2 Akbar Jazayeri Director of Revenue and Tariffs April 2, 2002 ADVICE 1607-E (U 338-E) PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION SUBJECT: Tariff Language Modifications and Clarifications Required to Maintain Existing Tariff Provisions Related to Bill and Rate Limiters and Other Rate Structures Consistent with Resolution E-3765 Southern California Edison Company (SCE) hereby submits for filing the following changes to its tariff schedules. The revised tariff sheets are listed on Attachment A and are attached hereto. PURPOSE This advice filing proposes tariff language modifications and clarifications that are necessary to address a number of issues originally resolved in Decision (D.) , and later modified pursuant to Assembly Bill (AB) These changes primarily modify references within SCE s tariff schedules that were mandated by AB 1890, and extend the current treatment of the relevant provisions of SCE s tariffs until SCE can address the full revenue impact of any changes in Phase II of its 2003 GRC, 1 consistent with the ratemaking to implement the Settlement Agreement approved by the California Public Utilities Commission (Commission) in Resolution E BACKGROUND On April 10, 1996, the Commission issued D in SCE s 1995 General Rate Case (GRC). The decision ordered that SCE file, on or before April 26, 1996, revised tariff sheets incorporating authorized rates and make other revisions as necessary. In compliance, SCE filed Advice Letters 1161-E and 1161-E-A to make the required 1 SCE expects the revenue impact of maintaining these provisions to be small. P.O. Box Walnut Grove Ave. Rosemead, California (626) Fax (626)

3 ADVICE 1607-E (U 338-E) April 2, 2002 changes to the tariff schedules 2. These changes included, among other things, the addition of various bill and rate limiters designed to provide customers protection from excessive bill increases resulting from the elimination of their existing tariff schedules. These phased limiters were designed to offer decreasing levels of protection from bill increases over specified time periods, typically 3 years, at which time the rate or bill limiter would no longer have applied. D also ordered the phased elimination of Schedule DE, which provids a 25% discount on bills for electric service for SCE employees and retirees. Decreasing levels of percentage discounts were planned over a period of 3 years for active employees and 10 years for retirees, at the conclusion of which the employee discount would no longer have applied. AB 1890 modified Public Utilities (PU) Code Section 368(a) to require, among other things, that electric utilities freeze total rates at the levels authorized on June 10, 1996, and that Residential and Small Commercial customers receive a 10% bill credit for the duration of the rate freeze period. The statute also allowed for recovery of stranded generation costs from the frozen rate revenues through the Competition Transition Charge (CTC). One consequence of the rate freeze provision of AB 1890 was that certain tariff provisions, notably the bill and rate limiters and phased elimination of Schedule DE authorized in D , were suspended. SCE subsequently filed Advice 1187-E to add language to tariff schedules to identify limitations on changes to rates under the mandated rate freeze. Footnotes added beneath the bill and rate limiter provisions specified that, pursuant to AB 1890, any phased changes to rate levels or rate schedules were suspended. On October 2, 2001, SCE and the Commission entered into a Settlement Agreement in Federal District Court, Case No RSWL (Mcx), which among other things, established Settlement Rates and new ratemaking mechanisms that are to be effective September 1, 2001, and which effectively replace AB 1890 rates and ratemaking. On November 14, 2001, SCE filed Advice 1586-E to implement the provisions of the Settlement Agreement. In that advice letter, SCE further proposed that the establishment of Settlement Rates makes the post rate freeze filing requirement of D unnecessary. The Resolution E-3765, issued on January 23, 2002 concurred and removed that requirement for SCE 3. PROPOSED TARIFF MODIFICATIONS The displacement of the rate and ratemaking provisions of AB 1890 by those of the Settlement Agreement requires minor modifications to SCE s Rate Schedules. These modifications bring consistency in language to SCE s tariffs and update references in numerous areas to reflect the current state of the utility ratemaking. These changes are described in detail below. 2 Effective June 1, Resolution E-3765, Ordering Paragraphs 1, 5, 6, and 31.

4 ADVICE 1607-E (U 338-E) April 2, % Bill Credit The provisions related to the 10% bill credit for Residential and Small Commercial customers were established in AB Senate Bill (SB) X2-85 held that these customers would not be subject to any rate increase or surcharge solely as a result of the termination of the 10% rate reduction. Therefore, SCE proposes to retain the 10% bill credit for these customers, and modify the relevant tariff language accordingly, until a comprehensive revenue and rate design application is filed in Phase II of SCE s 2003 GRC. Bill and Rate Limiters As discussed above, SCE proposes to modify existing footnote language in its tariffs to describe the continued operation, at currently effective levels, of bill and rate limiters and other rate mechanisms until such time as SCE files a comprehensive revenue and rate design application in Phase II of its 2003 GRC. The affected provisions are identified below: 4! Bill Limiter for customers who were transferred from Schedule D-PG as of April 30, 1996, to Schedules D and S.! Bill Limiter for customers transferred from Schedule GS-1-PG as of April 30, 1996, to Schedules GS-1 and S.! Bill Limiter for customers transferred from Schedule PA-1-PG as of April 30, 1996, to Schedules PA-1 and S.! Bill Limiter for customers transferred from Schedule TOU-PA-SOP as of December 31, 1992, concurrently served under interruptible Schedule AP-I as of January 1, 1993, to Schedules TOU-PA-SOP-I.! Average Rate Limiter for customers transferred from Schedule TOU- ALMP-2 as of April 30, 1996 to Schedule PA-1.! Average Rate Limiter for customers transferred from Schedule TOU- ALMP-2 as of April 30, 1996, to Schedule TOU-PA.! Schedule DE, Domestic Service to Utility Employees. Competition Transition Charge Under the AB 1890 rate freeze, SCE recovered CTC revenues as a function of total rates less the market price for energy established in the California Power Exchange (PX). With the demise of the PX and the now effective Settlement Rates, CTC as envisioned under AB 1890 is no longer applicable. SCE proposes in this filing to remove 4 SCE is also proposing to maintain the interruptible bill limiter for former I-3 and I-5 customers served on Schedule I-6 until the Commission issues a final decision on the retention or elimination of their bill limiter in R

5 ADVICE 1607-E (U 338-E) April 2, 2002 references to CTC, and hourly-pricing options based on PX energy prices from its tariff schedules. Elimination of Rate Schedules Consistent with the changes described above, SCE proposes to eliminate two rate schedules. Both of these rate schedules were set to expire on March 31, 2002, and neither of the schedules has any subscribing customers. The schedules that SCE proposes to eliminate are:! Schedule CTCE-IWD: This schedule exempted irrigation districts and power pump load of the East Side Power Authority from CTC, consistent with Section 374 of the Public Utilities Code.! Schedule GS-FR: This was an optional schedule that allowed customers in certain Standard Industrial Code (SIC) classifications to restructure their billing arrangements so that charges were on a usage basis (per kwh) rather than on a demand charge basis, thereby allowing greater management of cash-flow. CONCLUSION The tariff modifications proposed in this filing will result in no change to rates or, ultimately, bills paid by any of SCE s customers. SCE intends to revisit all issues addressed above in its comprehensive revenue allocation and rate design filing in Phase II of its 2003 GRC. The Rate structure changes adopted in Phase II of SCE s 2003 GRC are expected to become effective after the balance in SCE s Procurement Related Obligation Account (PROACT) has been fully recovered and Settlement Rates are no longer in effect. No cost information is required for this filing. This advice filing will not increase any rate, cause the withdrawal of service, or conflict with any other schedule or rule. EFFECTIVE DATE SCE proposes that this advice filing become effective on April 1, NOTICE Anyone wishing to protest this advice filing may do so by letter via U.S. Mail, facsimile, or electronically, any of which must be received by the Energy Division and SCE no later than 20 days after the date of this advice filing. Protests should be mailed to:

6 ADVICE 1607-E (U 338-E) April 2, 2002 IMC Program Manager Energy Division California Public Utilities Commission 505 Van Ness Avenue, Room 4002 San Francisco, California Facsimile: (415) jjr@cpuc.ca.gov Copies should also be mailed to the attention of the Director, Energy Division, Room 4004 (same address above). In addition, protests and all other correspondence regarding this advice letter should also be sent by letter and transmitted via facsimile or electronically to the attention of: Akbar Jazayeri Director of Revenue and Tariffs Southern California Edison Company 2244 Walnut Grove Avenue, Rm. 303 Rosemead, California Facsimile: (626) Emelyn.Lawler@sce.com Bruce Foster Vice President of Regulatory Operations Southern California Edison Company 601 Van Ness Avenue, Suite 2040 San Francisco, California Facsimile: (415) Bruce.Foster@sce.com There are no restrictions on who may file a protest, but the protest shall set forth specifically the grounds upon which it is based and shall be submitted expeditiously. In accordance with Section III, Paragraph G, of General Order No. 96-A, SCE is mailing copies of this advice filing to the interested parties shown on the attached service list and A Address change requests to the attached GO 96-A Service List should be directed to Emelyn Lawler at (626) or by electronic mail at Emelyn.Lawler@sce.com For changes to the A Service List, please contact the Commission s Process Office at (415) or by electronic mail at ven@cpuc.ca.gov. Further, in accordance with Public Utilities Code Section 491, notice to the public is hereby given by filing and keeping the advice filing open for public inspection at SCE s corporate headquarters. To view other SCE advice letters filed with the Commission, log on to SCE s web site at and choose Regulatory Info Center/Advice Letters.

7 ADVICE 1607-E (U 338-E) April 2, 2002 For questions regarding this advice letter, please contact Martin Collette at (626) or by electronic mail at Martin.Collette@SCE.com. Southern California Edison Company AJ:mc Enclosures Akbar Jazayeri

8 Public Utilities Commission 1607-E Attachment A Cal. P.U.C. Sheet No. Title of Sheet Cancelling Cal. P.U.C. Sheet No. Revised E Preliminary Statement Part W Revised E Revised E Preliminary Statement Part W Revised E Revised E Preliminary Statement Part W Revised E thru Revised E Revised E Preliminary Statement Part W Revised E Revised E Revised E Preliminary Statement Part W Revised E Revised E Preliminary Statement Part W Revised E Revised E Preliminary Statement Part W Revised E Revised E Preliminary Statement Part W Revised E Revised E Preliminary Statement Part W Revised E Revised E Schedule D Revised E Revised E Schedule D Revised E Revised E Schedule D Revised E Revised E Schedule D-APS Revised E Revised E Schedule D-APS Revised E Revised E Schedule D-APS-E Revised E Revised E Schedule D-APS-E Revised E Revised E Schedule D-CARE Revised E Revised E Schedule D-CARE Revised E Revised E Schedule D-CARE Revised E Revised E Schedule DE Revised E Revised E Schedule DE Revised E Revised E Schedule DE Revised E Revised E Schedule DM Revised E* Revised E Schedule DM Revised E* Revised E Schedule DMS-1 Revised E Revised E Schedule DMS-1 Revised E Revised E Schedule DMS-2 Revised E Revised E Schedule DMS-2 Revised E Revised E Schedule DMS-3 Revised E Revised E Schedule DMS-3 Revised E Revised E Schedule DS Revised E Revised E Schedule DS Revised E Revised E Schedule TOU-D-1 Revised E Revised E Schedule TOU-D-1 Revised E Revised E Schedule TOU-D-1 Revised E Revised E Schedule TOU-D-2 Revised E Revised E Schedule TOU-D-2 Revised E Revised E Schedule TOU-D-2 Revised E Revised E* Schedule TOU-EV-1 Revised E* 1

9 Public Utilities Commission 1607-E Attachment A Cal. P.U.C. Sheet No. Title of Sheet Cancelling Cal. P.U.C. Sheet No. Revised E* Schedule TOU-EV-1 Revised E* Revised E Schedule TOU-EV-1 Revised E Revised E* Schedule TOU-EV-2 Revised E* Revised E* Schedule TOU-EV-2 Revised E* Revised E Schedule TOU-EV-2 Revised E Revised E Schedule AEDR Revised E Revised E Schedule AEDR Revised E Revised E Schedule AEDR Revised E Revised E Schedule EEDR Revised E Revised E Schedule EEDR Revised E Revised E Revised E Schedule EEDR Revised E Revised E Schedule GS-1 Revised E Revised E Revised E Schedule GS-1 Revised E Revised E Schedule GS-1 Revised E Revised E Schedule GS-2 Revised E Revised E Schedule GS-2 Revised E Revised E Schedule GS-2 Revised E Revised E Schedule GS-APS Revised E Revised E Schedule GS-APS Revised E Revised E Schedule GS-APS-E Revised E Revised E Schedule GS-APS-E Revised E Revised E Schedule I-6 Revised E** Revised E Schedule I-6 Revised E Revised E Schedule I-6 Revised E Revised E Schedule I-6 Revised E Revised E Schedule I-6 Revised E* Revised E* Schedule I-6 Revised E* Revised E Schedule I-6 Revised E Revised E Schedule I-6 Revised E Revised E Schedule I-6 Revised E Revised E Schedule I-6 Revised E Revised E Schedule REDR Revised E Revised E Schedule REDR Revised E Revised E Revised E Schedule REDR Revised E Revised E Schedule RTP-2 Revised E Revised E Schedule RTP-2 Revised E Revised E* Schedule RTP-2-I Revised E Revised E Schedule RTP-2-I Revised E Revised E Schedule SSGDR Revised E 2

10 Public Utilities Commission 1607-E Attachment A Cal. P.U.C. Sheet No. Title of Sheet Cancelling Cal. P.U.C. Sheet No. Revised E Schedule SSGDR Revised E Revised E Schedule SSGDR Revised E Revised E* Schedule TOU-EV-3 Revised E* Revised E* Schedule TOU-EV-3 Revised E* Revised E Schedule TOU-EV-3 Revised E Revised E* Schedule TOU-EV-4 Revised E* Revised E Schedule TOU-EV-4 Revised E Revised E Schedule TOU-GS-1 Revised E Revised E Schedule TOU-GS-1 Revised E Revised E Schedule TOU-GS-1 Revised E Revised E Schedule TOU-GS-2 Revised E Revised E Schedule TOU-GS-2 Revised E Revised E Schedule TOU-GS-2 Revised E Revised E Schedule TOU-GS-2 Revised E Revised E Schedule TOU-GS-2-SOP Revised E Revised E Schedule TOU-GS-2-SOP Revised E Revised E Schedule TOU-GS-2-SOP Revised E Revised E Schedule TOU-8 Revised E Revised E Schedule TOU-8 Revised E* Revised E Schedule TOU-8 Revised E Revised E Schedule TOU-8 Revised E Revised E Schedule TOU-8 Revised E Revised E Schedule TOU-8 Revised E Revised E Schedule TOU-8 Revised E Revised E Schedule TOU-8-BU Revised E Revised E Schedule TOU-8-BU Revised E Revised E Schedule TOU-8-BU Revised E Revised E Schedule TOU-8-BU Revised E Revised E Schedule TOU-8-BU Revised E Revised E Schedule TOU-8-BU Revised E Revised E Schedule TOU-8-CR-1 Revised E Revised E Schedule TOU-8-CR-1 Revised E Revised E Schedule TOU-8-RTP Revised E Revised E Schedule TOU-8-RTP Revised E Revised E Schedule TOU-8-RTP Revised E Revised E Schedule TOU-8-RTP Revised E Revised E Schedule TOU-8-RTP Revised E Revised E Schedule TOU-8-SOP Revised E Revised E Schedule TOU-8-SOP Revised E Revised E Schedule TOU-8-SOP Revised E Revised E Schedule TOU-8-SOP Revised E Revised E Schedule TOU-8-SOP Revised E Revised E Schedule TOU-8-SOP-I Revised E 3

11 Public Utilities Commission 1607-E Attachment A Cal. P.U.C. Sheet No. Title of Sheet Cancelling Cal. P.U.C. Sheet No. Revised E Schedule TOU-8-SOP-I Revised E* Revised E* Schedule TOU-8-SOP-I Revised E* Revised E Schedule TOU-8-SOP-I Revised E Revised E Schedule TOU-8-SOP-I Revised E Revised E Schedule TOU-8-SOP-I Revised E Revised E Schedule TOU-8-SOP-RTP Revised E Revised E Schedule TOU-8-SOP-RTP Revised E Revised E Schedule TOU-8-SOP-RTP Revised E Revised E Schedule TOU-8-SOP-RTP Revised E Revised E Schedule TOU-8-SOP-RTP Revised E Revised E Schedule TOU-8-SOP-RTP Revised E Revised E Schedule AP - I Revised E Revised E Schedule AP - I Revised E Revised E Schedule AP - I Revised E Revised E Schedule PA-1 Revised E Revised E Schedule PA-1 Revised E Revised E Schedule PA-1 Revised E Revised E Schedule PA-1 Revised E Revised E Schedule PA-2 Revised E Revised E Schedule PA-2 Revised E Revised E Schedule PA-RTP Revised E Revised E Schedule PA-RTP Revised E Revised E Schedule TOU-PA Revised E Revised E Schedule TOU-PA Revised E Revised E* Schedule TOU-PA Revised E Revised E Schedule TOU-PA Revised E Revised E Schedule TOU-PA Revised E Revised E Schedule TOU-PA-3 Revised E Revised E Schedule TOU-PA-3 Revised E Revised E Schedule TOU-PA-3 Revised E Revised E Schedule TOU-PA-4 Revised E Revised E Schedule TOU-PA-4 Revised E Revised E Schedule TOU-PA-4 Revised E Revised E Schedule TOU-PA-5 Revised E Revised E Schedule TOU-PA-5 Revised E Revised E Schedule TOU-PA-5 Revised E Revised E Schedule TOU-PA-6 Revised E Revised E Schedule TOU-PA-6 Revised E Revised E Schedule TOU-PA-6 Revised E Revised E Schedule TOU-PA-6 Revised E Revised E Schedule TOU-PA-7 Revised E Revised E Schedule TOU-PA-7 Revised E Revised E Schedule TOU-PA-7 Revised E 4

12 Public Utilities Commission 1607-E Attachment A Cal. P.U.C. Sheet No. Title of Sheet Cancelling Cal. P.U.C. Sheet No. Revised E Schedule TOU-PA-7 Revised E Revised E Schedule TOU-PA-7 Revised E Revised E Schedule TOU-PA-7 Revised E Revised E Schedule TOU-PA-7 Revised E Revised E Schedule TOU-PA-SOP Revised E Revised E Schedule TOU-PA-SOP Revised E Revised E Schedule TOU-PA-SOP Revised E Revised E Schedule TOU-PA-SOP-I Revised E Revised E Schedule TOU-PA-SOP-I Revised E* Revised E Schedule TOU-PA-SOP-I Revised E Revised E Schedule AL-1 Revised E Revised E Schedule AL-1 Revised E Revised E Schedule AL-1 Revised E Revised E Schedule AL-2 Revised E Revised E Schedule AL-2 Revised E Revised E Schedule AL-2 Revised E Revised E Schedule DWL Revised E Revised E Schedule DWL Revised E Revised E Schedule DWL Revised E Revised E Schedule LS-1 Revised E Revised E Schedule LS-1 Revised E Revised E Schedule LS-1 Revised E Revised E Schedule LS-2 Revised E Revised E Schedule LS-2 Revised E Revised E Schedule LS-2 Revised E Revised E Schedule LS-2 Revised E Revised E Schedule LS-3 Revised E Revised E Schedule LS-3 Revised E Revised E Schedule OL-1 Revised E Revised E Schedule OL-1 Revised E Revised E Schedule OL-1 Revised E Revised E Schedule TC-1 Revised E Revised E Schedule TC-1 Revised E Revised E Schedule CC-DSF Revised E Revised E Schedule DA-RCSC Revised E Revised E* Schedule DL-NBC Revised E Revised E Revised E Schedule DL-NBC Revised E Revised E Schedule DBP Original E 5

13 Public Utilities Commission 1607-E Attachment A Cal. P.U.C. Sheet No. Title of Sheet Cancelling Cal. P.U.C. Sheet No. Revised E* Schedule NEM Revised E Revised E Schedule PE Original E Revised E Schedule RRB Revised E Revised E Schedule S Revised E Revised E Schedule S Revised E Revised E Schedule S Revised E Revised E Schedule SLRP Revised E Revised E Schedule WTR Revised E Revised E Schedule WTR Revised E Revised E Rule 1 Revised E Revised E Rule 5 Revised E Revised E Rule 15 Revised E* Revised E* Rule 18 Revised E Revised E* Rule 22 Revised E Revised E* Rule 22 Revised E Revised E Rule 22 Revised E* Revised E Rule 22 Revised E** WITHDRAWN E WITHDRAWN E Schedule CTCE-IWD Schedule CTCE-IWD WITHDRAWN E Experimental Schedule GS-FR General Service Flat Rate WITHDRAWN E Experimental Schedule GS-FR General Service Flat Rate WITHDRAWN E Experimental Schedule GS-FR General Service Flat Rate WITHDRAWN E WITHDRAWN E Spot Pricing Amendment (SPA) To Contract For Service Form Spot Pricing Amendment (SPA) To Contract For Service Form Revised E Table of Contents Revised E Revised E Table of Contents Revised E Revised E Table of Contents Revised E Revised E Table of Contents Revised E Revised E Table of Contents Revised E Revised E Table of Contents Revised E Revised E Table of Contents Revised E Revised E Table of Contents Revised E Revised E Table of Contents Revised E Revised E Table of Contents Revised E 6

14 Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California Cancelling Revised Cal. PUC Sheet No E PRELIMINARY STATEMENT Sheet 1 W. DEPARTING LOAD RESPONSIBILITY 1. Definitions. a. Departing Load: Departing Load is that portion of SCE s customer s electric load, subject to changes occurring in the normal course of business as verified pursuant to Part W, Section 3.a., for which the customer, on or after December 20, 1995: (1) discontinues or reduces its purchases of electricity supply and delivery services from SCE; (2) purchases or consumes electricity supplied and delivered by sources other than SCE to replace such SCE purchases; and (3) remains physically located at the same location or within SCE s service area as it existed on December 20, Reduction in load qualifies as Departing Load only to the extent that such load is subsequently served with electricity from a source other than SCE and is not residential load served by a solar electrical generating facility with a capacity of not more than 10 kilowatts per California Public Utilities (PU) Code Sections 371 and The definition of Departing Load specifically does not include: (1) a customer s load that moves to a new location outside SCE s service area as it existed on December 20, 1995; (2) a customer s load that is no longer served with electricity from any source; or (3) a new customer that, after January 1, 1998, locates new load in SCE s service territory, provided such customer does not purchase electricity from SCE and does not use SCE s transmission or distribution system (either directly or indirectly through a third party) in any manner to supply electricity to its load. When an SCE retail customer that purchased electricity from SCE on or after December 20, 1995, subsequently replaces such SCE purchases with purchases from an entity that supplies such retail customer using SCE s transmission and/or distribution system (other than through a Direct Transaction), that load is classified as Departing Load for the portion of its requirements that are purchased through such an alternative supplier. 1H11 Resolution E-3765

15 Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California Cancelling Revised Cal. PUC Sheet No E PRELIMINARY STATEMENT Sheet 2 W. DEPARTING LOAD RESPONSIBILITY 1. Definitions. b. Direct Access (Direct Transaction): A contract between any one or more electric generators, marketers, or brokers of electric power and one or more retail customers providing for the purchase and sale of electric power or any ancillary services. c. SCE Bundled Service Customer: A customer who takes bundled services from SCE including all the customer s energy requirements purchased through the Procured Energy (PE) by SCE. d. Reference Period Annual Bill: The customer s Reference Period Annual Bill will be calculated by multiplying the customer s applicable reference period billing determinants (as determined according to Part W, Section 4.b.(3) by those rates that are currently applicable (as of the customer s Notice Date) for bundled retail service under the customer s applicable rate schedule and service voltage options. 2. Applicability. SCE s nonbypassable costs shall be recovered from all existing SCE Bundled Service Customers, future SCE Bundled Service Customers, Direct Access Customers, and Departing Load Customers who take or took retail service from SCE on or after December 20, 1995, and remain in the service territory in which SCE provided electricity services as of December 20, 1995, except as specifically provided for in PU Code Sections 369 and 371 to 374, inclusive. Application of certain exemptions established in the PU Code is clarified by Decision and Decision Remaining issues may be addressed in dispute resolution procedures for Bundled Service Customers and Direct Access Customers (Rule 10, Disputed Bills), and Departing Load Customers (Preliminary Statement Part W, Section 4.e.). 2H13 Resolution E-3765

16 Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California Cancelling Revised Cal. PUC Sheet No E thru E PRELIMINARY STATEMENT Sheet 3 W. DEPARTING LOAD RESPONSIBILITY 3. Departing Load Calculation. a. As provided herein, the charges of SCE s rate schedules, contracts, or tariff options will contain a Departing Load component as defined in DL-NBC. Chapter 2.3, Electric Restructuring, in Part 1 of Division 1 of the PU Code provides that Departing Load charges shall be applied to each customer based on the amount of the customer s electricity consumption (i.e., all generation-related billing determinants used to determine a customer s bill), which is subject to changes occurring in the normal course of business, whether such consumption is served by SCE or an alternate supplier of electricity. Pursuant to PU Code Section 371 of Chapter 2.3, changes occurring in the normal course of business are those resulting from changes in business cycles, termination of operations, departure from the utility service territory, weather, reduced production, modifications to production equipment or operations, changes in production or manufacturing processes, fuel switching, including installation of fuel cells, enhancement or increased efficiency of equipment or performance of existing self-cogeneration equipment, replacement of existing cogeneration equipment with new power generation equipment of similar size, installation of demand-side management equipment or facilities, energy conservation efforts, or other similar factors. The billed Departing Load charges will be based on metered consumption. Third party metering will be allowed subject to verification procedures sufficient to assure reliability of such consumption data and/or information. Meter reliability would be pursuant to SCE s Rule 17 and the Direct Access Standards for Metering and Meter Data ( DASMMD ). Each party will be responsible for its own costs associated with the agreed upon verification process. If reliable metered consumption information is not made available to SCE, SCE will estimate the consumption based on that customer s historical load pursuant to Part W, Section 4.b.(3) at the time the customer discontinues or reduces its purchases from SCE. This estimated consumption will also be used as the basis for calculation of a Reference Period Annual Bill. b. The billed Departing Load is calculated as described in DL-NBC. (N) 3H14 Resolution E-3765

17 Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California Cancelling Revised Cal. PUC Sheet No E E PRELIMINARY STATEMENT Sheet 4 W. DEPARTING LOAD RESPONSIBILITY 4. Departing Load Customers. a. Departing Load customers are obligated to make ongoing Departing Load payments to SCE in accordance with the following procedure. (1) Customer Notice to SCE: Customers shall notify SCE in writing or by reasonable means, through a designated SCE account representative authorized to receive such notification, of their intention to take steps that will qualify their load as Departing Load at least 30 days in advance of discontinuation or reduction of electric service from SCE. The customer shall specify in its notice the following: (a) (b) (c) Date of the departure or reduction of load (Date of Departure); Description of the load that will depart or be reduced; and Method by which the Departing Load consumption will be determined consistent with procedures outlined in Part W, Section 4.b.(3). (2) The Failure to Provide Notice: If a customer does not provide notice of departure, such action will constitute a violation of this tariff and breach of the customer s obligation to SCE. Upon discovery of such violation and breach by a Departing Load customer, SCE will provide notice of the violation and breach to the customer. This notice provides 20 days in which the customer has the opportunity to cure the breach as defined in Preliminary Statement, Part W, Section 4.f. 4H15 Resolution E-3765

18 Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California Cancelling Revised Cal. PUC Sheet No E PRELIMINARY STATEMENT Sheet 5 W. DEPARTING LOAD RESPONSIBILITY 4. Departing Load Customers. b. Departing Load Statement: (1) By no later than 20 days after receipt from a customer of notice, SCE shall mail or otherwise provide the customer with a Departing Load Statement. (2) If SCE fails to provide the customer with a Departing Load Statement containing the billed Departing Load amount, the applicable rate schedule and the due date for the billed Departing Load within 20 days of SCE s receipt of the notice from the customer, then the customer s obligation to pay the Departing Load Statement shall not commence until the later of the Date of Departure or 30 days from the customer s receipt of SCE s Departing Load Statement. 5H13 Resolution E-3765

19 Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California Cancelling Revised Cal. PUC Sheet No E PRELIMINARY STATEMENT Sheet 6 W. DEPARTING LOAD RESPONSIBILITY 4. Departing Load Customers. b. Departing Load Statement: (3) When the customer does not select third party metering, the Departing Load customer s monthly consumption estimation will be based upon the customer s historical load at the time it discontinues or reduces retail service with SCE, using one of the two following options: (a) (b) The customer s demand and energy usage over the 12 month period prior to the customer s submission of notice; or The customer s average 12 month demand and energy usage, with such average to be as measured over the prior 36 months of usage; or In the event the 12-month average usage differs from the 36-month average by an amount greater than 25 percent, the 36-month average will be used unless there is substantial evidence to demonstrate that the more recent usage is the result of a persisting change in the customer s electric usage, and that the 12-month average will be more indicative of the customer s future electric requirements. If the customer does not indicate its option in its notice, the default method will be the customer s demand and energy usage over the 12 month period prior to the customer s submission of notice. In circumstances where the Departing Load has been reduced following departure from SCE due to use of energy efficiency equipment or for other reasons, the customer and SCE may agree in writing to use metered or other data on a prospective basis to verify such load reduction for the Departing Load. If a metering agreement is reached, SCE will adjust the calculation of Departing Load payments. 6H13 Resolution E-3765

20 Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California Cancelling Revised Cal. PUC Sheet No E PRELIMINARY STATEMENT Sheet 7 W. DEPARTING LOAD RESPONSIBILITY 4. Departing Load Customers. b. Departing Load Statement: (3) If the customer has switched between applicable rate schedules or service voltages during the 36 month period prior to the Date of Departure, the Departing Load Statement will be based on the customer s final applicable rate schedule and service voltage. Where a customer provides reliable third party metered consumption data, the rate schedules used for Departing Load purposes shall be consistent with that metered information. c. Departing Load Agreement: Departing Load customers shall execute a filed form Departing Load Agreement with SCE at least five days before the Date of Departure. SCE shall provide the Departing Load Agreement (suitable for execution) to the customer with the Departing Load Statement. Whether a Departing Load customer signs the agreement or not, such customer will be deemed to have agreed to the terms of the Departing Load Agreement by taking retail service on or after December 20, d. Customer Obligation to Make Departing Load Payments: During the period between the Date of Departure and December 31, 2001 (or until such time as the Departing Load customers procedures are terminated by the Commission), SCE will issue monthly bills in accordance with the provisions of this tariff and the Departing Load Statement. Customers shall pay to SCE, the monthly charge within 20 days of receipt of the bill. Failure to pay two consecutive monthly Departing Load payments constitutes a violation of this tariff and breach of the customer s obligation to SCE. Opportunity to Cure this breach is described in Preliminary Statement, Part W, Section 4.f. 7H13 Resolution E-3765

21 Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California Cancelling Revised Cal. PUC Sheet No E PRELIMINARY STATEMENT Sheet 8 W. DEPARTING LOAD RESPONSIBILITY 4. Departing Load Customers. e. Dispute Resolution: If a customer believes that its Statement does not comply with the terms and conditions provided for in this section, or a customer disputes the Departing Load responsibility for new or incremental load served by a Direct Transaction, the customer must notify SCE of the basis for this disagreement in writing, within 20 days after receipt of the Departing Load Statement provided by SCE. If SCE does not accept the customer s position, it will respond in writing within 5 days after receipt of such notice. If the customer is not satisfied with SCE s response, within 14 days of receiving SCE s response the customer shall notify SCE in writing or by reasonable means through a designated SCE account representative authorized to receive such notification that the customer wishes to pursue informal dispute resolution. If the customer makes a timely request for informal dispute resolution, SCE and the customer shall promptly seek assistance in reaching informal dispute resolution from the Commission s Energy Division, or shall seek mediation of the dispute from the Commission s Administrative Law Judge Division. If the dispute is not resolved within 60 days of the customer s request to pursue informal dispute resolution, the customer may file a compliant with the Commission within the next 20 days. (SCE and the customer may also agree to extend this 20 day period, in order to allow for further negotiations or other resolution techniques.) In such events, the customer shall continue to be responsible for making the monthly nonbypassable charge payments on a timely basis, with such payments subject to future refund or other adjustment as appropriate if the Commission establishes that different information should have been used as the basis for the customer s Departing Load Statement. Failure to file a complaint with the Commission within the specified period shall constitute agreement with and acceptance of such Departing Load Statement. f. Opportunity to Cure: If a customer fails to provide notice of departure, or fails to make two Departing Load Payments within the period specified in Part W, Section 4.d., then SCE shall send the customer a notice specifying its failure to comply with this tariff and providing the customer with 30 days from the date of the notice within which to take action curing its breach of its obligation to SCE. 8H13 Resolution E-3765

22 Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California Cancelling Revised Cal. PUC Sheet No E PRELIMINARY STATEMENT Sheet 9 W. DEPARTING LOAD RESPONSIBILITY 4. Departing Load Customers. f. Opportunity to Cure: (1) If the breach was a failure to provide notice, to cure the breach the customer must provide the notice required, pay any amounts which would have been assessed had the customer provided SCE with a timely notice, and pay a Deposit equal to four (4) times the monthly Departing Load Payment. (2) If the breach was a failure to pay two consecutive monthly Departing Load Payments, to cure the breach the customer must pay all such delinquent monthly Departing Load Payments plus a Deposit equal to four (4) times the monthly Departing Load Payment. g. Return of Deposit: SCE will apply the Deposit to outstanding Departing Load Balances at the end of the transition period and refund any remaining balance. Interest shall be paid on any amounts credited as defined in SCE s Rule 7, Sections C.1 and 2. h. Demand for Lump Sum Payment: If the customer does not cure the breach and pay the Deposit as described in Part W, Section 4.f., then SCE may issue a Demand for Lump Sum Payment of Default for Departing Load responsibility. Such default Lump Sum Departing Load Payment shall be an amount equal to 0.8 times the Customer s annual billed Departing Load, plus two percent of the Customer s annual billed Departing Load multiplied by 1.1 and then by the number of whole months remaining between the date of the customer s first missed payment, or date of unnoticed departure, and December 31, The customer shall pay the Lump Sum Payment as calculated in accordance with this Section within 30 days of receipt of the Demand for Lump Sum Payment. The Demand for Lump Sum Payment will reflect the application of any Deposit to this final bill. i. Enforceability: Failure to make Departing Load Payments or provide notice as specified herein constitute a breach of the customer s continuing legal obligations to SCE and a breach and violation of this tariff. After the customer has been given the opportunity to cure as specified in Part W, Section 4.f., and after expiration of the 30 day period specified therein, SCE may enforce this obligation by making a Demand for Lump Sum Payment as described in Section h. If this Demand is not honored within 30 days of receipt of the Demand for Lump Sum Payment, SCE may enforce this obligation by filing suit to enforce this tariff in any court of competent jurisdiction. 9H13 Resolution E-3765

23 Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California Cancelling Revised Cal. PUC Sheet No E Schedule D Sheet 3 DOMESTIC SERVICE SPECIAL CONDITIONS 4. Customer-Owned Electrical Generating Facilities: b. (3) Billing: Payment by the Company to the customer for Net Energy transmitted shall be included as a component of the customer's bill for service rendered under this tariff. c. Customer-owned electrical generating facilities used solely for auxiliary, emergency, or standby purposes (auxiliary/emergency generating facilities) to serve the customer s load during a period when the Company s service is unavailable and when such load is isolated from the service of the Company are not subject to Schedule S. However, upon approval by the Company, momentary parallel operation may be permitted to allow the customer to test the auxiliary/emergency generating facilities. A Momentary Parallel Generation Contract is required for this type of service. 5. Bill Limiter: For customers of record on Schedule D-PG as of April 30, 1996 who are transferred by the Utility to a combination of Schedule D and Schedule S, the customer s total monthly bill for charges under Schedule D and Schedule S, excluding the Public Utilities Reimbursement Fee, California Alternate Rates for Energy Surcharge, as set forth in Preliminary Statement, Part O, Section 5, and taxes, shall for the first three years following transfer be limited to no more than the customer s comparable monthly bill for charges under Schedule D-PG* for the same period plus the following percentages: Period Percentages 1st year 10 2 nd year 20** 3 rd year 30** The Bill Limiter shall not apply commencing in the fourth year after the customer has transferred to Schedule D. *D-PG rates effective April 30, 1996: Baseline Service $ per kwh Nonbaseline Service $ per kwh Minimum Charge $0.175 per meter per day ** These changes are suspended consistent with Commission Resolution E Until modified or eliminated in SCE s next General Rate Case, scheduled for late 2003, the 1 st year Bill Limiter shown above, 10%, is the effective Bill Limiter. (C) (C) 3H13 Resolution E-3765

24 Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California Cancelling Revised Cal. PUC Sheet No E Schedule D Sheet 4 DOMESTIC SERVICE SPECIAL CONDITIONS 5. 10% Credit: Pursuant to Public Utilities Code Section 368.5, customers will continue to receive the 10% credit originally mandated by Assembly Bill 1890 and implemented through Public Utilities Code Section 368(a). The 10% bill credit applies to the portion of the total bill representing rates in effect on January 3, 2001 for Bundled Service customers. The 10% bill credit does not apply to increases in total rates implemented after January 3, Billing: A customer s bill is first calculated according to the total rates and conditions above. The following adjustments are made depending on the option applicable to the customer. a. Bundled Service Customers receive supply and delivery services solely from SCE. The customer s bill is based on the total rates set forth above. The Procured Energy (supply) component is equal to the Procured Energy (PE) Charge as set forth in Schedule PE. b. Direct Access Customers purchase energy from an Energy Service Provider and continue receiving supply and delivery services from SCE. The PE Charge is determined as specified for a Bundled Service Customer. The customer s bill will be calculated as for a Bundled Service Customer, but the customer will receive a credit for the PE Charge. 7. Generation Charge: The generation charge is calculated based on the total rate less the sum of: Distribution, Transmission, Public Purpose Program, Nuclear Decommissioning, and Fixed Transition Amount (where applicable) charges, the Transmission Owners Tariff Charge Adjustments (TOTCA), and the Public Utilities Commission Reimbursement Fee. (C) (C) 4H14 Resolution E-3765

25 Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California Cancelling Revised Cal. PUC Sheet No E Schedule D Sheet 5 DOMESTIC SERVICE RATE COMPONENTS Rate Components Table Rate Schedule Summary Trans 1 Distrbtn 2 Gen 3 NDC 4 PPPC 5 TOTCA 6 PUCRF 7 FTAC 8 Total Energy Charge- $/kwh Baseline Summer ( ) Winter ( ) Nonbaseline 101% - 130% of Baseline - Summer ( ) Winter ( ) % - 200% of Baseline Summer ( ) Winter ( ) % - 300% of Baseline Summer ( ) Winter ( ) Over 300% of Baseline Summer ( ) Winter ( ) Basic Charge - $/day Single-Family Residence Multi-Family Residence Minimum Charge - $/day Single-Family Residence Multi-Family Residence Minimum Energy Charge $/kwh ( ) Bill Limiter - % * 10% Rate Reduction * Dept. of Water Resources (DWR) Procurement Charge-$/kWh *The "total" shown above represents 100% of the discount percentage as set forth in the specific rate schedule. 1 Trans = Transmission 2 Distrbtn = Distribution 3 Gen = Generation 4 NDC = Nuclear Decommissioning Charge 5 PPPC = Public Purpose Programs Charge (includes California Alternate Rates for Energy Surcharge where applicable.) 6 TOTCA = Transmission Owners Tariff Charge Adjustments [FERC approved represents Transmission Revenue Balancing Account Adjustment (TRBAA) of negative $ per kwh, Reliability Services Balancing Account Adjustment (RSBAA) of $ per kwh, and Transmission Access Charge Balancing Account Adjustment (TACBAA) of $ per kwh]. 7 PUCRF = The PUC Reimbursement Fee is described in Schedule RF-E. 8 FTAC = The Fixed Transition Amount Charge is described in Schedule RRB. 5H10 Resolution E-3765

26 Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California Cancelling Revised Cal. PUC Sheet No E Schedule D-CARE Sheet 3 CALIFORNIA ALTERNATE RATES FOR ENERGY DOMESTIC SERVICE SPECIAL CONDITIONS 6. Commencement of Rate: Eligible customers shall be billed on this schedule commencing no later than one billing period after receipt and approval of the customer's application by SCE. 7. Verification: Information provided by the applicant is subject to verification by SCE. Refusal or failure of a customer to provide documentation of eligibility acceptable to SCE, upon request by SCE, shall result in removal from this rate schedule. 8. Notice From Customer: It is the customer's responsibility to notify SCE if there is a change in his eligibility status. 9. Rebilling: Customers may be rebilled for periods of ineligibility under the applicable rate schedule. 10. This schedule may only be combined with D-APS, D-APS-E, DM, DMS-1, DMS-2, DMS-3, DS, TOU-D-1, and TOU-D % Credit: Pursuant to Public Utilities Code Section 368.5, customers will continue to receive the 10% credit originally mandated by Assembly Bill 1890 and implemented through Public Utilities Code Section 368(a). The 10% bill credit applies to the portion of the total bill representing rates in effect on January 3, 2001 for Bundled Service Customers. The 10% bill credit does not apply to increases in total rates implemented after January 3, (C) (C) 3H11 Resolution E-3765

27 Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California Cancelling Revised Cal. PUC Sheet No E Schedule D-CARE Sheet 4 CALIFORNIA ALTERNATE RATES FOR ENERGY DOMESTIC SERVICE SPECIAL CONDITIONS 12. Billing: A customer s bill is first calculated according to the total rates and conditions above. The following adjustments are made depending on the option applicable to the customer. a. Bundled Service Customers receive supply and delivery services solely from SCE. The customer s bill is based on the total rates set forth above. The Procured Energy (supply) component is equal to the Procured Energy (PE) Charge as set forth in Schedule PE. b. Direct Access Customers purchase energy from an Energy Service Provider and continue receiving delivery services from SCE. The PE Charge is determined as specified for a Bundled Service Customer. The customer s bill will be calculated as for a Bundled Service Customer, but the customer will receive a credit for the PE Charge. 13. Generation Charge: Generation charge is calculated based on the total rate less the sum of: Distribution, Transmission, Public Purpose Programs, Nuclear Decommissioning, and Fixed Transition Amount (where applicable) charges, the Transmission Owners Tariff Charge Adjustments (TOTCA), and the Public Utilities Commission Reimbursement Fee. 4H11 Resolution E-3765

October 30, 2002 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION

October 30, 2002 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION Akbar Jazayeri Director of Revenue and Tariffs October 30, 2002 ADVICE 1657-E (U 338-E) PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION SUBJECT: Revision to Schedule AL-2, Outdoor

More information

May 22, 2001 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION

May 22, 2001 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION Akbar Jazayeri Director of Revenue and Tariffs May 22, 2001 ADVICE 1545-E (U 338-E) PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION SUBJECT: Tariffs Implementing Decision No. 01-05-064

More information

March 13, 2000 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION. Modification to Power Factor Adjustment Special Condition

March 13, 2000 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION. Modification to Power Factor Adjustment Special Condition Donald A. Fellows, Jr. Manager of Revenue and Tariffs March 13, 2000 ADVICE 1439-E (U 338-E) PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION SUBJECT: Modification to Power Factor

More information

January 18, 2002 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION

January 18, 2002 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION Akbar Jazayeri Director of Revenue and Tariffs January 18, 2002 ADVICE 115-G (U 338-E) PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION SUBJECT: Decrease in Santa Catalina Island

More information

November 8, 2004 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION

November 8, 2004 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION Akbar Jazayeri Director of Revenue and Tariffs November 8, 2004 ADVICE 1656-E-A (U 338-E) PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION SUBJECT: Supplemental to Advice 1656-E,

More information

Schedule D DOMESTIC SERVICE

Schedule D DOMESTIC SERVICE Southern California Edison Rosemead, California (U 338-E) Revised Cal. PUC Sheet No. 50818-E Cancelling Revised Cal. PUC Sheet No. 50295-E Sheet 1 APPLICABILITY Applicable to domestic service including

More information

January 20, 2004 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION

January 20, 2004 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION Akbar Jazayeri Director of Revenue and Tariffs January 20, 2004 ADVICE 123-G (U 338-E) PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION SUBJECT: Increase in Santa Catalina Island

More information

March 30, 2005 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION. 1% Franchise Surcharge for City of Santa Barbara Residents

March 30, 2005 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION. 1% Franchise Surcharge for City of Santa Barbara Residents Akbar Jazayeri Director of Revenue and Tariffs March 30, 2005 ADVICE 1881-E (U 338-E) PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION SUBJECT: 1% Franchise Surcharge for City of

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 52116-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 45654-E Schedule GS-2 Sheet 1 APPLICABILITY Applicable to single- and

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 57587-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 57762-E Schedule GS-1 Sheet 1 APPLICABILITY Applicable to single- and

More information

Southern California Edison Revised Cal. PUC Sheet No. Withdrawn Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No. Withdrawn Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 52399-E APPLICABILITY Schedule TOU-PA-5 Sheet 1 Applicable where SCE determines that 70% or more of the customer's electrical usage

More information

ELECTRIC SCHEDULE E-1 Sheet 1 RESIDENTIAL SERVICES

ELECTRIC SCHEDULE E-1 Sheet 1 RESIDENTIAL SERVICES Revised Cal. P.U.C. Sheet No. 33759-E Cancelling Revised Cal. P.U.C. Sheet No. 33566-E ELECTRIC SCHEDULE E-1 Sheet 1 APPLICABILITY: TERRITORY: RATES: This schedule is applicable to single-phase and polyphase

More information

Revised Cal. P.U.C. Sheet No E Cancelling Revised Cal. P.U.C. Sheet No E. San Francisco, California

Revised Cal. P.U.C. Sheet No E Cancelling Revised Cal. P.U.C. Sheet No E. San Francisco, California Revised Cal. P.U.C. Sheet No. 42736-E Cancelling Revised Cal. P.U.C. Sheet No. 41884-E ELECTRIC SCHEDULE EL-1 Sheet 1 APPLICABILITY: This schedule is applicable to single-phase and polyphase residential

More information

Southern California Edison Original Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Cal. PUC Sheet No.

Southern California Edison Original Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Cal. PUC Sheet No. Southern California Edison Original Cal. PUC Sheet No. 52386-E Schedule TOU-PA-3-SOP Sheet 1 APPLICABILITY Applicable where SCE determines that 70% or more of the customer's electrical usage is for Agricultural

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 57606-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 57765-E Schedule PA-2 Sheet 1 APPLICABILITY Applicable where SCE determines

More information

Schedule TOU-EV-8 Sheet 1 GENERAL SERVICE TIME-OF-USE, ELECTRIC VEHICLE CHARGING, DEMAND METERED

Schedule TOU-EV-8 Sheet 1 GENERAL SERVICE TIME-OF-USE, ELECTRIC VEHICLE CHARGING, DEMAND METERED Southern California Edison Revised Cal. PUC Sheet No. 66647-E Rosemead, California (U 338-E) Cancelling Original Cal. PUC Sheet No. 64807-E Schedule TOU-EV-8 Sheet 1 APPLICABILITY Applicable solely for

More information

Schedule TOU-EV-9 Sheet 1 GENERAL SERVICE TIME-OF-USE, ELECTRIC VEHICLE CHARGING, LARGE DEMAND METERED

Schedule TOU-EV-9 Sheet 1 GENERAL SERVICE TIME-OF-USE, ELECTRIC VEHICLE CHARGING, LARGE DEMAND METERED Southern California Edison Revised Cal. PUC Sheet No. 66651-E Rosemead, California (U 338-E) Cancelling Original Cal. PUC Sheet No. 64815-E Schedule TOU-EV-9 Sheet 1 APPLICABILITY Applicable solely for

More information

Revised Cal. P.U.C. Sheet No E Pacific Gas and Electric Company Cancelling Revised Cal. P.U.C. Sheet No E San Francisco, California

Revised Cal. P.U.C. Sheet No E Pacific Gas and Electric Company Cancelling Revised Cal. P.U.C. Sheet No E San Francisco, California Revised Cal. P.U.C. Sheet No. 26003-E Pacific Gas and Electric Company Cancelling Revised Cal. P.U.C. Sheet No. 25736-E APPLICABILITY: This schedule is applicable to single-phase and polyphase residential

More information

Schedule TOU-EV-7 Sheet 1 GENERAL SERVICE TIME-OF-USE, ELECTRIC VEHICLE CHARGING

Schedule TOU-EV-7 Sheet 1 GENERAL SERVICE TIME-OF-USE, ELECTRIC VEHICLE CHARGING Southern California Edison Revised Cal. PUC Sheet No. 66642-E Rosemead, California (U 338-E) Cancelling Original Cal. PUC Sheet No. 64800-E Schedule TOU-EV-7 Sheet 1 APPLICABILITY Applicable solely for

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 57591-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 57763-E Schedule GS-2 Sheet 1 APPLICABILITY Applicable to single- and

More information

Revised Cal. P.U.C. Sheet No E** Pacific Gas and Electric Company Cancelling Revised Cal. P.U.C. Sheet No E San Francisco, California

Revised Cal. P.U.C. Sheet No E** Pacific Gas and Electric Company Cancelling Revised Cal. P.U.C. Sheet No E San Francisco, California Revised Cal. P.U.C. Sheet No. 25718-E** Pacific Gas and Electric Company Cancelling Revised Cal. P.U.C. Sheet No. 24808-E APPLICABILITY: TERRITORY: This voluntary schedule is available to customers for

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 66180-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 65821-E 62660-E Schedule TOU-GS-2 Sheet 1 APPLICABILITY Applicable to

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 62149-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 54195-E Schedule TOU-EV-4 Sheet 1 APPLICABILITY Applicable solely for

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 66268-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 65843-E Schedule TOU-8 Sheet 1 APPLICABILITY Applicable to general service

More information

ELECTRIC SCHEDULE E-9 EXPERIMENTAL RESIDENTIAL TIME-OF-USE SERVICE FOR LOW EMISSION VEHICLE CUSTOMERS

ELECTRIC SCHEDULE E-9 EXPERIMENTAL RESIDENTIAL TIME-OF-USE SERVICE FOR LOW EMISSION VEHICLE CUSTOMERS Revised Cal. P.U.C. Sheet No. 31575-E Cancelling Revised Cal. P.U.C. Sheet No. 29680-E ELECTRIC SCHEDULE E-9 APPLICABILITY: This optional experimental schedule applies to electric service to customers

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 62988-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 62337-E Schedule LS-3 Sheet 1 APPLICABILITY Applicable to metered service

More information

Revised Cal. P.U.C. Sheet No E Cancelling Revised Cal. P.U.C. Sheet No E

Revised Cal. P.U.C. Sheet No E Cancelling Revised Cal. P.U.C. Sheet No E Revised Cal. P.U.C. Sheet No. 41679-E Cancelling Revised Cal. P.U.C. Sheet No. 40893-E ELECTRIC SCHEDULE ESR Sheet 1 APPLICABILIT: TERRITORY: RATES: This schedule is applicable to single-phase and polyphase

More information

Revised Cal. P.U.C. Sheet No E Cancelling Original Cal. P.U.C. Sheet No E

Revised Cal. P.U.C. Sheet No E Cancelling Original Cal. P.U.C. Sheet No E Revised Cal. P.U.C. Sheet No. 35229-E Cancelling Original Cal. P.U.C. Sheet No. 28209-E ELECTRIC SCHEDULE EM-TOU Sheet 1 APPLICABILITY: TERRITORY: This schedule is applicable to service for residential

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 60366-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 59337-E Schedule WTR Sheet 1 APPLICABILITY Applicable to single-phase

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 62668-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 57597-E Schedule TOU-8 Sheet 1 APPLICABILITY Applicable to general service

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 62984-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 62336-E APPLICABILITY Schedule LS-2 Sheet 1 Applicable to unmetered service

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 64587-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 63944-E Schedule LS-1 Sheet 1 APPLICABILITY Applicable to service for

More information

TERRITORY: This rate schedule applies everywhere PG&E provides electric service. I

TERRITORY: This rate schedule applies everywhere PG&E provides electric service. I Original Cal. P.U.C. Sheet No. 36419-E ELECTRC SCHEDULE E-TOUPP Sheet 1 (N) RESDENTAL TME-OF-USE PLOT PROJECT SERVCE (N) APPLCABLTY: This schedule is available to residential customers who have been selected

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 62335-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 61755-E All Night Service 0.00632 0.01240 0.00510 0.00001 0.00798 (R)

More information

Schedule TOU-PA-2-SOP Sheet 1 TIME-OF-USE - AGRICULTURAL AND PUMPING SUPER OFF-PEAK - SMALL TO MEDIUM

Schedule TOU-PA-2-SOP Sheet 1 TIME-OF-USE - AGRICULTURAL AND PUMPING SUPER OFF-PEAK - SMALL TO MEDIUM Southern California Edison Revised Cal. PUC Sheet No. 54265-E Rosemead, California (U 338-E) Cancelling Original Cal. PUC Sheet No. 52345-E Schedule TOU-PA-2-SOP Sheet 1 APPLICABILITY Applicable where

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 65451-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 65032-E Schedule OL-1 Sheet 1 OUTDOOR AREA LIGHTING SERVICE - UNMETERED

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 59090-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 57592-E Schedule TOU-GS-2 Sheet 1 APPLICABILITY Applicable to single-

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 62664-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 59107-E Schedule TOU-GS-3 Sheet 1 APPLICABILITY Applicable to single-

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 65025-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 64585-E Schedule DWL Sheet 1 APPLICABILITY Applicable to the lighting

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 65860-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 63087-E Schedule TOU-PA-3 Sheet 1 APPLICABILITY Applicable where SCE determines

More information

FITCHBURG GAS AND ELECTRIC LIGHT COMPANY NET METERING SCHEDULE NM

FITCHBURG GAS AND ELECTRIC LIGHT COMPANY NET METERING SCHEDULE NM Sheet 1 FITCHBURG GAS AND ELECTRIC LIGHT COMPANY SCHEDULE NM Applicability The following tariff provisions shall be applicable to a Host Customer, as defined herein, that requests net metering services

More information

REVISED. February 27, Advice 2975-E-A (Pacific Gas and Electric Company ID U39E) Public Utilities Commission of the State of California

REVISED. February 27, Advice 2975-E-A (Pacific Gas and Electric Company ID U39E) Public Utilities Commission of the State of California Brian K. Cherry Vice President Regulatory Relations 77 Beale Street, Room 1087 San Francisco, CA 94105 Mailing Address Mail Code B10C Pacific Gas and Electric Company P.O. Box 770000 San Francisco, CA

More information

Public Utilities Commission of the State of California

Public Utilities Commission of the State of California March 1, 2000 ADVICE 1972-E Utilities Commission of the State of California Pacific Gas and Electric Company (PG&E) hereby submits for filing revisions to its electric tariff sheets. The affected tariff

More information

LIBERTY UTILITIES (CALPECO ELECTRIC) LLC SOUTH LAKE TAHOE, CALIFORNIA 20th Revised CPUC Sheet No. 84 Canceling 19th Revised CPUC Sheet No.

LIBERTY UTILITIES (CALPECO ELECTRIC) LLC SOUTH LAKE TAHOE, CALIFORNIA 20th Revised CPUC Sheet No. 84 Canceling 19th Revised CPUC Sheet No. SOUTH LAKE TAHOE, CALIFORNIA 20th Revised CPUC Sheet No. 84 Canceling 19th Revised CPUC Sheet No. 84 APPLICABILITY This rate schedule is applicable to all domestic power service to separately metered single

More information

SUBJECT: Implementation of the New Solar Homes Partnership Program Rate Change Pursuant to D Effective October 1, 2016

SUBJECT: Implementation of the New Solar Homes Partnership Program Rate Change Pursuant to D Effective October 1, 2016 STATE OF CALIFORNIA Edmund G. Brown Jr., Governor PUBLIC UTILITIES COMMISSION 505 VAN NESS AVENUE SAN FRANCISCO, CA 94102-3298 October 19, 2016 Advice Letter 3477-E Russell G. Worden Director, State Regulatory

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 62982-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 62335-E Schedule LS-1 Sheet 1 LIGHTING - STREET AND HIGHWAY - UNMETERED

More information

Phase 2 of 2009 General Rate Case Proposed Tariff Changes and Proposal for Commercial Submetering in High Rise Office Buildings

Phase 2 of 2009 General Rate Case Proposed Tariff Changes and Proposal for Commercial Submetering in High Rise Office Buildings Application : A.08-03-002 Exhibit : SCE-05 (Updated Previously Exhibit SCE-04, Appendix L) Witnesses: J. Schichtl L. Vellanoweth (U 338-E) Phase 2 of 2009 General Rate Case Proposed Tariff Changes and

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 64593-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 63752-E Lamp Type - New Installations: Beginning November 1, 2018, the

More information

Subject: Revenue Neutral Time-of-Use Rate Proposal --Electric Rate Schedule A-10

Subject: Revenue Neutral Time-of-Use Rate Proposal --Electric Rate Schedule A-10 February 15, 2002 Advice 2150-E-B (Pacific Gas and Electric Company ID U 39 E) Public Utilities Commission of the State of California Subject: Revenue Neutral Time-of-Use Rate Proposal --Electric Rate

More information

LIBERTY UTILITIES (CALPECO ELECTRIC) LLC SOUTH LAKE TAHOE, CALIFORNIA 11th Revised CPUC Sheet No. 80 Canceling 10th Revised CPUC Sheet No.

LIBERTY UTILITIES (CALPECO ELECTRIC) LLC SOUTH LAKE TAHOE, CALIFORNIA 11th Revised CPUC Sheet No. 80 Canceling 10th Revised CPUC Sheet No. SOUTH LAKE TAHOE, CALIFORNIA 11th Revised CPUC Sheet No. 80 Canceling 10th Revised CPUC Sheet No. 80 APPLICABILITY TERRITORY This time-of-use rate schedule is optional for Customers for whom Schedule D-1

More information

RIDER RTP REAL-TIME PRICING

RIDER RTP REAL-TIME PRICING d/b/a Ameren Illinois 2 nd Revised Sheet No. 27 Electric Service Schedule Ill. C. C. No. 1 (Canceling 1 st Revised Sheet No. 27) PURPOSE Rider RTP Real-Time Pricing (Rider RTP), along with Delivery Service

More information

KANSAS CITY POWER AND LIGHT COMPANY P.S.C. MO. No. 7 Fourth Revised Sheet No. 39 Canceling P.S.C. MO. No. 7 Third Revised Sheet No.

KANSAS CITY POWER AND LIGHT COMPANY P.S.C. MO. No. 7 Fourth Revised Sheet No. 39 Canceling P.S.C. MO. No. 7 Third Revised Sheet No. P.S.C. MO. No. 7 Fourth Revised Sheet No. 39 Canceling P.S.C. MO. No. 7 Third Revised Sheet No. 39 PURPOSE: The purpose of the Solar Subscription Pilot Rider (Program) is to provide a limited number of

More information

Public Utilities Commission of the State of California (CPUC)

Public Utilities Commission of the State of California (CPUC) June 30, 2003 Advice 2350-E-A (Pacific Gas and Electric Company ID U39 E) Public Utilities Commission of the State of California (CPUC) Subject: New Electric Rate Schedule E-BIO--Net Energy Metering Service

More information

Revised Cal. P.U.C. Sheet No E Cancelling Revised Cal. P.U.C. Sheet No E

Revised Cal. P.U.C. Sheet No E Cancelling Revised Cal. P.U.C. Sheet No E Revised Cal. P.U.C. Sheet No. 40092-E Cancelling Revised Cal. P.U.C. Sheet No. 38105-E ELECTRC SCHEDULE EV Sheet 1 RESDENTAL TME-OF-USE SERVCE FOR PLUG-N ELECTRC VEHCLE CUSTOMERS APPLCABLTY: This optional

More information

Subject - Revisions to PG&E Forms Entitled General Terms and Conditions (Form ) and Declarations (Form ).

Subject - Revisions to PG&E Forms Entitled General Terms and Conditions (Form ) and Declarations (Form ). May 11, 2001 ADVICE 2316-G/2116-E (Pacific Gas and Electric Company ID U 39 M) Subject - Revisions to PG&E Forms Entitled General Terms and Conditions (Form 79-716) and Declarations (Form 62-0980). Public

More information

FITCHBURG GAS AND ELECTRIC LIGHT COMPANY NET METERING SCHEDULE NM

FITCHBURG GAS AND ELECTRIC LIGHT COMPANY NET METERING SCHEDULE NM Sheet 1 FITCHBURG GAS AND ELECTRIC LIGHT COMPANY SCHEDULE NM Applicability The following tariff provisions shall be applicable to a Host Customer, as defined herein, that requests net metering services

More information

ELECTRIC SCHEDULE EV Sheet 1 RESIDENTIAL TIME-OF-USE SERVICE FOR PLUG-IN ELECTRIC VEHICLE CUSTOMERS

ELECTRIC SCHEDULE EV Sheet 1 RESIDENTIAL TIME-OF-USE SERVICE FOR PLUG-IN ELECTRIC VEHICLE CUSTOMERS Revised Cal. P.U.C. Sheet No. 33809-E Cancelling Revised Cal. P.U.C. Sheet No. 33619-E ELECTRC SCHEDULE EV Sheet 1 RESDENTAL TME-OF-USE SERVCE FOR PLUG-N ELECTRC VEHCLE CUSTOMERS APPLCABLTY: This optional

More information

July 6, 2001 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION. Extension of the Electric Vehicle Adjustment Clause (EVAC)

July 6, 2001 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION. Extension of the Electric Vehicle Adjustment Clause (EVAC) Akbar Jazayeri Director of Revenue and Tariffs July 6, 2001 ADVICE 1558-E (U 338-E) PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION SUBJECT: Extension of the Electric Vehicle Adjustment

More information

Thank you for your time and attention to this matter. Please feel free to contact me if you have any questions regarding the filing.

Thank you for your time and attention to this matter. Please feel free to contact me if you have any questions regarding the filing. Mary L. Cottrell, Secretary March 27, 2009 Page 1 Stacey M. Donnelly Counsel September 23, 2009 Mark D. Marini, Secretary Department of Public Utilities One South Station Boston, MA 02110 Re: D.P.U. 09-03

More information

Southern California Edison Original Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Cal. PUC Sheet No.

Southern California Edison Original Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Cal. PUC Sheet No. Southern California Edison Original Cal. PUC Sheet No. 58584-E Schedule CRPP Sheet 1 APPLICABILITY This Schedule is applicable to Customer Participants, as defined below, who elect to participate in the

More information

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA Order Instituting Rulemaking Concerning Energy Efficiency Rolling Portfolios, Policies, Programs, Evaluation, and Related Issues. R.13-11-005

More information

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

California Independent System Operator Corporation Fifth Replacement Electronic Tariff Table of Contents 41. Procurement Of RMR Generation... 2 41.1 Procurement Of Reliability Must-Run Generation By The CAISO... 2 41.2 Designation Of Generating Unit As Reliability Must-Run Unit... 2 41.3

More information

D.P.U A Appendix B 220 CMR: DEPARTMENT OF PUBLIC UTILITIES

D.P.U A Appendix B 220 CMR: DEPARTMENT OF PUBLIC UTILITIES 220 CMR 18.00: NET METERING Section 18.01: Purpose and Scope 18.02: Definitions 18.03: Net Metering Services 18.04: Calculation of Net Metering Credits 18.05: Allocation of Net Metering Credits 18.06:

More information

City of, Kansas Electric Department. Net Metering Policy & Procedures for Customer-Owned Renewable Energy Resources

City of, Kansas Electric Department. Net Metering Policy & Procedures for Customer-Owned Renewable Energy Resources Ordinance No. Exhibit A ----------------------------------------- City of, Kansas Electric Department Net Metering Policy & Procedures for Customer-Owned Renewable Energy Resources -------------------------------------

More information

Consolidated Edison Company of New York, Inc.

Consolidated Edison Company of New York, Inc. PSC NO: 11 Electricity Leaf: 1 Initial Superseding Economic Development Delivery Service No. 2 Consolidated Edison Company of New York, Inc. Schedule For Economic Development Delivery Service Subsequent

More information

MENARD ELECTRIC COOPERATIVE POLICY MANUAL. SECTION IV Operating Rules for Cooperative Members

MENARD ELECTRIC COOPERATIVE POLICY MANUAL. SECTION IV Operating Rules for Cooperative Members 49.1 INTERCONNECTION OF AND SERVICE TO QUALIFYING FACILITIES UNDER Objective To provide for the interconnection of and service to a Qualifying Facility in keeping with the provisions of the Public Utility

More information

City of Washington, Kansas Electric Department. Net Metering Policy & Procedure For Customer-Owned Renewable Energy Resources

City of Washington, Kansas Electric Department. Net Metering Policy & Procedure For Customer-Owned Renewable Energy Resources Ordinance No. 743 Exhibit A City of Washington, Kansas Electric Department Net Metering Policy & Procedure For Customer-Owned Renewable Energy Resources Page 1 of 7 1. INTRODUCTION The provisions of this

More information

ELECTRIC SCHEDULE AG-ICE Sheet 1 AGRICULTURAL INTERNAL COMBUSTION ENGINE CONVERSION INCENTIVE RATE - EXPIRATION TRANSITION RATE

ELECTRIC SCHEDULE AG-ICE Sheet 1 AGRICULTURAL INTERNAL COMBUSTION ENGINE CONVERSION INCENTIVE RATE - EXPIRATION TRANSITION RATE Revised Cal. P.U.C. Sheet No. 36458-E Cancelling Revised Cal. P.U.C. Sheet No. 36036-E ELECTRIC SCHEDULE AG-ICE Sheet 1 APPLICABILITY: This rate schedule is available to agricultural customers who currently

More information

EASTERN ILLINI ELECTRIC COOPERATIVE REGULATION NO. 26A

EASTERN ILLINI ELECTRIC COOPERATIVE REGULATION NO. 26A EASTERN ILLINI ELECTRIC COOPERATIVE REGULATION NO. 26A SUBJECT: Interconnection of and Service to Qualifying Facilities under Public Utility Regulatory Policies Act (PURPA) OBJECTIVE: To provide, through

More information

THE CONNECTICUT LIGHT AND POWER COMPANY dba EVERSOURCE ENERGY AND THE UNITED ILLUMINATING COMPANY

THE CONNECTICUT LIGHT AND POWER COMPANY dba EVERSOURCE ENERGY AND THE UNITED ILLUMINATING COMPANY THE CONNECTICUT LIGHT AND POWER COMPANY dba EVERSOURCE ENERGY AND THE UNITED ILLUMINATING COMPANY Virtual Net Metering Application Effective November 18, 2016 This application form addresses virtual net

More information

SOUTHWEST GAS CORPORATION P.O. Box 98510 Las Vegas, Nevada 89193-8510 118th Revised Cal. P.U.C. Sheet No. 65 California Gas Tariff Canceling 114th Revised Cal. P.U.C. Sheet No. 65 STATEMENT OF RATES RATES

More information

CHAPTER 25. SUBSTANTIVE RULES APPLICABLE TO ELECTRIC SERVICE PROVIDERS.

CHAPTER 25. SUBSTANTIVE RULES APPLICABLE TO ELECTRIC SERVICE PROVIDERS. 25.211. Interconnection of On-Site Distributed Generation (DG). (a) (b) (c) Application. Unless the context indicates otherwise, this section and 25.212 of this title (relating to Technical Requirements

More information

New Ulm Public Utilities. Interconnection Process and Requirements For Qualifying Facilities (0-40 kw) New Ulm Public Utilities

New Ulm Public Utilities. Interconnection Process and Requirements For Qualifying Facilities (0-40 kw) New Ulm Public Utilities New Ulm Public Utilities Interconnection Process and Requirements For Qualifying Facilities (0-40 kw) New Ulm Public Utilities INDEX Document Review and History... 2 Definitions... 3 Overview... 3 Application

More information

STATE CORPORATION COMMISSION DIVISION OF PUBLIC UTILITY REGULATION. May 22, 2018

STATE CORPORATION COMMISSION DIVISION OF PUBLIC UTILITY REGULATION. May 22, 2018 William F. Stephens Director (804) 371-9611 FAX (804)371-9350 PO Box 1197 Richmond, Virginia 23218-1197 DIVISION OF May 22, 2018 Mr. Eric M. Page Ecker Seamans Cherin & Mellott, LLC 919 East Main Street

More information

National Grid. Narragansett Electric Company INVESTIGATION AS TO THE PROPRIETY OF COMPLIANCE TARIFF CHANGES. 2 nd Amended Compliance Filing

National Grid. Narragansett Electric Company INVESTIGATION AS TO THE PROPRIETY OF COMPLIANCE TARIFF CHANGES. 2 nd Amended Compliance Filing National Grid Narragansett Electric Company INVESTIGATION AS TO THE PROPRIETY OF COMPLIANCE TARIFF CHANGES 2 nd Amended Compliance Filing Attachment 1: Book 2 of 2 April 2010 Submitted to: Rhode Island

More information

INTERCONNECTION STANDARDS FOR CUSTOMER-OWNED GENERATING FACILITIES 25 kw OR LESS PUBLIC UTILITY DISTRICT NO. 1 OF CHELAN COUNTY

INTERCONNECTION STANDARDS FOR CUSTOMER-OWNED GENERATING FACILITIES 25 kw OR LESS PUBLIC UTILITY DISTRICT NO. 1 OF CHELAN COUNTY INTERCONNECTION STANDARDS FOR CUSTOMER-OWNED GENERATING FACILITIES 25 kw OR LESS PUBLIC UTILITY DISTRICT NO. 1 OF CHELAN COUNTY Table of Contents Chapter 1. Purpose and scope. Pg 3 Chapter 2. Application

More information

RAPPAHANNOCK ELECTRIC COOPERATIVE SCHEDULE NEM-8 NET ENERGY METERING RIDER

RAPPAHANNOCK ELECTRIC COOPERATIVE SCHEDULE NEM-8 NET ENERGY METERING RIDER Page 1 of 5 ACCEPTED FOR RUHR RAPPAHANNOCK ELECTRIC COOPERATIVE SCHEDULE NEM-8 NET ENERGY METERING RIDER APPLICABILITY Unless specifically excluded within this Schedule, all of the Cooperative's Terms

More information

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) APPLICATION

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) APPLICATION BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA Application of Great Oaks Water Company (U-162-W for an Order establishing its authorized cost of capital for the period from July 1, 2019

More information

ELECTRIC SCHEDULE E-37 Sheet 1 Medium General Demand-Metered Time-of-Use Service To Oil & Gas Extraction Customers

ELECTRIC SCHEDULE E-37 Sheet 1 Medium General Demand-Metered Time-of-Use Service To Oil & Gas Extraction Customers Revised Cal. P.U.C. Sheet No. 35787-E Cancelling Revised Cal. P.U.C. Sheet No. 31446*-E ELECTRC SCHEDULE E-37 Sheet 1 1. APPLCABLTY: This schedule is closed to new customers. Customers taking service on

More information

ADVICE LETTER (AL) SUSPENSION NOTICE ENERGY DIVISION. Utility Name: SCE Date Utility Notified: 11/20/13

ADVICE LETTER (AL) SUSPENSION NOTICE ENERGY DIVISION. Utility Name: SCE Date Utility Notified: 11/20/13 ADVICE LETTER (AL) SUSPENSION NOTICE ENERGY DIVISION Utility Name: SCE Date Utility Notified: 11/20/13 Utility No./Type: U 338-E [X] E-Mail to: AdviceTariffManager@sce.com Advice Letter Nos.: Advice Letter

More information

MASSACHUSETTS ELECTRIC COMPANY NANTUCKET ELECTRIC COMPANY NET METERING PROVISION

MASSACHUSETTS ELECTRIC COMPANY NANTUCKET ELECTRIC COMPANY NET METERING PROVISION Sheet 1 of 28 Applicability The following tariff provisions shall be applicable to a Host Customer, as defined herein, that requests Net Metering services from the Distribution Company, with the exception

More information

JEA Distributed Generation Policy Effective April 1, 2018

JEA Distributed Generation Policy Effective April 1, 2018 Summary This JEA Distributed Generation Policy is intended to facilitate generation from customer-owned renewable and non-renewable energy generation systems interconnecting to the JEA electric grid. The

More information

(2) Scope. 220 CMR applies to all Distribution Companies subject to the jurisdiction of the Department.

(2) Scope. 220 CMR applies to all Distribution Companies subject to the jurisdiction of the Department. D.P.U. 11-10-A 220 CMR 18.00: NET METERING Section 18.01: Purpose and Scope 18.02: Definitions 18.03: Net Metering Services 18.04: Calculation of Net Metering Credits 18.05: Allocation of Net Metering

More information

December 2, Advice Letter 2856-E-A

December 2, Advice Letter 2856-E-A STATE OF CALIFORNIA ARNOLD SCHWARZENEGGER, Governor PUBLIC UTILITIES COMMISSION 505 VAN NESS AVENUE SAN FRANCISCO, CA 94102-3298 December 2, 2009 Brian K. Cherry Vice President, Regulatory Relations Pacific

More information

Municipality Generator Interconnection Application Single Meter Application Part I

Municipality Generator Interconnection Application Single Meter Application Part I Municipality Generator Interconnection Application Single Meter Application Part I New Application Revised Application A single customer interconnecting to a single meter at a single premise makes a new

More information

SERVICE CLASSIFICATION "CEF" COMMUNITY ENERGY FACILITY

SERVICE CLASSIFICATION CEF COMMUNITY ENERGY FACILITY P.S.C. Del. No. 8 - Electric Original Leaf No. 95a SERVICE CLASSIFICATION "CEF" COMMUNITY ENERGY FACILITY A Community Energy Facility (CEF) consists of one or more generators located in Company s service

More information

SCHEDULE 6 RESIDENTIAL SERVICE ON-SITE GENERATION

SCHEDULE 6 RESIDENTIAL SERVICE ON-SITE GENERATION I.P.U.C. No. 29, Tariff No. 101 Original Sheet No. 6-1 PUBLIC UTILITIES COMMISSION AVAILABILITY Service under this schedule is available at points on the Company's interconnected system within the State

More information

The Commonwealth of Massachusetts

The Commonwealth of Massachusetts The Commonwealth of Massachusetts DEPARTMENT OF PUBLIC UTILITIES D.P.U. 16-64-H November 6, 2017 Investigation of the Department of Public Utilities, on its own Motion, Commencing a Rulemaking pursuant

More information

Southern California Edison Rule 21 Storage Charging Interconnection Load Process Guide. Version 1.1

Southern California Edison Rule 21 Storage Charging Interconnection Load Process Guide. Version 1.1 Southern California Edison Rule 21 Storage Charging Interconnection Load Process Guide Version 1.1 October 21, 2016 1 Table of Contents: A. Application Processing Pages 3-4 B. Operational Modes Associated

More information

SALT RIVER PROJECT AGRICULTURAL IMPROVEMENT AND POWER DISTRICT E-27 CUSTOMER GENERATION PRICE PLAN FOR RESIDENTIAL SERVICE

SALT RIVER PROJECT AGRICULTURAL IMPROVEMENT AND POWER DISTRICT E-27 CUSTOMER GENERATION PRICE PLAN FOR RESIDENTIAL SERVICE SALT RIVER PROJECT AGRICULTURAL IMPROVEMENT AND POWER DISTRICT E-27 CUSTOMER GENERATION PRICE PLAN FOR RESIDENTIAL SERVICE Effective: April 2015 Billing Cycle AVAILABILITY: The E-27 Price Plan is subject

More information

Power Supply Cost Recovery

Power Supply Cost Recovery First Revised Sheet No. D-1.00 Cancels Original Sheet No. D-1.00 Power Supply Cost Recovery Power Supply Cost Recovery (PSCR) refers to a pricing mechanism commonly employed by utilities such as (Cherryland).

More information

THE NARRAGANSETT ELECTRIC COMPANY LARGE DEMAND RATE (G-32) RETAIL DELIVERY SERVICE

THE NARRAGANSETT ELECTRIC COMPANY LARGE DEMAND RATE (G-32) RETAIL DELIVERY SERVICE Sheet 1 AVAILABILITY Electric delivery service shall be taken under this rate for all purposes by any customer who is placed on the rate by the Company in accordance with this paragraph. The Company shall

More information

LANCASTER CHOICE ENERGY S BIENNIAL ENERGY STORAGE PROCUREMENT COMPLIANCE REPORT

LANCASTER CHOICE ENERGY S BIENNIAL ENERGY STORAGE PROCUREMENT COMPLIANCE REPORT January 1, 2016 CA Public Utilities Commission Energy Division Attention: Tariff Unit 505 Van Ness Avenue, 4thFloor San Francisco, CA 94102-3298 Advice Letter LCE 001-E RE: LANCASTER CHOICE ENERGY S BIENNIAL

More information

Rate Schedules. Effective 1/1/2019

Rate Schedules. Effective 1/1/2019 Rate Schedules 2019 Effective 1/1/2019 SUMMARY OF RATE SCHEDULES REVISIONS FOR RATES EFFECTIVE JANUARY 1, 2019 (1) Rate component changes for Residential and Heating Service rate schedules. (2) General

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 46705-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 40018-E Rule 1 Sheet 2 California Alternate Rates for Energy (CARE). The

More information

Springfield Utility Board Net Metering Policy Adopted on February 13, 2008 (Resolution 08-1)

Springfield Utility Board Net Metering Policy Adopted on February 13, 2008 (Resolution 08-1) Springfield Utility Board Net Metering Policy Adopted on February 13, 2008 (Resolution 08-1) 4-2-2 NET METERING. The objective of this net metering policy is to establish Springfield Utility Board (SUB)

More information

GENERAL INFORMATION 15. MARKET SUPPLY CHARGE ("MSC")

GENERAL INFORMATION 15. MARKET SUPPLY CHARGE (MSC) P.S.C. NO. 3 ELECTRICITY LEAF: 214 ORANGE AND ROCKLAND UTILITIES, INC. REVISION: 3 INITIAL EFFECTIVE DATE: November 1, 2015 SUPERSEDING REVISION: 1 Issued in compliance with Order in Case 14-E-0493 dated

More information

THE EMPIRE DISTRICT ELECTRIC COMPANY P.S.C. Mo. No. 5 Sec. 4 1st Revised Sheet No. 23

THE EMPIRE DISTRICT ELECTRIC COMPANY P.S.C. Mo. No. 5 Sec. 4 1st Revised Sheet No. 23 P.S.C. Mo. No. 5 Sec. 4 1st Revised Sheet No. 23 Canceling P.S.C. Mo. No. 5 Sec. 4 Original Sheet No. 23 PURPOSE: The purpose of this Rider SR is to implement the solar rebate established through 393.1030

More information

Southern California Edison Company Demand Response Appendices to SCE-1, Volumes 1-4 ERRATA Replacing Appendix D, Pages D-1 & D-3

Southern California Edison Company Demand Response Appendices to SCE-1, Volumes 1-4 ERRATA Replacing Appendix D, Pages D-1 & D-3 Application No.: Exhibit No.: Witness: A.11-03-003 SCE-1, Volume 5 (Appendices to SCE-1 Volumes 1 4) - ERRATA (U 338-E) Southern California Edison Company Demand Response Appendices to SCE-1, Volumes 1-4

More information

LIBERTY UTILITIES (CALPECO ELECTRIC) LLC SOUTH LAKE TAHOE, CALIFORNIA 3rd Revised CPUC Sheet No. 137 Canceling 2nd Revised CPUC Sheet No.

LIBERTY UTILITIES (CALPECO ELECTRIC) LLC SOUTH LAKE TAHOE, CALIFORNIA 3rd Revised CPUC Sheet No. 137 Canceling 2nd Revised CPUC Sheet No. SOUTH LAKE TAHOE, CALIFORNIA 3rd Revised CPUC Sheet No. 137 Canceling 2nd Revised CPUC Sheet No. 137 NET METERING SERVICE APPLICABILITY This net energy-metering schedule is applicable to residential, small

More information