3J. Transportation, Circulation and Parking

Size: px
Start display at page:

Download "3J. Transportation, Circulation and Parking"

Transcription

1 This section presents the methodology, findings, and conclusions of the traffic impact analysis prepared by Fehr & Peers/Kaku Associates to evaluate the potential traffic and circulation impacts of the proposed project. 1 The primary purpose of this analysis is to review existing traffic conditions in the vicinity of the project site and analyze the impacts associated with 1) the proposed project, including parking; and 2) cumulative developments in the City of Los Angeles and surrounding area. A copy of the full traffic study is in Appendix F of this EIR. 3J.1 Existing Setting The following describes existing transportation conditions in the vicinity of the project site. It includes an analysis of the traffic circulation characteristics of six study intersections and an assessment of ten neighborhood street segments serving the project area. The six study intersections are as follows: 1. Campus Road and Alumni Avenue; 2. Eagle Rock and Westdale Avenue; 3. Eagle Rock and Avenue 45; 4. Eagle Rock and York /Alumni Avenue; 5. Avenue 46 and York ; and 6. Armadale Avenue and York. In addition, ten neighborhood street segments were analyzed. The street segments are as follows: 1. Westdale Avenue, west of Campus Road; 2. Corliss Street, west of Campus Road; 3. Paulhan Avenue, west of Campus Road; 4. Alumni Avenue, west of Campus Road; 5. Hazelwood Avenue, south of Campus Road; 6. Avenue 47, south of Campus Road; 7. Munson Avenue, south of Campus Road; 8. Armadale Avenue, south of Campus Road; 9. Campus Road, south of Stratford Road; and 10. Eaton Street, west of Avenue 51. The six study intersections and ten neighborhood street segments were specified by the City of Los Angeles, the Lead Agency, as those deemed most likely to experience impacts due to the project. The location of study intersections and street segments are shown in Figure 3J.1. There is ample existing parking provided on the campus. Existing parking is quantified in the context of an overall parking analysis presented on p. 3J-17. Many of the internal campus roads are easily accessible to bicycles and the campus provides bicycle racks at convenient locations throughout the campus (outside residence halls, the library and central college buildings). The campus has an extensive network of walkways and internal streets that encourage students to walk. See the discussion of the City s Walkability Checklist contained in Section 3G Land Use (setting and impacts). 1 Fehr & Peers/Kaku Associates, Traffic and Parking Study for the Occidental College Specific Plan Environmental Impact Report, April Occidental College Specific Plan 3J-1 ESA / D205278

2 SOURCE: Kaku Associates, 2006 Occidental College Figure 3J.1 Study Intersections

3 Description of Key Roadways Primary regional access to the study area is provided by the Ventura Freeway (State Route 134), which runs generally in an east/west direction approximately two miles north of the Occidental College campus, and the Glendale Freeway (State Route 2), which runs in a north/south direction approximately one mile west of the campus. Eagle Rock, York, Yosemite Drive, and Townsend Avenue/Avenue 51 provide area access to the project site. Local access and circulation to the campus is provided by Ridgeview Avenue, Westdale Avenue, Corliss Street, Paulhan Avenue, Alumni Avenue, Hazelwood Avenue, Avenue 47, Minson Avenue, Armadale Avenue, and Campus Road. Table 3J-1 provides a complete description of all the roadways in the study area. TABLE 3J-1 DESCRIPTION OF EXISTING ROADWAYS IN STUDY AREA Lane Segment From To NB/EB SB/WB Parking Restrictions Median Type NB/EB SB/WB Speed Limit Eagle Rock York Avenue 46 Corliss Street Yosemite Drive Westdale Avenue Eagle Rock Eagle Rock Eagle Rock Westdale Avenue 2 2 RM PA PA 35 York 2 3 RM PA PA 35 Avenue /3 1 2/3 DY PA PA 35 York 1 1 UD PA PA 25 Campus Road 1 1 UD PA PA 25 Paulhan Avenue Avenue 45 Campus Road 1 1 UD PA PA 25 Alumni Avenue Eagle Rock Campus Road 1 1 UD PA PA 25 Armdale Avenue York Campus Road 1 1 UD PA PA 25 Avenue 49 York Stratford Road 1 1 UD PA PA 25 Campus Road Escarpa Drive York 1 1 UD PA PA 25 Ridgeview Avenue Townsend Avenue Avenue 46 Campus Road 1 1 UD PA PA 25 Avenue 51 Yosemite Drive 1 1 SDY NSAT NSAT 30 Avenue 51 York Townsend Avenue 2 2 SDY PA PA 30 MEDIAN TYPE: DY = Double Yellow Centerline RM = Raised Median SDY = Single Dashed Yellow Centerline UD = Undivided Lane SOURCE: Fehr & Peers/Kaku Associates, PARKING: PA = Parking Allowed NSAT = No Stopping Anytime LANES: # = Number of lanes 2/3 = Shared Parking/Driving Lane NB = North Bound EB = East Bound SB = South Bound WB = West Bound Occidental College Specific Plan 3J-3 ESA / D205278

4 Existing Transit Service The project study area is served by bus transit lines operated by the MTA, one by the Los Angeles Department of Transportation (LADOT) through its Downtown Area Shuttle (DASH) service. MTA Transit Service MTA Bus Line 83 runs along York from Eagle Rock near Occidental College to Piedmont Avenue. It then travels along Figueroa Street and Broadway to downtown Los Angeles. This line is located approximately 0.20 of a mile south of the project site. MTA Bus Line 84 runs mainly along Broadway, Colorado, Eagle Rock and Cypress Avenue to downtown Los Angeles. This line is located approximately 0.20 of a mile northwest of the project site. MTA Bus Line 181 begins at the Sierra Madre Villa Transportation Center (Metro Gold Line) and travels along Colorado, Broadway, Los Feliz, Franklin Avenue to the Hollywood/Vine Metro Red Line Station. Within the study area, it operates along Yosemite Drive. This line is located approximately 0.3 of a mile north of the project site. 2 LADOT (DASH Service) DASH Highland Park/Eagle Rock (HPER) begins at Eagledale Avenue and Colorado Street and then runs mainly along Colorado Street/, 3 Yosemite Drive, Townsend Avenue/Avenue 51, and then Figueroa Street to Pascuala Avenue. This line has a stop which is located directly adjacent to the eastern boarder of the project site. Methodology Study Scenarios Weekday AM and PM peak hour traffic operations were evaluated at the study intersections for each of the following traffic scenarios: Existing (Year 2006) Conditions; Future (Year 2028) Cumulative Base (No Project) Conditions; and Future (Year 2028) Cumulative and Proposed Project Conditions. Existing Period Conditions Weekday morning and evening peak hour traffic counts were conducted at the analyzed intersections on Thursday, October 19, This date was chosen because it falls within the early to middle part of Occidental College s fall semester and data reflects a typical travel pattern for campus activities. 2 There is no direct route from the campus to Yosemite Drive. Riders would have to walk an estimated 0.70 of a mile to ride MTA bus line Colorado Street becomes Colorado at Broadway. Occidental College Specific Plan 3J-4 ESA / D205278

5 Future Period Conditions In order to evaluate potential impacts of the proposed project on the street system, it is necessary to develop estimates of future traffic conditions in the study area both with and without the project. Future (Year 2028) traffic volumes were first estimated for the study area without the project. These future forecasts were based on LADOT guidelines and reflect traffic increases due to general regional growth and traffic expected to be generated by other specific developments in the project vicinity. They represent cumulative base (no project) conditions. The additional amount of traffic expected to be generated by the proposed project was then estimated and assigned to the surrounding street system using the LADOT guidelines. The sum of the cumulative base and project-generated traffic represents the cumulative plus project conditions. The City of Los Angeles has also established threshold criteria used to determine the significant traffic impacts of a proposed project in its jurisdiction based on level of service (LOS). Level of service (LOS) is a qualitative measure used to describe the traffic flow conditions, ranging from excellent to overloaded conditions. The range of conditions is expressed by letters from A to F. LOS D is typically recognized as the minimum acceptable LOS in urban areas such as the City of Los Angeles. LOS definitions for signalized intersections and street segments are presented below. Under the LADOT guidelines, an intersection would be significantly impacted with an increase in V/C ratio equal to or greater than 0.04 for intersections operating at LOS C, equal to or greater than 0.02 for intersections operating at LOS D, and equal to or greater than 0.01 for intersections operating at LOS E or F after the addition of project traffic. Intersections operating at LOS A or B after the addition of the project traffic are not considered significantly impacted regardless of the increase in V/C ratio. The following summarizes the impact criteria: LOS Final V/C Ratio Project-related Increase in V/C C > equal to or greater than D > equal to or greater than E or F > equal to or greater than Unsignalized intersections were analyzed using the 2000 Highway Capacity Manual (HCM) stopcontrolled methodology. This method quantifies intersection operations in terms of delay in seconds. To assess significant impacts using the LADOT incremental impact criteria outlined above, unsignalized intersections were evaluated using signalized intersection methods and evaluated using V/C ratios. The City of Los Angeles established threshold criteria used to determine significant impacts to local residential streets attributable to proposed projects. According to the LADOT criteria, a local residential street is deemed significantly impacted based on an increase in the projected average daily traffic (ADT) volume as follows: Occidental College Specific Plan 3J-5 ESA / D205278

6 Projected Average Daily Traffic with Project (Final ADT) Project-Related Increase in ADT Less than 1,000 16% or more of final ADT 1,000 or more 12% or more of final ADT 2,000 or more 10% or more of final ADT 3,000 or more 8% or more of final ADT Cumulative Base Conditions Cumulative base (no project) traffic forecasts include the effects of specific projects, called related projects, expected to be implemented in the vicinity of the proposed project area to the build-out date of the proposed project. Traffic expected to be generated by specific development projects within the vicinity of the study area was also considered. A total of seven cumulative projects were identified within the study area (see Table 3J-2). TABLE 3J-2 RELATED PROJECTS Index AM Peak Hour PM Peak Hour Project Location Project Description Size Daily Trips In Out Total In Out Total San Fernando Road Self Storage 124 KSF Figueroa Street Fast Food Restaurant 3.4 KSF Colorado Retail 1.6 KSF Health Club 20 KSF 657 (21) (27) (48) Colorado Middle School 250 Students (123) Verdugo Secondary School 120 Students Colorado 3901 Eagle Rock 4414 E. York Restaurant/Retail 15 KSF 1, Condos 114 DU Retail 11.2 KSF Drugstore 15.7 KSF 1, Restaurant and Coffee Shop 2.8 KSF N. Fletcher Drive Los Angeles City College Northwest Campus 3,000 Students N/A N. Early Educational Occidental College Specific Plan 3J-6 ESA / D205278

7 Index AM Peak Hour PM Peak Hour Project Location Project Description Size Verdugo Road Center Students Daily Trips In Out Total In Out Total Affordable Apartments 45 DU Total 6, NOTE: Related projects were obtained from LADOT staff; Trip generation estimates were obtained from LADOT. Peak hour in and out splits were developed using Trip Generation, 7 th Edition (ITE, 2003). SOURCE: Fehr & Peers/Kaku Associates, Project Trip Generation and Distribution Forecast project trip generation for faculty/staff housing was derived from the Institute of Transportation Engineers (ITE) Trip Generation, 7 th Edition. Trip generation for academic growth was estimated by developing empirical rates based on counts done at campus driveways with an adjustment for those parking off-campus. Trip generation estimates for the related projects were provided by LADOT. Table 3J-3 shows trip generation estimates for both academic growth and faculty/staff housing. TABLE 3J-3 OCCIDENTAL COLLEGE SPECIFIC PLAN TRIP GENERATION ESTIMATES AM Peak Hour PM Peak Hour Land Use Size Daily In Out Total In Out Total Academic Net Growth a Faculty/Staff Housing b 250 students Single-Family Detached Housing 5 dwelling units Apartment 35 dwelling units Subtotal 40 dwelling units Total Estimated Trips 1, a b Trip generation estimated based on empirical data collected at Occidental College driveways in October and November In/out splits 70 percent inbound/30 percent outbound during the AM peak hour and 45 percent inbound/55 percent outbound during the PM peak hour. Trip generation estimated using rates from Trip Generation, 7 th Edition (ITE, 2003), land use categories 210 Single Family Housing and 220 Apartment. Existing LOS and Traffic Volumes Table 3J-4 presents LOS definitions for signalized intersections and street segments. Five of the six analyzed intersections are controlled by traffic signals. The remaining intersection, Campus Occidental College Specific Plan 3J-7 ESA / D205278

8 Road and Alumni Avenue, is a four-way stop controlled intersection. This unsignalized intersection was analyzed using the 4-Way Stop method from the 2000 Highway Capacity Manual (HCM) (Transportation Research Board, 2000). The HCM methodology determines the average vehicle delays to find the corresponding LOS. TABLE 3J-4 LOS DEFINITIONS FOR SIGNALIZED INTERSECTIONS LOS A B C D E F Interpretation Excellent operation. No vehicle waits longer than one red light and no approach phase is fully used. Very good operation. An occasional approach phase is fully utilized; many drivers begin to feel somewhat restricted within groups of vehicles. Good operation. Occasionally drivers may have to wait through more than one red light; backups may develop behind turning vehicles. Fair operation. Delays may be substantial during portions of the rush hours, but enough lower volume periods occur to permit clearing of developing lines, preventing excessive backups. Poor operation. Represents the most vehicles intersection approaches can accommodate; there may be long lines of waiting vehicles through several signal cycles. Failure. Backups from nearby locations or on cross streets may restrict or prevent movement of vehicles out of the intersection approaches; tremendous delays with continuously increasing queue lengths. Signalized Intersection v/c Ratio (ICU) >1.000 SOURCE: Transportation Research Board, Highway Capacity Manual, Special Report 209, In addition, two of the five signalized study intersections are currently controlled by the City of Los Angeles Automated Traffic Surveillance and Control (ATSAC) system. In accordance with LADOT procedures, a capacity of seven percent (0.07 V/C adjustment) was applied to reflect the benefits of ATSAC control at these two intersections, identified as follows: Eagle Rock and Westdale Avenue; and Eagle Rock and York /Alumni Avenue. Table 3J-5 summarizes the existing weekday morning and evening peak hour V/C ratio or delay and the corresponding LOS for each of the six study intersections. The results of this analysis indicate that all six study intersections are currently operating at LOS C or better during both the morning and afternoon peak periods. Occidental College Specific Plan 3J-8 ESA / D205278

9 3J.2 Regulatory Environment State California Department of Transportation The California Vehicle Code establishes height, weight, length, and width restrictions for vehicles and their loads. 4 Vehicles or loads that exceed these limitations are considered oversize and require a special permit to operate on the state highway system. The code authorizes Caltrans to TABLE 3J-5 EXISTING INTERSECTIONS LEVELS OF SERVICE Existing Intersection Peak Hour V/C or Delay LOS 1. Campus Drive & Alumni Avenue b AM 0,275 A 1. Campus Drive & Alumni Avenue a,b PM A 2. Eagle Rock & Westdale Avenue a AM A 2. Eagle Rock & Westdale Avenue a PM A 3. Eagle Rock & Avenue 45 AM A 3. Eagle Rock & Avenue 45 PM A 4. Eagle Rock & York / Alumni Avenue a AM B 4. Eagle Rock & York / Alumni Avenue a PM C 5. Avenue 46 & York AM C 5. Avenue 46 & York PM C 6. Armadale Avenue & York AM B 6. Armadale Avenue & York PM B a b Intersection is currently operating under ATSAC system. Intersection is four-way stop controlled. Average vehicular delay in seconds per vehicle is reported than V/C ratio. SOURCE: Fehr & Peers/Kaku Associates, issue special permits for the movement of these oversize vehicles along specified routes on the state highway system. The code authorizes county and city governments, such as the City of Los Angeles, to issue special permits for movement of oversize vehicles through their jurisdictions. 4 California Department of Motor Vehicles, California Vehicle Code Section 35000, January Occidental College Specific Plan 3J-9 ESA / D205278

10 Local Congestion Management Program (2004) New projects within the County of Los Angeles must comply with the Congestion Management Program (CMP) for Los Angeles County that was adopted by the MTA in November 1995 pursuant to state law (MTA, 1995). The CMP involves monitoring traffic conditions and performance measures on the designated transportation network, analysis of the impact of land use decisions on the transportation network, and mitigation to reduce impacts on the transportation network. Appendix D of the CMP includes Transportation Impact Assessment (TIA) guidelines (MTA, 1995). The TIA guidelines require analysis at monitored street intersections and segments, including freeway on-and off-ramp intersections where a project is expected to add 50 or more peak hour vehicle trips and mainline freeway or ramp monitoring locations where a project is expected to add 150 or more peak hour trips. If a project does not add, but merely shifts trips at a given monitoring location, the CMP analysis is not required. City of Los Angeles LADOT is responsible for transportation issues within the City of Los Angeles. LADOT reviews the transportation/traffic studies prepared for projects of all types for which the City is the lead agency, in addition to other public agency projects (county, state, or federal) located within, or that may affect, the City. LADOT is also responsible for implementing the Los Angeles Municipal Code (LAMC) parking requirements (Section 12.21). 3J.3 Impacts and Mitigation Measures Methodology The analytic methodology (including evaluation of existing and future conditions) is discussed above in Environmental Setting starting on p. 3J.4 Criteria for Determining Significance LADOT has established specific threshold criteria that are used to determine if implementation of a project would result in a significant traffic impact. Using these criteria, a proposed project may result in a significant impact on intersection capacity if the estimated project traffic would increase the V/C ratio under one or more of the following conditions: V/C ratio increase is equal to or greater than and the final LOS (defined as projected future conditions including project, ambient, and related project growth but without project traffic mitigation) is C; V/C ratio increase is equal to or greater than and the final LOS is D; or V/C ratio increase is equal to or greater than and the final LOS is E or F. Occidental College Specific Plan 3J-10 ESA / D205278

11 Additionally, the proposed project may result in potentially significant impacts relating to traffic if it would: cause an increase in the project-related average daily traffic (ADT) on a residential street if the increases exceed the following project-related increases in ADT: cause a substantial increase in traffic in relation to the existing traffic load and capacity of the street system (for example, result in a substantial increase in either the number of vehicle trips, the V/C ratio on roads, or congestion at intersections); exceed, either individually or cumulatively, a LOS standard established by the county congestion management agency for designated roads or highways; result in inadequate parking capacity; and/or result in a cumulatively considerable impact with respect to traffic. Impact Discussion Future Traffic Projections Estimates of future traffic conditions both with and without the proposed project are necessary to evaluate the potential impact of the proposed project on the local street system. The cumulative case traffic scenario represents future traffic conditions without the addition of the proposed project, while the cumulative plus project scenario represents future traffic conditions with the development of the proposed project. Cumulative Base Traffic Projections The cumulative base traffic projections reflect growth in traffic over existing conditions from two sources. The first source is the ambient growth in traffic, which reflects increases in traffic due to regional growth and development. The second source is growth due to traffic generated by specific projects located within or in the vicinity of the study area. Table 3J-6 summarizes the results of the cumulative base traffic projections analysis. As shown in Table 3J-6, one of the six study intersections (Eagle Rock and York /Alumni Avenue) was projected to operate at LOS E during the PM peak hour under year 2025 cumulative base conditions. The remaining intersections are projected to operate at LOS D or better during both peak periods. Cumulative Plus Project Traffic Conditions Also, as shown in Table 3J-6, the proposed project traffic would not result in a V/C increase large enough to result in significant traffic impacts at any of the analyzed intersections during peak hour conditions for cumulative plus project traffic conditions. As such, the proposed development would not generate significant traffic impacts at any of the analyzed intersections under cumulative plus project conditions. Less than significant impacts would result and no mitigation measures are necessary. Occidental College Specific Plan 3J-11 ESA / D205278

12 Neighborhood Street Segment Traffic Impact Analysis Since the residential neighborhoods surrounding the campus are not expected to grow in coming years, the neighborhood street impact analysis was conducted by adding the projected incremental increase in Occidental College traffic to the existing daily volumes on the subject streets. Table 3J-7 summarizes the results of the neighborhood traffic impact analysis. Using the City s significance criteria, the proposed project would not significantly impact any of the ten analyzed segments, as shown in Table 3J-7. Less than significant impacts would result and no mitigation measures are necessary. However, if 232 parking spaces are constructed on BOS 28, significant neighborhood traffic impacts could occur (see below). Construction of an Underground Parking Structure at Building Opportunity Site 28 Although the construction of an underground parking structure with 232 parking spaces would not generate any traffic impacts to any of the analyzed intersections under cumulative plus project conditions, it could result in significant neighborhood traffic impacts along two analyzed (local) streets segments. The City s threshold for impacting a local street is that the impact is significant if project traffic would comprise more than 16% of final volumes when the total volume is 1,000 ADT or less. The project with the 232 space garage at BOS 28 would impact the following neighborhood street segments: Alumni Avenue between Avenue 46 and Campus Road (a potential increase in traffic of 349 cars or 49% of the trips on the segment), and Campus Road between York and Stratford Road (158 cars or 16.9% of the trips on the local street segment). This analysis is provided in Table 3J-8, below. If a parking structure were built, implementation of neighborhood traffic management measures would likely reduce the impacts on Alumni Avenue and Campus Road to less-than-significant impacts. However because Occidental College cannot unilaterally impose these measures, implementation of these neighborhood traffic management measures cannot be prescribed as mitigation measures. As a result, the impacts on Alumni Avenue and Campus Road would be significant and unavoidable. CMP Regional Arterial and Freeway Analysis The criteria for determining the study area for the CMP arterial monitoring intersections and for the freeway monitoring locations are: All CMP arterial monitoring intersections, including monitored freeway on- or off-ramp intersections, where the proposed project will add 50 or more trips during either the am or pm weekday peak hours (of adjacent street traffic) All mainline freeway monitoring locations where the project will add 150 or more trips, in either direction, during either the weekday AM or PM peak hours The nearest CMP monitoring intersection is located at Arroyo Parkway and California, and the nearest CMP freeway monitoring location is located at State Route 2 at Round Top Road. Based on the project trip generation, the proposed project is not expected to add more than 50 trips to any arterial monitoring locations. In addition, the project-related traffic in any direction during either peak hour at freeway monitoring locations is projected to be less than 150 vehicles per hour. Therefore, project impacts on the regional arterial and freeway system are determined to be insignificant and no further arterial or freeway CMP analysis is required. Occidental College Specific Plan 3J-12 ESA / D205278

13 TABLE 3J-6 FUTURE (YEAR 2028) INTERSECTION LEVEL OF SERVICE ANALYSIS Intersection Peak Hour Cumulative Base Cumulative Plus Project Project Increase in V/C Significant Project Impact 1. Campus Drive & Alumni Avenue b 2. Eagle Rock & Westdale Avenue a 3. Eagle Rock & Avenue Eagle Rock & York / Alumni Avenue a 5. Avenue 46 & York 6. Armadale Avenue & York AM A A No PM A A No AM A A No PM A A No AM A A No PM A A No 0 D 0 D 0 No PM E E No AM D D No PM E E No AM C D No PM D D No a b Intersection is operating under ATSAC system under the existing condition. Stop-controlled intersection analysis was performed using the CMA methodology and a reduced capacity of 1,200 vehicles per hour per lane. SOURCE: Fehr & Peers/Kaku Associates, Occidental College Specific Plan 3J-13 ESA /

14 TABLE 3J-7 NEIGHBORHOOD STREET SEGMENT ANALYSIS Location Classification a Existing ADT (2006) b Project- Related Increase in ADT Existing Plus Project ADT (Final ADT) Project Percent of Final ADT Significant Impact c 1. Westdale Avenue between Woodrow Avenue and Campus Road Collector 4, ,921 10% No d 2. Corliss Street between Avenue 46 and Campus Road Local % No 3. Paulhan Avenue between Avenue 46 and Campus Road Local % No 4. Alumni Avenue between York and Campus Road Local % No 5. Hazelwood Avenue between York and Campus Road Local % No 6. Avenue 47 between York and Campus Road Local % No 7. Munson Avenue between York and Campus Road Local % No 8. Armadale Avenue between York and Campus Road Collector 1, ,129 9% No d 9. Campus Road between York and Stratford Road Local % No 10. Eaton Street, west of Avenue 51 Local % No a Street classification per City of Los Angeles General Plan. b ADT counts conducted on Monday, October 9, c City of Los Angeles significance criteria for local residential streets (per Traffic Study Policies and Procedures, LADOT, March 2002): Final ADT Project-Related Increase Less than 1,000 16% or more of Final ADT 1,000 or more 12% or more of Final ADT 2,000 or more 10% or more of Final ADT d 3,000 or more 8% or more of Final ADT Significance criteria applies to local residential streets not collectors. ADT = Average Daily Traffic SOURCE: Fehr & Peers/Kaku Associates, Occidental College Specific Plan 3J-14 ESA / D205278

15 TABLE 3J-8 NEIGHBORHOOD STREET SEGMENT ANALYSIS WITH 232 UNDERGOUND PARKING SPACES IN BUILDING OPPORTUNITY SITE 28 Location Classification a Existing ADT (2006) b Project- Related Increase in ADT Existing Plus Project ADT (Final ADT) Project Percent of Final ADT Significant Impact c 11. Westdale Avenue between Woodrow Avenue and Campus Road Collector 4, ,572 4% No d 12. Corliss Street between Avenue 46 and Campus Road Local % No 13. Paulhan Avenue between Avenue 46 and Campus Road Local % No 14. Alumni Avenue between York and Campus Road Local % Yes 15. Hazelwood Avenue between York and Campus Road Local % No 16. Avenue 47 between York and Campus Road Local % No 17. Munson Avenue between York and Campus Road Local % No 18. Armadale Avenue between York and Campus Road Collector 1, ,253 18% No d 19. Campus Road between York and Stratford Road Local % Yes 20. Eaton Street, west of Avenue 51 Local % No a Street classification per City of Los Angeles General Plan. b ADT counts conducted on Monday, October 9, c City of Los Angeles significance criteria for local residential streets (per Traffic Study Policies and Procedures, LADOT, March 2002): Final ADT Project-Related Increase Less than 1,000 16% or more of Final ADT 1,000 or more 12% or more of Final ADT 2,000 or more 10% or more of Final ADT d 3,000 or more 8% or more of Final ADT Significance criteria applies to local residential streets. ADT = Average Daily Traffic SOURCE: Fehr & Peers/Kaku Associates, Occidental College Specific Plan 3J-15 ESA / D205278

16 Parking Impact Analysis The proposed Specific Plan determined that there are currently more parking spaces serving the Occidental College campus than necessary to satisfy the campus parking demand. The Specific Plan proposes to remove 390 excess parking spaces on the campus to extend walkways and improve landscaping, and to create a pedestrian zone at the core of the campus. The spaces would be removed in two steps: 282 spaces would be removed in the near future and the remaining 108 spaces would be removed over the 20-year period of the Specific Plan. The Specific Plan proposes a parking monitoring strategy to ensure that the spaces to be removed are in fact excess, with excess defined as spaces in excess of the campus demand plus a 10 percent contingency/circulation cushion. Subsequently, if no excess of on-street and on-campus parking spaces remain, as determined by continuous parking monitoring, the 390 parking spaces proposed to be removed would not be removed. Implementation of Measure 3J.2 would ensure that parking is not removed if it is not excess parking, thereby reducing the potential for insufficient parking to a less than significant impact. Campus Parking Demand Projections The parking analysis for the proposed project was conducted using customized parking demand rates established for Occidental College. A parking model based on campus utilization surveys conducted in August (out of session) and October (in session) 2006 found that the peak academic parking demand rate for Occidental College is approximately 0.61 spaces per enrolled student. The estimated current and projected future campus parking demands and supplies are shown in Table 3J-9. Existing Parking Supply A total of 1,371 spaces are currently provided on the campus (including spaces temporarily closed due to construction of the new student residence hall); this number rises to 1,576 with opening of the new Rangeview Residence Hall. An estimated 157 on-street parking spaces fronting the campus side of Campus Road are considered to be available for use by campus students, faculty/staff and visitors. Thus, a total of 1,528 existing parking spaces are available for college-related activities (rising to 1,733 with opening of the new student Residence Hall). Existing Parking Demand As shown in Table 3J-9, the observed peak on-campus parking demand was 952 occupied spaces. The on-street parking demand generated by the college was derived from the differences between August and October surveys, which represent out of- and in-session respectively. At the campus peak time of 11 AM to 12 PM, the difference in on-street parking utilization between the August and October surveys that was attributed to campus-generated demands was 113 occupied spaces. The results of the parking utilization surveys indicate that the estimated peak parking demand generated by the Occidental College campus is approximately 1,065 spaces at about 11 AM. Occidental College Specific Plan 3J-16 ESA /

17 TABLE 3J-9 ACADEMIC PARKING SUPPLY/DEMAND ANALYSIS Proposed Specific Plan Traffic Study a Parking Demand (Spaces) Existing Peak On-Campus Demand (includes general spaces and spaces reserved for faculty, students, visitors) 1, d Existing Peak On-Street Parking Demand generated by Occidental College N/A 113 e Existing Total Peak Parking Demand 1,078 1,065 Increase in Parking Demand due to Growth (Additional 250 Students b ) N/A 152 Contingency: Additional 10% Over Demand Existing Facilities Spaces Included 63 Total Estimated Parking Need 1,186 1,402 Parking Supply (Spaces) Existing On-Campus Parking Supply 1,371 1,371 Proposed New Student Residence Hall Subtotal On-Campus 1,576 1,576 Existing On-Street Parking Supply c n/a 157 Total Baseline Supply 1,576 1,733 Parking Removal (390) (390) Estimated Campus-Serving Parking Supply After Removals 1,186 g 1,343 g Parking Surplus / (Shortfall) 0 (59) a Based on utilization surveys conducted in October, b Parking demand estimated based on empirical rate of 0.61 spaces per enrolled student derived from on- and off-campus parking survey in October c On-Street spaces located on Campus Road immediately fronting the campus. d Based on on-campus parking survey in October e On-street parking demand generated by Occidental College was estimated by comparing results from August 2006 out of session parking survey and October 2006 in session survey f Parking removals would not occur unless it is determined through ongoing monitoring of the parking system that the spaces to be removed are excess spaces beyond the established campus parking demand plus 10 percent. SOURCE: Fehr & Peers/Kaku Associates, Projected Parking Demands at Specific Plan Build-out Although the Specific Plan does not increase the current cap of 2,000 students enrolled at the campus, the 2007 approximately 1,750 enrolled students on campus could potentially increase to the 2,000 student cap during the Specific Plan period, an increase of about 250 enrolled students. It is estimated that the campus could generate a peak demand for 1,217 spaces. Including an additional 10 percent for circulation contingency plus the 63 existing spaces for facilities, the campus would need a total of approximately 1,402 spaces at proposed project build-out. Parking Supply at Specific Plan Build-out The new Rangeview student residence hall provides an additional 205 parking spaces. The majority of the future residents of the new residence hall would be students who currently live on Occidental College Specific Plan 3J-17 ESA /

18 campus. Thus, the residence hall would not generate any additional traffic or parking demand (Traffic Study for the Occidental College Student Residence Conditional Use Permit, Kaku Associates, Inc., June 2005). Completion of the residence hall increases the total supply of parking serving the Occidental College campus to about 1,733 spaces. The Specific Plan proposes to remove a total of 390 parking spaces for landscape and pedestrian improvements. With these removals, a total of 1,343 parking spaces would be available in oncampus parking facilities and on-street spaces immediately adjacent to the campus. Comparison of Projected Demand to Proposed Supply As Table 3J-9 illustrates, there could be a projected shortage of approximately 59 parking spaces. The Specific Plan parking strategy, however, is self-mitigating since the Specific Plan provides that the long-term Stage 2 parking removals would not occur unless it is determined through ongoing monitoring of the parking system that the spaces to be removed are excess spaces beyond the established campus parking demand plus 10 percent. Therefore, the projected shortfall would not result in a parking impact since the spaces would not be removed if the need could not be accommodated. Implementation of Measure 3J.2 would further ensure that parking that is needed would not be removed. To ensure that the spaces would not be needed, however, the monitoring system should not only include annual utilization surveys of the campus but should also consider campus-generated onstreet demands and should allow for the possibility of an increase in demand if the number of enrolled students at the time of the survey is below the 2,000 student cap. The estimated 59-space shortfall represents only about 4 percent of the projected total future need of 1,402 spaces. If the College were to be successful in reducing demands over time via implementation of transportation demand management (TDM) and/or demand reduction measures, it appears possible that the ongoing monitoring could ultimately allow removal of many of the spaces identified in the Specific Plan. Thus, with implementation of Mitigation Measure 3J.1 and Mitigation Measure 3J.2 and the proposed development of pedestrian walkways, parking issues would be a less than significant impact. During special events, such as graduation ceremonies, large athletic events, weddings, and concerts, on-campus parking is utilized. The traffic study (Fehr & Peers, 2007) indicates that its information was based on typical Average Vehicle Occupancy (AVO) for related uses, which estimate approximately 2.5 persons per vehicle for performing arts theaters and 3.0 persons per vehicle for athletic events. The largest events include Occidental College commencement (1,430 vehicles at 3.5 AVO), Eagle Rock High School graduation (1,290 vehicles at 3.5 AVO), football games (870 vehicles at 3.0 AVO), Eagle Rock relays track meet (1,000 vehicles at 3.0 AVO), and the Oxy Invitational track meet (330 vehicles at 3.0 AVO). Assuming an AVO of 1.5 to 2.5 for conference/seminars and AVOs of 2.5 to 3.0 for large events such as a capacity event in Rush Gymnasium or at Bird Theater, there would be insufficient parking available. Implementation of Mitigation Measure 3J.3 would reduce impacts related to insufficient parking during large events to a less-than-significant impact. Occidental College Specific Plan 3J-18 ESA /

19 Site Access Main Campus Access Vehicular access into and out of the Occidental College campus during the proposed project implementation would continue to be obtained via the existing driveways located along Campus Road. Faculty/Staff Multi-Family Housing Access Access to the faculty/staff multi-family housing proposed for development on the eastern side of the campus would be via a new driveway connecting to Townsend Avenue. The proposed new driveway onto Townsend Avenue serving the multifamily housing would intersect Townsend Avenue on the outside of a curve at the crest of the hill. Implementation of Mitigation Measure 3J.4 would configure and control this intersection. With proposed stop signs and re-striping of Townsend Avenue, the stop-controlled movements on the driveway approach are projected to operate at LOS C during the AM peak hour and LOS B during the PM peak hour, while the through movements on Townsend Avenue would be uncontrolled. Furthermore, in addition to field observations indicating that vehicles approaching on Townsend Avenue would be visible, there would be no increase in hazards due to its design features and less than significant impacts would result. Faculty/Staff Single-Family Housing Access The Specific Plan indicates that the proposed faculty/staff single-family housing would be accessed via individual driveways directly onto Townsend Avenue. These driveways would be onto the steep portion of the hill on Townsend Avenue in an area that currently has no side access and no on-street parking. However, with the implementation of Mitigation Measure 3J.5 less than significant impacts would occur. Mitigation Measures The following measures shall apply to the proposed project to reduce traffic and circulation impacts: Measure 3J.1: Transportation Demand Management. To reduce the demand for parking to minimal possible levels, to the greatest extent feasible the following Transportation Demand Management measures shall be implemented: Education. Occidental College shall provide education and awareness training and materials to students and employees regarding the TDM program, availability of transit, alternatives to single occupancy vehicles (SOV) and the motivation for participating in the TDM program. o Post in areas on campus information for students about MTA (B-TAP, EZ, and student) passes, transit routes and times, and information on alternative transportation and commuting options. Commuting Alternatives. Occidental College shall support alternatives to commuting and shall support transit, biking, walking, carpooling and vanpooling. Occidental College Specific Plan 3J-19 ESA /

20 Staff Trip reduction. For employees, Occidental College shall subsidize MTA passes (B-TAP or EZ Pass) and/or provide other compensation, prizes, or awards to ride-sharers, and shall provide guaranteed rides home. Provide adequate, secure bike racks and showers for those using bicycles. Occidental College shall provide preferential parking to high occupancy vehicles and shuttle services. Also, Occidental College shall designate ample car pool and/or van pool parking to more than meet demand. Occidental College shall follow applicable City of Los Angeles TDM regulations (LAMC J3). Measure 3J.2: Long-term Stage 2 parking removals shall not occur unless it is determined through ongoing monitoring of the parking system that the parking spaces to be removed are excess spaces beyond the established campus parking demand plus 10 percent. Therefore, the projected shortfall would not result in a parking impact since the spaces would not be removed if the need could not be accommodated. To ensure that the spaces would not be needed, however, the monitoring system should not only include annual utilization surveys of the campus but should also consider campus-generated onstreet demands and should allow for the possibility of increased demands if the number of enrolled students at the time of the survey is below the 2,000 student cap. Measure 3J.3: During special events, Occidental College shall adopt all of the following measures: Develop and implement a special event management plan for the largest events such as commencement, whereby arrangements are made to ensure that utilization of all available spaces on campus is maximized, to encourage carpooling, and to park attendees on surrounding streets. Parking attendees at remote locations with connecting shuttle service could also be considered for the largest events. Develop and implement a special event management plan for weeknight and weekend events to ensure that utilization of all available spaces on campus is maximized and, if necessary, restrict attendance. The special event management plan for weeknight and weekend events shall address potential options such as valet parking, and/or arrangements for the use of parking lots off-campus and the use of shuttle service from off-campus locations to events. Limit daytime events to the size supported by the available parking capacity. Measure 3J.4: Occidental College shall implement one of the following mitigation measures: a. The Occidental College shall control the multi-family faculty/staff housing driveway approach to Townsend Avenue with a stop sign and re-stripe Townsend Avenue to provide a left-turn storage pocket. With this control, the stopcontrolled movements on the driveway approach are projected to operate at LOS C during the AM peak hour and LOS B during the PM peak hour, while the through movements on Townsend Avenue would be uncontrolled. - or - Occidental College Specific Plan 3J-20 ESA /

21 b. Occidental College shall install stop-signs controlling all three following approaches (i.e., the two Townsend Avenue approaches as well as the driveway approach). This would be similar to other existing intersections along Townsend Avenue, such as Townsend Avenue/Avenue 51 to the southeast and Townsend Avenue/Grove Drive to the north and would be consistent with Townsend Avenue s classification in the City of Los Angeles General Plan as a collector street. With all-way stop control, a left-turn pocket would not be necessary on Townsend Avenue. With this control, the intersection is projected to operate at LOS B during both the AM and PM peak hours. Measure 3J.5: The driveways near faculty/staff single-family housing shall be designed with off-street turnaround capability located between the vehicle parking area and the street so that the potential for backing maneuvers onto Townsend Avenue is minimized. In addition, sufficient off-street parking area should be provided at each residence (not including the turnaround area) for both resident and guest vehicles, since on-street parking is prohibited on the Townsend Avenue grade. Measure 3J.6: If 232 parking spaces are developed on BOS 28, Occidental College shall work with LADOT and the neighboring community to implement a Neighborhood Traffic Management Plan that shall include traffic calming measures. If the neighbors agree that these solutions are workable, the improvement(s) would be installed on a trial basis. Once the improvements have been in place for a sufficient trial (usually six months), and the neighbors approve, the improvements would be installed permanently. Although this measure is feasible, Occidental College cannot unilaterally impose these measures, and the measure cannot be assured, therefore this EIR considers the impact on two neighborhood streets to remain significant and unavoidable if BOS 28 is developed with 232 parking spaces. 3J.4 Cumulative Impacts As described above, the proposed project would not generate significant traffic impacts under cumulative traffic conditions. 3J.5 Significance after Mitigation Less than significant impacts would occur to parking and street intersections due to proposed project implementation. If 232 parking spaces were constructed on BOS 28, the impact to two local street segments (Alumni Avenue between York and Campus Road and Campus Road between York and Stratford Road) would remain significant. Occidental College Specific Plan 3J-21 ESA /

2. Valley Circle Boulevard/Andora Avenue/Baden Avenue and Lassen Street

2. Valley Circle Boulevard/Andora Avenue/Baden Avenue and Lassen Street IV.J TRANSPORTATION 1. INTRODUCTION This section presents an overview of the existing traffic and circulation system in and surrounding the project site. This section also discusses the potential impacts

More information

APPENDIX B Traffic Analysis

APPENDIX B Traffic Analysis APPENDIX B Traffic Analysis Rim of the World Unified School District Reconfiguration Prepared for: Rim of the World School District 27315 North Bay Road, Blue Jay, CA 92317 Prepared by: 400 Oceangate,

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS N. TRANSPORTATION AND TRAFFIC

IV. ENVIRONMENTAL IMPACT ANALYSIS N. TRANSPORTATION AND TRAFFIC IV. ENVIRONMENTAL IMPACT ANALYSIS N. TRANSPORTATION AND TRAFFIC The following section summarizes the information provided in the traffic report entitled Traffic Impact Analysis for a Proposed Residential

More information

Traffic Impact Analysis 5742 BEACH BOULEVARD MIXED USE PROJECT

Traffic Impact Analysis 5742 BEACH BOULEVARD MIXED USE PROJECT Traffic Impact Analysis 5742 BEACH BOULEVARD MIXED USE PROJECT CITY OF BUENA PARK Prepared by Project No. 14139 000 April 17 th, 2015 DKS Associates Jeffrey Heald, P.E. Rohit Itadkar, T.E. 2677 North Main

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS K.2. PARKING

IV. ENVIRONMENTAL IMPACT ANALYSIS K.2. PARKING IV. ENVIRONMENTAL IMPACT ANALYSIS K.2. PARKING ENVIRONMENTAL SETTING The following analysis summarizes the findings and conclusions of the Traffic Analysis (Traffic Study), prepared by The Mobility Group,

More information

Appendix Q Traffic Study

Appendix Q Traffic Study Appendices Appendix Q Traffic Study Crummer Site Subdivision Draft EIR City of Malibu Appendices This page intentionally left blank. The Planning Center April 2013 TRAFFIC IMPACT ANALYSIS Photo z here

More information

TRANSPORTATION STUDY FOR THE 8899 BEVERLY BOULEVARD PROJECT

TRANSPORTATION STUDY FOR THE 8899 BEVERLY BOULEVARD PROJECT DRAFT TRANSPORTATION STUDY FOR THE 8899 BEVERLY BOULEVARD PROJECT WEST HOLLYWOOD, CALIFORNIA NOVEMBER 2013 PREPARED FOR BEVERLY BOULEVARD ASSOCIATION PREPARED BY DRAFT TRANSPORTATION STUDY FOR THE 8899

More information

IRSCH REEN Hirsch/Green Transportation Consulting, Inc.

IRSCH REEN Hirsch/Green Transportation Consulting, Inc. IRSCH REEN Hirsch/Green Transportation Consulting, Inc. February 6, 2013 Mr. David Weil Director of Finance St. Matthew s Parish School 1031 Bienveneda Avenue Pacific Palisades, California 90272 RE: Trip

More information

Table Existing Traffic Conditions for Arterial Segments along Construction Access Route. Daily

Table Existing Traffic Conditions for Arterial Segments along Construction Access Route. Daily 5.8 TRAFFIC, ACCESS, AND CIRCULATION This section describes existing traffic conditions in the project area; summarizes applicable regulations; and analyzes the potential traffic, access, and circulation

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS J. TRANSPORTATION AND TRAFFIC

IV. ENVIRONMENTAL IMPACT ANALYSIS J. TRANSPORTATION AND TRAFFIC IV. ENVIRONMENTAL IMPACT ANALYSIS J. TRANSPORTATION AND TRAFFIC This Section summarizes the information provided in the Traffic Study for the Santa Monica College Bundy Campus Master Plan (Traffic Study),

More information

Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT

Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT Escondido Marriott Hotel and Mixed-Use Condominium Project TRAFFIC IMPACT ANALYSIS REPORT Prepared for Phelps Program Management 420 Sixth Avenue, Greeley, CO 80632 Prepared by 5050 Avenida Encinas, Suite

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS L. TRANSPORTATION/TRAFFIC

IV. ENVIRONMENTAL IMPACT ANALYSIS L. TRANSPORTATION/TRAFFIC IV. ENVIRONMENTAL IMPACT ANALYSIS L. TRANSPORTATION/TRAFFIC INTRODUCTION The following section summarizes the information provided in the traffic report entitled Traffic Impact Analysis for a Proposed

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS B. TRAFFIC AND CIRCULATION

IV. ENVIRONMENTAL IMPACT ANALYSIS B. TRAFFIC AND CIRCULATION IV. ENVIRONMENTAL IMPACT ANALYSIS B. TRAFFIC AND CIRCULATION 1. INTRODUCTION This section is based on the technical report, Traffic Study for 10131 Constellation Boulevard Residential Project, prepared

More information

Appendix G Traffic and Parking Report

Appendix G Traffic and Parking Report Appendix G Traffic and Parking Report TABLE OF CONTENTS SECTION PAGE Executive Summary... v 1.0 Introduction... 1 1.1 Study Area... 3 2.0 Project Description... 4 2.1 Site Location... 4 2.2 Existing Project

More information

3.8 TRANSPORTATION, CIRCULATION AND PARKING

3.8 TRANSPORTATION, CIRCULATION AND PARKING 3.8 TRANSPORTATION, CIRCULATION AND PARKING This section provides an overview of traffic, circulation and parking impacts and evaluates the construction and operational impacts associated with the Proposed

More information

The major roadways in the study area are State Route 166 and State Route 33, which are shown on Figure 1-1 and described below:

The major roadways in the study area are State Route 166 and State Route 33, which are shown on Figure 1-1 and described below: 3.5 TRAFFIC AND CIRCULATION 3.5.1 Existing Conditions 3.5.1.1 Street Network DRAFT ENVIRONMENTAL IMPACT REPORT The major roadways in the study area are State Route 166 and State Route 33, which are shown

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS C. TRAFFIC, CIRCULATION AND PARKING

IV. ENVIRONMENTAL IMPACT ANALYSIS C. TRAFFIC, CIRCULATION AND PARKING IV. ENVIRONMENTAL IMPACT ANALYSIS C. TRAFFIC, CIRCULATION AND PARKING 1. INTRODUCTION This section is based on the technical report Traffic Study for the Villa Marina Residential Project, prepared by Kaku

More information

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS TRAFFIC IMPACT STUDY FEBRUARY 214 OA Project No. 213-542 TABLE OF CONTENTS 1. INTRODUCTION...

More information

Los Angeles Mission College Facilities Master Plan Draft Program Environmental Impact Report 3.13 TRANSPORTATION / TRAFFIC

Los Angeles Mission College Facilities Master Plan Draft Program Environmental Impact Report 3.13 TRANSPORTATION / TRAFFIC 3.13 TRANSPORTATION / TRAFFIC As a result of the analysis undertaken in the Initial Study for the Los Angeles Mission College Facilities Master Plan, the (LACCD) determined that the proposed project may

More information

Traffic Impact Analysis for 2171 Rosecrans Avenue

Traffic Impact Analysis for 2171 Rosecrans Avenue Traffic Impact Analysis for 2171 Rosecrans Avenue Prepared for: Continental Development Corporation Revised May 2016 LA16-2831 Prepared by: Fehr & Peers 600 Wilshire Blvd, Suite 1050 Los Angeles, CA 90017

More information

APPENDIX VMT Evaluation

APPENDIX VMT Evaluation APPENDIX 2.7-2 VMT Evaluation MEMORANDUM To: From: Mr. Jonathan Frankel New Urban West, Incorporated Chris Mendiara LLG, Engineers Date: May 19, 2017 LLG Ref: 3-16-2614 Subject: Villages VMT Evaluation

More information

RE: A Traffic Impact Statement for a proposed development on Quinpool Road

RE: A Traffic Impact Statement for a proposed development on Quinpool Road James J. Copeland, P.Eng. GRIFFIN transportation group inc. 30 Bonny View Drive Fall River, NS B2T 1R2 May 31, 2018 Ellen O Hara, P.Eng. Project Engineer DesignPoint Engineering & Surveying Ltd. 200 Waterfront

More information

Oakbrook Village Plaza City of Laguna Hills

Oakbrook Village Plaza City of Laguna Hills Oakbrook Village Plaza City of Laguna Hills Traffic Impact Analysis Prepared by: HDR Engineering 3230 El Camino Real, Suite 200 Irvine, CA 92602 October 2012 Revision 3 D-1 Oakbrook Village Plaza Laguna

More information

Section 5.8 Transportation and Traffic

Section 5.8 Transportation and Traffic Section 5.8 Transportation and Traffic 5.8 TRANSPORTATION AND TRAFFIC Generous This Section is based on the Topgolf Specific Plan Traffic Impact Analysis (RK Engineering Group, Inc., October 31, 2016);

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS C. TRAFFIC CIRCULATION AND PARKING

IV. ENVIRONMENTAL IMPACT ANALYSIS C. TRAFFIC CIRCULATION AND PARKING IV. ENVIRONMENTAL IMPACT ANALYSIS C. TRAFFIC CIRCULATION AND PARKING 1. INTRODUCTION This section is based on the technical report Traffic Impact Study Health Sciences Campus Project, City of Los Angeles,

More information

TABLE OF CONTENTS SECTION PAGE. Executive Summary... xii

TABLE OF CONTENTS SECTION PAGE. Executive Summary... xii TABLE OF CONTENTS SECTION PAGE Executive Summary... xii 1.0 Introduction... 1 1.1 Study Area... 2 1.2 Traffic Impact Analysis Scenarios... 4 1.3 Study Area - City of Orange... 4 2.0 Project Description

More information

Appendix C. Traffic Study

Appendix C. Traffic Study Appendix C Traffic Study TABLE OF CONTENTS SECTION Executive Summary PAGE 1.0 Introduction... 1 1.1 Scope of Work... 1 1.2 Study Area... 2 2.0 Project Description... 3 2.1 Site Access... 4 2.2 Pedestrian

More information

Alpine Highway to North County Boulevard Connector Study

Alpine Highway to North County Boulevard Connector Study Alpine Highway to North County Boulevard Connector Study prepared by Avenue Consultants March 16, 2017 North County Boulevard Connector Study March 16, 2017 Table of Contents 1 Summary of Findings... 1

More information

TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY Prepared for:

TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY Prepared for: TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY 2014 Prepared for: Hartford Companies 1218 W. Ash Street Suite A Windsor, Co 80550 Prepared by: DELICH ASSOCIATES 2272 Glen Haven Drive

More information

Appendix C. Traffic Impact Study

Appendix C. Traffic Impact Study Appendix C Traffic Impact Study TRAFFIC STUDY FOR THE EAGLE ROCK AGGREGATE TERMINAL Prepared by: FEHR & PEERS 201 Santa Monica Blvd. Suite 500 Santa Monica, CA 90401-2213 T. (310) 458-9916 F. (310) 394-7663

More information

Downtown Lee s Summit Parking Study

Downtown Lee s Summit Parking Study Downtown Lee s Summit Parking Study As part of the Downtown Lee s Summit Master Plan, a downtown parking and traffic study was completed by TranSystems Corporation in November 2003. The parking analysis

More information

2.0 Development Driveways. Movin Out June 2017

2.0 Development Driveways. Movin Out June 2017 Movin Out June 2017 1.0 Introduction The proposed Movin Out development is a mixed use development in the northeast quadrant of the intersection of West Broadway and Fayette Avenue in the City of Madison.

More information

TRANSPORTATION 1. INTRODUCTION

TRANSPORTATION 1. INTRODUCTION IV.F TRANSPORTATION 1. INTRODUCTION This section evaluates potential impacts associated with Project-related traffic, circulation, and access. The analysis summarizes the findings of the traffic study

More information

Volume 1 Traffic Impact Analysis Turtle Creek Boulevard Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas.

Volume 1 Traffic Impact Analysis Turtle Creek Boulevard Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas. Volume 1 Traffic Impact Analysis 2727 Dallas, Texas June 18, 2018 Kimley-Horn and Associates, Inc. Dallas, Texas Project #064523000 Registered Firm F-928 Traffic Impact Analysis 2727 Dallas, Texas Prepared

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS M. TRANSPORTATION AND TRAFFIC

IV. ENVIRONMENTAL IMPACT ANALYSIS M. TRANSPORTATION AND TRAFFIC IV. ENVIRONMENTAL IMPACT ANALYSIS M. TRANSPORTATION AND TRAFFIC INTRODUCTION This section of the (Draft EIR) addresses the subject of traffic and transportation with respect to the proposed (Project or

More information

BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: Barrhaven Fellowship CRC 3058 Jockvale Road Ottawa, ON K2J 2W7 December 7, 2016 116-649 Report_1.doc D. J.

More information

ZINFANDEL LANE / SILVERADO TRAIL INTERSECTION TRAFFIC ANALYSIS

ZINFANDEL LANE / SILVERADO TRAIL INTERSECTION TRAFFIC ANALYSIS ZINFANDEL LANE / SILVERADO TRAIL INTERSECTION TRAFFIC ANALYSIS UPDATED TRAFFIC STUDY FOR THE PROPOSED RAYMOND VINEYARDS WINERY USE PERMIT MODIFICATION #P11-00156 AUGUST 5, 2014 PREPARED BY: OMNI-MEANS,

More information

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project.

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project. EXECUTIVE SUMMARY This study addresses the traffic impacts associated with the proposed Shopko redevelopment located in Sugarhouse, Utah. The Shopko redevelopment project is located between 1300 East and

More information

5.9 TRANSPORTATION AND TRAFFIC

5.9 TRANSPORTATION AND TRAFFIC 5.9 TRANSPORTATION AND TRAFFIC This section evaluates transportation- and traffic-related impacts that have the potential to result from the construction and operation of the Project. Information and analysis

More information

Lacey Gateway Residential Phase 1

Lacey Gateway Residential Phase 1 Lacey Gateway Residential Phase Transportation Impact Study April 23, 203 Prepared for: Gateway 850 LLC 5 Lake Bellevue Drive Suite 02 Bellevue, WA 98005 Prepared by: TENW Transportation Engineering West

More information

Existing Traffic Conditions

Existing Traffic Conditions May 14, 2014 Ms. Lorraine Weiss City of San Mateo 330 West 20 th Avenue San Mateo, CA 94403 Subject: Traffic Operational Study for the Proposed Tilton Avenue Residential Development in San Mateo, California

More information

TRANSPORTATION 1. INTRODUCTION 2. METHODOLOGY

TRANSPORTATION 1. INTRODUCTION 2. METHODOLOGY IV.K TRANSPORTATION 1. INTRODUCTION This section provides an analysis of potential impacts associated with traffic, parking, and access. The analysis provides an overview of existing traffic conditions

More information

San Rafael Civic Center Station Area Plan May 2012 DRAFT FOR PUBLIC REVIEW

San Rafael Civic Center Station Area Plan May 2012 DRAFT FOR PUBLIC REVIEW CHAPTER 4. PARKING Parking has been identified as a key concern among neighbors and employers in the area, both in terms of increased demand from potential new development and from SMART passengers that

More information

Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois

Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois Submitted by April 9, 2009 Introduction Kenig, Lindgren, O Hara, Aboona,

More information

The key roadways in the project vicinity are described below. Exhibit displays the existing number of lanes on the study roadways.

The key roadways in the project vicinity are described below. Exhibit displays the existing number of lanes on the study roadways. 4.2 TRAFFIC AND CIRCULATION This section presents the key assumptions, methods, and results of analysis for the transportation and circulation impacts of the proposed project. This section is based on

More information

APPENDIX C-2. Traffic Study Supplemental Analysis Memo

APPENDIX C-2. Traffic Study Supplemental Analysis Memo APPENDIX C-2 Traffic Study Supplemental Analysis Memo The Mobility Group Transportation Strategies & Solutions Memorandum To: From: Subject: Tomas Carranza, LADOT Matthew Simons Traffic Review - Revised

More information

Traffic Impact Study Speedway Gas Station Redevelopment

Traffic Impact Study Speedway Gas Station Redevelopment Traffic Impact Study Speedway Gas Station Redevelopment Warrenville, Illinois Prepared For: Prepared By: April 11, 2018 Table of Contents 1. Introduction... 1 2. Existing Conditions... 4 Site Location...

More information

King Soopers #116 Thornton, Colorado

King Soopers #116 Thornton, Colorado Traffic Impact Study King Soopers #116 Thornton, Colorado Prepared for: Galloway & Company, Inc. T R A F F I C I M P A C T S T U D Y King Soopers #116 Thornton, Colorado Prepared for Galloway & Company

More information

Quantitative analyses of weekday a.m. and p.m. commuter hour conditions have been conducted for the following five scenarios:

Quantitative analyses of weekday a.m. and p.m. commuter hour conditions have been conducted for the following five scenarios: 6.1 TRANSPORTATION AND CIRCULATION 6.1.1 INTRODUCTION This section of the EIR presents the results of TJKM s traffic impact analysis of the proposed Greenbriar Development. The analysis includes consideration

More information

BERKELEY DOWNTOWN AREA PLAN PROGRAM ENVIRONMENTAL IMPACT REPORT TRAFFIC IMPACT ANALYSIS

BERKELEY DOWNTOWN AREA PLAN PROGRAM ENVIRONMENTAL IMPACT REPORT TRAFFIC IMPACT ANALYSIS BERKELEY DOWNTOWN AREA PLAN PROGRAM ENVIRONMENTAL IMPACT REPORT TRAFFIC IMPACT ANALYSIS Prepared for: City of Berkeley Prepared by: REVISED JANUARY 9, 2009 Berkeley Downtown Area Plan Program EIR Traffic

More information

Traffic Engineering Study

Traffic Engineering Study Traffic Engineering Study Bellaire Boulevard Prepared For: International Management District Technical Services, Inc. Texas Registered Engineering Firm F-3580 November 2009 Executive Summary has been requested

More information

ENVIRONMENTAL IMPACT ANALYSIS D. TRANSPORTATION AND CIRCULATION 1. INTRODUCTION

ENVIRONMENTAL IMPACT ANALYSIS D. TRANSPORTATION AND CIRCULATION 1. INTRODUCTION IV. ENVIRONMENTAL IMPACT ANALYSIS 1. INTRODUCTION This section is based on a traffic and parking impact study that was prepared for the proposed CSMC West Tower Project by Linscott, Law & Greenspan, Engineers,

More information

TRAFFIC IMPACT STUDY FOR SONIC DRIVE-IN RESTAURANT. Vallejo, CA. Prepared For:

TRAFFIC IMPACT STUDY FOR SONIC DRIVE-IN RESTAURANT. Vallejo, CA. Prepared For: TRAFFIC IMPACT STUDY FOR SONIC DRIVE-IN RESTAURANT Vallejo, CA Prepared For: ELITE DRIVE-INS, INC. 2190 Meridian Park Blvd, Suite G Concord, CA 94520 Prepared By: KD Anderson & Associates 3853 Taylor Road,

More information

West Hills Shopping Centre Lowe s Expansion Traffic Impact Study

West Hills Shopping Centre Lowe s Expansion Traffic Impact Study West Hills Shopping Centre Lowe s Expansion Traffic Impact Study Prepared for: Armel Corporation January 2015 Paradigm Transportation Solutions Ltd. 22 King Street South, Suite 300 Waterloo ON N2J 1N8

More information

INDUSTRIAL DEVELOPMENT

INDUSTRIAL DEVELOPMENT INDUSTRIAL DEVELOPMENT Traffic Impact Study Plainfield, Illinois August 2018 Prepared for: Seefried Industrial Properties, Inc. TABLE OF CONTENTS Executive Summary 2 Introduction 3 Existing Conditions

More information

Section 5.0 Traffic Information

Section 5.0 Traffic Information Section 5.0 Traffic Information 10.0 TRANSPORTATION MDM Transportation Consultants, Inc. (MDM) has prepared an evaluation of transportation impacts for the proposed evaluation for the expansion of the

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS H. TRANSPORTATION/TRAFFIC

IV. ENVIRONMENTAL IMPACT ANALYSIS H. TRANSPORTATION/TRAFFIC IV. ENVIRONMENTAL IMPACT ANALYSIS H. TRANSPORTATION/TRAFFIC The following summarizes the information provided in the traffic report prepared by Fehr & Peers/Kaku Associates entitled, Traffic Study for

More information

Ingraham High School Parking and Traffic Analysis

Ingraham High School Parking and Traffic Analysis Parking and Traffic Analysis Seattle, WA Prepared for: URS Corporation 1501 4th Avenue, Suite 1400 Seattle, WA 98101-1616 Mirai Transportation Planning & Engineering 11410 NE 122nd Way, Suite 320 Kirkland,

More information

THE CORNERSTONE APARTMENTS TRAFFIC IMPACT STUDY R&M PROJECT NO

THE CORNERSTONE APARTMENTS TRAFFIC IMPACT STUDY R&M PROJECT NO THE CORNERSTONE APARTMENTS SITUATED AT N/E/C OF STAUDERMAN AVENUE AND FOREST AVENUE VILLAGE OF LYNBROOK NASSAU COUNTY, NEW YORK TRAFFIC IMPACT STUDY R&M PROJECT NO. 2018-089 September 2018 50 Elm Street,

More information

TRAFFIC IMPACT ANALYSIS FOR A PROPOSED MIXED USE DEVELOPMENT

TRAFFIC IMPACT ANALYSIS FOR A PROPOSED MIXED USE DEVELOPMENT TRAFFIC IMPACT ANALYSIS FOR A PROPOSED MIXED USE DEVELOPMENT Located at southeast corner of Winnetka Avenue and Prairie Street In the City of Los Angeles Prepared for: Sky Tech Management & Construction

More information

Proposed location of Camp Parkway Commerce Center. Vicinity map of Camp Parkway Commerce Center Southampton County, VA

Proposed location of Camp Parkway Commerce Center. Vicinity map of Camp Parkway Commerce Center Southampton County, VA Proposed location of Camp Parkway Commerce Center Vicinity map of Camp Parkway Commerce Center Southampton County, VA Camp Parkway Commerce Center is a proposed distribution and industrial center to be

More information

CHAPTER 9: VEHICULAR ACCESS CONTROL Introduction and Goals Administration Standards

CHAPTER 9: VEHICULAR ACCESS CONTROL Introduction and Goals Administration Standards 9.00 Introduction and Goals 9.01 Administration 9.02 Standards 9.1 9.00 INTRODUCTION AND GOALS City streets serve two purposes that are often in conflict moving traffic and accessing property. The higher

More information

DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Subhas Bhargava. July 9, Overview_1.

DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Subhas Bhargava. July 9, Overview_1. DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW Prepared for: Subhas Bhargava July 9, 2015 115-620 Overview_1.doc D. J. Halpenny & Associates Ltd. Consulting Transportation

More information

Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS...

Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS... Crosshaven Drive Corridor Study City of Vestavia Hills, Alabama Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA... 3 Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS...

More information

UC Santa Cruz TAPS 3-Year Fee & Fare Proposal, through

UC Santa Cruz TAPS 3-Year Fee & Fare Proposal, through UC Santa Cruz TAPS 3-Year Fee & Fare Proposal, 2016-17 through 2018-19 Introduction Transportation and Parking Services (TAPS) proposes a three-year series of annual increases to most Parking fees and

More information

Trip Generation & Parking Occupancy Data Collection: Grocery Stores Student Chapter of Institute of Transportation Engineers at UCLA Spring 2014

Trip Generation & Parking Occupancy Data Collection: Grocery Stores Student Chapter of Institute of Transportation Engineers at UCLA Spring 2014 Trip Generation & Parking Occupancy Data Collection: Grocery Stores Student Chapter of Institute of Transportation Engineers at UCLA Spring 2014 Page 1 Introduction The UCLA Institute of Transportation

More information

4.4 Transportation and Circulation

4.4 Transportation and Circulation 4.4.1 Introduction This section evaluates the potential for construction traffic and operational impacts to result from implementation of the proposed project. This includes the potential for the project

More information

Transportation & Traffic Engineering

Transportation & Traffic Engineering Transportation & Traffic Engineering 1) Project Description This report presents a summary of findings for a Traffic Impact Analysis (TIA) performed by A+ Engineering, Inc. for the Hill Country Family

More information

L1TILE BEARS DAY CARE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY Prepared for:

L1TILE BEARS DAY CARE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY Prepared for: L1TILE BEARS DAY CARE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY 2012 Prepared for: Hillside Construction, Inc. 216 Hemlock Street, Suite B Fort Collins, CO 80534 Prepared by: DELICH ASSOCIATES

More information

4.14 TRANSPORTATION AND CIRCULATION

4.14 TRANSPORTATION AND CIRCULATION 4.14 TRANSPORTATION AND CIRCULATION 4.14.1 Summary Table 4.14-1 summarizes the identified environmental impacts, proposed mitigation measures, and residual impacts of the proposed project with regard to

More information

Date: February 7, 2017 John Doyle, Z-Best Products Robert Del Rio. T.E. Z-Best Traffic Operations and Site Access Analysis

Date: February 7, 2017 John Doyle, Z-Best Products Robert Del Rio. T.E. Z-Best Traffic Operations and Site Access Analysis Memorandum Date: February 7, 07 To: From: Subject: John Doyle, Z-Best Products Robert Del Rio. T.E. Z-Best Traffic Operations and Site Access Analysis Introduction Hexagon Transportation Consultants, Inc.

More information

TRANSPORTATION REVIEW

TRANSPORTATION REVIEW TRANSPORTATION REVIEW - PROPOSED MIX OF LAND USES IS CONSISTENT WITH THE CITY S UNDER THE GRANVILLE BRIDGE POLICIES THAT AIM TO MEET NEIGHBOURING RESIDENTS SHOPPING NEEDS AND REDUCE RELIANCE ON AUTOMOBILE

More information

APPENDIX F-IV.K Updated Transportation Impact Analysis (June 2010)

APPENDIX F-IV.K Updated Transportation Impact Analysis (June 2010) APPENDIX F-IV.K Updated Transportation Impact Analysis (June 2010) TRANSPORTATION IMPACT ANALYSIS FOR THE LOYOLA MARYMOUNT UNIVERSITY MASTER PLAN PROJECT JUNE 2010 PREPARED FOR AECOM Design PREPARED BY

More information

Vanier Parkway and Presland Road Residential Development Transportation Impact Study

Vanier Parkway and Presland Road Residential Development Transportation Impact Study Vanier Parkway and Presland Road Residential Development Transportation Impact Study Final Report (Revised) March 2011 Submitted to: Groupe Lépine Ottawa Project No. 09-1613 Submitted by: Groupe Lépine

More information

4.11 TRANSPORTATION AND CIRCULATION

4.11 TRANSPORTATION AND CIRCULATION 4.11 TRANSPORTATION AND CIRCULATION This section analyzes onsite development s impacts to the local transportation and circulation system. The analysis is based upon the traffic study prepared by KOA Corporation

More information

Draft Report: West Berkeley Bowl Project

Draft Report: West Berkeley Bowl Project Draft Report: West Berkeley Bowl Project July 2004 Prepared for: The City of Berkeley 1031-1925 F EHR & PEERS TRANSPORTATION CONSULTANTS 3685 Mt. Diablo Blvd. #301 Lafayette, CA 94549 925-284-3200 Fax:

More information

Parking Management Element

Parking Management Element Parking Management Element The State Transportation Planning Rule, adopted in 1991, requires that the Metropolitan Planning Organization (MPO) area implement, through its member jurisdictions, a parking

More information

TRAFFIC IMPACT ANALYSIS SAFARI HIGHLANDS RANCH

TRAFFIC IMPACT ANALYSIS SAFARI HIGHLANDS RANCH TRAFFIC IMPACT ANALYSIS SAFARI HIGHLANDS RANCH, California November 11, 2016 LLG Ref. 3-14-2334 EXECUTIVE SUMMARY The Project proposes the development of 550 luxury residential dwelling units, public trails,

More information

Section 3.12 Traffic and Transportation

Section 3.12 Traffic and Transportation Section. Traffic and Transportation SECTION SUMMARY This section describes existing ground transportation within the Port and surrounding area associated with implementation of the proposed Project. An

More information

Traffic Impact Statement (TIS)

Traffic Impact Statement (TIS) Traffic Impact Statement (TIS) Vincentian PUDA Collier County, FL 10/18/2013 Prepared for: Global Properties of Naples Prepared by: Trebilcock Consulting Solutions, PA 2614 Tamiami Trail N, Suite 615 1205

More information

MONTEREY BAY AQUARIUM RESEARCH INSTITUTE (MBARI) MASTER PLAN UPDATE MOSS LANDING, CALIFORNIA

MONTEREY BAY AQUARIUM RESEARCH INSTITUTE (MBARI) MASTER PLAN UPDATE MOSS LANDING, CALIFORNIA MONTEREY BAY AQUARIUM RESEARCH INSTITUTE (MBARI) MASTER PLAN UPDATE MOSS LANDING, CALIFORNIA TRAFFIC IMPACT ANALYSIS Administrative Draft Report Prepared For Monterey Bay Aquarium Research Institute Moss

More information

DRAFT TRANSPORTATION IMPACT STUDY CASTILIAN REDEVELOPMENT PROJECT

DRAFT TRANSPORTATION IMPACT STUDY CASTILIAN REDEVELOPMENT PROJECT DRAFT TRANSPORTATION IMPACT STUDY CASTILIAN REDEVELOPMENT PROJECT Prepared for: Submitted by: 299 Lava Ridge Ct. Suite 2 Roseville, CA. 95661 June 212 TABLE OF CONTENTS 1. Introduction... 1 Project Location

More information

RICHMOND OAKS HEALTH CENTRE 6265 PERTH STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Guycoki (Eastern) Limited.

RICHMOND OAKS HEALTH CENTRE 6265 PERTH STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Guycoki (Eastern) Limited. RICHMOND OAKS HEALTH CENTRE 6265 PERTH STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: Guycoki (Eastern) Limited June 16, 2016 116-638 Brief_1.doc D. J. Halpenny & Associates Ltd. Consulting

More information

APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS

APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS February 2018 Highway & Bridge Project PIN 6754.12 Route 13 Connector Road Chemung County February 2018 Appendix

More information

Address Land Use Approximate GSF

Address Land Use Approximate GSF M E M O R A N D U M To: Kara Brewton, From: Nelson\Nygaard Date: March 26, 2014 Subject: Brookline Place Shared Parking Analysis- Final Memo This memorandum presents a comparative analysis of expected

More information

Mercer Island Center for the Arts Parking Management Plan

Mercer Island Center for the Arts Parking Management Plan Parking Stalls Mercer Island Center for the Arts Parking Management Plan June 15, 2016 This Parking Management Plan (P) covers all tenants at the Mercer Island Center for the Arts (MICA) campus, including

More information

TRAFFIC PARKING ANALYSIS

TRAFFIC PARKING ANALYSIS TRAFFIC PARKING ANALYSIS NAPA FLEA MARKET COUNTY OF NAPA Prepared for: Tom Harding Napa-Vallejo Flea Market 33 Kelly Road American Canyon, CA 9453 Prepared by: 166 Olympic Boulevard, Suite 21 Walnut Creek,

More information

APPENDIX H. Transportation Impact Study

APPENDIX H. Transportation Impact Study APPENDIX H Transportation Impact Study BUENA VISTA LAGOON ENHANCEMENT PROJECT TRANSPORTATION IMPACT STUDY Prepared for: San Diego Association of Governments Prepared by: VRPA Technologies, Inc. 9520 Padgett

More information

Develop ground transportation improvements to make the Airport a multi-modal regional

Develop ground transportation improvements to make the Airport a multi-modal regional Project Overview TRANSPORTATION IMPROVEMENTS WHAT ARE THE PROJECT GOALS? Transportation transportation hub. Develop ground transportation improvements to make the Airport a multi-modal regional Land Use

More information

APPENDIX G TRAFFIC STUDY TECHNICAL MEMORANDUM

APPENDIX G TRAFFIC STUDY TECHNICAL MEMORANDUM APPENDIX G TRAFFIC STUDY TECHNICAL MEMORANDUM TECHNICAL MEMORANDUM To: From: Date: Subject: Jerry Flores - AECOM Brian A. Marchetti, AICP September 9, 5 DRAFT Traffic Study LABOE Channel 5 Studio Relocation

More information

IV. Environmental Impact Analysis J. Traffic, Access, and Parking

IV. Environmental Impact Analysis J. Traffic, Access, and Parking IV. Environmental Impact Analysis J. Traffic, Access, and Parking 1. Introduction This section of the Draft EIR analyzes the proposed Project s potential impacts on traffic, access, and parking. This section

More information

King County Metro. Columbia Street Transit Priority Improvements Alternative Analysis. Downtown Southend Transit Study. May 2014.

King County Metro. Columbia Street Transit Priority Improvements Alternative Analysis. Downtown Southend Transit Study. May 2014. King County Metro Columbia Street Transit Priority Improvements Alternative Analysis Downtown Southend Transit Study May 2014 Parametrix Table of Contents Introduction... 1 Methodology... 1 Study Area...

More information

CORE AREA SPECIFIC PLAN

CORE AREA SPECIFIC PLAN only four (A, B, D, and F) extend past Eighth Street to the north, and only Richards Boulevard leaves the Core Area to the south. This street pattern, compounded by the fact that Richards Boulevard is

More information

4.7 Construction Surface Transportation

4.7 Construction Surface Transportation 4.7 Construction Surface Transportation 4.7.1 Introduction The traffic analysis presented in this section addresses the construction traffic impacts specific to the proposed Project. The construction traffic

More information

MINERVA PARK SITE TRAFFIC IMPACT STUDY M/I HOMES. September 2, 2015

MINERVA PARK SITE TRAFFIC IMPACT STUDY M/I HOMES. September 2, 2015 5500 New Albany Road Columbus, Ohio 43054 Phone: 614.775.4500 Fax: 614.775.4800 Toll Free: 1-888-775-EMHT emht.com 2015-1008 MINERVA PARK SITE TRAFFIC IMPACT STUDY M/I HOMES September 2, 2015 Engineers

More information

4.1 Traffic, Circulation, and Parking

4.1 Traffic, Circulation, and Parking 4.1 Traffic, This section describes the existing transportation and parking conditions within and adjacent to the project area. A traffic report describing the potential impacts of the proposed project

More information

MADERAS HOTEL TRANSPORTATION IMPACT ANALYSIS. LLG Ref Transportation Planner III & Jorge Cuyuch Transportation Engineer I

MADERAS HOTEL TRANSPORTATION IMPACT ANALYSIS. LLG Ref Transportation Planner III & Jorge Cuyuch Transportation Engineer I TRANSPORTATION IMPACT ANALYSIS MADERAS HOTEL Poway, California June 21, 2016 LLG Ref. 3-16-2602 Prepared by: Amelia Giacalone Transportation Planner III & Jorge Cuyuch Transportation Engineer I Under the

More information

RE: 67/71 Marquette Avenue Redevelopment Transportation Overview

RE: 67/71 Marquette Avenue Redevelopment Transportation Overview 1223 Michael Street, Suite 100, Ottawa, Ontario K1J 7T2 Tel: 613.738.4160 Fax: 613.739.7105 www.delcan.com April 23, 2014 OUR REF: TO3157TOA00 BY EMAIL: mark.larose@urbanrisedevelopment.com Urban Rise

More information

TALMONT TOWNHOMES MADISON KENNETH SPA TRAFFIC IMPACT STUDY. Sacramento, CA. Prepared For: MBK Homes. Prepared By:

TALMONT TOWNHOMES MADISON KENNETH SPA TRAFFIC IMPACT STUDY. Sacramento, CA. Prepared For: MBK Homes. Prepared By: TALMONT TOWNHOMES MADISON KENNETH SPA TRAFFIC IMPACT STUDY Sacramento, CA Prepared For: MBK Homes Prepared By: KD Anderson & Associates 3853 Taylor Road, Suite G Loomis, California 95650 (916) 660-1555

More information

TRAFFIC IMPACT ANALYSIS FOR. McDONALD S RESTAURANT IN CARMICAEL Sacramento County, CA. Prepared For:

TRAFFIC IMPACT ANALYSIS FOR. McDONALD S RESTAURANT IN CARMICAEL Sacramento County, CA. Prepared For: TRAFFIC IMPACT ANALYSIS FOR McDONALD S RESTAURANT IN CARMICAEL Sacramento County, CA Prepared For: McDonald s USA, LLC Pacific Sierra Region 2999 Oak Road, Suite 900 Walnut Creek, CA 94597 Prepared By:

More information