMENTAL IMPACT ANALYSIS I. TRAFFIC / TRANSPORTATION IV. ENVIRONMENTAL IMPACT ANALYSIS I. TRAFFIC / TRANSPORTATION 1. INTRODUCTION The following section summarizes the information provided in the following traffic studies and collectively referred to as

More information

3.17 Energy Resources

3.17 Energy Resources 3.17 Energy Resources 3.17.1 Introduction This section characterizes energy resources, usage associated with the proposed Expo Phase 2 project, and the net energy demand associated with changes to the

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS K.2. PARKING

IV. ENVIRONMENTAL IMPACT ANALYSIS K.2. PARKING IV. ENVIRONMENTAL IMPACT ANALYSIS K.2. PARKING ENVIRONMENTAL SETTING The following analysis summarizes the findings and conclusions of the Traffic Analysis (Traffic Study), prepared by The Mobility Group,

More information

WESTSIDE SUBWAY EXTENSION PROJECT. Updated Off-street Parking Analysis Memorandum

WESTSIDE SUBWAY EXTENSION PROJECT. Updated Off-street Parking Analysis Memorandum WESTSIDE SUBWAY EXTENSION PROJECT Updated Off-street Analysis Memorandum April 2011 Table of Contents 1.0 INTRODUCTION... 1 2.0 DATA SOURCE... 1 3.0 OFF-STREET LAND USE & PARKING ANALYSIS... 2 3.1 Station

More information

Traffic Impact Analysis for 2171 Rosecrans Avenue

Traffic Impact Analysis for 2171 Rosecrans Avenue Traffic Impact Analysis for 2171 Rosecrans Avenue Prepared for: Continental Development Corporation Revised May 2016 LA16-2831 Prepared by: Fehr & Peers 600 Wilshire Blvd, Suite 1050 Los Angeles, CA 90017

More information

TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA

TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA PREPARED FOR: UNIVERSITY OF PENNSYLVANIA HEALTH SYSTEM 34 CIVIC CENTER BOULEVARD PHILADELPHIA, PA 1987 (61)

More information

TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY Prepared for:

TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY Prepared for: TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY 2014 Prepared for: Hartford Companies 1218 W. Ash Street Suite A Windsor, Co 80550 Prepared by: DELICH ASSOCIATES 2272 Glen Haven Drive

More information

Appendix B Traffic Impact Analysis, Asphalt Plant No. 1 Replacement and Modernization

Appendix B Traffic Impact Analysis, Asphalt Plant No. 1 Replacement and Modernization Appendix B Traffic Impact Analysis, Asphalt Plant No. 1 Replacement and Modernization DRAFT REPORT Traffic Impact Analysis, Asphalt Plant No. 1 Replacement and Modernization Prepared for City of Los Angeles

More information

2. Valley Circle Boulevard/Andora Avenue/Baden Avenue and Lassen Street

2. Valley Circle Boulevard/Andora Avenue/Baden Avenue and Lassen Street IV.J TRANSPORTATION 1. INTRODUCTION This section presents an overview of the existing traffic and circulation system in and surrounding the project site. This section also discusses the potential impacts

More information

DRAFT TRANSPORTATION IMPACT STUDY CASTILIAN REDEVELOPMENT PROJECT

DRAFT TRANSPORTATION IMPACT STUDY CASTILIAN REDEVELOPMENT PROJECT DRAFT TRANSPORTATION IMPACT STUDY CASTILIAN REDEVELOPMENT PROJECT Prepared for: Submitted by: 299 Lava Ridge Ct. Suite 2 Roseville, CA. 95661 June 212 TABLE OF CONTENTS 1. Introduction... 1 Project Location

More information

Appendix G Traffic and Parking Report

Appendix G Traffic and Parking Report Appendix G Traffic and Parking Report TABLE OF CONTENTS SECTION PAGE Executive Summary... v 1.0 Introduction... 1 1.1 Study Area... 3 2.0 Project Description... 4 2.1 Site Location... 4 2.2 Existing Project

More information

Table 1: Existing Trip Generation A.M. Peak Hour P.M. Peak Hour Land Use ITE Code Intensity Daily Total In Out Total In Out

Table 1: Existing Trip Generation A.M. Peak Hour P.M. Peak Hour Land Use ITE Code Intensity Daily Total In Out Total In Out October 24, 218 Mr. Justin D. Bridges, AIA, LEED AP Davidson A+E 431 Indian Creek Parkway Overland Park, KS 6627 RE: Dear Mr. Bridges, Trip Generation Overland Park, Kansas As requested, Priority Engineers,

More information

Oakbrook Village Plaza City of Laguna Hills

Oakbrook Village Plaza City of Laguna Hills Oakbrook Village Plaza City of Laguna Hills Traffic Impact Analysis Prepared by: HDR Engineering 3230 El Camino Real, Suite 200 Irvine, CA 92602 October 2012 Revision 3 D-1 Oakbrook Village Plaza Laguna

More information

Appendix B Traffic Impact Analysis, Asphalt Plant No. 1 Replacement and Modernization

Appendix B Traffic Impact Analysis, Asphalt Plant No. 1 Replacement and Modernization Appendix B Traffic Impact Analysis, Asphalt Plant No. 1 Replacement and Modernization REPORT Traffic Impact Analysis, Asphalt Plant No. 1 Replacement and Modernization Prepared for City of Los Angeles

More information

APPENDIX TR-1 PARKING AND QUEUING ASSESSMENT

APPENDIX TR-1 PARKING AND QUEUING ASSESSMENT APPENDIX TR-1 PARKING AND QUEUING ASSESSMENT Overland Overland Traffic Consultants, Traffic Consultants, Inc. Inc. Overland Traffic Consultants 952 Manhattan Beach Boulevard, Suite #100 Manhattan Beach,

More information

Traffic Impact Analysis. Alliance Cole Avenue Residential Site Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas.

Traffic Impact Analysis. Alliance Cole Avenue Residential Site Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas. Traffic Impact Analysis Alliance Cole Avenue Residential Site Dallas, Texas February 15, 2018 Kimley-Horn and Associates, Inc. Dallas, Texas Project #064524900 Registered Firm F-928 Traffic Impact Analysis

More information

Proposed location of Camp Parkway Commerce Center. Vicinity map of Camp Parkway Commerce Center Southampton County, VA

Proposed location of Camp Parkway Commerce Center. Vicinity map of Camp Parkway Commerce Center Southampton County, VA Proposed location of Camp Parkway Commerce Center Vicinity map of Camp Parkway Commerce Center Southampton County, VA Camp Parkway Commerce Center is a proposed distribution and industrial center to be

More information

Parks and Transportation System Development Charge Methodology

Parks and Transportation System Development Charge Methodology City of Sandy Parks and Transportation System Development Charge Methodology March, 2016 Background In order to implement a City Council goal the City of Sandy engaged FCS Group in January of 2015 to update

More information

THE CORNERSTONE APARTMENTS TRAFFIC IMPACT STUDY R&M PROJECT NO

THE CORNERSTONE APARTMENTS TRAFFIC IMPACT STUDY R&M PROJECT NO THE CORNERSTONE APARTMENTS SITUATED AT N/E/C OF STAUDERMAN AVENUE AND FOREST AVENUE VILLAGE OF LYNBROOK NASSAU COUNTY, NEW YORK TRAFFIC IMPACT STUDY R&M PROJECT NO. 2018-089 September 2018 50 Elm Street,

More information

Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. HNTB Project File: Subject

Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. HNTB Project File: Subject TECHNICAL MEMORANDUM To Kumar Neppalli Traffic Engineering Manager Town of Chapel Hill From Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. Cc HNTB Project File: 38435 Subject Obey Creek TIS 2022

More information

Traffic Impact Study for Proposed Olive Boulevard Development

Traffic Impact Study for Proposed Olive Boulevard Development Traffic Impact Study for Proposed 11330 Olive Boulevard Development Creve Coeur, Missouri July 7, 2017 Prepared For: 11330 Olive Boulevard Development 11330 Olive Boulevard Creve Coeur, Missouri 63141

More information

DELICETO, LLC PALM BEACH COUNTY, FL

DELICETO, LLC PALM BEACH COUNTY, FL COMPREHENSIVE PLAN AMENDMENT TRAFFIC ANALYSIS DELICETO, LLC PALM BEACH COUNTY, FL PREPARED FOR: DELICETO, LLC Project #042787007 April 18, 2018 Revised May 29, 2018 CA 00000696 Kimley-Horn and Associates,

More information

YULA Boys High School Expansion

YULA Boys High School Expansion Environmental Review Section City Hall 200 N. Spring Street, Room 750 Los Angeles, CA 90012 RECIRCULATED TRAFFIC/TRANSPORTATION/PARKING CHAPTER WEST LOS ANGELES COMMUNITY PLAN AREA YULA Boys High School

More information

REGIONAL TRANSPORTATION SETTING

REGIONAL TRANSPORTATION SETTING CIRCULATION ELEMENT WHITE PAPER NO. 1 REGIONAL TRANSPORTATION SETTING INTRODUCTION According to the Southern California Association of Governments (SCAG), by 2030 the six- County region will be home to

More information

Transportation Land Development Environmental S e r v i c e s

Transportation Land Development Environmental S e r v i c e s Transportation Land Development Environmental S e r v i c e s Memorandum To: Ms. Kristin E. Kassner Planning Director Town Hall Annex 25 Center Street Burlington, MA 01803 Date: September 23, 2013 Project

More information

4.4 Transportation and Circulation

4.4 Transportation and Circulation 4.4.1 Introduction This section evaluates the potential for construction traffic and operational impacts to result from implementation of the proposed project. This includes the potential for the project

More information

Expo Light Rail Line. Expo Line Community Meeting Quarterly Phase 2 Construction Update Los Angeles February 2015

Expo Light Rail Line. Expo Line Community Meeting Quarterly Phase 2 Construction Update Los Angeles February 2015 Expo Line Community Meeting Quarterly Phase 2 Construction Update Los Angeles February 2015 Meeting Agenda Phase 2 Construction Update Meeting Meeting Purpose and Format Construction Update Expo Bikeway

More information

MINERVA PARK SITE TRAFFIC IMPACT STUDY M/I HOMES. September 2, 2015

MINERVA PARK SITE TRAFFIC IMPACT STUDY M/I HOMES. September 2, 2015 5500 New Albany Road Columbus, Ohio 43054 Phone: 614.775.4500 Fax: 614.775.4800 Toll Free: 1-888-775-EMHT emht.com 2015-1008 MINERVA PARK SITE TRAFFIC IMPACT STUDY M/I HOMES September 2, 2015 Engineers

More information

TRANSPORTATION REVIEW

TRANSPORTATION REVIEW TRANSPORTATION REVIEW - PROPOSED MIX OF LAND USES IS CONSISTENT WITH THE CITY S UNDER THE GRANVILLE BRIDGE POLICIES THAT AIM TO MEET NEIGHBOURING RESIDENTS SHOPPING NEEDS AND REDUCE RELIANCE ON AUTOMOBILE

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS H. TRANSPORTATION/TRAFFIC

IV. ENVIRONMENTAL IMPACT ANALYSIS H. TRANSPORTATION/TRAFFIC IV. ENVIRONMENTAL IMPACT ANALYSIS H. TRANSPORTATION/TRAFFIC The following summarizes the information provided in the traffic report prepared by Fehr & Peers/Kaku Associates entitled, Traffic Study for

More information

Date: February 7, 2017 John Doyle, Z-Best Products Robert Del Rio. T.E. Z-Best Traffic Operations and Site Access Analysis

Date: February 7, 2017 John Doyle, Z-Best Products Robert Del Rio. T.E. Z-Best Traffic Operations and Site Access Analysis Memorandum Date: February 7, 07 To: From: Subject: John Doyle, Z-Best Products Robert Del Rio. T.E. Z-Best Traffic Operations and Site Access Analysis Introduction Hexagon Transportation Consultants, Inc.

More information

RE: A Traffic Impact Statement for a proposed development on Quinpool Road

RE: A Traffic Impact Statement for a proposed development on Quinpool Road James J. Copeland, P.Eng. GRIFFIN transportation group inc. 30 Bonny View Drive Fall River, NS B2T 1R2 May 31, 2018 Ellen O Hara, P.Eng. Project Engineer DesignPoint Engineering & Surveying Ltd. 200 Waterfront

More information

30-Day Look Ahead Summary August 2011

30-Day Look Ahead Summary August 2011 Wilshire Segment 30-Day Look Ahead Summary August 2011 DWP and SCE Utility Relocation Sepulveda reduced to one lane in each direction, Constitution to Ohio, 9pm to 6am Westbound Wilshire reduced to one

More information

3.8 TRANSPORTATION, CIRCULATION AND PARKING

3.8 TRANSPORTATION, CIRCULATION AND PARKING 3.8 TRANSPORTATION, CIRCULATION AND PARKING This section provides an overview of traffic, circulation and parking impacts and evaluates the construction and operational impacts associated with the Proposed

More information

MEMO VIA . Ms. Amy Roth DPS Director, City of Three Rivers. To:

MEMO VIA  . Ms. Amy Roth DPS Director, City of Three Rivers. To: MEMO To: Ms. Amy Roth DPS Director, City of Three Rivers VIA EMAIL From: Michael J. Labadie, PE Julie M. Kroll, PE, PTOE Brandon Hayes, PE, P.Eng. Fleis & VandenBrink Date: January 5, 2017 Re: Proposed

More information

EXECUTIVE SUMMARY. The valet operation, service area, and drop-off lanes provided will be adequate Page i

EXECUTIVE SUMMARY. The valet operation, service area, and drop-off lanes provided will be adequate Page i EXECUTIVE SUMMARY MacKenzie Engineering and Planning, Inc. performed an analysis of the traffic impacts resulting from the proposed project site located at 25 SE 4th Avenue, Delray Beach, Florida (PCN

More information

MANHATTAN VILLAGE ENHANCEMENT PROJECT

MANHATTAN VILLAGE ENHANCEMENT PROJECT MANHATTAN VILLAGE ENHANCEMENT PROJECT Traffic & Parking Analysis Manhattan Beach City Council September 2013 Study Area and Analyzed Intersections Intersection LOS Results Project Improvements Dedicate

More information

APPENDIX F-IV.K Updated Transportation Impact Analysis (June 2010)

APPENDIX F-IV.K Updated Transportation Impact Analysis (June 2010) APPENDIX F-IV.K Updated Transportation Impact Analysis (June 2010) TRANSPORTATION IMPACT ANALYSIS FOR THE LOYOLA MARYMOUNT UNIVERSITY MASTER PLAN PROJECT JUNE 2010 PREPARED FOR AECOM Design PREPARED BY

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS C. TRAFFIC, CIRCULATION AND PARKING

IV. ENVIRONMENTAL IMPACT ANALYSIS C. TRAFFIC, CIRCULATION AND PARKING IV. ENVIRONMENTAL IMPACT ANALYSIS C. TRAFFIC, CIRCULATION AND PARKING 1. INTRODUCTION This section is based on the technical report Traffic Study for the Villa Marina Residential Project, prepared by Kaku

More information

Draft Date: February 9, 2018 DRAFT RESOLUTION

Draft Date: February 9, 2018 DRAFT RESOLUTION Draft Date: February 9, 2018 DRAFT RESOLUTION A RESOLUTION OF THE COUNCIL OF THE CITY OF LOS ANGELES, CALIFORNIA, TO ADOPT FINDINGS PURSUANT TO THE MITIGATION FEE ACT, TO UPDATE TRANSPORTATION IMPACT FEES,

More information

TRAFFIC IMPACT ANALYSIS FOR. McDONALD S RESTAURANT IN CARMICAEL Sacramento County, CA. Prepared For:

TRAFFIC IMPACT ANALYSIS FOR. McDONALD S RESTAURANT IN CARMICAEL Sacramento County, CA. Prepared For: TRAFFIC IMPACT ANALYSIS FOR McDONALD S RESTAURANT IN CARMICAEL Sacramento County, CA Prepared For: McDonald s USA, LLC Pacific Sierra Region 2999 Oak Road, Suite 900 Walnut Creek, CA 94597 Prepared By:

More information

Appendix C. Traffic Impact Study

Appendix C. Traffic Impact Study Appendix C Traffic Impact Study TRAFFIC STUDY FOR THE EAGLE ROCK AGGREGATE TERMINAL Prepared by: FEHR & PEERS 201 Santa Monica Blvd. Suite 500 Santa Monica, CA 90401-2213 T. (310) 458-9916 F. (310) 394-7663

More information

Appendix 5. Haymeadow Interim Traffic Analysis

Appendix 5. Haymeadow Interim Traffic Analysis Appendix 5 Haymeadow Interim Traffic Analysis 20 MEMORANDUM To: From: Rick Pylman Gary Brooks Bill Fox Date: September 15, 2016 Project: Subject: Haymeadow Evaluation of interim access configuration Currently

More information

ENVIRONMENTAL SETTING

ENVIRONMENTAL SETTING II. ENVIRONMENTAL SETTING A. OVERVIEW OF ENVIRONMENTAL SETTING This section provides a brief overview of the project site s regional and local setting. Additional descriptions of the environmental setting

More information

IV. REVISIONS TO THE DRAFT IS/MND

IV. REVISIONS TO THE DRAFT IS/MND IV. REVISIONS TO THE DRAFT IS/MND 1. REVISIONS TO THE DRAFT IS/MND This section presents corrections and clarifications that have been made to the text of the Draft IS/MND. These changes include revisions

More information

TABLE OF CONTENTS SECTION PAGE. Executive Summary... xii

TABLE OF CONTENTS SECTION PAGE. Executive Summary... xii TABLE OF CONTENTS SECTION PAGE Executive Summary... xii 1.0 Introduction... 1 1.1 Study Area... 2 1.2 Traffic Impact Analysis Scenarios... 4 1.3 Study Area - City of Orange... 4 2.0 Project Description

More information

Shoppes at Pine Meadow BPUD DeBary, Florida. Traffic Impact Analysis

Shoppes at Pine Meadow BPUD DeBary, Florida. Traffic Impact Analysis Shoppes at Pine Meadow BPUD DeBary, Florida Traffic Impact Analysis Prepared for: CPH, Inc. By: Lassiter Transportation Group, Inc. Revised October 2015 Table of Contents Introduction... 1 Study Procedures...

More information

2. PROJECT ALTERNATIVES

2. PROJECT ALTERNATIVES 2. PROJECT ALTERNATIVES 2.1 Introduction Six alternatives are evaluated in detail in this Draft Final Environmental Impact Report (DFEIR) for the Exposition Corridor Transit Project Phase 2 (Expo Phase

More information

TRAFFIC IMPACT ANALYSIS

TRAFFIC IMPACT ANALYSIS TRAFFIC IMPACT ANALYSIS Emerald Isle Commercial Development Prepared by SEPI Engineering & Construction Prepared for Ark Consulting Group, PLLC March 2016 I. Executive Summary A. Site Location The Emerald

More information

L. KASSAN, P.E. Consulting Traffic Engineer

L. KASSAN, P.E. Consulting Traffic Engineer ARTHUR L. KASSAN, P.E. Consulting Traffic Engineer Honorable Members of the Planning and Land Use Management Committee c/o City Clerk Room 395, City Hall 200 North Spring Street Los Angeles, CA 90012 Subject:

More information

4131 Chain Bridge Road

4131 Chain Bridge Road Traffic Impact Study 4131 Chain Bridge Road City of Fairfax, VA 05/04/16 May 4, 2016 Prepared for: Paradigm 1415 North Taft Street Suite 100 Arlington, VA 22201 This report is printed on environmentally

More information

I-405 Sepulveda Pass Improvements Project

I-405 Sepulveda Pass Improvements Project I-405 Sepulveda Pass Improvements Project Community Meeting November 15, 2012 1 Wilshire Segment Overview of Wilshire Segment There are a total of 23 bridges being constructed on this project; almost half

More information

MONTEREY BAY AQUARIUM RESEARCH INSTITUTE (MBARI) MASTER PLAN UPDATE MOSS LANDING, CALIFORNIA

MONTEREY BAY AQUARIUM RESEARCH INSTITUTE (MBARI) MASTER PLAN UPDATE MOSS LANDING, CALIFORNIA MONTEREY BAY AQUARIUM RESEARCH INSTITUTE (MBARI) MASTER PLAN UPDATE MOSS LANDING, CALIFORNIA TRAFFIC IMPACT ANALYSIS Administrative Draft Report Prepared For Monterey Bay Aquarium Research Institute Moss

More information

Per Revised Concept Plan Residential Condo/Townhouse. Proposed Land Use per TIS

Per Revised Concept Plan Residential Condo/Townhouse. Proposed Land Use per TIS January 2, 2018 Mr. Paul DeBotton Marple Associates, L.P. 1604 Walnut Street, 4 th Floor Philadelphia, PA 19103 RE: Langford Run Road Traffic Analysis Proposed Mid County Shopping Center Marple Township,

More information

TRAFFIC VOLUME TRENDS

TRAFFIC VOLUME TRENDS Page 1 U. S. Department Transportation Federal Highway Administration Office Highway Policy Information TRAFFIC VOLUME TRENDS September Travel on all roads and streets changed by +2.5 (5.8 billion vehicle

More information

Costco Gasoline Fuel Station Transportation Characteristics

Costco Gasoline Fuel Station Transportation Characteristics Exhibit A MEMORANDUM Date: May 23, 2013 Project #: I-10 To: Jennifer Murillo, Costco Wholesale Terry Odle, Mulvanny G2 Architecture From: Sonia Hennum, PTOE Project: Subject: Signal Hill Costco Gasoline

More information

DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Subhas Bhargava. July 9, Overview_1.

DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Subhas Bhargava. July 9, Overview_1. DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW Prepared for: Subhas Bhargava July 9, 2015 115-620 Overview_1.doc D. J. Halpenny & Associates Ltd. Consulting Transportation

More information

appendix 4: Parking Management Study, Phase II

appendix 4: Parking Management Study, Phase II appendix 4: Parking Management Study, Phase II A4-1 A4-2 Eastlake Parking Management Study Final Phase 2 Report Future Parking Demand & Supply January 6, 2017 Submitted by Denver Corp Center III 7900 E.

More information

Proposed Inn at Bellefield Traffic Impact Assessment

Proposed Inn at Bellefield Traffic Impact Assessment Proposed Inn at Bellefield Traffic Impact Assessment Town of Hyde Park Dutchess County, New York Prepared for: T-Rex Hyde Park Owner LLC 500 Mamroneck Avenue, Suite 300 Harrison, NY 10528 June 21, 2017

More information

Proposed Hotel and Restaurant Development

Proposed Hotel and Restaurant Development Traffic Impact Study Proposed Hotel and Restaurant Development Marbledale Road Tuckahoe, NY PREPARED FOR BILLWIN DEVELOPMENT AFFILIATES, LLC 365 WHITE PLAINS ROAD EASTCHESTER, NY. 10709 PREPARED BY Engineering

More information

3.14 Parks and Community Facilities

3.14 Parks and Community Facilities 3.14 Parks and Community Facilities 3.14.1 Introduction This section identifies the park and community facility resources in the study area and examines the potential impacts that the proposed Expo Phase

More information

11012 FIRESTONE BLVD., NORWALK, CA 90650

11012 FIRESTONE BLVD., NORWALK, CA 90650 FOR SALE Norwalk Auto Center 11012 FIRESTONE BLVD., NORWALK, CA 90650 3701 Stocker Street, Suite 410, Los Angeles 90008 Office: 310-272-7616 Fax: 310-272-1444 curtis@fralincommercial.com stan@fralincommercial.com

More information

Dulles Corridor Air Rights Study Investigation

Dulles Corridor Air Rights Study Investigation Dulles Corridor Air Rights Study Investigation Fairfax County Board of Supervisors Transportation Committee September 17, 2013 1 On March 19, 2013 the Fairfax County Board of Supervisors asked FCDOT staff

More information

BERKELEY DOWNTOWN AREA PLAN PROGRAM ENVIRONMENTAL IMPACT REPORT TRAFFIC IMPACT ANALYSIS

BERKELEY DOWNTOWN AREA PLAN PROGRAM ENVIRONMENTAL IMPACT REPORT TRAFFIC IMPACT ANALYSIS BERKELEY DOWNTOWN AREA PLAN PROGRAM ENVIRONMENTAL IMPACT REPORT TRAFFIC IMPACT ANALYSIS Prepared for: City of Berkeley Prepared by: REVISED JANUARY 9, 2009 Berkeley Downtown Area Plan Program EIR Traffic

More information

Table 8-1: Service Frequencies for All Short-List Alternatives by Day of Week and Time of Day Frequency Day of Week Time of Day Time Period

Table 8-1: Service Frequencies for All Short-List Alternatives by Day of Week and Time of Day Frequency Day of Week Time of Day Time Period 8. Operating Plans The following Section presents the operating plans for the Short-List Alternatives. The modern streetcar operating plans are presented for Alternatives 2 and 3, followed by bus rapid

More information

Appendix C. Traffic Study

Appendix C. Traffic Study Appendix C Traffic Study TABLE OF CONTENTS SECTION Executive Summary PAGE 1.0 Introduction... 1 1.1 Scope of Work... 1 1.2 Study Area... 2 2.0 Project Description... 3 2.1 Site Access... 4 2.2 Pedestrian

More information

MEMORANDUM. Project Description. Operational Trip Generation. Construction Trip Generation. Date: August 12, 2014 TG: To: From: Subject:

MEMORANDUM. Project Description. Operational Trip Generation. Construction Trip Generation. Date: August 12, 2014 TG: To: From: Subject: MEMORANDUM Date: August 12, 2014 TG: 13329.01 To: From: Subject: Jeremy Krout EPD Solutions Inc. Rafik Albert EPD Solutions Inc. Rawad Hani Transpo Group AP North Lake Solar Project Traffic Scoping The

More information

Transportation & Traffic Engineering

Transportation & Traffic Engineering Transportation & Traffic Engineering 1) Project Description This report presents a summary of findings for a Traffic Impact Analysis (TIA) performed by A+ Engineering, Inc. for the Hill Country Family

More information

Subarea Study. Manning Avenue (CSAH 15) Corridor Management and Safety Improvement Project. Final Version 1. Washington County.

Subarea Study. Manning Avenue (CSAH 15) Corridor Management and Safety Improvement Project. Final Version 1. Washington County. Subarea Study Manning Avenue (CSAH 15) Corridor Management and Safety Improvement Project Final Version 1 Washington County June 12, 214 SRF No. 138141 Table of Contents Introduction... 1 Forecast Methodology

More information

13.1. INTRODUCTION AND SUMMARY OF FINDINGS

13.1. INTRODUCTION AND SUMMARY OF FINDINGS Chapter 13: Traffic and Transportation 13.1. INTRODUCTION ND SUMMRY OF FINDINGS This Chapter assesses the potential traffic and transportation impacts of the Proposed Project and the Proposed Project s

More information

Study Area, Related Projects and Travel Markets

Study Area, Related Projects and Travel Markets Study Area, Related Projects and Travel Markets Study area and related projects Travel between Valley and Westside North San Fernando Valley BRT (Alignment TBD) East San Fernando Valley Transit Corridor

More information

Re: 233 Armstrong Street Residential Condominium Traffic Brief

Re: 233 Armstrong Street Residential Condominium Traffic Brief 1223 Michael Street, Suite 100, Ottawa, ON K1J 7T2 Tel: 613.738.4160 Fax: 613.739.7105 www.delcan.com August 8, 2008 TO3031TOP00 BY E-MAIL: gerry.lalonde@rogers.com Spencedale Properties 7 Cobb Court Ottawa,

More information

WESTSIDE SUBWAY EXTENSION. Traffic Analysis Impact Report

WESTSIDE SUBWAY EXTENSION. Traffic Analysis Impact Report Traffic Analysis Impact Report August 2010 Table of Contents Table of Contents 1.0 INTRODUCTION/SUMMARY...1-1 1.1 Existing (Year 2006) Setting... 1-1 1.2 Future (Year 2035) Setting... 1-2 2.0 PROJECT

More information

Countdown to the Closure Extended 53-Hour Closure of I-405 Freeway Between U.S. 101 and I-10 Planned in Mid-July for Mulholland Bridge Demolition

Countdown to the Closure Extended 53-Hour Closure of I-405 Freeway Between U.S. 101 and I-10 Planned in Mid-July for Mulholland Bridge Demolition Countdown to the Closure Extended 3-Hour Closure of I-40 Freeway Between U.S. 0 and I-0 Planned in Mid-July for Mulholland Bridge Demolition Work Los Angeles, Calif. Plan Ahead, Avoid The Area, Or Stay

More information

April 7, Mr. Blake Shutler Compass Homes Development LLC Summit Homes Construction, LLC PO Box 6539 Dillon, CO 80435

April 7, Mr. Blake Shutler Compass Homes Development LLC Summit Homes Construction, LLC PO Box 6539 Dillon, CO 80435 Compass Homes Development LLC Summit Homes Construction, LLC PO Box 6539 Dillon, CO 80435 Re: Trip Generation Comparison West Hills Townhomes Keystone, Colorado FHU Reference No. 116388-01 Dear Mr. Shutler:

More information