RAJASTHAN ELECTRICITY REGULATORY COMMISSION

Size: px
Start display at page:

Download "RAJASTHAN ELECTRICITY REGULATORY COMMISSION"

Transcription

1 RAJASTHAN ELECTRICITY REGULATORY COMMISSION NOTIFICATION Jaipur, No. RERC/Secy/Reg In exercise of powers conferred under Section 181 read with Sections 61, 66 and 86(1) (e) of the Electricity Act, 2003 (Act 36 of 2003) and all other provisions enabling it in this behalf, the Rajasthan Electricity Regulatory Commission hereby makes the following Regulations for Net Metering and grid connectivity of grid connected Rooftop & Small Solar Photovoltaic systems. 1. Short title, extent and commencement (1) These regulations shall be called the Rajasthan Electricity Regulatory Commission (Connectivity and Net Metering for Rooftop and Small Solar Grid Interactive Systems) Regulations, 2015, in short, RERC Net Metering Regulations, (2) These Regulations shall come into force from the date of their publication in the Official Gazette. 2. Definitions and interpretations (1) In these Regulations, unless the context otherwise requires, (a) (b) (c) (d) (e) Act means The Electricity Act, 2003 (36 of 2003) and subsequent amendments thereof; Connection Agreement means the agreement entered into by the Distribution Licensee and the consumer; Billing cycle or billing period means the period for which regular electricity bills as specified by the Commission, are prepared for different categories of consumers by the licensee; Commission means Rajasthan Electricity Regulatory Commission constituted under the Act; Connected load shall mean the sum of rated capacities of all the energy consuming devices on the consumer's premises, which can be operated simultaneously. For the purpose of levy of any charges and for deciding the supply voltage, the connected

2 load shall be determined as per method prescribed in the Rajasthan Electricity Regulatory Commission (Electricity Supply Code and Connected Matters) Regulations, 2004 and subsequent amendments thereto; (f) (g) (h) (i) (j) (k) Distribution Licensee or Licensee means a person granted a license under Section 14 of the Act or deemed licensee as per Section 14 of the Act authorizing him to operate and maintain a distribution system for supplying electricity to the consumers in his area of supply; "Electricity Supply Code" means the Electricity Supply Code specified under section 50 of the Act and subsequent amendments thereof; Eligible Consumer means a consumer of electricity in the area of supply of the distribution licensee, who uses or proposes to use a rooftop or small solar system installed in the consumer premises, to offset part or all of the consumer's own electrical requirements, given that such systems can be self-owned or third party owned; Financial year or year means the period beginning from first day of April in an English calendar year and ending with the thirty first day of March of the next year; Interconnection point means the interface of solar power generation facility system with the network of distribution licensee ; Invoice means either a periodic bill / supplementary bill or a periodic Invoice/ supplementary invoice raised by the Distribution Licensee; (l) kvah means kilo volt ampere hour ; (m) kwp means kilo watt peak; (n) Net meter means an appropriate energy meter capable of recording both import & export of electricity or a pair of meters one each for recording the import and export of electricity as the case may be; RERC Net-Metering Regulations, 2015 Page 2 of 33

3 (o) (p) (q) (r) (s) (t) (u) "Net metering" means methodology under which the electricity generated by the Solar rooftop system owned by the consumer and delivered to the Distribution Licensee may be utilized to offset the electricity supplied by the Distribution Licensee to the consumer during the applicable billing period; Obligated Entity means the entity mandated under clause (e) of subsection (1) of section 86 of the Act to fulfill the renewable purchase obligation and identified under RERC (Renewable Energy Certificate and Renewable Purchase Obligation Compliance Framework) Regulations, 2010; Premises means rooftops or/and elevated areas on the land, building or infrastructure or part or combination thereof in respect of which a separate meter or metering arrangements have been made by the licensee for supply of electricity; Rooftop PV Solar Power Plant means the solar photo voltaic power plant including small solar systems installed on the rooftops/ground mounted or open land of consumer premises that uses sunlight for direct conversion into electricity through photo voltaic technology; Renewable Energy Certificate (REC) means the certificate issued in accordance with the Central Electricity Regulatory Commission (Terms and Conditions for recognition and issuance of Renewable Energy Certificate for Renewable Energy Generation) Regulations, 2010 and subsequent amendments thereof; Renewable energy system means the system to generate electricity from such source(s) which are recognized as renewable energy source(s) by Ministry of New and Renewable Energy (MNRE) or any other agency as may be notified by Government of India/Commission; State Agency means the agency as designated by the Commission under regulation 6 of the RERC (Renewable Energy Certificate and Renewable RERC Net-Metering Regulations, 2015 Page 3 of 33

4 Purchase Obligation Compliance Framework) Regulations, (v) Third party owner means a developer who is generating solar energy on a rooftop but does not own the roof top, and who also enters into a lease/commercial agreement with the roof top owner. (2) All other words and expressions used in these Regulations although not specifically defined herein above, but defined in the Act, shall have the meaning assigned to them in the Act. The other words and expressions used herein but not specifically defined in these Regulations or in the Act but defined under any law passed by the Parliament applicable to the electricity industry in the State shall have the meaning assigned to them in such law. (3) Words or expressions occurring in these regulations and not defined shall bear the same meaning as in the Act. (4) Abbreviations used in these Regulations shall have the meanings as stated in Annexure I. 3. Scope and application (1) These Regulations shall apply to the distribution licensee and consumers of the distribution licensee availing supply from it in its area of supply in the State of Rajasthan. (2) The Eligible Consumer may install the rooftop solar system under net metering arrangement which, (a) (b) (c) shall be within the permissible rated capacity as defined under these Regulations. shall be located on the consumer premises. shall interconnect and operate safely in parallel with the distribution licensee network. (3) These Regulations do not preclude the right of State Nodal Agency or Distribution Licensee of the State to undertake Rooftop PV Solar Power Plants of 1 MWp and above capacity through alternative mechanisms. RERC Net-Metering Regulations, 2015 Page 4 of 33

5 4. General Principles The distribution licensee shall offer the provision of net metering arrangement to the consumer, who intends to install grid connected Rooftop PV Solar Power Plants, in its area of supply on non-discriminatory and first come first serve basis: Provided further that the Consumer is Eligible to install the grid connected Rooftop PV Solar Power Plants of the rated capacity as specified under these Regulations: Provided also that the interconnection of such system with the grid is undertaken as specified under these Regulations and in compliance of Central Electricity Authority (Technical Standards for Connectivity of the Distributed Generation Resources) Regulations, Connectivity of Roof Top PV Solar Power Plants (1) The cumulative capacity to be allowed at a particular distribution transformer shall not exceed 30% of the capacity of the distribution transformer: (2) The distribution licensee shall update distribution transformer level capacity available for connecting Rooftop PV Solar Power Plants under net metering arrangement on yearly basis and shall provide the information on its website as well as to the Commission. 6. Eligible Consumer and Individual Project Capacity (1) All Eligible Consumers of electricity in the area of supply of the distribution licensee having or proposing to install a roof top solar energy system may opt for grid connectivity subject to the net metering arrangement pursuant to these Regulations. (2) The maximum Rooftop PV Solar Power Plant capacity to be installed at any Eligible Consumer premises shall not be more than 80% of the sanctioned connected load/contract demand of the consumer; (3) The capacity of Rooftop PV Solar Power Plant to be installed at the Premises of any Eligible Consumer shall be more than one kilo watt peak minimum and shall not be more than one RERC Net-Metering Regulations, 2015 Page 5 of 33

6 Mega Watt peak (1000 kwp) subject to the condition as specified in sub-regulation (2). Provided that the capacity of the solar energy system shall be in conformity with the provisions relating to the connected load or contract demand permissible under the Rajasthan Electricity Regulatory Commission (Electricity Supply Code and Connected Matters) Regulations, 2004 and subsequent amendments thereto. 7. Procedure for application (1) The Eligible Consumer who proposes to install a solar energy system in his premises shall apply in the application form (Annexure II), which the distribution licensee shall notify on its website as downloadable as well as make available at the relevant subdivisional office of the distribution licensee along with the application fees as specified in the schedule (Annexure-III) of these Regulations. (2) The licensee shall acknowledge the receipt of the application form and register the application and shall process the application in the order of the receipt. (3) Within ten (10) working days of receipt of the Eligible Consumer s application, the distribution licensee shall provide written notice that it has received all documents required by the standard interconnection agreement or indicate how the application is deficient. (4) The Distribution Licensee shall assess the feasibility and intimate the Eligible Consumer within fifteen days from the receipt of completed application. The feasibility shall be valid for a period of one month, unless extended by the Distribution Licensee. Provided that if the Distribution Licensee determines that an interconnection study is necessary as per sub regulation (5), the Distribution Licensee shall intimate feasibility or otherwise within sixty (60) days from the receipt of completed application. (5) While intimating the feasibility for the connection of Rooftop PV Solar Power Plant as specified in sub-regulation(4), the Distribution Licensee shall also intimate the Eligible Consumer: RERC Net-Metering Regulations, 2015 Page 6 of 33

7 (a) The details of documents to be submitted by the Eligible Consumer. (b) Particulars of any deficiencies, if noticed, along with instructions to remove such defects. (c) Details of any interconnection study required. (d) The amount of security deposit for the installation of the Rooftop PV Solar Power Plant as specified in the schedule at Annexure-III. (6) The Distribution Licensee shall, on receipt of the security deposit and on removing defects, if any and the documents submitted under sub regulation(5), inform the approval within ten(10) working days from the date of receipt. Provided that if the deficiency as per sub regulation (5) is not removed by the Eligible Consumer within thirty(30) days from the date of receipt of such intimation to the Eligible Consumer, the application shall stand cancelled and the application fee shall be forfeited. (7) The interconnection agreement (Annexure - IV) shall be executed by the distribution licensee within thirty (30) days of receipt of a completed application. If the distribution licensee determines that an interconnection study is necessary, the distribution licensee shall carry out such interconnection study within sixty (60) days so as to enable it to execute the standard interconnection agreement within ninety (90) days of a completed application. (8) The Eligible Consumer must execute the standard interconnection agreement and return it to the distribution licensee within thirty (30) days from the date of receipt. 8. Standards, Operation and Maintenance of Solar Power Generators (SPGs) The Solar Power Generator (SPG) and equipments will conform to the standards and requirements specified in these Regulations and in the following Regulations and codes as amended from time to time: RERC Net-Metering Regulations, 2015 Page 7 of 33

8 (1) Central Electricity Authority (Technical Standards for connectivity of the Distributed Generating Resources) Regulations, (2) Central Electricity Authority (Installation and Operation of Meters) Regulations, (3) RERC (Electricity Supply Code and Connected Matters) Regulations, The equipments of Solar PV Roof top shall be pre tested by the supplier and a test certificate for the concerned equipment shall be provided to the consumer. The consumer shall get the equipment installed at his/her premises by the representative of the supplier to confirm satisfactory working. 9. Interconnection with the Grid: Standards and Safety (1) The interconnection of the Rooftop PV Solar Power Plant with the network of the distribution licensee shall be made as per the technical specifications and standards for connectivity provided in the Central Electricity Authority (Technical Standards for Connectivity of the Distributed Generation Resources) Regulations, 2013, as amended from time to time. (2) The connectivity levels at which the Rooftop PV Solar Power Plants shall be connected with the grid are as specified below: S.No. Connected load of Eligible Connectivity level Consumer 1. Upto 5 kw 240 V- single phase 2. Above 5 kw and upto V-Three phase kw 3. Above kw and upto 415 V-Three phase 50 kw/kva 4. Above 50 kw/kva HT/EHT level (3) The above connectivity norms are applicable to all the solar power generators who seek connectivity with network of the distribution licensees. EHT/HT consumers may install solar power generators at LT/HT voltage and connect them to their LT/HT system. (4) In the interconnection of roof top PV solar energy generator with the local distribution licensee s grid, the relevant provisions of the Central Electricity Authority (Measures RERC Net-Metering Regulations, 2015 Page 8 of 33

9 relating to Safety and Electric Supply) Regulations, 2010 as amended from time to time shall apply. (5) The solar energy generator shall be responsible for safe operation, maintenance and rectification of defect of its system up to the interconnection point beyond which the responsibility of safe operation, maintenance and rectification of any defect in the system including the net meter shall rest with the distribution licensee. (6) The consumer shall be solely responsible for any accident to human being/ animals whatsoever (fatal/nonfatal/departmental/non-departmental) that may occur due to back feeding from the SPG plant when the grid supply is off. The distribution licensee reserves the right to disconnect the consumer s installation at any time in the event of such exigencies to prevent accident or damage to man and material. (7) The tests as per EN and as per distribution licensee s standards shall be done to ensure the quality of power generated from the Solar PV systems. (8) Any alternate source of supply shall be restricted to the consumer s network and the consumer shall be responsible to take adequate safety measures to prevent battery power/diesel generator power/ backup power extending to distribution licensee s LT grid on failure of distribution licensee s grid supply. (9) The distribution licensee shall have the right to disconnect the roof top PV solar energy generator from its system at any time in the following conditions: i. Emergencies or maintenance requirement on the distribution licensee s electric system; ii. Hazardous condition existing on the distribution licensee s system due to operation of solar energy generator or protective equipment as determined by the Distribution Licensee/Transmission Licensee/SLDC. iii. Adverse electrical effects, such as power quality problems, on the electrical equipment of the other consumers of the distribution licensee caused by the solar energy generation as determined by the distribution licensee. RERC Net-Metering Regulations, 2015 Page 9 of 33

10 (10) Subject to sub regulation 8(5) above, the distribution licensee may call upon the roof top PV solar energy generator to rectify the defect within a reasonable time. (11) The Rooftop PV Solar Power Plant should be capable of detecting an unintended islanding condition. These systems must have anti-islanding protection to prevent any unfavorable conditions including failure of supply. IEC shall be followed to test islanding prevention measure for grid connected photovoltaic inverters. (12) Every Rooftop PV Solar Power Plant shall be equipped with automatic synchronization device: Provided that Rooftop PV Solar Power Plant using inverter shall not be required to have separate synchronizing device, if the same is inherently built into the inverter. (13) The Rooftop PV Solar Power Plant operating in parallel with electricity system shall be equipped with the following protective functions to sense abnormal conditions on electricity system and cause the Rooftop PV Solar Power Plant to be automatically disconnected from the electricity system or to prevent the Rooftop PV Solar Power Plant from being connected to electricity system inappropriately: i. Over and under voltage trip functions if voltage reaches above 110% or below 80% respectively with a clearing time upto two seconds; however, appropriate licensee may prescribe a narrower range of voltage for the purpose. ii. Over and under frequency trip functions, if frequency reaches 50.5 Hz or below 47.5 Hz with a clearing time upto 0.2 seconds; however, appropriate licensee may prescribe a narrower range of frequency for the purpose. iii. The Rooftop PV Solar Power Plant shall cease to energize the circuit to which it is connected in case of any fault in this circuit. iv. A voltage and frequency sensing and time delay function to prevent the Rooftop PV Solar Power Plant from energizing a de-energized circuit and to prevent the Rooftop PV Solar Power Plant from reconnecting with electricity system unless voltage and frequency is within the prescribed limits and are stable for at least sixty seconds; and RERC Net-Metering Regulations, 2015 Page 10 of 33

11 v. A function to prevent the Rooftop PV Solar Power Plant from contributing to the formation of an unintended island, and cease to energize the electricity system within two seconds of the formation of an unintended island. (14) The equipment of the Rooftop PV Solar Power Plant shall meet following requirements, namely: i. Circuit Breakers or other interrupting equipment shall be suitable for their intended application with the capability of interrupting the maximum available fault current expected at their location. ii. The Rooftop PV Solar Power Plant and associated equipment shall be designed so that the failure of any single device or component shall not potentially compromise the safety and reliability of the electricity system. iii. Paralleling device of the Rooftop PV Solar Power Plant shall be capable of withstanding 220% of the nominal voltage at the interconnection point. (15) Every time the Rooftop PV Solar Power Plant of the Eligible Consumer is synchronized to the electricity system, it shall not cause voltage fluctuation greater than ±5% at the point of inter connection. (16) After considering the maintenance and safety procedures, the distribution licensee may require a Rooftop PV Solar Power Plant to provide a manually operated isolating switch between the Rooftop PV Solar Power Plant and the electricity system, which shall meet following requirements: i. Allow visible verification that separation has been accomplished; ii. Include indications to clearly show open and closed positions; iii. Be capable of being reached quickly and conveniently twenty four hours a day by licensee s personnel without requiring clearance from the applicant; iv. Be capable of being locked in the open position; v. May not be rated for load break nor may have feature of over-current protection; and vi. Be located at a height of at least 2.44 m above the ground level. (17) Prior to synchronization of the Rooftop PV Solar Power Plant for the first time with electricity system, the applicant and RERC Net-Metering Regulations, 2015 Page 11 of 33

12 the appropriate licensee shall agree on the protection features and control diagrams. (18) The power conditioning unit shall have the features of filtering out harmonics and other distortions before injecting the energy into the system of the distribution utility. The technical standards, power quality standards and inverter standards shall be as per Annexure V of these Regulations or any other standards as may be specified by CEA from time to time. 10. Energy Accounting and Settlement (1) Distribution licensee shall install metering equipment at the point of interconnection which shall be capable of measuring the difference between the electricity supplied to the Eligible Consumer from the distribution licensee and the electricity delivered by solar system to the distribution licensee s electric grid. Separate meter shall be provided for measuring quantum of Solar energy generated by the Eligible Consumer. (2) Meter readings shall be taken monthly or as per the billing cycle specified under the applicable Electricity Supply Code and Connected Matters Regulations. (3) For each billing period, the licensee shall show separately the quantum of electricity injected by Eligible Consumer during the billing period, electricity supplied by distribution licensee during the billing period, net electricity billed for payment by the consumer for that billing period and the solar energy generated by the Eligible Consumer: Provided that in the event the electricity injected exceeds the electricity consumed during the billing period, such excess injected electricity shall be paid by the Distribution Licensee at feed in tariff determined by the Commission from time to time for Solar Photo Voltaic generation in next billing period provided that such export is above 50 units. Net energy credits less than 50 units under Net Metering achieved in the particular billing period shall be adjusted in the next billing period till credit of 50 units is achieved: RERC Net-Metering Regulations, 2015 Page 12 of 33

13 Provided further that in the event the electricity supplied by the distribution licensee during any billing period exceeds the electricity generated by the Eligible Consumer s Rooftop PV Solar Power Plant, the distribution licensee shall raise bill for the net electricity consumption at the tariff applicable after taking into account any electricity credit balance remaining from previous billing period: Provided also in case the Eligible Consumer is under the ambit of time of day tariff, as determined by the Commission from time to time, the electricity consumption in any time block (e.g., peak hours, off-peak hours, etc.) shall be first compensated with the electricity generation in the same time block. Any accumulated excess generation over consumption in any other time block in a billing cycle shall be accounted as if the excess generation occurred during the off-peak time block: Provided also that the excess electricity measured in kilowatt hour may only be utilized to offset the consumption measured in kilo-watt hour and may not be utilized to compensate any other fee and charges imposed by the distribution licensee as per the orders of the Commission: Provided also that the levy and duties imposed by the State Government shall be recoverable. (4) When an Eligible Consumer leaves the system, that customer s unused credits for excess energy generated shall be paid to the Eligible Consumer at the feed in tariff determined by the Commission from time to time for Solar Photo Voltaic Generation. (5) Regardless of whether excess energy is delivered to the distribution licensee electric grid, the consumer shall continue to pay applicable charges such as fixed/demand charges, Government levy, etc. The distribution licensee shall charge for electricity used by the consumer in excess of the generation supplied at the distribution licensee s otherwise applicable rate schedule. RERC Net-Metering Regulations, 2015 Page 13 of 33

14 (6) The licensee shall give a statement of accounts of electricity showing the following particulars, along with the electricity bill relating to each billing period: (a) Quantum of solar energy generated by the Eligible Consumer; (b) Quantum of electricity injected into the distribution system by the Eligible Consumer; (c) Quantum of electricity supplied by the distribution licensee to the Eligible Consumer; (d) Quantum of net electricity which has been billed for payment by the Eligible Consumer; and (e) Quantum of electricity injected into the distribution system in excess of the drawal by the Eligible Consumer which is carried over to the next billing period. (7) In case of any dispute in billing it would be settled by the Consumer Grievance Redressal Forum and if issue still remains unresolved shall be settled by the Ombudsman. 11. Reporting requirements Distribution licensee shall report the following, by June 1 of each year and shall also be placed on its web site: (1) Total number of Eligible Consumers interconnections at the end of the previous financial year; (2) Total kw capacity of the Eligible Consumers interconnected at the end of previous financial year; (3) Total kwh received by the Eligible Consumer from the distribution licensee by month and by year for the previous financial year; (4) Total kwh of solar energy generated by the Eligible Consumer by month and by year for the previous financial year; (5) Total kwh delivered by the Eligible Consumer to the distribution licensee as per billing cycle and by year for the previous financial year; (6) For each Eligible Consumer interconnection: (a) Solar technology utilized (b) Gross power rating; RERC Net-Metering Regulations, 2015 Page 14 of 33

15 (c) (d) Geographic location; and Date interconnected. 12. Solar Renewable Purchase Obligation The quantum of electricity generated from the Rooftop PV Solar Power Plant under net metering arrangement by an Eligible Consumer, who is not defined as obligated entity, shall qualify towards compliance of Renewable Purchase Obligation (RPO) for the distribution licensee in whose area of the supply the Eligible Consumer is located. 13. Applicability of other charges The Rooftop PV Solar Power Plant under net metering arrangement, whether self-owned or third party owned installed on Eligible Consumer premises, shall be exempted from banking and wheeling charges and cross subsidy surcharge. 14. Metering arrangement (1) The metering system shall be as per the Regulations for installation & operation of meters for rooftop solar systems under net-metering arrangement specified in these regulations. (2) The schematic arrangement for interconnection of Rooftop & Small PV Solar Power Plant with the Distribution Licensee s grid is shown at Annexure VI. There shall be two meters. The metering arrangement shall be as per Annexure VII. (3) The bi-directional (net meter) shall be installed at the interconnection point of the Eligible Consumer with the network of the distribution licensee: Provided that for the existing consumers, the consumer meter shall be replaced with the bi-directional/ net meter: Provided further that consumers having ABT compliant meters shall not be required to install additional net meter. (4) Solar meter shall be installed at the solar facility after the inverter to measure the solar generation. RERC Net-Metering Regulations, 2015 Page 15 of 33

16 (5) These meters shall have the facility for downloading meter readings using Meter Reading Instrument (MRI). Check meters shall be mandatory for rooftop solar systems having capacity more than 250 kw. For installations size of less than and equal to 250 kw, the solar check meters would be optional: Provided that the cost of new/additional meter (s) shall be borne by the Eligible Consumer and installed & owned by the distribution licensee: Provided, if bills are prepared on the basis of MRI downloads or if meter reading is taken on the basis of remote meterreading and the consumer wishes to have a record of the reading taken, he shall be allowed so by the licensee. (6) The meters installed shall be jointly inspected and sealed on behalf of both the parties and shall be interfered/tested or checked only in the presence of the representatives of the consumer and distribution licensee or as per the supply code specified by the Commission: Provided that the Eligible Consumer shall follow the metering specifications and provisions for placement of meter as developed by the distribution licensee from time to time and as per the supply code: Provided further that in case the Eligible Consumer is under the ambit of time of day (TOD) tariff, meters compliant of recording time of day consumption/generation shall be employed. (7) The meter readings taken by the distribution licensee shall form the basis of commercial settlement. (8) The technical standards for meters shall be as per Annexure VIII and shall comply with the standards specified by CEA from time to time. RERC Net-Metering Regulations, 2015 Page 16 of 33

17 15. Communication Facilities The meters installed for Rooftop PV Solar Power Plants with capacity above 250 kwp shall have the communication port for exchanging real time information with Distribution Licensee. 16. Sharing of CDM Benefits The CDM benefits arising from solar energy generation from the roof top PV facility shall be retained by Distribution Licensee: Provided that the entire CDM benefits obtained by the Distribution Licensee shall be fully passed on to the consumers through ARR. 17. Penalty In case of failure to meet the requirements under these regulations for net metering, the solar power generator shall be liable to pay penalty as decided by the Commission from time to time. 18. Power to give directions The Commission may from time to time issue such directions and orders as are considered appropriate for the due implementation of these Regulations. 19. Power to relax The Commission may by general or special order, for reasons to be recorded in writing, and after giving an opportunity of hearing to the parties likely to be affected may relax any of the provisions of these Regulations on its own motion or on an application made before it by an interested person. 20. Power to amend The Commission may from time to time add, vary, alter, suspend, modify, amend or repeal any provisions of these Regulations. By order of the Commission (Secretary) RERC Net-Metering Regulations, 2015 Page 17 of 33

18 Annexure - I LIST OF ABBREVIATIONS AC Alternating Current AT&C Aggregate Technical and Commercial BIS Bureau of Indian Standards CB Circuit Breaker CEA Central Electricity Authority CT Current Transformer DC Direct Current Discom Jaipur Vidyut Vitran Nigam Limited, Ajmer Vidyut Vitran Nigam Limited, Jodhpur Vidyut Vitran Nigam Limited EHT Extra High Tension EHV Extra High Voltage FOR Forum of Regulators GBI Generation Based Incentive GIS Geographic Information System GOI Government of India GOR Government of Rajasthan GPS Geographic Positioning System GSM Global System for Mobile Communications GSS Grid Substation HT High Tension IEC International Electro-technical Commission IEEE Institution of Electrical and Electronics Engineers INR Indian Rupee kv Kilo Volt kva kilo Volt Ampere kw Kilo Watt kwh Kilo-Watt Hour LT Low Tension MNRE Ministry of New and Renewable Energy MPLS Multiprotocol Label Switching MVA Mega Volt-Ampere NM Net-Meter O&M Operation and Maintenance PCU Power Conditioning Unit PT/VT Potential/ Voltage Transformer RE Renewable Energy REC Renewable Energy Certificate RERC Rajasthan Electricity Regulatory Commission RPO Renewable Purchase Obligation RERC Net-Metering Regulations, 2015 Page 18 of 33

19 RRECL SLDC SM SPV TVM Rajasthan Renewable Energy Corporation Limited State Load Despatch Centre Solar Meter Solar Photo Voltaic Tri-Vector Meter References of the Standards Standard Reference IS Standards for single or polyphase electrostatic watt hour meters IS Standards for static transformer operated watt hour meters and VAR hour meters IEEE Equipment standards to control/curtail flicker IEEE 519 Standards for limitation for Total Harmonic Distortion IEC Standards for Crystalline Silicon terrestrial photovoltaic (PV) modules- Design qualification and type approval IEC Standards for thin film terrestrial photovoltaic (PV) modules-design qualification and type approval IEC Standard for Photovoltaic (PV) module safety qualification- Part1: Requirement for construction Part 2: Requirements for testing IEC Standards for Salt mist corrosion testing for modules used in coastal corrosive atmosphere IEC Standards for power conditioning unit/inverters 2(1,2,14,30) for efficiency measurement and environment tests IEC Standards for power cables with extruded insulation and their accessories for rated voltages from 1 kv(um=1.2 kv) upto 30 Kv(Um=36 kv) IEC Standards for polyvinyl chloride insulated cables of rated voltages up to and including 450/750 V IEC Standards for utility-inter connected photovoltaic inverters-test procedures of islanding prevention measures. RERC Net-Metering Regulations, 2015 Page 19 of 33

20 Annexure - II Format for Application for Solar Power Connectivity To: The Sub-divisional Officer/ Designated Officer Distribution Licensee [Name of office] Date: [date] I / we herewith apply for a solar energy net-metering connection at the service connection and for the solar PV plant of which details are given below. 1 Name of applicant 2 Address of applicant 3 Service connection number 4 Service connection tariff 5 Telephone number(s) 6 ID 7 Solar PV plant capacity (kilo Watts) 8 Solar grid inverter make and type Solar grid inverter has automatic isolation protection (Y/N)? Has a Solar Generation Meter been installed (Y/N)? Expected date of commissioning of solar PV system. Details of test certificates of Solar PV plant/inverter for standards required under the Regulations Name: Signature RERC Net-Metering Regulations, 2015 Page 20 of 33

21 Net-metering Application Acknowledgement Received an application for a solar energy net-metering connection from, Name: Date: Service Connection number: Application registration no.: Solar Plant Capacity: Name of Officer: Signature: Designation/ (Name of Discom) RERC Net-Metering Regulations, 2015 Page 21 of 33

22 Annexure - III Schedule (Vide Regulation 7(1) & 7(5)) S. No. Description Amount 1. Application Fee i. LT Single Phase Rs. 200 ii. iii. iv. LT Three Phase HT 11 kv HT 33 kv Rs. 500 Rs Rs Security Deposit for Solar PV plant (a) (b) Domestic Non Domestic and others Rs. 100/kW Rs. 200/kW The amount of security for Eligible Consumer other than the owner of the premises, shall be double of the amount as mentioned above. The security deposit shall not bear any interest. RERC Net-Metering Regulations, 2015 Page 22 of 33

23 Annexure - IV Net Metering inter connection agreement This Agreement is made and entered into at (location) on this (date) day of (month) year between The Eligible Consumer, by the name of having premises at (address) as first party AND Distribution Licensee (herein after called as Discom) and represented by (designation of office) and having its registered office at (address) as second party of the agreement And whereas, the Discom agrees to provide grid connectivity to the Eligible Consumer for injection of the electricity generated from his SPV plant of capacity kilowatts into the power system of Discom and as per conditions of this agreement and RERC (Connectivity and Net Metering for Rooftop and Small Solar Grid Interactive Systems) Regulations, 2015 issued by the Rajasthan Electricity Regulatory Commission. Both the parties hereby agree to as follows: 1. Eligibility 1.1 Eligibility for net-metering has been specified in the relevant order of the Rajasthan Electricity Regulatory Commission. Eligible Consumer has to meet the standards and conditions for being integrated into grid/distribution system. 2. Technical and Interconnection Requirements 2.1 The Eligible Consumer agrees that his solar generation plant and net metering system will conform to the standards and requirements specified in RERC (Connectivity and Net Metering for Rooftop and Small Solar Grid Interactive Systems) Regulations, 2015 and in the following Regulations and codes as amended from time to time. i. CEA s (Technical Standards for connectivity of the Distributed Generating Resources) Regulations, 2013 ii. Central Electricity Authority (Installation and Operation of Meters) Regulation 2006 iii. RERC Supply Code Regulations Eligible Consumer agrees that he has installed or will install, prior to connection of Photovoltaic system to Discom s distribution RERC Net-Metering Regulations, 2015 Page 23 of 33

24 system, an isolation device (both automatic and inbuilt within inverter and external manual relays) and agrees for the Discom to have access to and operation of this, if required and for repair & maintenance of the distribution system. 2.3 Eligible Consumer agrees that in case of a power outage on Discom s system, photovoltaic system will disconnect/isolate automatically and his plant will not inject power into Licensee s distribution system. 2.4 All the equipment connected to distribution system shall be compliant with relevant International (IEEE/IEC) or Indian standards (BIS) and installations of electrical equipment must comply with Central Electricity Authority (Measures of Safety and Electricity Supply) Regulations, Eligible Consumer agrees that licensee will specify the interface/interconnection point and metering point. 2.6 Eligible Consumer and licensee agree to comply with the relevant CEA regulations and RERC (Metering) Regulations, 2007 in respect of operation and maintenance of the plant, drawing and diagrams, site responsibility schedule, harmonics, synchronization, voltage, frequency, flicker etc. 2.7 Due to Discom s obligation to maintain a safe and reliable distribution system, Eligible Consumer agrees that if it is determined by the Discom that Eligible Consumer s photovoltaic system either causes damage to and/or produces adverse effects affecting other consumers or Discom s assets, Eligible Consumer will have to disconnect photovoltaic system immediately from the distribution system upon direction from the Discom and correct the problem at his own expense prior to a reconnection. 2.8 The consumer shall be solely responsible for any accident to human being/animals whatsoever (fatal/non-fatal/departmental/nondepartmental) that may occur due to back feeding from the SPG plant when the grid supply is off. The distribution licensee reserves the right to disconnect the consumer s installation at any time in the event of such exigencies to prevent accident or damage to man and material. 3. Clearances and Approvals 3.1 The Eligible Consumer shall obtain all the necessary approvals and clearances (environmental and grid connection related) RERC Net-Metering Regulations, 2015 Page 24 of 33

25 before connecting the photovoltaic system to the distribution system. 4. Access and Disconnection 4.1 Discom shall have access to metering equipment and disconnecting means of the solar photovoltaic system, both automatic and manual, at all times. 4.2 In emergency or outage situation, where there is no access to the disconnecting means, both automatic and manual, such as a switch or breaker, Discom may disconnect service to the premises of the Eligible Consumer. 5. Liabilities 5.1 Eligible Consumer and Discom shall indemnify each other for damages or adverse effects from either party s negligence or intentional misconduct in the connection and operation of photovoltaic system or Discom s distribution system. 5.2 Discom and Eligible Consumer shall not be liable to each other for any loss of profits or revenues, business interruption losses, loss of contract or loss of goodwill, or for indirect, consequential, incidental or special damages, including, but not limited to, punitive or exemplary damages, whether any of the said liability, loss or damages arise in contract, or otherwise. 5.3 Discom shall not be liable for delivery or realization by Eligible Consumer for any fiscal or other incentive provided by the Central/State Government beyond the scope specified by the Commission in its relevant Order 5.4 The Discom may consider the quantum of electricity generation from the rooftop solar PV system under net metering arrangement towards RPO. (Applicable only in case of Eligible Consumer who is not defined as an Obligated Entity). 5.5 The proceeds from CDM benefits shall be retained by the Discom. 6. Commercial Settlement 6.1 All the commercial settlement under this agreement shall follow the Net Metering Regulations,2015 issued by the RERC. 7. Connection Costs 7.1 The Eligible Consumer shall bear all costs related to setting up of photovoltaic system including metering and interconnection costs. The Eligible Consumer agrees to pay the actual cost of RERC Net-Metering Regulations, 2015 Page 25 of 33

26 modifications and upgrades to the service line required to connect photovoltaic system to the grid in case it is required. 8. Termination 8.1 The Eligible Consumer can terminate agreement at any time by providing Discom with 90 days prior notice. 8.2 Discom has the right to terminate Agreement on 30 days prior written notice, if Eligible Consumer commits breach of any of the term of this Agreement and does not remedy the breach within 30 days of receiving written notice from Discom of the breach. 8.3 Eligible Consumer shall upon termination of this Agreement, disconnect the photovoltaic system from Discom s distribution system in a timely manner and to Discom s satisfaction. In witness, whereof, Mr for and on behalf of (Eligible Consumer) and Mr for and on behalf of (Discom) sign this agreement in two originals. Eligible Consumer Name Address Service connection No. Distribution Licensee Name Designation Office Address RERC Net-Metering Regulations, 2015 Page 26 of 33

27 Annexure - V Inverter Standards Inverter should comply with IEC 61683/IS for efficiency and Measurements and should comply with IEC (1,2,14,30) / Equivalent BIS Standard for environmental testing. Inverter should supervise the grid condition continuously and in the event of grid failure (or) under voltage (or) over voltage, Solar System should be disconnected by the circuit Breaker / Auto switch provided in the inverter and shall comply with requirements specified at regulation 8 of these Regulations. Harmonics Standards As per the standard IEEE 519, the permissible individual harmonics level shall be less than 3% (for both voltage and current harmonics) and Total Harmonics Distortion (THD) for both voltage and current harmonics of the system shall be less than 5%. Technical and interconnection requirements Parameters Parameter Reference Requirement Overall conditions of State Distribution/Supply Compliance with the terms service Code and conditions of supply. Overall Grid Standards Central Electricity Authority Compliance with Grid (Grid Standard) Regulations standards as regards the 2010 frequency, voltage and protection coordination. Meters Safety and supply Harmonic Requirements Harmonic Current Central Electricity authority (Installation & Operation of Meters) Regulations, 2006 and RERC Metering Regulations, 2007 as amended from time to time Central Electricity Authority(Measures of Safety and Electricity Supply) Regulations, 2010 IEEE 519 CEA (Technical Standards for Connectivity of the Distributed Generation Resources) Regulations, 2013 Compliance with the specifications of the meters. Compliance with safety provisions for electrical installations and apparatus of voltage below and above 650 volts. The Total Harmonic Distortion (THD) for voltage at the interconnection point should not exceed 5%. For the current distortion limits, the Total Demand Distortion (TDD) in terms of ratio of available short circuit current to the RERC Net-Metering Regulations, 2015 Page 27 of 33

28 Parameter Reference Requirement demand current (Isc/IL) should remain within limits specified for various harmonics for different TDD values. Synchronization Voltage Flicker Frequency CEA (Technical Standards for Connectivity of the Distributed Generation Resources) Regulations, 2013 CEA (Technical Standards for Connectivity of the Distributed Generation Resources) Regulations 2013 CEA (Technical Standards for Connectivity of the Distributed Generation Resources) Regulations CEA (Technical Standards for Connectivity of the Distributed Generation Resources) Regulations, 2013 Photovoltaic system must be equipped with a grid frequency synchronization device. Every time the generating station is synchronized to the electricity system, it shall not cause voltage fluctuation greater than +/- 5% at point of inter connection. The voltage-operating window should minimize nuisance tripping and should be within operating range of 80% to 110% of the nominal connected voltage. The photovoltaic system must isolate itself from the grid within a clearing time of 2 seconds. Operation of Photovoltaic system should not cause voltage flicker in excess of the limits stated in IEC standards as follows: Short-term flicker (Pst): The flicker severity evaluated over a short period of time (10 minutes) should be <=1. Long-term flicker (Plt): The flicker severity evaluated over a long period of time (typically 2 hours) should be <=0.65. There should be over and under frequency trip functions with a clearing time of 0.2 seconds, when the Distribution system frequency deviates RERC Net-Metering Regulations, 2015 Page 28 of 33

29 Parameter Reference Requirement outside the specified conditions (50.5 Hz on upper side and 47.5 Hz on lower side). DC injection CEA (Technical Standards for Photovoltaic system should Connectivity of the not inject DC power more Distributed Generation than 0.5% of full rated Resources) Regulations output at the interconnection point or 1% of rated inverter output current into distribution system under any Power Factor Islanding and Disconnection Overload and Overheat Paralleling Device CEA (Technical Standards for Connectivity of the Distributed Generation Resources) Regulations, CEA (Technical Standards for Connectivity of the Distributed Generation Resources) Regulations 2013 CEA (Technical Standards for Connectivity of the Distributed Generation Resources) Regulations 2013 CEA (Technical Standards for Connectivity of the Distributed Generation Resources) Regulations 2013 operating conditions. When the output of the inverter is greater than 50%, the power output from the inverter shall have a lagging power factor of greater than 0.9. The photovoltaic system must island/disconnect itself within IEC standard stipulated time in the event of fault, voltage or frequency variations. The inverter should have the facility to automatically switch off in case of overload or overheating and should restart when normal conditions are restored. Paralleling device of photovoltaic system shall be capable of withstanding 220% of the normal voltage at the interconnection point. RERC Net-Metering Regulations, 2015 Page 29 of 33

30 Annexure - VI Schematic Arrangement for interconnection of Rooftop & Small PV Solar Power Plant with the Distribution Licensee s/discom s grid Discom s Supply Export NM Import Switch S3 Main Consumer Panel Consumer Load SM PCU/ Inverter PV Array Normally, Solar Generation shall be connected with Grid. When grid fails, Inverter controlled Switch S3 Opens and on restoration of grid S3 Closes. Abbreviations: NM: Net Meter, SM: Solar Meter, PCU: Power Conditioning Unit RERC Net-Metering Regulations, 2015 Page 30 of 33

31 Annexure - VII Net Metering configuration options (1) Two meter configuration without storage NM Net Meter (2) Two meter configuration with storage Net Meter NM RERC Net-Metering Regulations, 2015 Page 31 of 33

32 Annexure - VIII Specification for meters for net metering (a) Meter for Solar Generation Measurements: Solar Meter Major Technical Parameters Sl. No. Technical Parameters 1. Applicability Solar plant capacity upto 4 kw 2. Number of phases and wires Connectivity at Connectivity at 415 V & below voltage level above 415 V voltage level Whole current meters CT operated CT-PT Operated Single Phase, 2 Wire Solar plant capacity above 4 kw and upto 15 kw Three Phase, 4 Wire Solar Plant Capacity above 15 kw and upto 50 kw Three Phase, 4 Wire 3. Measurand(s) kwh kwh kwh, kvah, kva, PF RERC Net-Metering Regulations, 2015 Page 32 of 33 HT/EHV supply Three Phase, 4 Wire kwh, kvah, kva, PF, Max. demand 3X63.5 V (P-N), 110 V (P-P) 4. Standard Voltage and frequency 240 V, 3X240 V (P- N), 415 V (P- P) 3X240 V (P-N), 415 V (P-P) 50±5% 50±5% 50±5% 50±5% 5. Current Rating Amp 1 Amp 6. Accuracy class S 0.2S 7. Indian Standard or IEC to which conforming 8. Import-export feature 9. Communication Port/ Protocol IS Forward import Optical/ DLMS (b) Meter for Net-Metering Measurements: Net-Meter Major Technical Parameters S. No. Technical Parameters 1. Applicability Upto 5 kw connecte d load 2. Number of phases and wires IS IS 14697,IS IS 14697,IS Forward import Optical, RS- 232/ DLMS Forward import Optical, RS-232/ DLMS Forward import Optical, RS-232/ DLMS Connectivity at Connectivity at 415 V & below voltage level above 415 V voltage level Whole current meters CT operated CT-PT Operated Single Phase, 2 Wire Above 5 kw and upto kw connecte d load Three Phase, 4 Wire Above kw and upto 50 kva contract demand HT/EHV supply Three Phase, 4 Wire Three Phase, 4 Wire 3. Measurand(s) kwh kwh kwh,kvah,kva, PF kwh,kvah,kva, PF, Max. demand 4. Standard Voltage and frequency 240 V, 3X240 V (P-N), 415 V (P- P) 3X240 V (P-N), 415 V (P-P) 3X63.5 V (P-N), 110 V (P-P)

Bihar Electricity Regulatory Commission Vidyut Bhawan, J.L.Nehru Marg, Patna

Bihar Electricity Regulatory Commission Vidyut Bhawan, J.L.Nehru Marg, Patna Bihar Electricity Regulatory Commission Vidyut Bhawan, J.L.Nehru Marg, Patna 800 021 ------------------------------------------------------------------------------------------------------------- ROOFTOP

More information

EXTRA ORDINARY 16 AASHAADHA, 1937(S) BIHAR ELECTRICITY REGULATORY COMMISSION

EXTRA ORDINARY 16 AASHAADHA, 1937(S) BIHAR ELECTRICITY REGULATORY COMMISSION REGISTERED NO. PT.-40 The B Bihar Gazett te EXTRA ORDINARY PUBLISHED BY AUTHORITY 16 AASHAADHA, 1937(S) (NO.PATNA 737) PATNA, TUESDAY, 7 TH JULY 2015 BIHAR ELECTRICITY REGULATORY COMMISSION NOTIFICATION

More information

POWER PURCHASE AGREEMENT FOR ROOFTOP SOLAR PV PLANTS WITH NET METERING ARRANGEMENT

POWER PURCHASE AGREEMENT FOR ROOFTOP SOLAR PV PLANTS WITH NET METERING ARRANGEMENT POWER PURCHASE AGREEMENT FOR ROOFTOP SOLAR PV PLANTS WITH NET METERING ARRANGEMENT This Power Purchase agreement is entered into at (place).. on this. day of between Manipur State Power Distribution Company

More information

ODISHA ELECTRICITY REGULATORY COMMISSION UNIT VIII, BHUBANESWAR

ODISHA ELECTRICITY REGULATORY COMMISSION UNIT VIII, BHUBANESWAR ODISHA ELECTRICITY REGULATORY COMMISSION UNIT VIII, BHUBANESWAR 751012 ORDER No. OERC-Engg. 02/2010/(Vol-III)/1597(A) Dated : 26.11.2014 ON NET METERING/BI-DIRECTIONAL METERING & THEIR CONNECTIVITY WITH

More information

ODISHA ELECTRICITY REGULATORY COMMISSION PLOT NO.4, CHUNOKOLI, SAILASHREE VIHAR, BHUBANESWAR ********

ODISHA ELECTRICITY REGULATORY COMMISSION PLOT NO.4, CHUNOKOLI, SAILASHREE VIHAR, BHUBANESWAR ******** ODISHA ELECTRICITY REGULATORY COMMISSION PLOT NO.4, CHUNOKOLI, SAILASHREE VIHAR, BHUBANESWAR - 751021 ******** ORDER No. OERC-Engg. 02/2010/(Vol-IV)/1131 Dated :19.08.2016 ON NET METERING/BI-DIRECTIONAL

More information

Instruction/Guidelines regarding rooftop solar PV Grid interactive systems and Net metering.

Instruction/Guidelines regarding rooftop solar PV Grid interactive systems and Net metering. Jharkhand Bijli Vitran Nigam Limited (CIN:U40108JH2013SGC001702) Regd. Office : Engineering Building, H.E.C., Dhurwa, Ranchi-834004, email:-coml.rev@rediffmail.com Telephone:-0651-2400826 & Fax:0651-2400799

More information

UP Electricity Regulatory Commission Vidyut Niyamak Bhawan, Vibhuti Khand, Gomti Nagar, Lucknow. Public Notice

UP Electricity Regulatory Commission Vidyut Niyamak Bhawan, Vibhuti Khand, Gomti Nagar, Lucknow. Public Notice UP Electricity Regulatory Commission Vidyut Niyamak Bhawan, Vibhuti Khand, Gomti Nagar, Lucknow No.UPERC/ Secy/JD(G)/2018/ dated : 20 th August, 2018 Public Notice The Commission is in process of reviewing

More information

Net +Plus Connection Code

Net +Plus Connection Code Net +Plus Connection Code LANKA ELECTRICITY COMPANY (PRIVATE) LIMITED 1.0 BACKGROUND The existing Net Metering Concept launched in the year 2010 noticed an exponential growth in the recent year and at

More information

CHECK LIST FOR REGISTRATION FORM

CHECK LIST FOR REGISTRATION FORM NNEXUREII CHECK LIST FOR REGISTRTION FORM S. No. DOCUMENTS REQUIRED SUMITTED 1 Registration form signed by Registered consumer on each page with stamp 2 Detailed SLD of solar plant signed by Registered

More information

Policy for Net-Metering based Renewable Energy Applications, Madhya Pradesh, DRAFT

Policy for Net-Metering based Renewable Energy Applications, Madhya Pradesh, DRAFT Policy for Net-Metering based Renewable Energy Applications, Madhya Pradesh, 2015- DRAFT 1. PREAMBLE 1.1 To harness the potential of renewable energy resources in the state, Government of Madhya Pradesh

More information

KERALA STATE ELECTRICITY REGULATORY COMMISSION. NOTIFICATION Dated, Thiruvananthapuram 6 th August,2007

KERALA STATE ELECTRICITY REGULATORY COMMISSION. NOTIFICATION Dated, Thiruvananthapuram 6 th August,2007 KERALA STATE ELECTRICITY REGULATORY COMMISSION NOTIFICATION No.1/1/KSERC-2006/ Dated, Thiruvananthapuram 6 th August,2007 KSERC (Supply of Power from Captive Generating Plants to Distribution Licensees)

More information

Roof Top Solar Power Net Metering Solution. Guidelines for implementation of Net Metering for Roof Top Solar Power System

Roof Top Solar Power Net Metering Solution. Guidelines for implementation of Net Metering for Roof Top Solar Power System Roof Top Solar Power Net Metering Solution Guidelines for implementation of Net Metering for Roof Top Solar Power System 1. Net Metering arrangement is permitted for 3 Phase connections only. The interconnection

More information

Policy for Net-Metering based Renewable Energy Applications, Madhya Pradesh, DRAFT

Policy for Net-Metering based Renewable Energy Applications, Madhya Pradesh, DRAFT Policy for Net-Metering based Renewable Energy Applications, Madhya Pradesh, 2015- DRAFT 1. PREAMBLE 1.1 To harness the potential of renewable energy resources in the state, Government of Madhya Pradesh

More information

SANTA CLARA CITY RENEWABLE NET METERING & INTERCONNECTION AGREEMENT

SANTA CLARA CITY RENEWABLE NET METERING & INTERCONNECTION AGREEMENT SANTA CLARA CITY RENEWABLE NET METERING & INTERCONNECTION AGREEMENT This Net Metering and Interconnection Agreement ( Agreement ) is made and entered into as of this day of, 2018, by the City of Santa

More information

INTERCONNECTION STANDARDS FOR CUSTOMER-OWNED GENERATING FACILITIES 25 kw OR LESS PUBLIC UTILITY DISTRICT NO. 1 OF CHELAN COUNTY

INTERCONNECTION STANDARDS FOR CUSTOMER-OWNED GENERATING FACILITIES 25 kw OR LESS PUBLIC UTILITY DISTRICT NO. 1 OF CHELAN COUNTY INTERCONNECTION STANDARDS FOR CUSTOMER-OWNED GENERATING FACILITIES 25 kw OR LESS PUBLIC UTILITY DISTRICT NO. 1 OF CHELAN COUNTY Table of Contents Chapter 1. Purpose and scope. Pg 3 Chapter 2. Application

More information

Northeastern Rural Electric Membership Corporation Schedule DG-2 Columbia City, Indiana Page 1 of 5

Northeastern Rural Electric Membership Corporation Schedule DG-2 Columbia City, Indiana Page 1 of 5 Columbia City, Indiana Page 1 of 5 SCHEDULE DG-2 LARGE POWER DISTRIBUTED GENERATION I. AVAILABILITY This Distributed Generation Rate is available to any member in good standing of Northeastern REMC (Northeastern)

More information

Columbia Water & Light Interconnection & Net Metering Agreement Electrical Facility

Columbia Water & Light Interconnection & Net Metering Agreement Electrical Facility Processed Date Columbia Water & Light Interconnection & Net Metering Agreement Electrical Facility Customer s Printed Name Installation Street Address Account Number Please note: Columbia Water & Light

More information

To complete the process for a net metering interconnection, please follow the steps below:

To complete the process for a net metering interconnection, please follow the steps below: We appreciate your interest in Rocky Mountain Power s net metering program. Before purchasing any net metering equipment, we recommend you review the requirements for interconnecting a net metering system

More information

Madhya Pradesh Policy for Net-Metered Renewable Energy Applications, 2016

Madhya Pradesh Policy for Net-Metered Renewable Energy Applications, 2016 Madhya Pradesh Policy for Net-Metered Renewable Energy Applications, 2016 1. PREAMBLE 1.1 To harness the potential of renewable energy resources in the state, Government of Madhya Pradesh wishes to encourage

More information

BANGALORE ELECTRICITY SUPPLY COMPANY LIMITED

BANGALORE ELECTRICITY SUPPLY COMPANY LIMITED GUIDELINES FOR EMPANELMENT OF GRID TIED INVERTER MANUFACTURERS FOR IMPLEMENTATION OF SRTPV PROGRAM IN BESCOM. I. NEW EMPANELMENT 1. The grid tied inverter manufacturer shall register their application

More information

SOLAR PHOTOVOLTAIC DISTRIBUTED GENERATION CUSTOMER GUIDELINES, APPLICATION & INTERCONNECTION AGREEMENT

SOLAR PHOTOVOLTAIC DISTRIBUTED GENERATION CUSTOMER GUIDELINES, APPLICATION & INTERCONNECTION AGREEMENT SOLAR PHOTOVOLTAIC DISTRIBUTED GENERATION CUSTOMER GUIDELINES, APPLICATION & INTERCONNECTION AGREEMENT INTERCONNECTION AGREEMENT FOR SOLAR PHOTOVOLTAIC DISTRIBUTED GENERATION THIS AGREEMENT MUST ACCOMPANY

More information

PUBLIC NOTICE. (G.K. Sharma) Secretary. (Not to be published) (G.K. Sharma) Secretary

PUBLIC NOTICE. (G.K. Sharma) Secretary. (Not to be published) (G.K. Sharma) Secretary Rajasthan Electricity Regulatory Commission Vidyut Viniyamak Bhawan, Near State Motor Garage,Sahakar Marg, Jaipur-302001 Phone: 0141-2741299, 2740067, Fax: 0141-2741018, E-mail: rercjpr@yahoo.co.in website:

More information

A member-consumer with a QF facility shall not participate in the Cooperative s electric heat rate program.

A member-consumer with a QF facility shall not participate in the Cooperative s electric heat rate program. Electric Tariff _2nd Revised Sheet No. 72 Filed with Iowa Utilities Board Cancels _1st Sheet No. _72 Cooperative is a member of Central Iowa Power Cooperative (CIPCO), a generation and transmission cooperative

More information

Noble County Rural Electric Membership Corporation

Noble County Rural Electric Membership Corporation Albion, Indiana Page 1 of 5 SCHEDULE NB-1 RESIDENTIAL NET BILLING I. AVAILABILITY This Net Billing Rate is available to any residential member in good standing of Noble REMC (Noble) who owns and operates

More information

To complete the process for a net metering interconnection, please follow the steps below:

To complete the process for a net metering interconnection, please follow the steps below: We appreciate your interest in Pacific Power s net metering program. Before purchasing any net metering equipment, we recommend you review the requirements for interconnecting a net metering system to

More information

London Hydro Connection Checklist

London Hydro Connection Checklist London Hydro Connection Checklist Applicants should be aware not to incur expenses prior to London Hydro approving the connection of the facility to the grid. Payment of Connection Fee: $1000 plus HST

More information

TERMS AND CONDITIONS

TERMS AND CONDITIONS XXV. NET METERING A. Applicability and Availability 1. The terms Net Metering Service, Demand Charge-based Time-of- Use Tariff, Net Metering Customer, Customer, Time-of-Use Customer, Time-of-Use Tier,

More information

CHAPTER 25. SUBSTANTIVE RULES APPLICABLE TO ELECTRIC SERVICE PROVIDERS.

CHAPTER 25. SUBSTANTIVE RULES APPLICABLE TO ELECTRIC SERVICE PROVIDERS. 25.211. Interconnection of On-Site Distributed Generation (DG). (a) (b) (c) Application. Unless the context indicates otherwise, this section and 25.212 of this title (relating to Technical Requirements

More information

Information Packet Kissimmee Utility Authority Customer-Owned Renewable Generation Interconnection And Net Metering Program

Information Packet Kissimmee Utility Authority Customer-Owned Renewable Generation Interconnection And Net Metering Program Information Packet Kissimmee Utility Authority Customer-Owned Renewable Generation Interconnection And Net Metering Program As part of our commitment to support renewable energy, Kissimmee Utility Authority

More information

Compendium of Regulations & Tariff Orders Issued by Regulatory Commissions for Renewable Energy Sources in India

Compendium of Regulations & Tariff Orders Issued by Regulatory Commissions for Renewable Energy Sources in India 457 JOINT ELECTRICITY REGULATORY COMMISSION Joint Electricity Regulatory Commission for State of Goa & Union Territories Grid Connected Solar Power Regulations 2015 Dated 8 th May 2015 Sl. No Description

More information

Umatilla Electric Cooperative Net Metering Rules

Umatilla Electric Cooperative Net Metering Rules Umatilla Electric Cooperative Net Metering Rules Version: July 2017 Umatilla Electric Cooperative NET METERING RULES Rule 0005 Scope and Applicability of Net Metering Facility Rules (1) Rule 0010 through

More information

KAUAI ISLAND UTILITY COOPERATIVE KIUC Tariff No. 1 RULE NO. 17 NET ENERGY METERING

KAUAI ISLAND UTILITY COOPERATIVE KIUC Tariff No. 1 RULE NO. 17 NET ENERGY METERING Third Revised Sheet 55a Cancels Second Revised Sheet 55a A. ELIGIBLE CUSTOMER-GENERATOR RULE NO. 17 NET ENERGY METERING Net energy metering is available to eligible customer-generators, defined as, permanent

More information

In the MERC (Net Metering for Roof-top Solar Photo Voltaic Systems) Regulations, 2015, the Eligible Consumer has been defined as under:

In the MERC (Net Metering for Roof-top Solar Photo Voltaic Systems) Regulations, 2015, the Eligible Consumer has been defined as under: ~~ NIAHA VITARAN MaharasIltn< State Electricity Distribution Co. Ltd. (A Govt. of Maharashtra Undertaking) ~IN:U40109MH2005SGC153645 No. Comm/CP/Solar-Net metering/ 3'(\"5/ Office of the Chief Engineer

More information

Montana-Dakota Utilities Co. A Division of MDU Resources Group, Inc. 400 N 4 th Street Bismarck, ND 58501

Montana-Dakota Utilities Co. A Division of MDU Resources Group, Inc. 400 N 4 th Street Bismarck, ND 58501 Original Sheet No. 72 Page 1 of 7 AVAILABILITY: Available to any customer that owns and operates a solar, wind or hydroelectric generating facility with a capacity of not more than 25 Kw that is located

More information

REVISED 8/1/2018 SOLAR PHOTOVOLTAIC DISTRIBUTED GENERATION CUSTOMER GUIDELINES, APPLICATION & WGC INTERCONNECTION AGREEMENT

REVISED 8/1/2018 SOLAR PHOTOVOLTAIC DISTRIBUTED GENERATION CUSTOMER GUIDELINES, APPLICATION & WGC INTERCONNECTION AGREEMENT REVISED 8/1/2018 SOLAR PHOTOVOLTAIC DISTRIBUTED GENERATION CUSTOMER GUIDELINES, APPLICATION & WGC INTERCONNECTION AGREEMENT INTRODUCTION Lathrop Irrigation District has created a policy to allow safe connection

More information

New Ulm Public Utilities. Interconnection Process and Requirements For Qualifying Facilities (0-40 kw) New Ulm Public Utilities

New Ulm Public Utilities. Interconnection Process and Requirements For Qualifying Facilities (0-40 kw) New Ulm Public Utilities New Ulm Public Utilities Interconnection Process and Requirements For Qualifying Facilities (0-40 kw) New Ulm Public Utilities INDEX Document Review and History... 2 Definitions... 3 Overview... 3 Application

More information

City of, Kansas Electric Department. Net Metering Policy & Procedures for Customer-Owned Renewable Energy Resources

City of, Kansas Electric Department. Net Metering Policy & Procedures for Customer-Owned Renewable Energy Resources Ordinance No. Exhibit A ----------------------------------------- City of, Kansas Electric Department Net Metering Policy & Procedures for Customer-Owned Renewable Energy Resources -------------------------------------

More information

RULES ENABLING THE NET- METERING PROGRAM FOR RENEWABLE ENERGY

RULES ENABLING THE NET- METERING PROGRAM FOR RENEWABLE ENERGY RULES ENABLING THE NET- METERING PROGRAM FOR RENEWABLE ENERGY Outline 1. Introduction 2. Legal Basis 3. Scope, Applicability & Qualification 4. Interconnection Set-Up 5. Pricing Methodology 6. Net-Metering

More information

GUIDE FOR MICROGENERATION INTERCONNECTION TO CITY OF MEDICINE HAT ELECTRIC DISTRIBUTION SYSTEM

GUIDE FOR MICROGENERATION INTERCONNECTION TO CITY OF MEDICINE HAT ELECTRIC DISTRIBUTION SYSTEM GUIDE FOR MICROGENERATION INTERCONNECTION TO CITY OF MEDICINE HAT ELECTRIC DISTRIBUTION SYSTEM Page 1 of 19 Table of Contents 1.0 SCOPE...4 2.0 PURPOSE...4 3.0 LIMITATIONS...5 4.0 GENERAL INTERCONNECTION

More information

FITCHBURG GAS AND ELECTRIC LIGHT COMPANY NET METERING SCHEDULE NM

FITCHBURG GAS AND ELECTRIC LIGHT COMPANY NET METERING SCHEDULE NM Sheet 1 FITCHBURG GAS AND ELECTRIC LIGHT COMPANY SCHEDULE NM Applicability The following tariff provisions shall be applicable to a Host Customer, as defined herein, that requests net metering services

More information

Name and address of DISCOM with Logo. TARIFF NOTIFICATION The 22 rd March, 2018 RETAIL SUPPLY TARIFF EFFECTIVE FROM 1 st APRIL, 2018

Name and address of DISCOM with Logo. TARIFF NOTIFICATION The 22 rd March, 2018 RETAIL SUPPLY TARIFF EFFECTIVE FROM 1 st APRIL, 2018 Name and address of DISCOM with Logo TARIFF NOTIFICATION The 22 rd March, 2018 RETAIL SUPPLY TARIFF EFFECTIVE FROM 1 st APRIL, 2018 In exercise of the powers conferred under section 64(3) and other related

More information

Distributed Generation Interconnection Policy

Distributed Generation Interconnection Policy Distributed Generation Interconnection Policy 1 Introduction Carroll Electric Membership Corporation Distributed Generation Interconnection Policy Carroll Electric Membership Corporation (herein after

More information

To complete the process for a net metering interconnection, please follow the steps below:

To complete the process for a net metering interconnection, please follow the steps below: We appreciate your interest in Pacific Power s net metering program. Before purchasing any net metering equipment, we recommend you review the requirements for interconnecting a net metering system to

More information

D.P.U A Appendix B 220 CMR: DEPARTMENT OF PUBLIC UTILITIES

D.P.U A Appendix B 220 CMR: DEPARTMENT OF PUBLIC UTILITIES 220 CMR 18.00: NET METERING Section 18.01: Purpose and Scope 18.02: Definitions 18.03: Net Metering Services 18.04: Calculation of Net Metering Credits 18.05: Allocation of Net Metering Credits 18.06:

More information

Northeastern Rural Electric Membership Corporation Columbia City, Indiana

Northeastern Rural Electric Membership Corporation Columbia City, Indiana Page 1 of 5 SCHEDULE ADG - 1 AGGREGATED DISTRIBUTED GENERATION SERVICE I. AVAILABILITY This Aggregated Distributed Generation Schedule is available to any member in good standing of Northeastern REMC (Northeastern),

More information

RATE 765 RENEWABLE FEED-IN TARIFF

RATE 765 RENEWABLE FEED-IN TARIFF NORTHERN INDIANA PUBLIC SERVICE COMPANY Original Sheet No. 104 TO WHOM AVAILABLE Sheet No. 1 of 12 This Rate Schedule is a voluntary offer available to any Customer that operates within the Company s service

More information

Application to Amend Net Metering Service under RS Appendix B. Revised RS 1289 Clean and Black-lined

Application to Amend Net Metering Service under RS Appendix B. Revised RS 1289 Clean and Black-lined Application to Amend Net Metering Service under RS 1289 Revised RS 1289 Clean and Black-lined Rate Schedule 1289 Revision 1 Effective: April 20, 2018 Page 6-1 Clean 6. OTHER RATE SCHEDULE 1289 NET METERING

More information

City of Washington, Kansas Electric Department. Net Metering Policy & Procedure For Customer-Owned Renewable Energy Resources

City of Washington, Kansas Electric Department. Net Metering Policy & Procedure For Customer-Owned Renewable Energy Resources Ordinance No. 743 Exhibit A City of Washington, Kansas Electric Department Net Metering Policy & Procedure For Customer-Owned Renewable Energy Resources Page 1 of 7 1. INTRODUCTION The provisions of this

More information

FITCHBURG GAS AND ELECTRIC LIGHT COMPANY NET METERING SCHEDULE NM

FITCHBURG GAS AND ELECTRIC LIGHT COMPANY NET METERING SCHEDULE NM Sheet 1 FITCHBURG GAS AND ELECTRIC LIGHT COMPANY SCHEDULE NM Applicability The following tariff provisions shall be applicable to a Host Customer, as defined herein, that requests net metering services

More information

INTERCONNECTION STANDARDS FOR PARALLEL OPERATION OF SMALL-SIZE GENERATING FACILITIES KILOWATTS IN THE STATE OF NEW JERSEY

INTERCONNECTION STANDARDS FOR PARALLEL OPERATION OF SMALL-SIZE GENERATING FACILITIES KILOWATTS IN THE STATE OF NEW JERSEY INTERCONNECTION STANDARDS FOR PARALLEL OPERATION OF SMALL-SIZE GENERATING FACILITIES 10-100 KILOWATTS IN THE STATE OF NEW JERSEY January 1, 2005 Rockland Electric Company 390 West Route 59 Spring Valley,

More information

Application for release of capital subsidy on installation of Grid Connected Solar Power Plant

Application for release of capital subsidy on installation of Grid Connected Solar Power Plant Chandigarh Renewal Energy, Science & Technology Promotion Society (CREST) Under the Aegis of Department of Science & Technology, Chandigarh Administration), Paryavaran Bhawan, First Floor, Sec-19B, Madhya

More information

NESCO UTILITY. Januganj, Balasore TARIFF NOTIFICATION The 23 rd March, 2015 RETAIL SUPPLY TARIFF EFFECTIVE FROM 1 st APRIL, 2015

NESCO UTILITY. Januganj, Balasore TARIFF NOTIFICATION The 23 rd March, 2015 RETAIL SUPPLY TARIFF EFFECTIVE FROM 1 st APRIL, 2015 NESCO UTILITY Januganj, Balasore-756019 TARIFF NOTIFICATION The 23 rd March, 2015 RETAIL SUPPLY TARIFF EFFECTIVE FROM 1 st APRIL, 2015 In exercise of the powers conferred under section 64(3) and other

More information

S T A F F R E P O R T

S T A F F R E P O R T S T A F F R E P O R T DATE: December 11, 2012 TO: FROM: Honorable Mayor and City Council Superintendent, Brandon Graham SUBJECT: Net Metering Policy Section A 2. b. (Change the maximum installation capacity

More information

BC Hydro Rate Schedule 1289 Revision 1 Effective: April 20, 2018 Page 6-1

BC Hydro Rate Schedule 1289 Revision 1 Effective: April 20, 2018 Page 6-1 Page 6-1 6. OTHER RATE SCHEDULE 1289 NET METERING SERVICE Availability For any Residential Service Customer and for any General Service Customer who: 1. installs a Generating Facility to generate electricity

More information

Noble County Rural Electric Membership Corporation

Noble County Rural Electric Membership Corporation Albion, Indiana Page 1 of 7 SCHEDULE LPDG-1 LARGE POWER AND COMMERCIAL MEMBER-OWNED GENERATION I. AVAILABILITY This Generation rate is available to any member in good standing of Noble REMC (Noble) who

More information

THE EMPIRE DISTRICT ELECTRIC COMPANY P.S.C. Mo. No. 5 Sec. 4 1st Revised Sheet No. 23

THE EMPIRE DISTRICT ELECTRIC COMPANY P.S.C. Mo. No. 5 Sec. 4 1st Revised Sheet No. 23 P.S.C. Mo. No. 5 Sec. 4 1st Revised Sheet No. 23 Canceling P.S.C. Mo. No. 5 Sec. 4 Original Sheet No. 23 PURPOSE: The purpose of this Rider SR is to implement the solar rebate established through 393.1030

More information

INTERCONNECTION for GENERATING FACILITIES Up to 20 MW

INTERCONNECTION for GENERATING FACILITIES Up to 20 MW PROGRAM REQUIREMENTS Important Information from Your Local Non-Profit Utility INTERCONNECTION for GENERATING FACILITIES Up to 20 MW Interconnecting to the Electrical Distribution System of Public Utility

More information

Net Metering Program

Net Metering Program Net Metering Program Chapter 1 Purpose and Scope. The purpose of this chapter is to establish rules for determining the terms and conditions governing the interconnection of electric generation facilities

More information

Consumer Guidelines for Electric Power Generator Installation and Interconnection

Consumer Guidelines for Electric Power Generator Installation and Interconnection Consumer Guidelines for Electric Power Generator Installation and Interconnection Habersham EMC seeks to provide its members and patrons with the best electric service possible, and at the lowest cost

More information

Ministry of New and Renewable Energy (Jawaharlal Nehru National Solar Mission) Form B for Project Proposals for

Ministry of New and Renewable Energy (Jawaharlal Nehru National Solar Mission) Form B for Project Proposals for Form B Ministry of New and Renewable Energy (Jawaharlal Nehru National Solar Mission) Form B for Project Proposals for Grid Connected Rooftop and Small SPV Power Plants (For the project above 5 kwp & upto

More information

Louisville Gas and Electric Company

Louisville Gas and Electric Company P.S.C. Electric No. 11, Original Sheet No. 57 APPLICABLE In all territory served. AVAILABILITY OF SERVICE Available to any customer-generator who owns and operates a generating facility located on Customer

More information

White River Electric Association, Inc. Net Metering Information & Service Requirements

White River Electric Association, Inc. Net Metering Information & Service Requirements White River Electric Association, Inc. Net Metering Information & Service Requirements What is Net Metering? Net Metering is an electric policy and service for consumers who own and utilize renewable energy

More information

RULE 21 GENERATING FACILITY INTERCONNECTION APPLICATION SMUD s Distribution System - (SMUD FORM 2655)

RULE 21 GENERATING FACILITY INTERCONNECTION APPLICATION SMUD s Distribution System - (SMUD FORM 2655) - (SMUD FORM 2655) A. Applicability: This Generating Facility Interconnection Application (Application) shall be used to request the interconnection of a Generating Facility to Sacramento Municipal Utility

More information

REVISION NO.: 7 EFFECTIVE: 07/07/16

REVISION NO.: 7 EFFECTIVE: 07/07/16 SOLAR PROGRAM INTERCONNECTION PROCESS OVERVIEW FOR RESIDENTIAL AND SMALL GENERAL SERVICE REVISION NO.: 7 EFFECTIVE: 07/07/16 Required Steps for ED3 s Solar Program Interconnection Process for Residential

More information

Adopted: September 24, 2015 Version: Version 1.0

Adopted: September 24, 2015 Version: Version 1.0 Interconnection Standards for Parallel Installation and Operation of Customer Owned Renewable Electric Generating Facilities for Coon Rapids Municipal Utilities Adopted: September 24, 2015 Version: Version

More information

INDUSTRIAL HAUL AGREEMENT

INDUSTRIAL HAUL AGREEMENT INDUSTRIAL HAUL AGREEMENT PUBLIC WORKS MEMORANDUM OF AGREEMENT entered into this day of, A.D., 20(yr). BETWEEN: PARKLAND COUNTY a County incorporated under the laws of the Province of Alberta, (hereinafter

More information

MEMBER RELATIONS POLICY NO SUBJECT: INTERCONNECTION OF CUSTOMER GENERATION RESOURCES

MEMBER RELATIONS POLICY NO SUBJECT: INTERCONNECTION OF CUSTOMER GENERATION RESOURCES Beartooth Electric Cooperative, Inc. MEMBER RELATIONS POLICY NO. 416 1. SUBJECT: INTERCONNECTION OF CUSTOMER GENERATION RESOURCES 2. OBJECTIVE: Beartooth Electric Cooperative, Inc. (BEC) recognizes that

More information

INTERCONNECTION RULES AND REGULATIONS FOR NET ENERGY METERING SYTEMS

INTERCONNECTION RULES AND REGULATIONS FOR NET ENERGY METERING SYTEMS INTERCONNECTION RULES AND REGULATIONS FOR NET ENERGY METERING SYTEMS TABLE OF CONTENTS Purpose and Scope...2 Authority...2 Applicability... 2 Intent.. 2 Maximum Connected Generation Allowed. 2 Definitions.

More information

SOLAR PV INTEGRATION: ISSUES & CHALLENGES with NET METERING

SOLAR PV INTEGRATION: ISSUES & CHALLENGES with NET METERING SOLAR PV INTEGRATION: ISSUES & CHALLENGES with NET METERING A.K. Bohra Chief Executive Officer NESCO, WESCO & SOUTHCO Central Service Office, Bhubaneswar DISTRIBUTED RENEWABLE ENERGY GENERATION With the

More information

City of Banning Electric Utility - Residential Self Generating Facility Program (Photovoltaic Systems <48kW)

City of Banning Electric Utility - Residential Self Generating Facility Program (Photovoltaic Systems <48kW) City of Banning Electric Utility - Residential Self Generating Facility Program (Photovoltaic Systems

More information

Street Address. City-Village-Township

Street Address. City-Village-Township Schedule Designation D11 Primary Supply Agreement D11 963-1816 77/15 THIS AGREEMENT, dated, 20, by and between (Name) a, (Legal Entity and State of Organization) herein called the "Customer", and DTE Electric

More information

Thank you for your time and attention to this matter. Please feel free to contact me if you have any questions regarding the filing.

Thank you for your time and attention to this matter. Please feel free to contact me if you have any questions regarding the filing. Mary L. Cottrell, Secretary March 27, 2009 Page 1 Stacey M. Donnelly Counsel September 23, 2009 Mark D. Marini, Secretary Department of Public Utilities One South Station Boston, MA 02110 Re: D.P.U. 09-03

More information

Wheeling charges, Banking charges & Cross Subsidy Surcharge for Solar Power Generators

Wheeling charges, Banking charges & Cross Subsidy Surcharge for Solar Power Generators KARNATAKA ELECTRICITY REGULATORY COMMISSION No.9/2, 6 th & 7 th Floor, Mahalaxmi Chambers, M.G.Road, Bangalore-560 001 Present: Shri M.R. Sreenivasa Murthy Chairman Shri H. D. Arun Kumar Shri D.B. Manival

More information

Enquiry Form (Non-Registered Generator With Capacity less than 5 MW)

Enquiry Form (Non-Registered Generator With Capacity less than 5 MW) Connection Applicant (Embedded Generating Unit Owner/Proponent) Business name: ABN: Contact name: Address: Telephone number: E-mail address: Connection Applicant acting and working on behalf of the above

More information

INTERCONNECTION REQUIREMENTS POLICY

INTERCONNECTION REQUIREMENTS POLICY Issue Date: January 8, 2018 Resolution No. 2097-18 INTERCONNECTION REQUIREMENTS POLICY 1. Purpose and Scope A. The purpose of these Interconnection Requirements is to establish rules for determining the

More information

WASHINGTON ELECTRIC COOPERATIVE, INC. NET METERING TARIFF POLICY BULLETIN NO. 38 NM

WASHINGTON ELECTRIC COOPERATIVE, INC. NET METERING TARIFF POLICY BULLETIN NO. 38 NM WASHINGTON ELECTRIC COOPERATIVE, INC. NET METERING TARIFF POLICY BULLETIN NO. 38 NM A. Application. The following tariff shall apply to members who: (1) take service under a rate within this electric service

More information

BC Hydro Rate Schedules Effective: August 1, 2015 Fourth Revision of Page 30

BC Hydro Rate Schedules Effective: August 1, 2015 Fourth Revision of Page 30 BC Hydro Effective: August 1, 2015 Fourth Revision of Page 30 SCHEDULE 1289- NET METERING SERVICE Availability: For any Residential Service Customer and for any General Service Customer who install a Generating

More information

M.P.S.C. No. 2 Electric Third Revised Sheet No. 65 (Rate Case) Cancels Second Revised Sheet No. 65

M.P.S.C. No. 2 Electric Third Revised Sheet No. 65 (Rate Case) Cancels Second Revised Sheet No. 65 M.P.S.C. No. 2 Electric Third Revised Sheet No. 65 (Rate Case) Cancels Second Revised Sheet No. 65 CLASS OF SERVICE: CUSTOMER GENERATING SYSTEMS OVER 20 KW RATE CGS 1 AVAILABILITY To customers owning generating

More information

Schedule SP SOLAR PURCHASE (Experimental)

Schedule SP SOLAR PURCHASE (Experimental) I. APPLICABILITY & AVAILABILITY This Schedule is available in conjunction with the Company s Solar Purchase Program ( Program ) and is applicable only where the Customer elects to receive Electricity Supply

More information

Policy Bulletin No. 25 Net Metering. Public Utility District No. 1 of Klickitat County 1313 South Columbus Goldendale, WA 98620

Policy Bulletin No. 25 Net Metering. Public Utility District No. 1 of Klickitat County 1313 South Columbus Goldendale, WA 98620 Policy Bulletin No. 25 Net Metering Public Utility District No. 1 of Klickitat County 1313 South Columbus Goldendale, WA 98620 Interconnection Standards For Residential Net Energy Metering With Electric

More information

(2) Scope. 220 CMR applies to all Distribution Companies subject to the jurisdiction of the Department.

(2) Scope. 220 CMR applies to all Distribution Companies subject to the jurisdiction of the Department. D.P.U. 11-10-A 220 CMR 18.00: NET METERING Section 18.01: Purpose and Scope 18.02: Definitions 18.03: Net Metering Services 18.04: Calculation of Net Metering Credits 18.05: Allocation of Net Metering

More information

Definitions. Scope. Customer Generation Interconnection Requirements

Definitions. Scope. Customer Generation Interconnection Requirements Updated 02/1 Page 1 Scope The purpose of this document is to describe Idaho Power s requirements for the installation and testing of Customer Generation acilities that are interconnected with Idaho Power

More information

SCHEDULE NO. ACG33 NET METERING SERVICE

SCHEDULE NO. ACG33 NET METERING SERVICE Approved by Decision No.: 75408 Effective: January 19, 2016 Applicability Applicable to "Net Metering Facility" as defined below, or applicable Arizona Corporation Commission ("Cmnn1ission") Decision,

More information

December 13, This document was filed with the Board of Public Utilities on December 13, It is awaiting final approval by BPU staff.

December 13, This document was filed with the Board of Public Utilities on December 13, It is awaiting final approval by BPU staff. JERSEY CENTRAL POWER & LIGHT UNIFORM TECHNICAL AND PROCEDURAL INTERCONNECTION REQUIREMENTS FOR NET METERING FACILITIES FOR INVERTER BASED WIND AND PHOTOVOLTAIC SYSTEMS OF 100 kw OR SMALLER for Atlantic

More information

To complete the process for a net metering interconnection, please follow the steps below:

To complete the process for a net metering interconnection, please follow the steps below: We appreciate your interest in Pacific Power s net metering program. Before purchasing any net metering equipment, we recommend you review the requirements for interconnecting a net metering system to

More information

Net Metering Interconnection Requirements

Net Metering Interconnection Requirements Net Metering Interconnection Requirements Customer Generation Capacity Not Exceeding 100 kw Date: 2017-07-01 Version: 1 Revision History Date Rev. Description July 1, 2017 1 Initial Release Newfoundland

More information

24. SOLAR INCENTIVE PROGRAM II

24. SOLAR INCENTIVE PROGRAM II 24. SOLAR INCENTIVE PROGRAM II A. General California Senate Bill 1 requires publicly owned utilities that sell electricity at the retail level, to adopt, implement, and fund a solar incentive program for

More information

MISSOURI SERVICE AREA

MISSOURI SERVICE AREA MO.P.S.C. SCHEDULE NO. 6 1st Revised SHEET NO. 171.5 CANCELLING MO.P.S.C. SCHEDULE NO. 6 Original SHEET NO. 171.5 INTERCONNECTION APPLICATION/AGREEMENT FOR NET METERING SYSTEMS WITH CAPACITY OF 100 kw

More information

Rider : NET METERING SERVICE AND ELECTRICAL SYSTEM INTEGRATION

Rider : NET METERING SERVICE AND ELECTRICAL SYSTEM INTEGRATION SAMPLE ORDINANCE 3/5/2012 Rider : NET METERING SERVICE AND ELECTRICAL SYSTEM INTEGRATION Section 1: Applicable Service Territory Net metering and electrical system interconnection is available on a first-come,

More information

ANNEXURE: TARIFF SCHEDULE

ANNEXURE: TARIFF SCHEDULE ANNEXURE: TARIFF SCHEDULE TARIFF FOR SUPPLY OF ELECTRICITY AT LOW TENSION, HIGH TENSION, AND EXTRA HIGH TENSION Effective from 1 st April, 2018 GENERAL 1. The tariff figures indicated in this tariff schedule

More information

Heber Light & Power Electric Service Rule No. 14 NET METERING SERVICE

Heber Light & Power Electric Service Rule No. 14 NET METERING SERVICE Heber Light & Power Electric Service Rule No. 14 NET METERING SERVICE 1. Overview The Company offers Residential and Small General Service Customers net metering service that allows the Customer to use

More information

RULES FOR CUSTOMER INTERCONNECTION OF ELECTRIC GENERATING FACILITIES

RULES FOR CUSTOMER INTERCONNECTION OF ELECTRIC GENERATING FACILITIES RULES FOR CUSTOMER INTERCONNECTION OF ELECTRIC GENERATING FACILITIES Last Revised Date: October 15, 2015 Contents Chapter 1 - Purpose and Scope 2 Chapter 2 - Application of Rules 2 Chapter 3 - Definitions

More information

JEA Distributed Generation Policy Effective April 1, 2018

JEA Distributed Generation Policy Effective April 1, 2018 Summary This JEA Distributed Generation Policy is intended to facilitate generation from customer-owned renewable and non-renewable energy generation systems interconnecting to the JEA electric grid. The

More information

Madhya Pradesh Policy for Rooftop Renewable Energy Projects, 2016

Madhya Pradesh Policy for Rooftop Renewable Energy Projects, 2016 Madhya Pradesh Policy for Rooftop Renewable Energy Projects, 2016 1. PREAMBLE 1.1 To harness the abundantly available renewable energy potential in the state, the Government of Madhya Pradesh wishes to

More information

NET METER REQUEST FORM

NET METER REQUEST FORM Form No. 3651 02/17 NET METER REQUEST FORM In order to receive a Net Meter, please provide the information requested below, sign and return only this coversheet by mail to the address below. NorthWestern

More information

Senate Substitute for HOUSE BILL No. 2101

Senate Substitute for HOUSE BILL No. 2101 Senate Substitute for HOUSE BILL No. 2101 AN ACT concerning utilities; relating to renewable energy resources; amending K.S.A. 2013 Supp. 66-1,184, 66-1265, 66-1266, 66-1267 and 66-1271 and repealing the

More information

Street Address. City-Village-Township

Street Address. City-Village-Township Schedule Designation D11 Primary Supply Agreement D11 963-1816 8/18 THIS AGREEMENT, dated, 20, by and between (Name) a, (Legal Entity and State of Organization) herein called the "Customer", and DTE Electric

More information

MISSOURI SERVICE AREA

MISSOURI SERVICE AREA MO.P.S.C. SCHEDULE NO. 6 4th Revised SHEET NO. 88 CANCELLING MO.P.S.C. SCHEDULE NO. 6 3rd Revised SHEET NO. 88 PURPOSE SOLAR REBATE The purpose of this Rider SR is to implement the solar rebate established

More information

TARIFF SCHEDULES FOR HIGH TENSION CONSUMERS. Table of Contents

TARIFF SCHEDULES FOR HIGH TENSION CONSUMERS. Table of Contents Annexure-1-B ANNEXURE TO TARIFF ORDER PASSED BY MPERC For Financial Year 2005-06 MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION TARIFF SCHEDULES FOR HIGH TENSION CONSUMERS Table of Contents Sr No Particulars

More information